j j i i i i i i - bescombescom.org/wp-content/uploads/2014/06/form-1-new-connection.pdf ·...

14
Format-I BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of KarnatakaUndertaking) REQUISITION FOR SUPPLY OF ENERGY UNDER ELECTRICITY ACT 2003 (please tick (11)on the appropriate box) ReferAnnexure-/ o LT-l BJ/KJInstallation D LT-2 Domestic ConsumerCategory 1 0 LT-2a(i) o LT-2a(ii) o LT-2b(i) 0 LT-2b(ii) o LT-3 Commercial Lighting & Heating I 0 LT-3(i) o LT-3(ii) D LT-4 IPSet Installations I o LT-4(a) o LT-4(b) o LT-4(c)(i) o LT-4(c)(ii) D LT-SInstallations of LTIndustries o LT-5(a) o LT-5(b) o LT-6Water Supply/ Street light o LT-6(a) o LT-6(b) o LT-7Temporary Connection Applicatin Type 1 o Regular 1 o Tatkal A I GENERALPARTICULARS For individual Applicants only Name Father's/Husband's Name Name of the Nominee (Optional) For Organization/ Corporate Applicants only Name of the Organization J II IIIII 1 1 Name of the Authorized Signatory Designation of the Authorized Signatory Complete Address of location where power supply is required House No./Flat No./Shop No'/Plot No. J J II II II Floor Street Name Area/ Location Cross Main City Pin I Ph.No. Mobile Landmark Email Permanent Address/ Registered Office Address in caseof Company o Sameaddressasmentioned above o If different, specify below House NO./FlatNo./Shop No.1Plot No. Floor Street Name Area/ Location Cross Main City Pin I Ph. No. Mobile Landmark Email B I PARTICULARSOFCONNECTION No. of Points Desired load (KW/HP) Required Voltage (V/ kV) PhaseRequirement o Singlephase o Three phase Version-I

Upload: others

Post on 05-Nov-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

Format-I

BANGALORE ELECTRICITYSUPPLY COMPANY LIMITED(Wholly owned Government of KarnatakaUndertaking)

REQUISITION FOR SUPPLY OF ENERGYUNDER ELECTRICITY ACT 2003

(please tick (11)on the appropriate box) ReferAnnexure-/

o LT-l BJ/KJInstallationD LT-2 Domestic ConsumerCategory 1 0 LT-2a(i) o LT-2a(ii) o LT-2b(i) 0 LT-2b(ii)o LT-3 Commercial Lighting & Heating I 0 LT-3(i) o LT-3(ii)D LT-4 IPSet Installations I o LT-4(a) o LT-4(b) o LT-4(c)(i) o LT-4(c)(ii)D LT-SInstallations of LTIndustries o LT-5(a) o LT-5(b)o LT-6Water Supply/ Street light o LT-6(a) o LT-6(b)o LT-7Temporary ConnectionApplicatin Type 1 o Regular 1 o Tatkal

A I GENERALPARTICULARSFor individual Applicants onlyNameFather's/Husband's NameName of the Nominee (Optional)For Organization/ Corporate Applicants onlyName of the Organization J

I I I I I I I 1 1Name of the Authorized SignatoryDesignation of the Authorized SignatoryComplete Address of location where power supply is requiredHouseNo./Flat No./Shop No'/Plot No. J J I I I I I IFloor Street NameArea/ Location CrossMain CityPin I Ph. No. MobileLandmarkEmailPermanent Address/ Registered Office Address in caseof Company

o Sameaddressasmentioned above o If different, specify belowHouseNO./Flat No./Shop No.1Plot No.Floor Street NameArea/ Location CrossMain CityPin I Ph. No. MobileLandmarkEmailB I PARTICULARSOFCONNECTIONNo. of Points Desired load (KW/HP)RequiredVoltage (V/ kV) PhaseRequirement o Singlephase oThree phase

Version-I

Page 2: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

This requisition is for oA new Service oA sub-service from existing serviceIn case of sub-service from existing serviceName of the existing consumerExisting R.R.No. Acc.ID.C 1ACCOUNT DETAILSPower Supply Required for (please tick (11)on the appropriate box)

Residential Commercial IndustrialPublic Water Supply Agriculture IP Set TemporaryKutira Jyothi Bhagya Jyothi Ganga KalyanaIf Government Central StatePublic Street light/ Public Park lightSelf Rental Public Use

D1ADDITIONAL DETAILSAny Other Special Government Scheme (please tick (11)on the appropriate box)

BJ KJ RGGVY GANGA KALYANAType of Ownership \';,

Individual Leased/ Rental Co ownedProprietorship Public Company Private CompanyPartnership Trust

If IP set, Water SourceOpen well Bore well RiverChannel Sub-channel Nallah

Details of any other installation in his/her/their name in BESCOMareaR.R.No. Account No.

