On 28th January 2021, there was Boots onGround - Management audit sessionconducted by Mr Bahtiar and Mr Nazrul Afiqfrom HSSE Department at Shell NTI SLEEast, under NTI Program.
The audit start with PH from EnotekEngineering Sdn Bhd Mr Mohammad Ainbriefed all the visitor about the siteinformation, emergency response plan,work activities and related hazard of theday. The audit conducted at work area ofexecution work to monitor and evaluate theHSSE compliances as per Shell, Meinhardtand Enotek requirements.
At the end of the audit, all the finding,recommendation, and challenges facedduring the project execution was discussedto ensure project run smoothly without anyissue or incident.
Health Safety Security Environmental & Quality Control
January 2021
POOR ISOLATION
HOUSEKEEPING
ELECTRICAL
7
5
3
11,194 536NMPIAUDITHOURS
HSSE – 5
PROJECT – 1
QAQC - 0
11,194
YTD
6HSSE – 5
PROJECT – 1
QAQC - 053
YTD YTD
JANUARY 2021ENOTEK BULLETIN
Site safety supervisor initially brief the WAH application and requirements at Shell NTI Jalan Kapar
12 LSR (R) TRAININGTRAINING PROGRAMS ,
12 LSR & SCAFFOLDING ERECTION COACHINGCOACHING PROGRAMS - SHELL NTI JLN KAPAR
Reflect to WAH stand down from
CBRE, Enotek SH NTI Jalan Kapar site
team triggered to educate and coach site
worker especially to frontliner who are
eligible to do WAH that been trained on
WAH previously. It is to ensure no repeated
mistake or unsafe condition/unsafe act been
occurred at this site as per shared by CBRE.
This coaching session are more to, on how
to erect and dismantle and meaning of
scaffold tagging. Chronology and sequence
of related 12 Life Saving Rules been
elaborated and share to worker which is to
focus on wearing full body harness when working at 1.8m
height. 3 categories of fall factor and recommended
method on how to hook full body harness been share, to
ensure if worker fell, low impact and not been hit by others
object due to pendulum effect.
At the end of the sharing session, presenter from HSSE
personnel had conducted Q&A session, and re-train worker
on all 12 LSR based on execution work at site. Next, all
attendees are understood the input from the coaching
session and can relate to execution work at site.
JANUARY 2021ENOTEK BULLETIN
On January 2021, Shell NTI SLE
East had conducted Blueboard
Gamification Session to site workers.
Pictorial and gamification concept been
use to increase knowledge and capability
of worker on managing hazards from
related activity, preventive barrier,
recovery barrier and consequences. It is
to ensure worker get clear picture and are
capable to relate the preventive and
recovery barrier during execution. At the
end of session, worker understand and
enjoy the way of coaching with using Blue
Board.
Site safety supervisor initially brief the blue board concept to worker at Shell NTI SLE East
BLUEBOARD GAMIFICATION SESSIONCOACHING PROGRAMS - SHELL SLE JOHOR
HIERARCHY OF FALL PROTECTIONSAFETY CORNER,
1 2 3 4 5HAZARD
ELIMINATION
FALL RESTRAINT
SYSTEM
PASSIVE FALL
PROTECTION
FALL ARREST
SYSTEM
ADMINISTRATIVE
CONTROL
Preferred
solution is to
eliminate the fall
hazard
Physical barriers,
like guardrails
around
unprotected edge
Use PPE to
restrict workers
range of
movement
Design for
situation where
exposure to a fall
is not
preventable
Least preferred
solution is work
procedure that
increase a worker
awareness of fall
hazard
JANUARY 2021ENOTEK BULLETIN
Quality
FORMWORK DEFINATION
Formwork is the term used for the process of creating a
temporary mold into which concrete is poured and formed.
FORMWORK SPECIFICATION
The formwork sides must be capable of resisting the hydrostatic
pressure of the wet concrete which will diminish to zero within several
hours depending on the rate of setting and curing. The formwork base
or soffit must be capable of resisting the initial dead load of the
wet concrete and the dead load of the dry set concrete.
ELEMENT STRUCTURE USE
1. Beam
2. ColumnInstallation of capping beam using method formwork before casting
SHARING BYGOOD FORMWORK• Strong enough to withstand dead and live loads.
• Capable of retaining its shape by being efficiently propped and
braced horizontally and vertically.
• Joints should prevent leakage of cement grout.
• Should be capable of being removed in various parts without
damaging the concrete.
• Material used be suitable for reuse.
• Should be set accurately to the desired line.
• As lightweight as possible.
• Material should not warp or distort on exposure to the elements.
• Should rest on a firm base.
HANAFI ROSLAN
QAQC Exec
FIRDAUS RAMLAN
QAQC Lead
JANUARY 2021ENOTEK BULLETIN
QAQC CHECKLISTCOACHING PROGRAM & SHARING
PROGRESS INSPECTIONJOINT INSPECTION WITH SITE PIC & FRONTLINER
In January 2021, ENOTEK QAQC
Department running an awareness campaign to
front liner in order to increase the quality of
work in project . The main objective of program
is to alert the site person about important and
awareness of QAQC which is to assure
the quality of a product, and quality control, the
process of ensuring products
and services meet consumer expectations.
In this session , coaching has been conducted to Site PIC
about the QAQC checklist related to the program which is
change opinion about work progress quality and how to
inspect progress in the field.
During the field inspection, Q&A also implement to ensure
Site PIC understand the related item to check.
The aim of this coaching is to close the gap and
standardise the inspection of site progress to meet the
procedure and expectation