INTRODUCTION TO COMPLETIONS
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
ContentsContents Page Page
Introduction .................................................. 1
Definition ......................................................2 Completion History and Evolution ................ 3 Reservoir Drive Mechanisms .......................4
Dissolved Gas Drive .......................... 4 Gas Cap Drive ...................................4
Water Drive ........................................ 5 Artificial Lift ......................................... 5
Completion Classification ............................. 6 Openhole or Barefoot Completions ....6 Perforated Completions .....................8
Naturally Flowing Completions .......... 8 Pumped Production Completions ......8
Single Zone Completions .................. 8
Multiple Zone Completions ................ 9 Phases of Well Completion .......................... 9
Establish Objectives and DesignCriteria ............................................... 10
Constructing the Wellbore ................. 11
Perforation and ComponentInstallation .........................................17
Stimulation ......................................... 18Initiating Production ........................... 20
Production Evaluation and
Monitoring ..........................................20 The DEE Cycle ............................................20
Introduction
After a well has been drilled, it must be properly completed
before it can be put into production. A complex technologyhas evolved around the techniques and equipment devel-
oped for this purpose. Consequently, the selection ofmaterials, equipment and techniques should only be
made following a thorough investigation of the factors
which are specific to the reservoir, wellbore and produc-tion system under study.
This manual has been prepared to outline the planning
and execution processes involved in completing wells foroil or gas production or injection. Several of the topics
reviewed are included in, or are closely associated with,the range of services and products offered by theSchlumberger organization or alliance partners. These
subjects are presented in greater detail to enable a clearerunderstanding of the technology and help identify poten-
tial applications of Schlumberger technology.
In support of the topics given a more general explanation,an extensive reference and further reading list is providedin Appendix I. Combining this manual with the reference
resources will enable engineers to obtain a working knowl-edge of most completion design and installation proce-
dures. However, developing familiarity and expertise withspecific completion technology often requires experience
within a particular operating environment.
There are three basic requirements of any completion (incommon with almost every oilfield product or service). A
completion system must provide a means of oil or gasproduction (or injection) which is;
Safe
Efficient
Economic
Current industry conditions may force operators to placeundue emphasis on the economic requirement of comple-
tions. However, as will be demonstrated later, a non-optimized completion system may compromise long-termcompany objectives. For example, if the company objec-
tive is to maximize the recoverable reserves of a reservoiror field, a poor or inappropriate completion design can
seriously jeopardize achievement of the objective as thereservoir becomes depleted. In short, it is the technical
efficiency of the entire completion system, viewed along-side the specific company objectives, which ultimatelydetermines the completion configuration and equipment
used.
http://../Index.pdf -
7/22/2019 introduction to completion.pdf
2/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
1300 Marco Polo reports wells on shore of Caspian Sea
1814 First well to produce oil - 475 ft
1822 Rudimentary art of drilling established
1861 First recorded blowout
1863 Screwed casing joints developed
1880 Standardization of casing begins
1882 Straddle rubber wall packer developed
1890 First extensive casing program
1895 Henry Ford builds the first commercial automobile
1905 Casing cemented for the first time
1910 Drillpipe tooljoints introduced
1911 First gas lift device
1913 First dual completed well
1922 Simple hole-survey tools introduced
1925 API addresses tooljoint threads
1926 First electric submersible pump used
1927 First electric log run (Schlumberger)
1930 Well depths exceed 10,000 ft
1932 First gravel pack job
1933 First gun perforation job
1943 First subsea completion (Lake Eire, U.S.A.)
1958 Thru-tubing workover techniques developed
1958 Wireline retrievable SSSV developed (Camco)
1960 Cement bond log developed
1967 Computerized well data monitoring developed
1969 First coiled tubing job (Bowen)
HISTORY/EVOLUTION OF COMPLETIONS
Fig. 1. Key events in the history and evolution of oil and gas well completions.
Definition
Well completion processes extend far beyond the instal-
lation of wellbore tubulars and equipment. To highlightthis fact, the following definitions are presented. To the
majority of client organizations, completions are:
The methodology and technology required to produce
recoverable reserves (reservoir to surface).
The application of completion methodology and technol-ogy requires:
The design, selection and installation of tubulars, tools
and equipment located in the wellbore for the purpose ofconveying, pumping or controlling production or injec-
tion fluids.
