    Introduction toUnderbalanced

    Drilling Technology

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    2/50

    Wellsite UBDEquipment

    Camp

    GeologyNitrogen

    Separator

    Mud Treatment

    Rotating Head

    UB operators

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    3/50

    UB DRILLING !"B#

    1998 Spears & sso!

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    4/50

    Underbalanced Drilling in the United#tates

    YEAR

    95 96 97 98 99 00 01 02 03 04 05

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    TOT

    ALUNBD

    ERB

    ALANC

    ED

    WEL

    LS

    LOW

    HIGH

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    5/50

    UBD De$nition

    %ormation &ressure is

    equal to or greater than'irculating &ressure

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    6/50

    # Normally &ressured Reser(oirsppli!ations $or normal to a%oe normal

    pressured reseroirs utili'ing (uid

    systems in a !ontrolled (o) drillingte!*ni+ue"

    # Depleted Reser(oirs

    ,*ere a multi-p*ase !ir!ulating (uid isne!essary to a!*iee re+uired Bottom

    Hole Cir!ulating .ressure /BHC.0 -

    under%alan!ed or )it* minimal

    UBD Types

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    7/50

    Barriers to UB rilling

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    8/50

    REGUL)T"R* B)RRIER#to

    UnderBalance Drilling

    The regulatorsneed assuranceand details

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    9/50

    B)RRIER# T" UB D+'

    RegulatoryLac, o- #tandards

    Lac, o- ,no.ledge

    Little statistical history

    'oncern about .ell controlEn(ironmental questions

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    10/50

    "&ER)T"R# B)RRIER#

    The "peratorneeds

    e/perienceandcon$dence0

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    11/50

    "&ER)T"R# &R"BLE1#

    Un-amiliar .ith the systemris, o- the ne.

    Lac, o- e/perienced people

    Economics Too e/pensi(e

    'oncern liability'oncern .ell bore stability

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    12/50

    RE)#"N# %"R UBGR"WT2

    There are

    dri(ingeconomicreasons

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    13/50

    UBD %orecast by Region

    UBD Forecast by Region

    -

    200

    400

    600

    800

    1,000

    1,200

    1996 1997 1998 1999 2000 2001 2002

    Wells

    US

    Ca

    E!"

    S#A$

    %E&A'"

    (E

    1998 Spears & sso!

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    14/50

    RE)#"N# %"R UB

    GR"WT2

    Depleted reser(oirs

    ).areness o- s,in damage

    Limits o- lost circulation

    matl0'ost o- di3erential stic,ing

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    15/50

    RE)#"N# %"R UB

    GR"WT2

    #er(ice co0 competition

    Trade 4ournal publications

    2ori5ontal drilling

    'onsultants a(ailable

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    16/50

    TE'2NI')LI1&R"6E1ENT#

    We .ere not

    ready to putall o- thistogether untilthe 7889:s

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    17/50

    TE'2NI')LI1&R"6E1ENT#

    'ompressor E(olution

    2ammer drillsNitrogenIncreased a(ailability

    Reduced cost"n site generation

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    18/50

    TE'2NI')LI1&R"6E1ENT#

    Recyclable -oam systems

    Better gas separators'losed loop circulation

    2ydraulics models

    Impro(ed rotating headsWire line .et connect

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    19/50

    TE'2NI')LI1&R"6E1ENT#

    Impro(ed 1WD

    Rig assist snubbing units'oiled tubing equipment

    Nondamaging drilling

    ;uidsTop dri(e

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    20/50

    Reasons -or UB drilling

    Lostcirculation

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    21/50

    Reasons -or UB drilling

    Lostcirculation

    %aster Drilling

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    22/50

    Reasons -or UB drilling

    Lostcirculation

    %aster Drilling No

    Di3erential

    #tic,ing

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    23/50

    Reasons -or UB drilling

    000

    Reduce

    Reser(oirDamage

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    24/50

    Reasons -or UB drilling

    000

    Reduce

    Reser(oirDamage

    Impro(e &rod0

    E(aluation

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    25/50

    E3ect o- #,in on &roductionRates

    2

    322

    422

    522

    822

    16222

    S7N

    B.

    : 12-3 2 1:-; -1

    h i l i i i

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    26/50

    UBD is another tool in the toolbox,

    not a Panacea.

