Project : WasitPiping Work Volume and Iso. Schedule
Weight Dia-in Total
1st Batch
(Jan.30)
2nd Batch
(Mar.30)
3rd Batch
(May.30)
4t
(
3 Main P/R 201 17,371 561 337 112 56Equipment 876 75,556 2,439 732 732Main P/R 202 17,371 563 338 169Equipment 874 75,183 2,437 731 731Main P/R 202 17,371 563 338 169Equipment 874 75,183 2,437 731 731Main P/R 202 17,371 563 338 169Equipment 874 75,183 2,437 731 731Main P/R 88 7,497 150 90 45Equipment 264 22,494 450 135 135
4,657 400,580 12,600 337 4,276 3,668
1St Batch13-Jan-12 20-Jan-12 27-Jan-12 3-Feb-12
Staff 15 15 15 15w hrs consumed 600 600 600 600
22600 balance w hrs 22000 21400 20800 20200
Iso Production 20 110 100 11012600 Balance Isos 12580 12470 12370 12260
2nd Batch10-Feb-12 17-Feb-12 24-Feb-12 2-Mar-12 9-Mar-12 16-Mar-12 23-Mar-12 30
Staff 25 25 25 25 25 25 25w hrs consumed 1000 1000 1000 1000 1000 1000 1000
20200 balance w hrs 19200 18200 17200 16200 15200 14200 13200Iso Production 475 475 475 475 475 475 475
12260 Balance Isos 11785 11310 10835 10360 9885 9410 8935
3rd Batch6-Apr-12 13-Apr-12 20-Apr-12 27-Apr-12 4-May-12 11-May-12 18-May-12 25
Staff 25 25 25 25 25 25 25w hrs consumed 1000 1000 1000 1000 1000 1000 1000
12200 balance w hrs 11200 10200 9200 8200 7200 6200 5200Iso Production 475 475 475 475 475 475 475
8460 Balance Isos 7985 7510 7035 6560 6085 5610 5135
4th Batch8-Jun-12 15-Jun-12 22-Jun-12 29-Jun-12 6-Jul-12 13-Jul-12 20-Jul-12 2
Staff 25 25 25 25 25 25 25w hrs consumed 1000 1000 1000 1000 1000 1000 1000
3200 balance w hrs 2200 1200 200 -800 -1800 -2800 -3800Iso Production 475 475 475 475 475 475 475
4185 Balance Isos 3710 3235 2760 2285 1810 1335 860
JEB Observations:1 It is assumed that all vendor data will be available by 31-Jan-2012 & 90% model review will be conducted accordingly on 07-march-20122 90% model review is scheduled on 07-March-2012. Hence 1st week of March and thereafter 2 weeks will require model review preparat
Iso Production during this period will not be possible.3 Iso Production for Train-1 can be completed only after 90% model review tag closure. Also isos of affected lines of Train-2,3,4 cannot be4 Hence this schedule does not look feasible.
Sulfur Recovery Unit(TR#4)
Sulfur Handling Unit
Package# 3 Total
Iso. Drawing Schedule
Package Unit Area
Piping Volume
Sulfur Recovery Unit(TR#1)
Sulfur Recovery Unit(TR#2)
Sulfur Recovery Unit(TR#3)
-
7/28/2019 Iso Plan SKEC
2/10
Project : WasitPiping Work Volume and Iso. Schedule
Total Isos
340
3800
4275
4185
.
-
7/28/2019 Iso Plan SKEC
3/10
Weight Dia-in Total1st Batch
(Feb.03)
3 Main P/R 201 17,371 561 340Equipment 876 75,556 2,439Main P/R 202 17,371 563Equipment 874 75,183 2,437Main P/R 202 17,371 563
Equipment 874 75,183 2,437Main P/R 202 17,371 563Equipment 874 75,183 2,437Main P/R 88 7,497 150Equipment 264 22,494 450
4,657 400,580 12,600 340
1St Batch13-Jan-12 20-Jan-12 27-Jan-12 3-Feb-12
Staff 15 15 15 15w hrs consumed 600 600 600 600
22600 balance w hrs 22000 21400 20800 20200Iso Production 20 110 100 110
12600 Balance Isos 12580 12470 12370 12260
2nd Batch10-Feb-12 17-Feb-12 24-Feb-12 2-Mar-12 9-Mar-12
Staff 17 17 17 17 17w hrs consumed 680 680 680 680 680
20200 balance w hrs 19520 18840 18160 17480 16800Iso Production 250 250 250 0 0
12260 Balance Isos 12010 11760 11510 11510 11510
3rd Batch1-Jun-12 8-Jun-12 15-Jun-12 22-Jun-12 29-Jun-12
Staff 20 20 20 20 20w hrs consumed 800 800 800 800 800
8240 balance w hrs 7440 6640 5840 5040 4240Iso Production 360 360 360 360 360
8360 Balance Isos 8000 7640 7280 6920 6560
4th Batch24-Aug-12 31-Aug-12 7-Sep-12 14-Sep-12 21-Sep-12
Staff 20 20 20 20 20w hrs consumed 800 800 800 800 800
-1360 balance w hrs -2160 -2960 -3760 -4560 -5360Iso Production 400 400 400 400 400
4040 Balance Isos 3640 3240 2840 2440 2040
JEB Observations:1 It is assumed that all vendor data will be available by 31-Jan-2012 & 90% model review will be2 90% model review is scheduled on 07-March-2012. Hence 1st week of March and thereafter 2
Iso Production during this period will not be possible.
