introducing the radon-t - spruce · radon system stabilizer introducing the specifi cally...

2
Radon System Stabilizer Introducing the Specifically engineered as the starting point for new construction and crawlspace radon systems. Designed to help meet ENERGY STAR ® IAP, NAHB, LEED-H and other RRNC and Green Building requirements. Allows moisture and soil gases to be drawn from under the slab from all angles. Stands flat and can be staked in place to avoid shaky or crooked pipes. Eliminates the problem of blocked PVC tees that can hinder soil gas and vapor flow. The right fitting to do the right job. 4-Way Airflow with Side Knockouts Easily Saddles Over Drainage Piping Crawlspace Installation New Construction Installation Radon-T Radon system stabilizer for RRNC and Radon Systems from RadonAway, the world’s leading radon fan manufacturer. RadonAway.com/radon-t 800-767-3703 Watch a Radon-T installation video at www.RadonAway.com/radon-t

Upload: nguyenhuong

Post on 20-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Introducing the Radon-T - Spruce · Radon System Stabilizer Introducing the Specifi cally engineered as the starting point for new construction and crawlspace radon systems. Designed

Radon System Stabilizer

Introducing the

Specifi cally engineered as the starting point for new construction and crawlspace radon systems.

Designed to help meet ENERGY STAR® IAP, NAHB, LEED-H and other RRNC and Green Building requirements.

Allows moisture and soil gases to be drawn from under the slab from all angles.

Stands fl at and can be staked in place to avoid shaky or crooked pipes. Eliminates the problem of blocked PVC tees that can hinder soil gas and vapor fl ow.

The right fi tting to do the right job.

4-Way Airfl ow with Side Knockouts

Easily Saddles Over Drainage Piping Crawlspace Installation

New Construction Installation

Radon-TRadon system stabilizer for RRNC and Radon Systems from RadonAway, the world’s leading radon fan manufacturer.

RadonAway.com/radon-t800-767-3703

Watch a Radon-T installation video at www.RadonAway.com/radon-t

Page 2: Introducing the Radon-T - Spruce · Radon System Stabilizer Introducing the Specifi cally engineered as the starting point for new construction and crawlspace radon systems. Designed

Cap

Radon-T

The Radon-T Kit includes

• Radon-T To prepare for installation of an active or passive radon, soil gas and moisture control system.

• 4 Stakes To stabilize the T in preparation for aggregate fi ll and slab pour.

• Vent Pipe Cap To prevent debris entry and, because it is clearly labeled, avoid the possibility of mistaking the vent pipe stub for a utility pipe “rough in”.

• Instruction Guide Providing installation and use instructions for Radon-T as well as full RRNC system installation instructions (to assist compliance with ANSI/AARST CCAH-2013, ASTM E1465, IRC Appendix F, and state and local codes where applicable).

• Set of 4 Labels To clearly mark Radon/RRNC vent pipes.

The Radon-T• Easily Saddles over drainage piping

• Works with aggregate or geotextile matting

• Provides 4-way air fl ow with side knockouts

• Accepts 4” schedule 40 into socket

• Ideal for new construction and crawlspace mitigations

Pipe provided by builder or installer

Features

RadonAway.com/radon-t800-767-3703

020292/13