PROJECT SPECS PROJECT SPECS PROJECT SPECS Date Planted...June 2010 Date Planted...June 2010 Date Planted...June 2010 Shoreline Protection ~50 ft Shoreline Protection ~50 ft Shoreline Protection ~50 ft Buffer Length……….~50 ft Buffer Length……….~50 ft Buffer Length……….~50 ft (total buffer length = 85ft) (total buffer length = 85ft) (total buffer length = 85ft) Buffer Area……...~500 ft² Buffer Area……...~500 ft² Buffer Area……...~500 ft² Natives Planted……….~882 Natives Planted……….~882 Natives Planted……….~882 Cost Share Funding 50% of Cost Share Funding 50% of Cost Share Funding 50% of project expenses up to project expenses up to project expenses up to $2,000.00 $2,000.00 $2,000.00 IRLBECK PROPERTY IRLBECK PROPERTY IRLBECK PROPERTY —Shoreline Restoration & Water Quality Buffer Pre-Restoration Conditions The Irlbeck property lies on the western shore of Forest Lake (Lake 1). The site was domi- nated by mown turf grass and a earthen berm made up mostly of dirt and construction debris: Active shoreline erosion was occurring due to a combination of steep slope and uncon- solidated material that made up the earthen berm. Direct conveyance of nutrients and pol- lution from the property into the lake, increasing algae and unwanted vegeta- tion blooms Limited plant diversity After Restoration Mown turf grass and earthen berm were re- placed with a variety of native plantings along the lakeshore and additional rip-rap was prop- erly installed to stop the active shoreline ero- sion that was occurring. The project consisted in the establishment of 550 sq. ft. of new buffer and the 50 linear feet of shoreline protec- tion. Approximately 882 native grasses, flowers, and aquatic plants were planted. The native plant- ings combined with the shoreline provide many benefits, including; Erosion of shore into the lake is stopped Stormwater is slowed and retained increas- ing infiltration and decreasing input of nutrients and pollutants to Forest Lake Plant diversity is dramatically increased and the increase in root structure, along with the properly installed rip-rap, protects the shoreline from erosion due to runoff and wave/ice action Fish and wildlife habitat is increased August, 2010 August, 2010 August, 2010 Project Profile

Upload: others

Post on 13-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Irlbeck project flyer - Comfort Lakeproject expenses up to $2,000.00 IRLBECK PROPERTY IRLBECK PROPERTY — Shoreline Restoration & Water Quality Buffer Pre-Restoration Conditions The

PROJECT SPECSPROJECT SPECSPROJECT SPECS

Date Planted...June 2010Date Planted...June 2010Date Planted...June 2010

Shoreline Protection ~50 ftShoreline Protection ~50 ftShoreline Protection ~50 ft

Buffer Length……….~50 ftBuffer Length……….~50 ftBuffer Length……….~50 ft

(total buffer length = 85ft) (total buffer length = 85ft) (total buffer length = 85ft)

Buffer Area……...~500 ft² Buffer Area……...~500 ft² Buffer Area……...~500 ft²

Natives Planted……….~882Natives Planted……….~882Natives Planted……….~882

Cost Share Funding 50% of Cost Share Funding 50% of Cost Share Funding 50% of

project expenses up to project expenses up to project expenses up to

$2,000.00$2,000.00$2,000.00

IRLBECK PROPERTY IRLBECK PROPERTY IRLBECK PROPERTY —Shoreline Restoration &

Water Quality Buffer

Pre-Restoration Conditions

The Irlbeck property lies on the western shore

of Forest Lake (Lake 1). The site was domi-

nated by mown turf grass and a earthen berm

made up mostly of dirt and construction debris:

• Active shoreline erosion was occurring due

to a combination of steep slope and uncon-

solidated material that made up the earthen

berm.

• Direct conveyance of nutrients and pol-

lution from the property into the lake,

increasing algae and unwanted vegeta-

tion blooms

• Limited plant diversity

After Restoration

Mown turf grass and earthen berm were re-

placed with a variety of native plantings along

the lakeshore and additional rip-rap was prop-

erly installed to stop the active shoreline ero-

sion that was occurring. The project consisted

in the establishment of 550 sq. ft. of new

buffer and the 50 linear feet of shoreline protec-

tion.

Approximately 882 native grasses, flowers, and

aquatic plants were planted. The native plant-

ings combined with the shoreline provide

many benefits, including;

• Erosion of shore into the lake is stopped

• Stormwater is slowed and retained increas-

ing infiltration and decreasing input of

nutrients and pollutants to Forest Lake

• Plant diversity is dramatically increased

and the increase in root structure, along

with the properly installed rip-rap, protects

the shoreline from erosion due to runoff

and wave/ice action

• Fish and wildlife habitat is increased

August, 2010August, 2010August, 2010

Project Profile