james walker, oregon shakespeare festival andrew recinos ... · james walker, oregon shakespeare...
TRANSCRIPT
![Page 1: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/1.jpg)
James Walker, Oregon Shakespeare Festival
Andrew Recinos, Tessitura Network
Ravi Ranjan, Tessitura Network
![Page 2: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/2.jpg)
About Us
James Ravi Andrew
![Page 3: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/3.jpg)
Agenda
Brief overview of Agile Methodology
Key concepts enacted – from ticketing perspective
Summary of take-aways and resources
![Page 4: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/4.jpg)
Brief Agile Overview
“Agile is the best kept
management secret on the planet”
- Forbes Magazine
![Page 5: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/5.jpg)
How Technology Projects Traditionally Work
Figure out what you
want to do
Create detailed
specification
Do all the work to
complete the project
Do all the testing
Go live with everything!
![Page 6: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/6.jpg)
Waterfall Project
![Page 7: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/7.jpg)
Fake Example of a Waterfall Project
Figure out what you
want to do
Create detailed
specification
Do all the work to
complete the project
Do all the testing
Go live with everything!
![Page 8: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/8.jpg)
Figure out what you
want to do
Let’s build a highly-addictive
geometric video game!
![Page 9: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/9.jpg)
Create detailed
specification
Perfect from the start! No detail left out!
![Page 10: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/10.jpg)
Do all the work to
complete the project
Hi nerds! Tell us when it’s done and awesome!
![Page 11: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/11.jpg)
Do all the testing
Now that’s done, let’s see it!
![Page 12: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/12.jpg)
Go live with everything!
Everything is perfect!
![Page 13: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/13.jpg)
Benefits of Waterfall Projects
All requirements known in detail from the start
No opportunity for scope to change
Completed product is unveiled at the end of the project
![Page 14: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/14.jpg)
Problems with Waterfall Projects
All requirements must be known in detail from the start
No opportunity for scope to change
Completed product is unveiled at the end of the project
![Page 15: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/15.jpg)
Problems with Waterfall Projects
All requirements must be known in detail from the start
No opportunity for scope to change means that mid-project
change is difficult and costly
Completed product is unveiled at the end of the project
![Page 16: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/16.jpg)
Problems with Waterfall Projects
All requirements must be known in detail from the start
No opportunity for scope to change means that mid-project
change is difficult and costly
Completed product is unveiled at the end of the project
meaning that users/stakeholders have little or no opportunity
for feedback
![Page 17: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/17.jpg)
What is more likely…
January:
Let’s build a video game!
February:
Totally detailed
specifications
Mar – Aug: developers go
away and build to spec
![Page 18: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/18.jpg)
What is more likely…
January:
Let’s build a video game!
February:
Totally detailed specs
Mar – Nov: developers go away and build to
spec
testing
Go
Live?
This is the first time
many of the
stakeholders or
users see the
“finished product”
And – oh no! there
are major changes!
And this late in the game,
either the changes can’t
happen, will be hugely
costly or will delay the go-
live!
Development takes
longer than
expected
Testing is rushed!
![Page 19: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/19.jpg)
Where it ends up
Finger-pointing and recrimination
More processes, policies, documentation
Major changes kill the timeline and the budget
![Page 20: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/20.jpg)
A New Way of Thinking…
![Page 21: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/21.jpg)
Manifesto for Agile Software Development
We are uncovering better ways of developing software by doing it
and helping others do it. Through this work we have come to value:
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
![Page 22: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/22.jpg)
Individuals and interactions over processes and tools
January: Let’s build a video
game!
February:
Totally detailed
specifications
Mar – Aug: developers go
away and build to spec
Sep – Oct:
extensive testing
November:
Go-live!
Decision
Makers Builders Users
![Page 23: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/23.jpg)
Working software over comprehensive documentation
January: Let’s build a video
game!
February:
Totally detailed
specifications
Mar – Aug: developers go
away and build to spec
Sep – Oct:
extensive testing
November:
Go-live!
Comprehensive
Documentation
Software not ready or visible
until end of the project
![Page 24: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/24.jpg)
Responding to change over following a plan
January: Let’s build a video
game!