3 Iso Production for Train-1 can be completed only after 90% model review tag closure. Also isos4
Package# 3 Total
Iso.
Sulfur Recovery Unit(TR#1)
Sulfur Recovery Unit(TR#2)
Sulfur Recovery Unit(TR#3)
Package Unit Area
Piping Volume
Sulfur Recovery Unit(TR#4)
Sulfur Handling Unit
-
7/28/2019 Iso Plan SKEC
4/10
2nd Batch
(May.25)
3rd Batch
(Aug.17)
4th Batch
(Oct.26)
221 0 01,390 1,049 0563 0 0
0 1,090 1,347563 0 0
0 1,090 1,347563 0 0
0 1,091 1,346150 0 0450 0 0
3,900 4,320 4,040
16-Mar-12 23-Mar-12 30-Mar-12 6-Apr-12 13-Apr-12 20-Apr-12 27-Apr-12 4-May-1217 17 20 20 20 20 20 20
680 680 800 800 800 800 800 80016120 15440 14640 13840 13040 12240 11440 10640
0 0 350 350 350 350 350 35011510 11510 11160 10810 10460 10110 9760 9410
6-Jul-12 13-Jul-12 20-Jul-12 27-Jul-12 3-Aug-12 10-Aug-12 17-Aug-1220 20 20 20 20 20 20
800 800 800 800 800 800 8003440 2640 1840 1040 240 -560 -1360
360 360 360 360 360 360 360
6200 5840 5480 5120 4760 4400 4040
28-Sep-12 5-Oct-12 12-Oct-12 19-Oct-12 26-Oct-1220 20 20 20 20
800 800 800 800 800-6160 -6960 -7760 -8560 -9360400 410 410 410 410
1640 1230 820 410 0
conducted accordingly on 07-march-2012.weeks will require model review preparation & tag closure efforts.
of affected lines of Train-2,3,4 cannot be started.
rawing Schedule
-
7/28/2019 Iso Plan SKEC
5/10
Total Isos
340
11-May-12 18-May-12 25-May-1220 20 20
800 800 8009840 9040 8240
350 350 350 39009060 8710 8360
4320
4040
-
7/28/2019 Iso Plan SKEC
6/10
January-12 January-12 January-12 February-12 February-12 February-12
Staff 15 15 15 15 17 17
w/hrs consumed 600 600 600 600 680 680
balance w/hrs 22000 21400 20800 20200 19520 18840
Iso Production 20 110 100 110 250 250
Balance Isos 12580 12470 12370 12260 12010 11760
0
50
100
150
200
250
300
350
400
450
1/13/2012
1/27/2012
2/10/2012
2/24/2012
3/9/2012
3/23/2012
4/6/2012
4/20/2012
5/4/2012
5/18/2012
6/1/2012
Is
-
7/28/2019 Iso Plan SKEC
7/10
February-12 March-12 March-12 March-12 March-12 March-12 April-12 April-12 April-12
17 17 17 17 17 20 20 20 20
680 680 680 680 680 800 800 800 800
18160 17480 16800 16120 15440 14640 13840 13040 12240
250 0 0 0 0 350 350 350 350
11510 11510 11510 11510 11510 11160 10810 10460 10110
6/15/2012
6/29/2012
7/13/2012
7/27/2012
8/10/2012
8/24/2012
9/7/2012
9/21/2012
10/5/2012
1
0/19/2012
Production
Iso Production
-
7/28/2019 Iso Plan SKEC
8/10
April-12 May-12 May-12 May-12 May-12 June-12 June-12 June-12 June-12 June-12 July-12
20 20 20 20 20 20 20 20 20 20 20
800 800 800 800 800 800 800 800 800 800 800
11440 10640 9840 9040 8240 7440 6640 5840 5040 4240 3440
350 350 350 350 350 360 360 360 360 360 360
9760 9410 9060 8710 8360 8000 7640 7280 6920 6560 6200
-
7/28/2019 Iso Plan SKEC
9/10
July-12 July-12 July-12 August-12 August-12 August-12 August-12 August-12 September-12
20 20 20 20 20 20 20 20 20
800 800 800 800 800 800 800 800 800
2640 1840 1040 240 -560 -1360 -2160 -2960 -3760
360 360 360 360 360 360 400 400 400
5840 5480 5120 4760 4400 4040 3640 3240 2840
-
7/28/2019 Iso Plan SKEC
10/10
September-12 September-12 September-12 October-12 October-12 October-12 October-12
20 20 20 20 20 20 20
800 800 800 800 800 800 800
-4560 -5360 -6160 -6960 -7760 -8560 -9360
400 400 400 410 410 410 410
2440 2040 1640 1230 820 410 0