Installation #1Installation #2Installation #3E I PARTICULARS OF LECName of the LicensedElectrical Contractor

I IAddress ofthe LEC

I IClassLicense No. ValiditySupervisor Permit No. ValidityIf LECis different from the one mentioned herein, same may brought to the knowledge of BESCOM

DECLARATIONI/We hereby declare that the information provided herein are true and to the best of my/ourknowledge and I/We agree with the licensee to take a power supply for the above mentionedpurposes in accordance with KERCConditions of Supply (CoS& Supply Code) as amended fromtime to time generally and specifically bound by the provisions of Clause 43 of Conditions ofSupply, 2006.

Name

Affix Recent Name/Seal of Organization

PassportSizePhotograph of

Applicant DatePlace Applicant's Signature

Page 3: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

Format-I

BANGALORE ELECTRICITYSUPPLY COMPANY LIMITED(Wholly owned Government of KarnatakaUndertaking)

F List of Documents to be submitted (please tick ('I/) on the appropriate box) Refer Annexure-II1 Proof of Ownership of the premises or Proof of Occupancy2 General Licensefrom the local authority, if such Licenseis provided for3 In caseof partnership firm, registered partnership deed4 In caseof a Limited Company,Memorandum and Articles of Association and Certificate of

Incorporation5 Indemnity Bond if the Applicant is not the owner of the premises6 Proof of Permanent residential addressof the applicant and PANnumber, if any7 An undertaking stating that the applicant will not engageChild Labour in their Industrial/

Commercial installation. Also consent to disconnect the power supply to the installation incaseof violation

8 Full addresswith Location sketch9 An undertaking on plain paper agreeing to install the SolarWater heater asper KERCtariff

order10 A power supply agreement for supply of lowl high tension electrical energy in the

prescribed format on a specified stamp duty paper of amount asprescribed by theCommissionfrom time to time

Version-I

Page 4: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

GENERAL INSTRUCTIONS

1. Application should be filled up in Blockletters only and tick the boxeswherever necessary

2. ReferANNEXURE-Ito know your Tariff Category

3. ReferANNEXURE-litoknow the list of documents to be submitted

4. Affix your photograph and signature compulsorily

5. The filled in requisition form should be submitted to the AEEof the SubDivision

6. For any clarifications pleasecontact concernedSubDivisionoffice

7. The application Registration / Re-registration cum Processingfees payable by the Applicant forregistration purpose is asfollows (Clause30.01) :

SI. Category AmountNo. (inRs.)1. Domestic/ Non-Commercial lighting. 25.002. Domesticcombined lighting & heating (AEH)/

Non-Commercial/ Non-Domesticcombined lighting 50.00& heating.

3. Commercial lighting. 50.004. l.T. Power (3 phase) 100.005. Commercial/Residential complexes/ M.S. As prescribed for each installation of

Buildings. that category as above subject tominimum of Rs.250.00 per premises

6. Layouts. 250.00 per layout

8. Process Flow Chart

PowerRegistration Estimate sanction Chargespayment

(AET) (Fieldofficer) /Intimation (Consumer)

1Submissionof wiring

Issueof R.R Executionof work Work Order .__ diagram,CompletionNo. +-- (Fieldofficer) ~ (AET) report Agreement

1 (Consumer)

ServicingofInstallation

Page 5: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

9. Indicative Maximum time limit (Clause 3, Duty of Licensee to Supply Electricity on request):

Release of Power Supply where service is Within one month of receipt of applicationfeasible from existing networkRelease of supply where Network Expansion/ LTsupply : 45 daysEnhancement required for providing connection llkV HT supply : 60 days

33kV HT supply : 90 daysEHTsupply : 180 days

IP sets Within 30 days after attaining seniority (Thenumber of new connections shall be limited tothe target fixed for the year)

For any Electricity Complaints/ Suggestions, please call BESCOMHelpline 1912Visit: www.bescom.org

Page 6: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

ANNEXURE-I

ELECTRICITY TARIFF SCHEDULE - 2015(LOW TENSION)