    &hysical Limitation toUBD

    # Bore*ole nsta%ility# Un!onsolidated Sands

    # ,ea< =ormations

    # Geopressured S*ales

    # Salt Beds

    #

    nade+uate Casing

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    27/50

    &roduction Limits to UBD

    &ermeabilityis so lo. the

    5one needs tobe -rac,ed

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    28/50

    1I#T%")1LI=UID G)#)ER)TED

    LI=UID

    Types o- %lo. Regimes

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    29/50

    Generali5ed

    >%luid? #ystems

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    30/50

    )Shaffer Rotating Blow-Out Preventor)2,!! "si rotating - ,!!! "si static

    Equipment Rotating2ead

    l d i l i

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    31/50

    'losed Loop 'irculation#ystem

    SE*ARATOR

    OILTAN+S

    WATER

    TAN+S

    NITROGEN*U%*ERS

    %UDTAN+S

    RIG

    RIG

    *U%*S

    R-BO*

    TO*DRIESYSTE%

    CATCHERS

    SA%*LE

    CHO+E%ANI(OLD

    (LARESTAC+

    N2& (LUID

    %I

    CUTTINGRETURN

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    32/50

    Stainless Steel

    >i+uid Nitrogen/-;32=0

    Car%on Steel

    Gaseous

    nitrogen to )ell82=6 2-126222psi

    .ump

    ?apori'er

    5"11";

    Equipment Gas #ource

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    33/50

    )IR DRILLING

    ) brie- summary

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    34/50

    )ir Drilling

    # ir@Gas drilling /Adust0 is a te!*ni+ue used inareas )*ere t*e $ormations are Ary i"e"6

    t*ere is no in(u o$ )ater or li+uid*ydro!ar%ons"

    #T*is medium re+uires signiD!ant !ompressed

    gas olumes to !lean t*e )ell )it* aerageelo!ities o$ oer ;6222 $t per minute"

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    35/50

    )ir Drilling Dusting

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    36/50

    )ir Drilling Bene$ts

    #Increased Rate o- &enetration#Reduced %ormation Damage

    #Impro(ed Bit &er-ormance#Lost 'irculation 'ontrol#'ontinuous Drill #tem Test

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    37/50

    )ir@Dust Drilling Layout

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    38/50

    1isting

    )ddition o- A to 9 bbl@hr o-;uid to the air stream0

    'leans and lubricates the bit'arries the cuttings to the

    sur-ace as a mist or more

    normally in a modi$ed t.ophase ;o.0

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    39/50

    TT96-86 39

    %")1 DRILLING

    Basic 'omments

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    40/50

    %oam Drilling

    #T*e most ersatile o$ t*e gas-generatedsystems"

    # EFe!tie operating range $rom 2"3 to 2"5 s"g"

    # Miture o$ gas p*ase and $oaming solution"

    # =oam (o) aries )it* dept* in t*e *ole"# dusta%le eFe!tie BH."

    # En*an!ed li$ting and )ell %ore !leaning"

    # Adispla!ing medium6 not a propellingmedium"

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    41/50

    %oam C2eading

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    42/50

    Impro(ed 2ole 'leaning

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    43/50

    %oam Drilling Bene$ts

    # =aster .enetration rate

    # >o) ir re+uirements

    # >o) (uid re+uirements# >o) Hydrostati! *ead

    # No damage to $ormation

    # Continuous rill Stem test# Best $or large *oles

    1ist or %oam Drilling

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    44/50

    1ist or %oam DrillingLayout

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    45/50

    G)#E)TED

    "R

    )ER)TED

    DRILLING

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    46/50

    Gaseate

    1ist

    TransitionWater

    Gas

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    47/50

    )erated %luid

    # GasiD!ation o$ .rimary rilling =luid"

    # nitially designed as a te!*ni+ue to lig*tenmud to redu!e lost !ir!ulation"

    # Met*ods# Standpipe ine!tion

    #et Su%

    # .arasite String

    # ual Casing String# s an UB (uid6 it is easiest to !ontrol in small

    *oles"

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    48/50

    #Small ine!tion string run simultane )it* intermediate !asing"

    #ne!ted gas does not aFe!t

    %it *ydrauli!s"# ne!ted gas does not eFe!t M,

    &arasite #tring

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    49/50

    )erated %luid Layout

  • 7/26/2019 IntroUnderBalancedDrill.ppt

    50/50

    Compressor@N3Cost

    Rotating B.Is

    Solid@>i+uid@GasSeparation

    Corrosion

    ?i%ration

    Hig* Tor+ue@rag

    Bore*ole Sta%ilityM, Transmission

    Hydrauli! Cal!ulations

    Cuttings >i$ting

    =luid n(u=ire@Eplosions

    Under%alan!edCompletion

    )erated Drilling &roblems