Under this definition, installing and cementing the produc-
tion casing or liner, as well as logging, perforating andtesting are part of the completion process. In addition,
complex wellhead equipment and processing or storagerequirements effect the production of a well so may have
some bearing on the design and configuration of thecompletion.
-
7/22/2019 introduction to completion.pdf
3/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Completion History and Evolution
As the understanding of reservoir and production perfor-
mance has evolved, then so too have the systems andtechniques put in place as part of the completion process.
Early wells were drilled in very shallow reservoirs which
were sufficiently consolidated to prevent caving. As deeperwells were drilled, the problems associated with surface
water prompted the use of a casing or conductor to isolatewater and prevent caving of the wellbore. Further devel-opment of this process led to fully cased wellbores in
which the interval of interest is selectively perforated.
Modern completions are now commonly undertaken indeep hot and difficult conditions.
With the simultaneous improvement in seismic interpreta-tion and drilling technology, wellbores can be precisely
placed to optimize production and enable effective reser-voir management. There are clear economic benefits to
be gained from reducing the number of wellbores requiredfor any reservoir development. However, fewer, but more
efficient wellbores require a greater emphasis to be placed
on the design, selection and installation of the completionequipment.
Horizontal wellbores, and the technology associated with
their completion are becoming common in many fields.Drilling extended reach wells often means that well servic-
ing and intervention options are severely restricted, fur-ther emphasizing the importance of correct design andinstallation of the initial completion equipment.
In all cases, achieving the completion objectives, and
subsequent production targets are a result of carefulplanning and preparation.
The introduction of key technologies and timing of eventsthat have significantly influenced oil and gas well comple-
tions are shown in Fig 1.
Fig. 2. Well cost breakdown example (10,000 ft land well).
Mob
/Dem
ob
Casin
g
Drilli
ngRig
Drilli
ngFlui
ds
Completio
nTu
bular
s&Eq
uipm
ent
Logg
ing&
Per
forati
ng
Dire
ction
alSe
rvice
s
Bits
&Co
ring
Cem
entin
g
Supe
rvisi
on
S
itePre
para
tion
R
enta
lEqu
ipmen
t
Per
sonn
elLo
gistic
s
Othe
r
Cam
p100
200
300
400
Operational Phase/Cost Category
US$
x1000
500
-
7/22/2019 introduction to completion.pdf
4/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
The cost breakdown example shown in Fig. 2 was pre-pared for a 10,000ft land well. Due to the variations in
specific drilling and completion conditions and options, it
is difficult to present data for a "typical well". However, inthe example shown, "completion equipment" accounted
for approximately 10% of the total cost for the well.
Reservoir Drive Mechanisms
Reservoirs are generally classified by the type of drivemechanism. As hydrocarbons are formed and accumu-lated, energy is stored within the reservoir which, under
favorable conditions, enables the flow of oil and gas to thewellhead. Three basic types of drive mechanisms are
most commonly encountered.
Dissolved gas
Gas cap
Water drive
In practice, most reservoirs produce under a combination
of these primary drive mechanisms.
When the reservoir drive is unable to provide sufficientenergy to overcome the hydrostatic pressure exerted by
the fluid in the wellbore, artificial lift will be required to
sustain production.
Dissolved Gas Drive
In a dissolved gas drive reservoir, the oil contains dis-solved gas. A pressure drop, or drawdown, causes the
gas to escape from the oil, thereby forcing fluid throughthe reservoir toward the wellbore. In addition, the gasassists in lifting fluids to the surface (Fig. 3).
Generally considered the least effective reservoir drive
mechanism, dissolved gas drive typically yields only 15%to 25% of the oil originally contained in the reservoir.
Gas Cap Drive
Some reservoirs contain more gas than can be dissolvedin the oil under the reservoir pressure and temperature
conditions. The surplus gas, rises to the top of the reser-voir and forms a gas cap over the oil. The gas expands to
drive the oil toward the wellbore (Fig. 4).
Fig. 3. Dissolved gas drive reservoir.
Reservoir
Cap rock
Basement
-
7/22/2019 introduction to completion.pdf
5/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Gas cap drive is more effective then dissolved gas drivetypically yielding from 25% to 50% of the oil contained in
the reservoir.
