Detailed Inspection & Test Plan ( ITP) for HDPE- Corrugated Sheathing Ducts (As Per IRC: 18- 2000, IRC - 112-2011 / Fib Bulletin 7 Specifications ) Sr. No. Inspection & Testing Description Granulate Duct Measuring Technique Acceptance Criteria Verifying Document Test Conducted By Frequency of Testing Every lot of 7000 mtrs Remark A RAW MATERIAL PROPERTIES 1 Density G -- IS : 7328 0.94 - 0.96 gm/cc Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 2 Melt Flow Rate (190 0 c / 5Kg.) G -- IS : 2530 0.4 0.6 gm /10 min Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 3 * Shore Hardness D G -- ASTMD 2240 3 sec -60 minimum 15 sec 58 minimum Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 4 * Charpy Impact Strength of Notched Specimens at + 23 0 c G -- ISO 179/1 eA 10 Kj/m 2 Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 5 * Charpy Impact Strength of Notched Specimens at - 30 0 c G -- ISO 179/1 eA 4 Kj/m 2 Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 6 Tensile Impact Strength of Notched Specimens at + 23 0 c G -- ISO 8256 > 130 KJ/m 2 Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 7 Tensile Stress at yield G -- ASTM D 638 (IV) > 22 N/mm 2 Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 8 Elongation at yield G -- ASTM D 638 (IV) > 7 % Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 9 E.S.C.R. ( 70 0 c ) G -- ASTM D 1693 > 192 hrs Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 10 Vicat VST B50 G -- ISO 306 > 70 0 c Manufacturer’s Test report Manufacturer 1 Sample per grade of raw material. 11 Linear expansion Coefficient between 20 0 c and 80 0 c G -- --- K -1 To be declared by supplier Supplier’s Typical declared value for HDPE Raw Material Supplier Copy of already declared value. 12 Carbon Content -- D IS : 2530 > 2 % Manufacturer’s Test report Manufacturer 1 Sample upto 7000 RM

Upload: saurabh-garg

Post on 27-Dec-2015

62 views

Category:

Documents


0 download

DESCRIPTION

Parameters for sheathing ducts

TRANSCRIPT

Page 1: Itp Hdpeducts Pwd

Detailed Inspection & Test Plan ( ITP) for HDPE- Corrugated Sheathing Ducts

(As Per IRC: 18- 2000, IRC - 112-2011 / Fib Bulletin 7 Specifications )

Sr. No.

Inspection & Testing Description

Gra

nu

late

Du

ct

Measuring Technique

Acceptance Criteria

Verifying Document

Test Conducted By

Frequency of Testing Every lot of 7000 mtrs

Remark

A RAW MATERIAL PROPERTIES

1 Density G -- IS : 7328 0.94 - 0.96 gm/cc Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

2 Melt Flow Rate (190 0 c / 5Kg.) G -- IS : 2530 0.4 – 0.6 gm /10 min Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

3 * Shore Hardness D G -- ASTMD 2240 3 sec -60 minimum

15 sec – 58 minimum Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

4 * Charpy Impact Strength of

Notched Specimens at + 23 0

c

G -- ISO 179/1 eA 10 Kj/m2 Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

5 * Charpy Impact Strength of

Notched Specimens at - 30 0

c

G -- ISO 179/1 eA 4 Kj/m2 Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

6 Tensile Impact Strength of Notched Specimens at + 23 0

c G -- ISO 8256 > 130 KJ/m2

Manufacturer’s Test report

Manufacturer 1 Sample per grade of raw

material.

7 Tensile Stress at yield G -- ASTM D 638 (IV) > 22 N/mm2 Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

8 Elongation at yield G -- ASTM D 638 (IV) > 7 % Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

9 E.S.C.R. ( 70 0 c ) G -- ASTM D 1693 > 192 hrs Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

10 Vicat VST B50 G -- ISO 306 > 70 0 c Manufacturer’s Test

report Manufacturer

1 Sample per grade of raw material.

11 Linear expansion – Coefficient between 200c and 800c

G -- --- K -1 To be declared by supplier Supplier’s Typical declared value for

HDPE

Raw Material Supplier

Copy of already declared value.

12 Carbon Content -- D IS : 2530 > 2 % Manufacturer’s Test

report Manufacturer 1 Sample upto 7000 RM

Page 2: Itp Hdpeducts Pwd

Page-2

Detailed Inspection & Test Plan ( ITP) for HDPE- Corrugated Sheathing Ducts

(As Per IRC: 18:2000, IRC 112-2011 / Fib Bulletin 7 Specifications )

Sr. No. Inspection & Testing

Description

Acceptance

Criteria

Verifying Document

Test Conducted By

Frequency of Testing Remark

B HDPE Sheathing Duct Properties

1 Dimensions

I. D … ID ± 1 % or ± 0.5mm whichever is the greater

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

2 Wall thickness As per Specified value. – Average ( to be checked at 4 points and average taken )

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

3 Flexural Behaviour of Duct

Record load at 20 mm deflection & 2 minutes after 20 mm deflection as well as instantaneous deflection after removing load and residual deflection after 2 minutes of removing load.

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

# 4 * Flexibility of Duct

Deformation preferably ≤ 5% of duct diameter, determined by passing a plunger through the duct at specified minimum bending radius. Internal Duct diameter < 85mm : r = 1800mm Internal Duct diameter > 85mm : r = 2800mm

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

5 Lateral Load Resistance

of Duct Deformation ≤ 10% or 5mm whichever is lesser after 2 minutes of unloading.

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM.

6 * Longitudinal Load

Resistance

Duct should sustain specified load for 10 minute.

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

7 * Leak Tightness of

duct system

No visually detectable loss of water during the test period of 5 minutes at Inside pressure of 0.5 bar.

Manufacturer’s Test report

Manufacturer 3 Samples upto 7000 RM

* For conformity of these tests, only butt welded joint or joint with heat shrink sleeves is prescribed.

C System Approval Test

1 Wear Resistance Of Duct Needs to be conducted only once for the project. At times tests conducted for the same

department in the last one year should be accepted and not to be conducted again

2 Bond Behavior of Tendon Should be conducted once for the project and report submitted to the department prior to commencement of supplies. At times tests conducted for the same department in the last one

year should be accepted and not to be conducted again 3 Coefficient of Friction