February:
Totally detailed
specifications
Mar – Aug: developers go
away and build to spec
Sep – Oct:
extensive testing
November:
Go-live!
If testing isn’t
happening until now,
hard to respond to
change
![Page 25: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/25.jpg)
So – let’s do this Agile…
![Page 26: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/26.jpg)
1. Break project into short, complete cycles
2. Focus on outcomes instead of output
3. Make work visible and transparent
4. Track progress
5. Embrace change
6. Eliminate waste
7. Let teams self organize for best results
8. Inspect & adapt
![Page 27: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/27.jpg)
Figure out what you
want to do
Let’s build a highly-addictive
geometric video game!
(still a good way to start)
![Page 28: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/28.jpg)
Create broad specification
(not a detailed specification)
![Page 29: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/29.jpg)
Prioritize
![Page 30: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/30.jpg)
Break into Releases
Release Three
1. Ability to play against friends on FB
![Page 31: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/31.jpg)
Choose small chunk of
work
(something you can accomplish in a few weeks)
![Page 32: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/32.jpg)
Fill in details
Shapes should fall from the top
Mouse can
control
position as
it falls
When it
lands, next
SQUARE
starts
(just for the work you plan to do now)
![Page 33: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/33.jpg)
Do just that small chunk
of work
![Page 34: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/34.jpg)
Thoroughly test just that
chunk of work
(testing as you go, rather than all at the end)
![Page 35: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/35.jpg)
Release-ready code
(live software in front of some users after 2 weeks rather than all at the end)
![Page 36: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/36.jpg)
Return to your list and
repeat
(if things have changed in the past two weeks, there is time to adjust to change)
![Page 37: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/37.jpg)
Analyze: Here are details for dropping a square
Develop: Code dropping a square
Test Dropping a Square
Dropping a Square is Release ready
Now more shapes!
![Page 38: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/38.jpg)
January November
January: Let’s build a video
game!
February:
Totally detailed
specifications
Mar – Aug: developers go
away and build to spec
Sep – Oct:
extensive testing
November:
Go-live!
Waterfall
![Page 39: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/39.jpg)
January November
Analyze
Develop
Test
Release ready
Prioritize Analyze
Develop
Test
Release ready
Prioritize Analyze
Develop
Test
Release ready
Prioritize
Pieces Dropping Piece Rotation Scoring
Agile
![Page 40: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/40.jpg)
In Summary
Waterfall Agile
Everything decided up front vs. Main ideas up-front, details later
All work delivered at the end vs. Work delivered continuously
Massive testing at the end vs. Testing throughout
User feedback late in game vs. User feedback throughout
Many risks left to the end vs. Risks uncovered throughout
![Page 41: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/41.jpg)
Let’s Look at Agile
OUTSIDE of Software Development
![Page 42: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/42.jpg)
How this will run
Introduce a scenario from the ticketing world
Discuss key agile concepts that could be used
Act out the concepts
Discuss
![Page 43: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/43.jpg)
Beck Arena
• Premiere multi purpose
venue
• 18,576 seats
• Hockey, basketball,
Moto-X
• Bieber, Elton John,
Metallica
![Page 44: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/44.jpg)
Monsters of Rock
We need to put the concerts on sale and fulfill ticket distribution.
1 Smashing
Pumpkins
March 7, 8 ,9
2 Radiohead March 19, 20,
21
3 The Tessiturians April 11, 12, 13
![Page 45: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/45.jpg)
Assumptions
Beck Arena has:
o an existing ecommerce website o ‘print at home’ with access control
o a 15 window box office
![Page 46: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/46.jpg)
Out of Scope
Beck Arena has:
o all stage, production and artist requirements
o event security
o Event marketing (excluding web content)
o social & digital media
![Page 47: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/47.jpg)
Create a Vision
“Have a successful on sale and fulfill ticket distribution of the Monsters of Rock Series.”
![Page 48: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/48.jpg)
Break The Vision Into Broad Specifications
o Let’s call them ‘Epics’
o Very high level
o Placeholders
![Page 49: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/49.jpg)
Create broad specification
(not a detailed specification)
Remember this?