Water Drive
When the formation containing an oil reservoir is uniformly
porous and is continuous over a large area, salt watergenerally is present in surrounding parts of the same
formation. These vast quantities of water provide a storeof energy which can aid the production of oil and gas. Theenergy comes from the expansion of water as pressure in
the petroleum reservoir is reduced through the productionof oil and gas. Water is generally considered incompress-
ible, but will actually compress and expand about one partin 2500 per 100 psi change in pressure. When the enor-
mous quantities of water present are considered, thisexpansion results in a significant amount of energy whichcan aid the drive of reservoir fluids to surface. The water
also moves and displaces oil and gas in an upwarddirection out of the lower parts of the reservoir (Fig. 5).
Water drive is the most efficient primary drive mecha-nism, capable of yielding up to 85% of the original oil in
place. This process is often supplemented by the injection
of treated salt water into the reservoir to maintain thepressure and 'sweep' the oil toward the well bore.
Artificial Lift
When the reservoir does not, or can no longer, provide
sufficient energy to produce fluid at an economical rate,some assistance through artificial lift may be required.There are four basic types of artificial lift (see Section 5),
rod pump, hydraulic lump, electric submersible pump andgas lift. Each system having advantages/disadvantages
that are considered during a completion equipment selec-tion process.
Only gas lift is compatible with all of the reservoir drivemechanisms previously identified.
Fig. 4. Gas cap drive reservoir.
Gas cap
Cap rock
Reservoir
Basement
-
7/22/2019 introduction to completion.pdf
6/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fig. 5. Water drive reservoir.
Completion Classification
There are several ways of classifying or categorizing oiland gas well completions. The most common criteria for
classification include the following.
Wellbore/reservoir interface, i.e., open-hole or casedhole completion.
Production method, i.e., natural flowing or pumpedproduction.
Producing zones, i.e., single zone or multiple zone
production.
Openhole or Barefoot Completions
Barefoot completions are only feasible in reservoirs with
sufficient formation strength to prevent caving or slough-ing. In such completions there exists no means of
selectively producing or isolating intervals within the res-ervoir or openhole section.
The production casing or liner is set and cemented in the
reservoir cap rock leaving the wellbore through the reser-voir open (Fig. 6a). Where possible, the final section
through the pay zone is drilled using non-damaging fluids,or is drilled in an underbalanced condition.
This completion technique is now almost entirely aban-doned except for a few low pressure formations and in
highly specialized conditions where formation damagefrom drilling fluids is severe. To prevent an unstable
formation from collapsing and plugging the wellbore,slotted screen or perforated liners may be placed across
the open hole sections.
External gravel packs may also be used to control sand
production in poorly consolidated reservoirs. In suchcases, it is common to underream the interval of interest
(Fig. 6b)
Cap rock
Reservoir
Water drive
-
7/22/2019 introduction to completion.pdf
7/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fig. 7. Openhole completions.
Fig. 6. Openhole completions.
(a) Openhole
completion
(b) Gravel pack or
uncementedliner
(a) CementedCasing
(b) CementedLiner
Reservoir
Cap Rock
Cap Rock
Reservoir
-
7/22/2019 introduction to completion.pdf
8/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Perforated Completions
The evolution and development of efficient and reliable
perforating tools and logging services has enabled com-plex completions to be designed with a high degree of
efficiency and confidence. Modern perforating chargesand techniques are designed to provide a clear perfora-
tion tunnel through the damaged zone surrounding thewellbore. This provides access to undamaged formation
allowing the reservoir to be produced to its full capability.
Cased and cemented wells generally require less com-
plex pressure control procedures during the early stagesof installing the completion components.
Efficient reservoir interpretation and appraisal techniques
combined with a high degree of depth control, enablesselective perforating. This helps ensure the successfulcompletion and production of modern-day oil and gas
wells by precisely defining which zones of the reservoirwill be opened for flow (Fig. 7).
Multiple zone completions are often used in reservoirs
with complex structures and unusual production charac-teristics. The ability to select and control the production (orinjection) of individual zones is often the key to ensuring
the most efficient production regime for the field or reser-voir. Consequently, modern multiple completions may be
complex but maintain a high degree of flexibility andcontrol of production.