TariffSchedule Sub Category Applicable to

LT-1 Installationsserviced under Bhagyajyothiand Kutirajyothi (BJ/KJ)Schemes

LT-2(a) Applicable to lighting/combined lighting, heating and motive Power installations of residential housesand also tosuch houseswhere a portion is used by the occupant for (a) Handloom weaving (b) Silk rearing and reeling andartisans using motors up to 200 watts (c) Consultancyin (i) Engineering(ii) Architecture (iii) Medicine (iv) Astrology(v) Legalmatters (vi) Incometax (vii) CharteredAccountants (d) Jobtyping (e)Tailoring (f) PostOffice (g)Gold smithy(h) Chawki rearing (i) Payingguests/Home stay guests (j) personal Computers (k) Dhobis (I) Hand operated printingpress (m) Beauty Parlours (n) Water Supply installations, Lift which is independently serviced for bonafide use ofresidential complexes/residence, (0) Farm Housesand yard lighting limiting to 120 Watts, (p) Fodder Choppers&Milking Machineswith a connected load up to 1 HP.Also applicable to the installations of (i) Hospitals,Dispensaries,Health Centers run by State /Central Govt. and local bodies. (ii) Houses,schoolsand Hostelsmeant for handicapped,

I-----------~ aged destitute and orphans (iii) Rehabilitation Centres run by charitable institutions, AIDS and drug addictsRehabilitation Centres (iv) Railwaystaff Quarterswith single meter(v) fire service stations. It is alsoapplicable to theinstallations of (a) Temples, Mosques, Churches,Gurudwaras,Ashrams, Mutts and religious/Charitable institutions(b) Hospitals,Dispensariesand Health Centresrun by Charitable institutions including X-ray units (c)Jailsand Prisons(d) Schools,Colleges,Educational institutions run by State/Central Govt.,/Local Bodies (e) Seminaries(f) Hostels runby the Government, Educational Institutions, Cultural, Scientific and Charitable Institutions (g) GuestHouses/TravelersBungalowsrun in Government buildings or by State/Central Govt./Religious/Charitable institutions(h) Public libraries (i) Silk rearing (j) Museums (k) Installations of Historical Monuments of ArchaeologyDepartments(l) Public Telephone Booths without STD/ISD/FAXfacility run by handicapped people (m) Sulabh/Nirmal Souchalayas(n) ViswaShedshavingLightingLoadsonly.

LT-2a(i)Applicable to areascoming underBruhat BangaloreMahanagaraPalike (BBMP),MunicipalCorporation and all Urban LocalBodies

LT-2a(ii)Applicable to Areasunder Village Panchayats

LT-2(b)Private and Professional unaided institutions, Nursing Homesand Private Hospitals having only lighting or combined lighting & heating, andEducational Institutions in BBMP motive power.Areas,Municipal Corporation andall areasunder urban LocalBodies

LT-2b(i)

LT-2b(ii)Private & ProfessionalEducational Institutions in Areasunder Village Panchayats

Applicable to the installations of Private Professional and other Private Educational Institutions including aided,

Page 7: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

TariffSub Category Applicable to

ScheduleLT-3 LT-3(i) Applicable to Commercial Lighting,Heatingand Motive Power installations of Clinics,DiagnosticCenters,X Rayunits,

Applicable in areascoming under Shops,Stores, Hotels/Restaurants/Boarding and Lodging Homes, Bars, Private guest Houses,Mess, Clubs, KalyanBBMP,Municipal Corporation Mantaps / Choultry, permanent Cinemas/ Semi Permanent Cinemas,Theatres, Petrol Bunks, Petrol, Diesel and oiland all areasunder urban local Storage Plants,ServiceStations/ Garages,Banks,Telephone Exchanges.T.V. Stations, Microwave Stations, All Indiabodies Radio,DishAntenna, PublicTelephone Booths/ STD,ISO,FAXCommunication Centers,Stud Farms,RaceCourse,Ice

LT-3(ii) CreamParlours,Computer Centres,Photo Studio / colour Laboratory, Xerox Copiers, Railway Installation excepting

Applicable in areasunder village Railwayworkshop, KSRTCBusStationsexceptingWorkshop, All offices, PoliceStations, Commercial Complexes,Lifts

Panchayats of Commercial Complexes,Battery Chargingunits, Tyre Vulcanizing Centres, Post Offices, Bakery shops, TailoringShops, Beauty Parlours, Stadiums other than those maintained by Govt. and Local Bodies. It is also applicable towater supply pumps and street lights not covered under LT 6, Cyber cafes, Internet surfing cafes, Call centers, LT.based medical transcription centers, Private Hostels not covered under LT-2 (a), Paying guests accommodationprovided in an independent / exclusivepremise.

