itc limited, munger

16
1 I T C L I M I T E D Presen tation for CII - National Award for Excellence in Water Management 2008 Water Management @ ITC Limited, Munger I T C L I M I T E D Profile Celebrated its Centenary Year on 6 th November, 2007. Located in Bihar, 173 km from Patna Key Achievements (2007- 2008) ISO 9001 : 2000 ; ISO 14001 : 2004 & OHSAS 18001 certified plant. National Award for excellence in Water Ma nageme nt 2007, CII – GB C. National Award for e nergy conservation - innovative project 2007, CII- GBC. Product : Packaged Cigarettes First prize in eastern region Safety Health & Environment Award 2007, CII .

Upload: india-water-portal

Post on 09-Jul-2015

2.600 views

Category:

Education


3 download

DESCRIPTION

This is a presentation from ITC Limited, one of the finalists at the 5th CII-GBC National Award for Excellence in Water Management in 2008. The awards are in 2 categories, Within the Fence for work done on minimizing the organisations water footprint, and Beyond the Fence for work done in the community around the industry. This presentation was in the "Within the Fence" category. We thank CII and the respective companies for giving us permission to upload these presentations on the India Water Portal website for dissemination to a wider audience.

TRANSCRIPT

Page 1: ITC Limited, Munger

1

I T C L I M I T E D

Presen tation forCII - National Award for Excellence in Water Manage ment 2008

Water Management @ ITC Limited, Munger

I T C L I M I T E D

Profile

• Celebrated its Centenary Year on 6th November, 2007.

• Located in Bihar, 173 km from Patna

Key Achievements (2007- 2008)

• ISO 9001 : 2000 ; ISO 14001 : 2004 & OHSAS 18001 certified plant.

• National Award for excellence in Water Ma nageme nt 2007, CII – GBC.

• National Award for e nergy conservation - innovative project 2007, CII- GBC.

• Product : Packaged Cigarettes

• First prize in eastern region Safety Health & Environment Award 2007, CII .

Page 2: ITC Limited, Munger

2

I T C L I M I T E D

ITC’s Sustainabil ity Report

I T C L I M I T E D

Water Management Approach

• Establish Overall Water Bal ance

• Reduce at source

• Reuse in other beneficial applications after treatment (land scaping,

toile t flushing, cooling tower applications and civil constructi ons etc.,)

• Recycle back to process appl ications after appropriate treatment

Page 3: ITC Limited, Munger

3

I T C L I M I T E D

Water Consumptio n Trend

Please Note: Please Note: Water consumption increased by 8.7 % as production increased by 15.0 % compared to last year however the specific water consumption is reduced by 6 %.

400

450

500

550

600

650

700

750

800

KLD

Year

Water Consumption

Ser ies1 775 712 682 526 463 467 5 08

0 1- 02 02- 03 0 3-04 04- 05 05- 06 06- 07 07 -08

I T C L I M I T E D

Specif ic Consumptio n

Please Note: Speci fic Water Consumption has reduced by 6 %

Specific Water Consumption

11.5210.11

8.80

5.89 5.33 5.02

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

02- 03 03-04 04-05 05-06 06-07 07-08

Index kl/mnc

Page 4: ITC Limited, Munger

4

I T C L I M I T E D

Specif ic Waste Water Discharge

Year

Qty generated (m3/day)

Qty recycled (m3/day)

Qty discharged (m3/day)

Volumes (MNC)

Specific water discharge (kL / mnc)

2004 - 2005 151.8 58 105 24 4.42005 - 2006 143.3 138 6 31 0.22006 - 2007 161.7 158 3 35 0.12007 - 2008 157.6 120 38 40.5 0.9

I T C L I M I T E D

Specif ic Waste Water Discharge

4.24

0.2 0.1

0.9

00.5

11.5

22.5

33.5

44.5

'04 - '05 '05 - '06 '06 - '07 '07 - '08

Specific Water discharge.

Page 5: ITC Limited, Munger

5

I T C L I M I T E D

Water Index : 5.02 KL/Millon of cigarettes

Target : August, 2009 (To achieve national and International Bench mark).