Naturally Flowing Completions
Wells completed in reservoirs which are capable of pro-ducing without assistance are typically more economic to
produce. However, in high-temperature, high-pressureapplications, a great deal of highly specialized engineer-
ing and design will be required to ensure the safetyrequirements are met.
In general, naturally flowing wells require less complex
downhole components and equipment. In addition, thelong-term reliability and longevity of the downhole compo-nents is generally better than that of pumped completions.
In many cases, wells may be flowed naturally during the
initial phases of their life, with some assistance providedby artificial lift methods as the reservoir depletes. Such
considerations must be reviewed at the time of initialcompletion to avoid unnecessary expense and interrup-
tion to production.
Pumped Production Completions
All pumped or artificially lifted completions require the
placement of specialized downhole components. Suchcomponents are electrically or mechanically operated, or
are precision engineered devices. These features oftenmean the longevity or reliable working life of a pumpedcompletion is limited. In addition, the maintenance or
periodic workover requirements will generally be greaterthan that of naturally flowing completions.
Pumped or assisted lift production methods currently in
use include the following.
Rod pump
Gas lift
Electric submersible pump
Plunger lift
Jet pump
Single Zone Completion
In single zone completions, it is relatively straightforwardto produce and control the interval of interest with theminimum of specialized wellbore or surface equipment.
Since typically one conduit or tubing string is involved, thesafety, installation and production requirements can be
easily satisfied.
In most single zone completions, a packer (or isolationdevice) and tubing string is used. This provides protectionfor the casing or liner strings and allows the use of flow
control devices to control production. The complexity of
the completion is determined by the functional require-ments and economic viability. Several contingency fea-tures may be installed at a relatively minor cost at the time
of initial installation. Consequently, close considerationmust be given to such options during the initial design
phase.
-
7/22/2019 introduction to completion.pdf
9/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Multiple Zone Completions
Multiple zone completions are obviously designed to
produce more than one zone of interest. However, thereare many possible configurations of multiple zone comple-
tion, some of which allow for selective, rather than simul-taneous production.
For a reservoir having multiple pay zones there are four
basic completion options.
Produce the zones sequentially through a single tubing
string.
Produce several zones simultaneously through multipletubing strings.
Produce several zones, commingled through a singleproduction string.
Drill and complete a separate well for each zone of
interest.
Selection of the most appropriate option must follow acareful study of the specific conditions encountered. Theequipment installed to allow the necessary flexibility and
production options may be complex (Fig 8).
Phases of Well Completion
Since the ultimate efficiency of a completion is determinedby operations and procedures executed during almostevery phase of a wells life, a continual review and moni-
toring process is required. In the majority of cases, asequential and logical approach to the design and execu-
tion process is required. Typically this can be summarizedas follows.
Establish objectives and design criteria
Constructing the wellbore
Installation of the completion components
Initiating production
Production evaluation and monitoring
Fig. 8. Multiple zone completion configuration
example.
-
7/22/2019 introduction to completion.pdf
10/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
As in all design and execution processes, the acquisitionof accurate or representative data is essential to the timely
achievement of the stated objectives. The level of accu-
racy required will vary with the data typefrom the as-sumption of essential reservoir formation and fluid prop-
erties to more general properties which can more easilybe measured (Fig 9).
1.5.1 Establish Objectives and Design Criteria
This initial phase may be summarized as the collection of
data pertaining to the reservoir, wellbore and productionfacility parameters. This data is considered alongside
constraints and limitations which may be technical or nontechnical in nature, e.g., company policy.
Some flexibility may be required, especially in exploration
or development wells, where there are several unknownor uncertain parameters.
Fig. 9. Principal factors affecting a wells performance.
3 CompletionCan be controlled.
2 Reservoir properties
Can be measured.
1 Reservoir boundaryCan be estimated.
12
3
-
7/22/2019 introduction to completion.pdf
11/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
The principal factors affecting the performance of any wellrelate to the three areas illustrated in Figure 9. Of these,
many of the fluid and reservoir properties can be mea-
sured or inferred from measurements. However, in gen-eral they cannot be controlled. By contrast, almost all
elements of a completion can be controlled and appropri-ate selection will therefore affect well performance.