LT-4 LT-4(a) (a) Agricultural Pump Sets including Sprinklers, (b) Pump sets used in (i) Nurseries of forest and HorticulturalApplicable to I.P.SetsUp to and Departments (ii) GrassFarmsand Gardens(iii) Plantations other than Coffee, Tea, Rubber and Private Horticultureinclusiveof 10 HP NurseriesLT-4(b)Applicable to IPsetsabove 10 HP

LT-4(c)(i) -Applicable to PrivateHorticultural Nurseries,Coffee,Teaand Rubberplantations ofsanctioned load up to andinclusiveof 10 HP.

LT-4(c)(ii)Applicable to PrivateHorticultural Nurseries,Coffee,Teaand Rubberplantations ofsanctioned load above 10 HP.

7

Page 8: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

TariffSchedule

LT-S

Sub Category Applicable to

LT-S(a) LT Heating & Motive power (including lighting) installations of industrial Units, Workshops, Poultry Farms,SugarcaneIndustries: Applicable to Crushers,Coffee Pulping,Cardamomdrying, Mushroom raising installations, Flour, Huller & RiceMills, Wet Grinders,BangaloreMetropolitan Area & Milk dairies, Dry Cleanersand Laundrieshavingwashing, Drying, Ironing etc., Bulk IceCreamand IcemanufacturingMunicipal Corporation Units, Coffee Roasting and Grinding Works, Cold Storage Plants, Bakery Product Mfg. Units, KSRTC

workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories, Printing Presses,Garment manufacturing units, Bulk Milk vending Booths, Swimming Pools of local Bodies, Tyre retreading units,Stone crushers, Stone cutting, Chilly Grinders, Phova Mills, pulverizing Mills, Decorticators, Iron & Red-Oxide

I- ----Icrushing units, crematoriums, hatcheries, Tissueculture, SawMills, Toy/wood industries, Viswa Shedswith mixedLT-S(b) LT load sanctioned under Viswa Scheme, Cinematic activities such as Processing, Printing, Developing, RecordingIndustries: Applicable to all areas theatres, DubbingTheatres and film studios, Agarbathi manufacturing unit., Water supply installations of KIADB&other than those covered underLT-S(a)

industrial units, Gem & Diamond cutting Units, Floriculture, Green House, Biotech Labs.,Hybrid seed processingunits. Information Technology industries engaged in development of hardware & Software, Information Technology(IT)enabled Services/ Start-ups/ Animation / Gaming/ Computer Graphicsascertified by the IT& BTDepartment ofGOK/GOI,Silk filature units, Aqua Culture, Prawn Culture, Brick manufacturing units, Silk / Cotton colour dying,Stadiums maintained by Govt. and local bodies, Fire service stations, Gold / Silver ornament manufacturing units,Effluent treatment plants, Drainagewater treatment plants, LPGbottling plants and petroleum pipeline projects,Piggeryfarms, Analytical Lab.for analysisof ore metals, Satellite communication centers, Mineral water processingplants / drinking water bottling plants and sodafountain units.

LT-6

LT-7

Water Water supply and sewerage pumping installations and also Applicable to Public Street lights/ Park lights of villagePanchayat,Town Panchayat,Town Municipalities, City Municipalities / Corporations / State and Central Govt. /APMC,Traffic signals,subways,water fountains of local bodies. Also applicable to Streetlights of residential Campusof universities, other educational institutions, housing colonies approved by local bodies/development authority,

1- ----1 religious institutions, organizations run on charitable basis,industrial area / estate and notified areas,alsoapplicablePublic to water supply installations in residential Layouts,Street lights alongwith signal lights including the gateman's shed

LT-6(a)Supply

LT-6(b)Lighting with associatedequipment provided at the Railwaylevel crossing.