Performance Index

Benchmark & Trend Setting

Benchmark ITC Munger

Water Index (National): 4 .88 KL/M illon of cigarettes**

Water Index (International): 4.85 KL/Millon of c igarettes*

* BAT’s S ocial Report 2007** ITC’ s Bangal ore Fac tory

I T C L I M I T E D

Sustainability – People Involv ement

v Water Manager.v Awareness Programmes.v Operatives training at OEMs.v Water brigade formation.v Water leakage Audit.v SGAv Suggestion to implementation competi tions & Quizs.v Lean-sigma approaches.

Page 6: ITC Limited, Munger

6

I T C L I M I T E D

Sustainability – People Involv ement

v Water Manager.v Awareness Programmes.v Operatives training at OEMs.v Water brigade formation.v Water leakage Audit.v SGAv Suggestion to implementation competi tions & Quizs.v Lean-sigma approaches.

I T C L I M I T E D

Sustainability – People Involv ement

v Water Manager.v Awareness Programmes.v Operatives training at OEMs.v Water brigade formation.v Water leakage Audit.v SGAv Suggestion to implementation competi tions & Quizs.v Lean-sigma approaches.

Page 7: ITC Limited, Munger

7

I T C L I M I T E D

Sustainabili ty – Review & Moni torin g

Daily ü Water Analysis Report ü Effluent Report

Monthly

ü Management Review (BM)ü Report to Chief Engineer.

Yearlyü Annual Water & EHS Reportü Director’s Reportü Unit Achievement Report

Beyond Equipm ent Performance….

ü Performance appraisal of M anagers

I T C L I M I T E D

Water Conserv ation Projects

160 m3/dayTotal

65 m3/dayRO reject for gardening & Toi let flashing s

50 m3/dayRO product for CT make-up15 m3/dayReduction in domestic water consumption

30 m3/dayReduction through recy cle of MGF /IRF b/w water160 m3/dayEffluen t discharge (2005 – 2006)

• Earlier Treated Discharge Water is being us ed by

•Local farmers for irrigation

•Small scale gardeni ng i nside factory

• CII Water Audit carried out in 2005-06. The following savi ngs potentials were identifi ed:

Page 8: ITC Limited, Munger

8

I T C L I M I T E D

Proposal # 1 : Recycle of Backwash Water

Raw watertank Soft

Water

– pH – 7.2-7.3– TSS – 15-20 ppm– TH – 500-550 ppm– TDS – 800-1000 ppm Backwash

Water

MGF IRF Soften er

– pH – 7.2-7.3– TSS – 40-50 ppm– TH – 500-525 ppm– TDS – 900-1000 ppm

Backwash water31 m3/day

SludgeTo dis posal

ExistingRaw wate r tankBy gra vit y( TSS <20 mg/l)

MF IRF

Impl emented

I T C L I M I T E D

Proposal # 1 Acco mplished

Tube Settler Plant

Savings: 30 m3/day (10500 m3/day annually )

Page 9: ITC Limited, Munger

9

I T C L I M I T E D

Proposal # 2 : Reduction in domestic Water

• Dual Flash

• e- Flash

• e- Ta p

I T C L I M I T E D

Proposal # 2 Acco mplished

Domestic Water Sav ing s

E-Taps

People Awa reness

Dual Flash

Foam- Taps

Page 10: ITC Limited, Munger

10

I T C L I M I T E D

Proposal # 3 Accomplished

Local Usage

Usage: 65-70 m3/day

Toilet Usage

Landscaping

I T C L I M I T E D

Proposal # 3 : RO Plant for Treated Effluent

vSegregate High T DS stream and directly pump to Final eff luent tank

ØAvoid the unnecessary TDS load to Aeration

ØHelp improve the Aeratio n tank performance

vTreat the final effluent through RO – 115 m3/day

Ø50 m3/day output as Cooling Tower Make-up

Ø65 m3/day reject to garden use, toilet flush

Page 11: ITC Limited, Munger

11

I T C L I M I T E D

Proposal # 3 : RO Plant for Treated Effluent

UF

110 m3/day

Treatedeffluent

tankMGF

Note:MGF - Multi grade filte rMF - Micron fil terUF - Ultra filtra tionRO - Reve rse Osmosis

Filter feedpump

Intermediatetank Intermediate

tank

RO module

RejectFor garde ning,Toilet flush

Treated wate r-50 m3/day for CT make up

ExistingExisting

Softene r

TDS – 1200 ppmTH – 700 ppm

TDS < 2100 ppmCOD < 250 ppmBOD < 75 ppm

TDS < 150 ppmTH < 100 ppm

TDS < 150 ppmTH < 50 ppm

I T C L I M I T E D

Proposal # 3 Acco mplished

Effluent Recy cling Scheme

Saving potential: 50 m3/day (17500 m3/day annually)