The objectives for which a completion system is designed
vary, however, the following points may be regarded asfundamental and will have some bearing in most applica-tions.
Ensure potential for optimum production (or injection).
Provide for adequate monitoring and servicing.
Provide some flexibility for changing conditions, applica-tions or contingency measures.
Contribute to efficient field/reservoir development and
production.
Ensure cost efficient installation and operation.
1.5.2 Constructing the Wellbore
The principal objectives associated with wellbore con-
struction will typically include:
Efficiently drill the formation while causing the minimumpracticable near wellbore damage.
Acquire wellbore survey and reservoir test data used toidentify completion design constraints.
Prepare the wellbore through the zone of interest for the
completion installation phase (run and cement produc-tion casing or liner and preparation for sand control orconsolidation services).
There are many issues which directly, or indirectly, influ-ence the process of wellbore design and construction.The examples provided below can have significant effect
on the productivity of a well. In addition, the effects are notalways consistent. For example, in one case impaired
vertical permeability may constrain production. In anothercase, the same condition may be helpful in reducing gasor water coning.
Formation damage (fluid invasion)
Completion geometry (wellbore profile)
Fluid behavior (multiphase flow)
Geology (fractures and heterogeneity)
Only in very rare circumstances can a wellbore be
constructed (drilled and cemented) without any damageto the reservoir occurring. The completion and perforationprocess presents an opportunity for early damage to be
bypassed, however, poorly designed and executedoperations may result in even further damage being
caused.
Once in production, the wellbore conditions, reservoirparameters and the characteristics of reservoir fluids mayresult in the deposition of scale, wax or asphaltenes in or
near the wellbore, causing additional skin effect. Workoveroperations performed later in the life of a well, especially
applications requiring the well to be killed, also present arisk of damage. Consequently, the risk of reservoir damage
is present throughout the life of a well.
Drilling and Cementing
Filtrate damage - reduced permeability caused by
interaction of drilling fluid filtrate, the reservoir rock and/orthe fluids within it (Fig. 10). Risk of damage is reduced by
careful fluid selection or treatment of base fluid, e.g.,freshwater muds tend to be more damaging than oil basedmuds.
Filter-cake formation - not generally a problem in perforated
wells, may effect open-hole or special gravel packcompletions.
Solids migration - Solids from the drilling fluid can plugvugs and natural fractures present in some reservoir
formations. If drilling losses have been controlled with
LCM (lost circulation material) the effect can be severeand the damage difficult to remove if the LCM is not acidsoluble.
Cement filtrate - as for drilling fluid, the effect of cement
filtrate can be damaging.
* Mark of Schlumberger
-
7/22/2019 introduction to completion.pdf
12/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Washes and Spacers - fluids intended to remove thedrilling fluid filtercake to ensure adequate cement bonding
can, by their nature, be invasive and be ultimately damag-
ing.
Completion
Perforating - underbalanced perforating provides severaladvantages in removing or avoiding damage, especially if
the well can be placed directly on production (no well kill)after perforating.
Completion fluid losses - if the well must be killed toconclude the completion process, it may be difficult to
prevent or control completion fluid losses.
Production
Scale - deposited following reaction of water soluble
materials to changing temperature and pressure condi-tions (Fig. 11). Depending on the type of scale and
location of the scale, removal may vary from easy toimpossible. Scale avoidance or inhibition is typically the
preferred option.
Wax and Asphaltene - solids which precipitate in or near
the wellbore with changing temperature and pressureconditions.
Workover
Workover fluid losses - kill pills, containing pluggingmaterials, are frequently spotted to enable the well to be
killed (Fig. 12). Selection of an appropriate material whichenables subsequent clean-up or removal is essential.
Completion geometry
The geometry of the wellbore and the dimensions of thecompletion components have obvious compatibility re-
quirements. Similarly, the nature and configuration of the
reservoir will have some bearing on the optimal wellboreprofile. There are two basic means of providing options forreservoir/wellbore interface:
Designing the wellbore profile
Selecting the perforated interval
Fig. 10 Drilling fluid damage.
Fig. 11 Production damage (scale)
Fig. 12 Workover fluid invasion.