Hoardings&Advertisement boards, BusShelterswith Advertising Boards, Private Advertising Posts/ Sign boards inthe interest of Public such as Police Canopy Direction boards, and other sign boards sponsored by the PrivateAdvertising Agencies.Temporary PowerSupplyof all categories

Page 9: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

ANNEXURE-II

Tariff wise List of documents required:

SLNo Name of the document LTl LT2 LT3 LT4 LTS LT6 LT1

1 Proof of Identity Voter ID Voter ID Voter ID Voter ID Voter ID Voter ID

(Anyone) BPLCard Ration Card Ration Card Ration Card Ration Card Ration Card

Ration Card Passport Passport Passport Passport Passport

Driving License Driving License Driving License Driving License Driving License

PAN card PAN card PAN card PAN card PAN card

2 Proof of ownership (Any Registered sale deed Registered sale deed Record of Rights (RTC) Registered sale deed Registered sale deed

one)Water rights certificate issued

Registered partition deed Registered partition deed by competent authority Registered partition deed Registered partition deed

NANo objection certificate(NOC) from horticultural

Registered gift deed Registered gift deed department {only for LT-4 (c)} Registered gift deed Registered gift deed

Registered lease deed and Registered lease deed and Registered lease deed and Registered lease deed and

Indemnity Bond (sincethe Indemnity Bond (sincethe Indemnity Bond (sincethe Indemnity Bond (since theApplicant is not the owner of the Applicant is not the owner of Applicant is not the owner of the Applicant is not the owner ofpremises) the premises) premises) the premises)

3 Architect Plan by registeredNA A A NA NA NA

Architect Application4 An undertaking on plain paper A A

from theagreeing to install the Solar Water

NA A(where hot water is required

NA(where hot water is required

competent NAheater as per KERCtariff order. for processing or auxiliary for processing or auxiliary

authority.purpose) purpose)

(MGPand YGM5 Trade license issued by Competent A to examine)

Authority NA NA A NA(General/Trade license

NAissued by Competent

Authority)Approval from the electricalinspectorate along with an

6undertaking by the applicant where

NA NA NA NA NA Aassembly of people is more than 99along with other statutoryapprovals.

Indemnity Bond indemnifying the7 licensee in respect of collateral NA NA NA NA NA A

damages.An undertaking stating that theapplicant will not engage ChildLabour in their Industrial!

8 Commercial installation. Also NA NA A NA A NA

consent to disconnect the powersupply to the installation in case ofviolation.

Page 10: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

Annex-7POWER SUPPLY AGREEMENT FOR SUPPLY OF LOW TENSION ELECTRICAL ENERGY

An Agreement made this day of (date) of (month)two thousand and __ between the --------------------ELECTRICITYSUPPLYCOMPANYLTD,a bodyconstituted by the Government of Karnataka (hereinafter called the 'LICENSEE'whichexpression,wherever the context so admits shall include its successorsand assigns)of the onepart;

AND

_______ (herein after called as the 'CONSUMER'which expression, wherever thecontext so admits shall include its successor,successorsin businessand assigns,heirs,executorsand administrators)of the other part.

Whereasat the request of the Consumer, the Licenseehasagreed to supply to the Consumerelectricity for the purpose of in hisher/it's premisesat

____________________________________________________________________ forbonafide purpose within the premises.

1. DEFINITIONS:In thisAgreement, unlessthe context otherwise requires:

a. "Act" shallmean the Electricity Act, 2003or such other enactment governing thesupply and useof electrical energy asmay be in force from time to time.

b. "Conditions of Supply" shall mean the "Conditions of Supply of Electricity ofDistribution Licensee in the State of Karnataka" approved by the KarnatakaElectricityRegulatoryCommissionand asamended from time to time.

c. "Commission"means the Karnataka ElectricityRegulatoryCommission.d. "Street" includes any way, road, lane, square, court, alley, passage or open

space, whether a thoroughfare or not, over which the public have a right of way,and also the roadway and footway over any public bridge or causeway;

2. CONDITIONS OF SUPPLY:a. The Licensee shall supply electrical energy to the aforesaid premises of theConsumer from its distributing main for the purpose at low tension as specified in the"Conditions of Supply" under classification of supply and the Consumer shall take fromthe Licensee, electricity required for the purpose herein above recited at the singlepoint of supply up to a maximum extent of __ KW/ HP,being the load sanctioned.The energy so supplied shall be utilized within the premisesmentioned hereto, for thebonafide useof the Consumer.

b. Electrical energy supplied to the premisesshall not be utilized by the Consumer inany manner prejudicial to the Licensee and all usage must be according to suchmethod or methods approved by the Licensee.Theuse of power must be confined tosuch places as shall have been previouslyapproved in writing by the Licensee. In caseprejudicial use of power is detected, the Consumer shall pay penal charges inaccordance with the provisionsof the "Conditions of Supply" as in force from time totime. Besides,for dishonestabstraction / use/ consumption of electricity or interferencewith the metering equipment or accessories, the Consumer shall also be liable forprosecution under the Act and any other law for the time being in force, and theinstallation shallbe liable for disconnection.