![Page 50: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/50.jpg)
Role Play: Epic Story Creation
![Page 51: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/51.jpg)
![Page 52: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/52.jpg)
Now we need to prioritize our items…
o Collaborate
o Strategize at a high level
o Build a roadmap
![Page 53: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/53.jpg)
Role Play: Roadmap Creation
![Page 54: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/54.jpg)
1. Pricing and Fees
2. Seating Maps
3. System - Event Setup
4. Anti-fraud & Scalping
5. Event Reporting
6. Schedule Staff
7. Website Content
8. Facebook Sales
1st
2nd
3rd
4th
![Page 55: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/55.jpg)
Break It Down… User Stories
o A small unit of work o Smaller pieces of a larger epic
o Usually written from the perspective of the
person needing the item
![Page 56: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/56.jpg)
![Page 57: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/57.jpg)
Role Play: User Story Creation
![Page 58: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/58.jpg)
User Stories
example
![Page 59: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/59.jpg)
![Page 60: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/60.jpg)
![Page 61: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/61.jpg)
Releases Summary
Release 1 Release 2 Release 3 Release 4
Pricing and
Fees
Seating Maps
System – Event
Setup
Anti-fraud &
Scalping
Event Reporting Schedule Staff
Website
Content
Facebook Sales
![Page 62: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/62.jpg)
Planning a release
Release One (6 Weeks)
Iteration 1
2 Weeks
Iteration 2 Iteration 3
2 Weeks 2 Weeks
![Page 63: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/63.jpg)
Planning a release
Release One (6 Weeks)
Iteration 1
2 Weeks
Iteration 2 Iteration 3
2 Weeks 2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
![Page 64: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/64.jpg)
Role Play : Release Planning
![Page 65: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/65.jpg)
Planning a release – 2
Release One
Iteration 1 Iteration 2 Iteration 3
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
As a marketer, I want a top
ticket price under $300,
because our market is price
sensitive.
As a promoter, I want 15% of
the face value of the ticket, to
cover promotional costs.
As a facility manager, I want a
$5 per ticket maintenance
fee, to ensure the facility is
kept in top shape.
As a presenter, I want 75% of
the face value of the ticket to
a sold capacity of 90%, to
ensure we make a profit.
As a marketer, I want a scaled
house, to ensure we optimize
our revenue.
As a box office manager, I
want a processing fee of $7
per ticket, to cover handling
costs.
![Page 66: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/66.jpg)
Iteration Planning
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
![Page 67: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/67.jpg)
Role Play: Iteration Planning
![Page 68: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/68.jpg)
Iteration 1 : Day 1
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
![Page 69: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/69.jpg)
Role Play: A Day on the Project
![Page 70: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/70.jpg)
Iteration 1 : Day 1
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
Andrew
James
![Page 71: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/71.jpg)
Iteration 1 : Day N
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
Andrew
James
![Page 72: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/72.jpg)
Iteration 1 : Day 10
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
Andrew
James
![Page 73: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/73.jpg)
Retrospective – Prime Directive
Regardless of what we discover,
We understand and truly believe that everyone did the best job he or she could,
given what was known at the time,
his or her skills and abilities,
the resources available,
and the situation at hand.
![Page 74: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/74.jpg)
Retrospective : the three questions
What went well?
What could have gone better?
What is puzzling us?
Action Items
Clearly Defined actionable items
Assign responsibility
Check status of action items from last retrospective
![Page 75: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/75.jpg)
Role Play: Retrospective
![Page 76: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/76.jpg)
Iteration 2 : Day 1
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
Andrew
James
As a marketer, I want a top
ticket price under $300,
because our market is price
sensitive.
As a promoter, I want 15% of
the face value of the ticket, to
cover promotional costs.
As a facility manager, I want a
$5 per ticket maintenance
fee, to ensure the facility is
kept in top shape.
As a presenter, I want 75% of
the face value of the ticket to
a sold capacity of 90%, to
ensure we make a profit.
![Page 77: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/77.jpg)
Iteration 2 : Day 1
Release One
Iteration 1
2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Card Wall
To Do In Progress Done
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
James
As a marketer, I want a top
ticket price under $300,
because our market is price
sensitive.
As a promoter, I want 15% of
the face value of the ticket, to
cover promotional costs.