Kill pillresidues
Completionfluid loss
Scale inperforations
Scale in the
formation
Filtrate invadedzone
Filter cake
Spurt loss
Dynamic
fluid loss
-
7/22/2019 introduction to completion.pdf
13/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fig. 15 Horizontal wellbore.
Fig. 13 Vertical wellbore.
Fig. 14 Deviated wellbore.
Cap rock
Basement
Cap rock
Basement
Cap rock
Water zone
The completion geometry can have several effects on theperformance of a well.
Influence of completion geometry skin (Sc)
Susceptibility to coning and resultant gas or waterproduction
Influence of mechanical skin (Sm) on productivity
In the case of an isotropic reservoir
ht
Total skin = Sm
+ So
hp
where :
Sm
= mechanical skin
So
= completion skinh
t= reservoir height
hp
= perforated interval
Most wellbores can be described as being vertical, devi-ated or horizontal. Each category has associated advan-
tages and disadvantages. However, in the majority ofreservoirs currently being developed, horizontal wells
provide significant benefits and are becoming a preferredoption in many cases.
Vertical wellbore - provides limited intersection of thereservoir, especially on thin reservoirs. However, this
configuration provides improved predictability/controlon reservoirs which are to be stimulated by hydraulic
fracturing (Fig. 13).
Deviated wellbore - extends the reach of the well toaccess outlying reserves and improves productivity byincreasing reservoir contact, especially in thin reservoirs.
(Fig. 14). In wellbores deviated greater than 45,
significant productivity gains can be realized.
Horizontal wellbore - significant increase in productivity,
especially in thin reservoirs. Reduced influence of skinand reduced susceptibility to water and gas coning (Fig.
15).
-
7/22/2019 introduction to completion.pdf
14/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fully completed wells - higher initial production but withreduced control or contingency for unwanted water or
gas.
Partial completion - reduced production but improved
control of coning or unwanted water/gas production.Effect of skin also increased.
Multiphase flow
Control of gas and water is an important aspect ofcompletion design and operation. In addition to meeting
the initial reservoir requirements, there is often need forcontingency or remedial redesign work. Consequently,
the wellbore should, in ideal circumstances, be designedfor conditions anticipated over the lifetime of the well or
reservoir.
Unwanted gas production may originate from several
sources (Fig. 16), e.g.,
Poor cement bond on casing/liner
Gas coning
Preferential flow through high permeability streaks
Falling gas/oil contact due to reservoir depletion
Two phase fluid flow resulting from unwanted gas produc-
tion may present several problems. These are largelydependent on the quantity/ratio of gas and the location at
which the gas breakout occurs. Figure 17 shows gasbreakout occurring in the reservoir formation.
Similarly, in some gas wells condensate dropout may
occur when the pressure drops below the dewpoint. Inaddition to causing a loading effect on the wellbore, liquidsmay induce a positive skin factor. The increase in friction
pressure caused by two-phase fluid flow can result in asignificant pressure drop in such cases.
Unlike gas, water production is always undesirable. Water
only acts to reduce the productivity of a well and subse-quently requires special treatment and disposal when
produced to surface. Similar to gas, sources of waterproduction include the following (Fig. 18):
Poor cement bond on casing/liner
Water coning
Preferential flow through high permeability streaksFig. 16 Gas production.
Fig. 17 Gas break-out.
GOC Gas
Oil
Cement channel
Bubble point
Gas coning
Oil production rate
Bottomh
olepressu
re
-
7/22/2019 introduction to completion.pdf
15/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Bubble
Point
Bubble
Point
GOC
OWG
Gravityslumping
High-perm
streak
Fig. 18 Water production.
Rising water/oil contact due to reservoir depletion
Injection water break-through
Break through of injection water may result from gravityslumping, a high permeability layer or viscous fingering
which may effect the reservoir at a significant distancefrom the injection wellbore.
Geology
Unlike the assumptions of many mathematical productionmodels and the simplicity of reservoir diagrams, very fewreservoirs are totally homogenous. The heterogenous
characteristics of a reservoir have bearing on severalparameters, e.g., productivity and unwanted water or gas
production.
Heterogeneities also make interpretation of test resultsmore difficult. Typically the vertical permeability (k
v) is less
than the horizontal permeability (kh), therefore k
v/k
h
-
7/22/2019 introduction to completion.pdf
16/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Reduced tendency to coning
Decreased productivity in partially completed wellbores
On a smaller scale, i.e., over several inches, the effects
may be more variable and may effect the performance ofindividual perforations (Figure 21).
