Page 1: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

ISE6 Demo Scenario

From 8/30/2007 Telecon

Page 2: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 2

Demonstration

• Core idea:– Use of PLCS enables:

• Maintaining the right configuration of appropriate logistics data and documents with links back to the underlying engineering data

• Ability to update that configuration, say for a Ship Alt

• Data Set– Use TWR data

• Approved for public release

• Existing engineering data– May need to extend to match specific demo use case

• Core SCLSIS data– Will need to add more attributes and records

• Tech Publication– Boat Information Handbook

Page 3: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 3

Proposed Demo Scenarios

1. Development of logistics data– Automating transfer of engineering data into logistics systems– Assessment

• Many different sub processes to transfer data• Parallel development once transferred• No single solution

2. Data exchange between IPDEs - reuse of logistics data– Assessment

• NPDI use case• Potential cost savings to ship programs

3. Delivery of configuration baseline at ship delivery– Assessment

• Configuration Baseline Data actually delivered via CDMD OA

4. Changes to configuration baseline for a Ship alt– Assessment

• Both Engineering and ILS need current configuration via ship check• ILS must react to engineering changes – need linkage back to engineering data

Page 4: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 4

Environments / Tools

• NGIT / NGSS (DDG 1000 IPDE)– Use Teamcenter Enterprise / Logistics Configuration Baseline

• Core DDG 1000 IPDE data– SCLSIS Configuration Baseline

– Documents

• Can modify or enhance to add attributes or entities if necessary

• Intergraph / NGSS (LPD 17 IPDE)– Use eINTEROP graphical walkthrough tool

• LPD 17 IPDE data + SCLSIS data– SCLSIS Configuration Baseline

– Documents

Page 5: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 5

Environments / Tools

• NSWC CD (Navy Analysis)– Use LEAPS

• Repository of engineering and analysis data only

• Can add link to SCLSIS data (RIN)

• Knowledge Systems Solutions– Use Epistree

• Organize data, can show integration of engineering and logistics data

• Industrial Planning Technology Inc – Use ShipConstructor AP 227 ed 2 translator– Exchange TWR Fuel Oil System

• LSC– Will participate if related projects are funded.

• Probably not known until Oct.

– Use LSC logistics environment tool

Page 6: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 6

Rough Demo Storyboard

• Exchange logistics data for reuse between IPDEs– Intergraph (eINTEROP) to NGIT (Teamcenter Enterprise)

• Exchange detailed piping design data– Industrial Planning Technology (ShipConstructor translator)– Could also be incorporated as part of Ship Alt scenario

• Exchange of logistics data with link to engineering data for Ship Alt– NSWC CD (LEAPS)– KSS (Epistree)– Others?– Scenario to be defined

Page 7: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 7

Exchange logistics data for reuse between IPDEs• Scenario –

– Show TWR– Show data for selected equipment in a system– Pick elements of a system for exchange, generate PLCS file– Import PLCS file– Show same data in new system

• For simplicity assume elements will be used in the same system by receiving SW– Teamcenter – may be able to view AP 214 graphics

• Data:– Core SCLSIS data

• System and part-related attributes, Type 3 records• Need to send instance data, but most attributes will be changed to fit the new intended usage.• CFF attributes: HSC, EFD, SAC, ESD, MEC, • Type 2 attributes: RIN, PRID, EIN, WCR, RIC, NSN• Type 3 attributes – probably all

– Technical Manual, Drawings– VFI, GFI– Provisioning Package– Logistics analysis reports

• Examples: R&M, environmental hazard, TOC, safety– STEP AP 214 file

• To allow visualization, emphasize tie to engineering

Page 8: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 8

Exchange detailed piping design data

• Scenario– Show Fuel Oil Transfer System in ShipConstructor

– Generate AP 227 ed 2 file

– Import

– Show Fuel Oil Transfer System

• Data– Detailed piping design data from ShipConstructor

Page 9: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 9

Exchange Ship Alt Data• Scenario not yet defined

– Need to define business case– Complicated by use of different Navy systems for engineering and logistics– Most of ISE members tools show an integrated environment

• Potential Scenarios– Engineering changes to ILS

• Emphasize importance to linking logistics data back to engineering data– Ship Alt

• Capture engineering and logiustics changes for a Ship Alt– Planning Yard to AIT

• Currently a package of paper • Has not been discussed in detail – not clear if feasible or if it offers any advantage

– Others?

• Issues– LEAPS

• Is repository of engineering and logistics data• However cannot be searched by GUID or RIN

– Epistree• Could show linkage between engineering and logistics

– CDMD OA• Might be able to arrange access to test environment

Page 10: ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration

8/30/2007 ISE6 Demo Scenario 10

TWR SCLSIS Data

• 347 Type 2 records– 61 systems (based on ESD) – see Excel spreadsheet

– 95 systems (based on SAC) – see Excel spreadsheet

– Eliminated 14 duplicate records

• 1928 CFF records (HSC structure)– 107 unique ESD

– 200 unique SAC