IGl

Page 11: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

c. The Consumer shall permit the Licensee, free of cost, to erect posts, distributionlines, structures, equipments, cables and other apparatus necessary for the supply ofelectrical energy under this Agreement over the land belonging to, or in the possessionof, the Consumer.

d. The Consumer agrees to take supply under any conditions of restrictions of loadand time that may be fixed by the Licensee from time to time and to pay fixed chargesunder this Agreement in full notwithstanding such restrictions.

e. The supply is liable to be restricted, staggered or cut off altogether, as the casemay be, if the power position or any other emergency warrants such a course ofaction. The Licensee reserves the right to periodical shutdown, as and when required,for the purposes of routine maintenance after giving reasonable intimation to theConsumer.

f. Fromthe date of commencement of supply as defined in the "Conditions of Supply"until termination of agreement, the Consumershallmake payment to the Licenseeforthe electricity supplied during the prescribed billing period at the rates specified in theLicensee's tariff from time to time and applicable to the class of power supplyirrespectiveof the installationbeing in serviceor under disconnection.

g. Subject to the provisionsof the Act, the "Conditionsof Supply" and any other lawfor the time being in force, the supply under thisAgreement isvalid initiallyfor a periodof two yearsfrom the date of commencement of supplyand shallstand automaticallyrenewed from year to year thereafter, until terminated by either of the parties.However, in case of TEMPORARYPOWERSUPPLY,the period of agreement shallbe fora period of days/weeks/months which period may beextended by the Licenseeat the request of the Consumer.The power supply shall bedisconnected after the expiration of the stipulated period unless a requisition isreceived for extension of the period, and such further deposit as may be demandedby the Licenseeispaid by the Consumerbefore the expirydate.

h.Without prejudice to the rights and liabilities of the parties in respect of any matterantecedent to termination, either party to this Agreement may terminate thisAgreement by giving three monthspriornotice inwriting.

i. The Licenseeshall not be liable to pay any damages or compensation in connectionwith lossof life or property arising,occurring or resultingfrom the useof power.

j. The industrial / I.P.Set Consumershall obtain written permissionfrom the Licenseeforany changes to be made in the equipment, machinery or motors installed by him atthe time of servicingthough hissanctioned load does not exceed due to suchchange.

k.ln case of street light installations,the maintenance of lamps and fixturesshall becarried out by the Consumerhimself/herself/itself.

I. Where the Consumer is required to obtain a license or permit or 'No objectioncertificate' for running hisIndustrial/commercial concern or lift irrigation scheme andthe Licenseor permit is suspended or cancelled, or the validity of the 'No objectioncertificate' issuedby the competent authority to lift water has expired, the Licenseeshallhave the right to discontinue power supplyduring the period when the Licenseorpermit iscancelled or suspended or the validity of the No Objection Certificate issuedby the competent authority hasexpired,

3. METERS:Theenergy supplied shallbe measuredand registeredby a meter or metersin or uponthe said premisesto be provided, fixed and kept in proper order by the Licensee.Theprocedure for billingwhen the meter isnot provided or is faulty shall be regulatedasper the relevant provisionsof the Act and the "Conditionsof Supply".

,I

Page 12: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

4. SECURITYDEPOSIT:

The Consumer, on a request made by the Licensee in this regard, shall renew orreplenish all security deposits in the event of the same becoming exhausted orinsufficient.

5. TARIFFAND PAYMENT OF ELECTRICITYCHARGES:

Fromthe date thisAgreement comes into force, the Consumershallbe bound by, andshall pay the Licensee,fixed charges, energy charges, and additional security depositin accordance with the tariffs approved by the Commissionand the "Conditions ofSupply" of the Licenseefrom time to time for the appropriate classof Consumers. TheConsumer shall pay the Licensee the tax on electricity charges as determined by theGovernment of Karnataka from time to time. In case even after disconnection, if thedues remain unpaid, then the Licensee shall be entitled to take recourse to theprovisionsstipulated in the "Conditions of Supply" and other laws for the time being inforce to recover the arrears.