Wellbores which intersect natural fractures will typicallyhave improved productivity (Fig. 22). However, the frac-
ture may provide a conduit to unwanted water or gas
which is ultimately difficult to control. In such a fracturedformation, wellbores which do not intersect a fracture willhave reduce productivity and may display abnormally
high skin values (Fig. 23).
Formations containing low permeability layers or streaksmay have reduced productivity due to reduced vertical
permeability. However, the disadvantage of any loss ofproductivity may be counteracted by a reduced tendencyto coning. The presence of shale may impose significant
barriers to reservoir production, even if only present as acontinuous thin streak (Fig. 24). In such cases, reservoir
management can be complex since predicting productionprofiles and characteristics is difficult.
The production of sand and formation fines can cause
several problems which, in addition to constraining wellproductivity, effect the production facilities, completioncomponents, and reservoir stability.
Fig. 20 Layered formation (macro). Fig. 21 Layered formation (micro).
Fig. 22 Fracture intersected. Fig. 23 Fracture missed.
Not producing
Not producing
Low permeability layers reduce vertical flow
FracturingOil
Water
-
7/22/2019 introduction to completion.pdf
17/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fig. 26 Formation/casing collapse.
Fig. 25 Sand voids.
Sand control measures may be necessary to:
Prevent erosion of wellbore and production components
Minimize surface disposal requirements
Minimize wellbore fill
Prevent the formation of large void areas behind the
casing/liner that may be impossible to isolate
Severe, or long-term, sand production may result in voids
forming behind the casing or liner (Fig. 25). Furthererosion over an extended period and wellbore interval
may lead to subsidence around the wellbore which couldultimately lead to casing collapse (Fig. 26).
Common sand control measures include sandconsolidation, sand screens and gravel packing. The
most common method, gravel packing, requires designand selection processes to be carefully undertaken to
ensure that the gravel (sorted sand), screens and othercompletion equipment are compatible with the wellbore
and reservoir conditions. Incorrectly applied, gravel packingcan pose a greater constraint on production than theproblem it is intended to avoid.
Perforation and Component Installation
Wellbores that are cased and cemented are generally
stable and enable selective production (or subsequentisolation) to be achieved easily and reliably.
The productivity of most perforated completions can bemaximized by optimizing the following.
Perforation length
High-shot densities
Perforation phasing
Underbalanced perforating
In an ideal reservoir, it would be desirable to perforate theentire producing interval. However, there are few reser-
voirs in which this is advisable. The effects of water andgas coning, high permeability streaks etc. can be signifi-cantly reduced by selective, or controlled, perforating
Fig. 24 Shale streak.
Gas coning preventedby shale
Shale
Gas
Oil
Gas under-
running
Partial completionskin = 0
Loose sand
Sandvoid
Pluggedperforation
-
7/22/2019 introduction to completion.pdf
18/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
(Fig. 27 and 28 ). This results in a partial completion which,if properly designed, provides the best compromise of
productivity and control.
The proper selection and installation of completion com-ponents is an obvious requirement. Components may be
broadly categorized as follows.
Primary completion components - essential componentsnecessary for the completion to function safely, e.g.,packers.
Ancillary completion components - providing the comple-
tion system with increased flexibility and control, e.g.,sliding sleeve.
Fig. 27 Partial completion (lower).
Fig. 28 Partial completion (upper).
In general, the optimum completion configuration (andsystem) will provide a balance between flexibility and
simplicity.
Stimulation
Many reservoirs require some stimulation applied during,
or soon after, the completion process to achieve viableproduction rates. Such treatments can generally be
categorized as hydraulic fracturing or matrix treatments,selection being dependent on the characteristics of thereservoir rock, fluids and the nature of any damage which
is to be removed or bypassed.
Hydraulic fracturing
Propped Fracs - A fracture is initiated and propagated withspecially engineered fluid, pumped at high-rate and high-pressure to form a fracture radiating from the wellbore.
Proppant carried by the fracturing fluid remains in place asthe pressure is bled off and the fracture close. The
resulting high permeability fracture provides a highproductivity conduit to the wellbore (Fig. 29).
