Page 1: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY

27.09.2010 / Nesebar, Bulgaria

Presented by Naoëlle MATAHRI, IRSN

Page 2: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 2

CONTEXT

A competitive environment

Optimization of the maintenance strategy

Increase of the availability

High level of safety

Page 3: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 3

The selected method: AP-913 METHOD

Method developed by INPO

Objectives: Improvement of the reliability of the systems and components Improvement of the availability

Principle: analysis of the components behaviour and the operating condition

Structure: 6 equipment reliability (ER) process areas

Page 4: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 4

AP-913 representation

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 5: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 5

ER process area « Scoping and identifcation of critical components »

Common scoping criteria

Identify important functions

Identify critical components

Identify non-critical components

Identify run-to-failure components

Based on the impact on the safety, the availability, the radiological protection, the personnel security and the environment

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 6: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 6

ER process area « Continuing equipment reliability improvement »

Development and use of preventive maintenance (PM) templates

Continuing adjustments to PM task and frequency based on station and industry equipment operating experience

Documentation of the PM technical bases

Consideration of alternative maintenance strategies to ensure reliable equipment

Continuous improvement from plant staff recommendations

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 7: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 7

ER process area « Performance monitoring »

System performance

Component performance

Predictive trending results

Operations rounds monitoring

Monitor testing and inspection results

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 8: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 8

ER process area « Preventive maintenance implementation »

Preventive maintenance work

Document equipment « as found », equipment condition

Equipment condition feedback

Standard post maintenance test

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 9: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 9

ER process area « Corrective action »

Corrective maintenance

Cause and corrective action

Prioritization of equipment problems

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 10: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 10

ER process area « Life cycle management »

Long term strategy for system and component health

Prioritization of improvement activities

Integration of long term plans with the station business strategy

Continuing equipment reliability

improvement

Performance monitoring

Corrective action

Life cycle management

Scoping and identification of

critical components

Preventive maintenance

implementation

Page 11: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 11

IRSN Strategy

Analysis of the international experience feedback of the implementation and use of the method.

Experiences of some American and foreign nuclear power plants and the American documents from INPO, EPRI, NEI and others.

A large EPRI documentation about the implementation but also the operating experience feedback : recommendations, advices and good practices detected and highlighted.

A complete understanding of the method and the key points of the implementation by foreign licensees.

Page 12: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 12

IRSN Strategy

Classification :Definition of common criteria for the nuclear power plant, Choice of these criteria,Methodology to classify.

Performance criteria: Definition of these criteria, Justification of the selected performance criteria.

Page 13: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 13

IRSN Strategy

PM Template:A matrix which represents, in a synthetic way, the monitoring and maintenance actions of similar equipment, and the associated periodicities. Objective: to guarantee zero failure for the critical components.Examples of tasks in these templates :

Diagnostic task,Functional test,Major periodic maintenance,Maintenance based on the results of the diagnostic task (the

preventive maintenance will be carried out only if the diagnosis shows weak points),

Periodic routine maintenance,Periodic test…

Analysis of the content of the templates in order to guarantee the availability of the SSC important for safety.

Page 14: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 14

IRSN Strategy

Organisational change: new divisions, new competences…

Competences: To understand the physical, mechanical… phenomena, To know the behaviour and the environment condition of the SSC, To evaluate the performance of the SSC and its possible degradation, To perform predictive trending analysis.

Necessary specific trainings for the plant staff

An accompaniment on site

Page 15: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 15

IRSN Strategy

Measurement of the effectiveness of this maintenance from the safety point of view:

Maintenance performance indicators (MPI), To monitor the maintenance performance in an effective and objective way, The leading indicators for the effectiveness of the maintenance process and the lagging indicators measure results.

This mix provides a general sense of the overall performance of a maintenance programme.

IRSN performed the operational state-of-art in many countries and international organizations (IAEA, UE…). This analysis of the existing practices is performed in nuclear and non-nuclear industries.

Page 16: IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY 27.09.2010 / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN

BgNS International Conference “NUCLEAR POWER FOR THE PEOPLE” – Page 16

Conclusion

The AP-913 method: a very structured asset management method

the main purpose : the zero failure for the structures, systems and components (SSC) classified in the critical category. all the stages of components life: manufacture, supply, installation, monitoring of the performance during its use, life cycle management of the component.

The international experience feedback of the use of the method taken into account in the IRSN first assessment.