6. DISCONNECTION FOR ARREARSAND RECONNECCTION:In case the Consumerfailsto pay the charges due for the electricity supplied within thedue date, the Licenseeshallbe entitled to cut off the supply after giving due notice asprovided in the Act and "Conditions of Supply" and power supply shallbe restoredonlyon payment of all arrears including interest and reconnection charges as stipulatedfrom time to time in the "Conditions of Supply".

7. CONTINUITY OF POWERSUPPLY:

The Licensee shall take all reasonable precautions to ensure continuity of supply ofpower to the Consumer at the point of commencement of supply. However, theLicenseeshall not be liable to the Consumer for any lossdue to the interruption in thesupply of power by reason of damage to the equipment of the Licenseeduring war,mutiny, riot, strike or by earth-quake, hurricane tempest or any accident or causesbeyond the control of the Licensee.

8. ENTRYINTO CONSUMER'S PREMISES:TheLicenseeshallhave access to the premisesof the Consumerat all reasonable timeswithout notice for meter reading, inspection, testing and / or for any other purposeincidental to, or connected with the proper maintenance of supply.

TheLicenseeshallhave access to the premisesat any time for inspection, if there isanyreason to suspect breach of the provision of this Agreement, the Act and the"Conditions of Supply".

If the Consumer, hisagent, employees or anyone else purporting to act on hisbehalfattempts to obstruct or impede the Licenseeor its employees or authorized person inthis regard, the Licensee shall be entitled to immediately cut off power supply. TheConsumershall also be liable to pay such penalty asmay be imposed by the Licenseein thisregard.

12-

Page 13: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

9. ASSIGNMENTS OR TRANSFER OF THE BENEFIT OF THIS AGREEMENT BY THE CONSUMER:The Consumer shall not, without the previous consent in writing of the Licensee, assign,transfer or part with the benefit of this Agreement and shall not in any manner partwith, or create any partial I separate interest in it.

10. APPLICATION OF THEPROVISIONS OF THEACT AND THE"CONDITIONS OF SUPPLY":

In all matters not herein specifically provided for, the provisions of the Act, the"Conditions of Supply" and other laws for the time being in force shall apply.

11. SAVING CLAUSE:Nothing contained in thisAgreement or any amendment thereof shall restrict any rightsand obligations, which the Licensee or the Consumer has derived under any legislationrelating to supply and consumption of electricity enacted during the period of thisAgreement.

In witness whereof, the Licensee through its duly authorized representative and theConsumer have executed this Agreement on the day month and year first abovewritten.

Consumer I Authorized signatory For .... mm .. Electricitv Supply CompanyLimitedSignature .Name .Designation .

(i) .(Signature)Name .Address .

Witnesses:(1) .(Signature)Name .Address .

Witnesses:(1) .(Signature)Name .Address .

Page 14: J J I I I I I I - BESCOMbescom.org/wp-content/uploads/2014/06/FORM-1-NEW-CONNECTION.pdf · workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories,

INDEMNITY BOND ANNEX-S(If the intending Consumer isnot the owner of the premises)

To:....................... Engineer,

From

Whereas the land / premisesdetailed hereunder, belongs to Sri/Smt.. and I am onlylessee / tenant / occupier of the said land / premiseswhere I have applied for the electricityconnection to the said land / premises and I am not able to obtain the consent of Sri /Smt.. but produced the proof of occupancy, ie valid power of attorney/ latest rent paid receipt / registered lease deed.

Thereto I, in consideration of the grant of electricity connection to me on the conditions ofsupply for which I have executed the Agreement, further agree to indemnify and keep harmlessthe Licenseefrom all damages and claims,whatsoever, including costs of suit, original petitionsand all manner of legal or other proceedings that the Licenseemay incur or likely to incur onaccount of any action or threat by or at the instance of the owner of the said land / premises(whether such owner be the said Sri/ Smt or any other). I also further agreethat such loss,damages and any other claim resulting out of the electricity connection beinggiven to me without the consent of the owner of the land / premisesare also recoverable fromme and my properties under the provisionsof the Revenue Recovery Act, in force at the time ofsuch recovery, or by such other proceedings as the Licenseemay deem fit to initiate.

I hold myselfanswerable to costsof such recoveries and proceedings also.

Place:Date:Witnessee:-1)2)

Signatureof lessee/ tenant / occupier