Acid Fracs - This technique applies to carbonate reservoirsand involves pumping acid in stages with the fracture fluid.
The acid reacts with the carbonate reservoir to formetched surfaces on the fracture, thereby preventing com-
plete closure following bleed-off of the fracture fluid (Fig.30).
Fig. 29 Hydraulic fracturing.
Water coning
Waterflow
ingthrough
high-perm
streak
Propanttrapped infracture
Wellbore
-
7/22/2019 introduction to completion.pdf
19/20
CONFIDENTIALITY
This manual section is a confidential document which must not be copied in whole or in part ordiscussed with anyone outside the Schlumberger organisation.
Fig. 30 Acid fracturing.
In all fracturing treatments care must be taken during thedesign and execution phases to minimize the risk of
fracturing into undesirable water or gas producing areas(Fig. 31).
Matrix Treatments - Designed to remove or bypass near
wellbore damage, the treatment is performed below theformation fracture pressure. The resulting interconnectedwormholes provide higher conductivity near the wellbore
(Fig. 32).
Appreciable productivity increases following matrix treat-ment will generally only occur if significant damage is
present.
Fig. 32 Matrix treatment (carbonates).
The treatment mechanism is dependent on the type ofreservoir rock. Most carbonate reservoirs are treatable
with hydrochloric acid (HCl). The acid bypasses damageand links vugs and natural fractures to create a highly
permeable path. In sandstone reservoirs, a mud acidtreatment (hydrofluoric acid - HF/HCl) is typically used.
This acid formulation can dissolve siliceous materials, sois capable of removing the damage rather than bypassingthe damage, as in carbonate reservoirs.
To be fully effective, any treatment should be properly
applied through the treatment interval. For near wellboretreatments, such as acidizing, incomplete treatments due
to variable perforation performance can be a problem(Fig. 33).
Fig. 31 Fracture design.
Fig. 33 Incomplete treatment.
Acid etched
wormholes
Fracture has growninto water zone
Stimulated area
Perforation plugged(e.g., with CaCO3)
Acid etchedfracture andworm holes
Wellbore
Water
Oil
Gas
Oil
Gas
Wellbore
-
7/22/2019 introduction to completion.pdf
20/20
CONFIDENTIALITY
Initiating Production
In most cases, this phase of the completion process is
further subdivided into the following three stages.
Initiating flow to establish communication between thereservoir and the wellbore.
Defining an appropriate clean up program to enable the
ultimate production rate to be achieved safely andwithout damage to the reservoir, completion compo-nents or surface production facilities.
Design of any initial stimulation treatment which may be
necessary to enable the restoration of permeability inthe near wellbore area.
Production Evaluation and Monitoring
An initial production evaluation is necessary to confirmthat the completion system achieves the production capa-
bilities required by the design objectives. Subsequentevaluation and monitoring exercises will provide the fol-
lowing production information on the reservoir, well andcompletion system.
Statistics relating to the reliability and longevity of comple-tion components.
Verification that assumptions made during the design
process were accurate or representative.
Trends or statistical departures which may provide early
indication of completion problems or the need for inter-vention or workover.
Periodic monitoring of reservoir parameters provides
useful data for the completion and production of offsetwells or recompletion as required by reservoir depletion.
The DEE Cycle
The previous five phases have, in effect, outlined aDESIGN, EXECUTE and EVALUATE* cycle for comple-
tion activities. They represent a logical and structuredapproach to a process which may be complex and require
the involvement of several departments and engineeringdisciplines.
Even by this short introduction to oil and gas well comple-tion, several conclusions quickly become apparent. These
should be borne in mind as the completion design process
is further investigated.
The safe, efficient and economic completion of an oil orgas well is a complex process.
A structured approach to defining the design criteria of
a well is essential. Critical to this effort is a comprehen-sive formation evaluation program.
The design of well completions is a dynamic process -taking into account data gathered on the performance of
previous completions. However, no two wells are ex-actly alike!
A degree of flexibility should be built into the design andconfiguration of completions to allow for anomalies and
uncertainties.
All completions comprise a variety of tubular and special-ized components. The total number of components will
directly effect the complexity, inherent reliability andlongevity of a successful completion system.