IPR #2NATO Sea-Strike 21, Team 2

Paid Proposal - Phase 0

TriguiLead Systems Engineer for Operations / SubcontractorPrecision Company, Inc.

Page 2: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Topics Mission Needs Statement NSS-21 Operational Concept Architecture Definition Options &

Choice Software Subcontractor Summary

Page 3: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Mission Need Statement

A mobile precision strike cell is required in order to command and control US, Allied and NATO strike forces against the TBM launcher threat

Mission – Plan, task, execute and assess precision strike against TBM launchers in-theatre in support of NATO requirements

Page 4: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Needs NATO needs a 24-hour, reliable and integrated command

and control cell which is not vulnerable to TBMs, local unrest, or terrorist violence

Reduce precision strike timelines compared to the current capability by improving target location, identification, weapons effectiveness and combat assessment.

Advance precision strike concepts of employment including real-time weapon sensor cueing, near real-time data dissemination, seamless sensor-to-shooter node communications and dynamic retargeting.

A mobile (ship-based) C&C cell is needed to perform this mission

NATO Sea- Strike 21

Page 5: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS NeedsFundamental Priniciples of TMD

1. Centralized Planning and Control with Decentralized Execution• Will allow integrated defense concepts to be

developed and implemented

2. Decide, Detect and Deliver• Allows use of preapproved rules of

engagement and battleplans that permit flexible decentralization schemes

• Maintains continuity of operations and integrated tactical missile defense.

Page 6: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Threat SS-1B/C ‘SCUD’ - Short-Range TBM

Mobile Launchers Fast Setup (<30 min) and Removal False Targets

New TBM Threats continue to be developed Existing threats are being upgraded

Page 7: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Turkish/Cypriot InstabilityShip-based Command Cell avoids civilian riots and potential terrorist cells compared to a shore-based C&C cell

Design architecture will be suitable to land and mobile based applications

MNS Threat

Page 8: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Threat Land-based Cell Vulnerability

Syria/Iraq/Iran sole/combined forces in pre-emptive attacks

Diyarbakir vulnerable from each threat nation SCUDs targeting strategic forces and capabilities

SCUD range includes Ankara, other NATO bases inside Turkey

NATO Sea-Strike 21 counters this threat

Page 9: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Requirements Prototype cell must be operational System must be supportable in the long-

term Hardware and software

Maintainable by NATO detachment & ships force

Interfaces with… Ship’s systems for navigation, communications & data

links, SIPRNET, ship’s internal voice net circuits, & power NATO personnel – User interfaces must meet NATO

tactical symbol standards & language requirements

Page 10: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Schedule

MAR APR MAY JUN JUL

ARCHITECTURE TRADE OFFS AND DECISION

• All Users Considered• PMO Review• PMO Approve

Demonstrate and Refine• Assessment Analysis• System Refinement• System Integration• TTP Refinement

Demonstrate and Refine• Assessment Analysis• System Refinement• System Integration• TTP Refinement

DeployDeploy

•Deploy SystemDeploy System

•Leave Behind SupportLeave Behind Support

•Training/TTP PackageTraining/TTP Package

Initial Planning

& Analysis

AUG SEP

Operations

Warfighter Assessments (US, NATO, CAOC, PSC)

SHORE-BASED BUILD

SHIP INTEGRATIONC

SHIP TEST

DEMONSTRATION

DEMONSTRATION

LAN & CLIENT/SERVER

USER SOFTWARE

NSS-21 Proposed Schedule

Page 11: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Requirements Interoperable with:

Microwave link to shore command CAOC Integrated Air Defense Commander (IADC) AOCC MASSTIC BICES RPC net / RAP US & Allied air and ground forces via TADIL-J

and HF/UHF communications

Page 12: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Constraints Command ship cannot accommodate large

contingent –footprint must be small Schedule – war imminent - 6 Months Costs - $5M budgeted for prototype cell PMO directed software subcontractor in

order to meet 6 month goal Drives the requirement to re-use previously developed

architecture and software

Contract specifies all hardware will be new

Page 13: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

MNS Alternatives Shore-based cells – vulnerable to TBM Air-Based cells - >1 year

development There are no viable alternatives to

NSS-21 that: Are not vulnerable to the TBM threat Allow direct, in-theatre C & C of forces Will be deliverable in 6 months

Page 14: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

NSS-21 Cell Concept Manning requirements:

O-6 NATO Commander – Senior Operations Officer

Leadership corps - 4 officers/NCOs Twelve cell operators

Four 3-person teams Guidance & support by leaders

Ships space – 5m x 9m, 3m high Subdivided into command, operations and

plan/task/assess compartments

Page 15: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Cell Conceptual Spaces

SOO Area

& Access Control

Operations Area Server

Area

Assess

Assess

Strike Ops Task

Plan

Plan/Task/Assess Area

Actors

Page 16: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Real-time Operations Area•Direct links to weapons

•Visible from command area

•Isolated from Planning area

•Separate Server (Redundant) from Planning / Tasking /Assessing area

Page 17: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Architecture Definition Object-oriented architecture

Hardware, software and people included User-Case examination determines

players and functions Abbreviated user-case definition period (2

weeks) due to time constraint Object-oriented design for future upgrades

and flexibility Ensure requirements are well understood

prior to system design/integration

Page 18: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Architecture Definition O-O architecture provides

inheritance, encapsulation, minimizes mistakes in developing requirements

Allows for future upgrades with reasonable efforts

Will work with software sub to implement the O-O methodology

Page 19: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Actors CAOC Coordinator Cell Commander – Senior Ops Officer TAO Strike Force Coordinator (SFC) Weapons Controller (2) (WCs) Weapons Planner Weapons Tasker Battle Damage Assessor

Page 20: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

User Processes Add current available weapon Assign available weapon Designate target/weapon pairing Designate weapons loitering area Assign loitering weapon Assemble ATO Submit ATO

Page 21: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Software Subcontractor Directed by PMO to subcontract S/W OPAINC has developed CAOC

software Excellent teamwork in developing

requirements Certification -- SEMM Level 5

(Optimizing) by CMI 3/1/00

Page 22: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Subcontractor Roles OPAINC will be the end-to-end software

developer Improved system integrity and interoperability Leverage the company’s experience in this area PCI will integrate the software, hardware, people

OPAINC has submitted software architecture and Budget OPA budget will fit within overall PCI budget for

NSS-21 cell Current SW architecture provides inputs for

developing NSS-21 architecture

Page 23: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Software Layer Hierarchy

Windows NT 2000 O.S.

Database

Control

Sensor Processing

Executive

ATO

Prep

Comm

Control

Maps Communications

Weapon Planning

Weapon Execution

Page 24: IPR #2 NATO Sea-Strike 21, Team 2 Paid Proposal - Phase 0 Trigui Lead Systems Engineer for Operations / Subcontractor Precision Company, Inc

Summary NATO Sea Strike will be field-ready

in time for currently unfolding conflicts Initial field prototype ready in 6 months

User-Case examples used to ensure system design complete and flexible

Software Sub developing end-to-end software solution per requirements