Page 12: ITC Limited, Munger

12

I T C L I M I T E D

Proposal # 3 Accomplished

Local Usage

Usage: 65-70 m3/day

Toilet Usage

Landscaping

I T C L I M I T E D

Other Initiatives

Remo te Radiator/T able Cooler

v ITC Munger has procured a Rotary UPS : A world class technology that has a mechanical stor ehous e of ener gy coupled with a Diesel Engi ne

vIn place of a conventional Cooling Tower, we have gone for a Table Cooler which is an Air Cooling Remote Radiator

vHigh on Cost

vBut saves over 400 KL water annually

Page 13: ITC Limited, Munger

13

I T C L I M I T E D

Other Initiatives

Better Effluent Handling

v Parallel Plate Separator post chemical treatment

vOrganic Waste r emoved as sludge

vSludge Dewatering/Filter Press

vFor Better Sludge handling

vOil Catch Pits

vTo arrest oil from enteri ng ET P Process

Filter Press Oil Catch Pits

Parallel Plate Separator

I T C L I M I T E D

Other Initiatives

Better Effluent Handling

vETP Automation

• 8 Level Sensors• 14 Auto valves• 6 NRVs• 5 parameter s ens ors

Controlled from HMI

On line monitoring of DO, pH, T urbidity, Fr ee Chlorine

Page 14: ITC Limited, Munger

14

I T C L I M I T E D

Other Initiatives

Better Effluent Handling

vRes ults

60

3036

36

32

40

48

20

30

40

50

60

70

80

90

100

Mg

/ L

'07

- '0

8

Apr

il

May

June

July

Aug

ust

Sept

I T C L I M I T E D

Initiatives in Residential Colony

Recharge Structures :

• Roof Top Water – Aquifer Recharge Str uctures

• Recharge Tre nch

• Online Recharge Pit

Rain Water Harvesting

Page 15: ITC Limited, Munger

15

I T C L I M I T E D

Impact of Recharging -

Year Total Ju ne Ju ly Aug Sept.

1 Borewe ll n ear 2006 19.00 17.00 16.25 14.50Bird’s eye 2007 15.60 14.40 13.82 13.80Increment 3.40 2.60 2.43 0.70

2 Borewe ll n ear 2006 18.00 16.00 15.50 13.00Bank Hal l 2007 15.50 14.30 13.65 12.65Increment 2.50 1.70 1.85 0.35

3 Borewe ll n ear 2006 17.25 16.50 16.25 16.00Near W are House I 2007 17.13 16.00 15.80 15.80Increment 0.12 0.50 0.45 0.20

4 Borewe ll n ear 2006 18.00 17.00 16.00 14.70Near W are House II 2007 16.13 16.00 15.80 15.80Increment 1.87 1.00 0.20 -1.10

2006 916 13 284 416 2032007 1109 250 246 142 471

Depth to Wate r Level (mbsl)IT C Park , Mun ger

Hydrograph Stati on

Rai nfall (mm)

I T C L I M I T E D

Impact of Recharging -Ground Water Level- Borewell-Bi rd' s E ye

-2 0-1 9

-1 8-1 7-1 6-1 5

-1 4-1 3-1 2-1 1

-1 0Jun e July August Septem ber

Met

er b

elow

Gro

und

Lvl

Ground Water Level- Borewell -Bank Hall

-19-18-17-16-15-14-13-12-11-10

June July A ugus t Sept ember

Met

er b

elow

Gro

und

Lvl

6

Ground Water Level- Borewell -W/H-1

-1 8

-1 7

-1 6

-1 5

-1 4

-1 3

-1 2

-1 1

-1 0Ju ne July August Se ptem ber

Met

er b

elow

Gro

und

Lvl

Ground Water Level- Borewell-W/H-2

-19

-18-17

-16

-15-14

-13

-12-11

-10June July August Sept ember

Met

er b

elow

Gro

und

Lvl

Page 16: ITC Limited, Munger

16

I T C L I M I T E D

We understand the worth of water,Even when the well is full of water.

Thank You