As a facility manager, I want a
$5 per ticket maintenance
fee, to ensure the facility is
kept in top shape.
As a presenter, I want 75% of
the face value of the ticket to
a sold capacity of 90%, to
ensure we make a profit.
Andrew
![Page 78: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/78.jpg)
Release Summary - Stories
Release One
Iteration 1 Iteration 2 Iteration 3
As a web manager, I want a
$5 per ticket processing fee,
to cover our processing costs.
As a box office manager, I
want a maximum of 5 fees. to
help ensure smooth
reconciliation
As a marketer, I want a bottom
ticket price of $50, to ensure
we make a profit.
As a web manager, I want to
eliminate the handling fee for
print at home tickets, to
encourage web sales.
As a marketer, I want a top
ticket price under $300,
because our market is price
sensitive.
As a promoter, I want 15% of
the face value of the ticket, to
cover promotional costs.
As a facility manager, I want a
$5 per ticket maintenance
fee, to ensure the facility is
kept in top shape.
As a presenter, I want 75% of
the face value of the ticket to
a sold capacity of 90%, to
ensure we make a profit.
As a marketer, I want a scaled
house, to ensure we optimize
our revenue.
As a box office manager, I
want a processing fee of $7
per ticket, to cover handling
costs.
![Page 79: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/79.jpg)
Release Summary - Iterations
Release One (6 Weeks)
Iteration 1
2 Weeks
Iteration 2 Iteration 3
2 Weeks 2 Weeks
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
Day 1 : IPM Iteration Planning
Meeting
Day 10 :
Retrospective
Everyday : Daily
Standup
![Page 80: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/80.jpg)
Releases Summary
Release 1 Release 2 Release 3 Release 4
Pricing and
Fees
Seating Maps
System – Event
Setup
Anti-fraud &
Scalping
Event Reporting Schedule Staff
Website
Content
Facebook Sales
![Page 81: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/81.jpg)
Summary
1. Break project into short, complete cycles
Releases, Iterations, Epic Stories, User Stories
2. Focus on outcomes instead of output
Prioritize, Delivery stories with maximum user value first
3. Make work visible and transparent
Card Wall, Daily Standup, Retrospective
4. Track progress
Release Planning, Iteration Planning, Card Wall
![Page 82: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/82.jpg)
Summary
5. Embrace change
All phases are open for modification, (Release Planning, Iteration Planning, Daily Standup)
6. Eliminate waste
Identify blocks at daily standup, retrospective and iteration planning
7. Let teams self organize for best results
Card signup at standup
8. Inspect & adapt
Retrospective, Daily Standup, Iteration Planning
![Page 83: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/83.jpg)
Using Agile Tomorrow
Try a retrospective as a routine part of your process (every two weeks, one a
month, etc.)
Try daily standups (a refreshing way to rethink the “daily check in meeting”)
Invite stakeholders/interested parties into your planning meetings
Start a project with broad brush-strokes and don’t get hung up on details until
you have to
![Page 84: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/84.jpg)
Questions?
![Page 85: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About](https://reader031.vdocuments.net/reader031/viewer/2022020317/5bafa8fd09d3f2a8728c5666/html5/thumbnails/85.jpg)
References
The Wall Street Journal recently posted on how modern families are using agile to improve communication within the family.
http://online.wsj.com/news/articles/SB10001424127887323452204578288192043905634
NPR has written about how they are using agile to reduce the costs of their programming by up to 66%.
http://www.innovation-series.com/2013/10/23/nprs-gone-agile-even-their-newsroom/
Here’s a recent TED talk about again, using agile in the family.
http://www.ted.com/talks/bruce_feiler_agile_programming_for_your_family.html
The Director of Marketing for REI recently published a video talking about how they use agile for marketing at REI.
http://moz.com/blog/agile-marketing-whiteboard-friday
http://www.cmo.com/content/cmo-com/home/articles/2013/2/14/agile_marketing_is_m.html
Finally, there was a recent article on Forbes about how agile is the “best kept management secret on the planet”.
http://www.forbes.com/sites/stevedenning/2012/04/09/the-best-kept-management-secret-on-the-planet-agile/