jc-360-mechanical equipment schedule for electrical panel(20!04!12)-rev1

2
1 of 2 PROJECT: AMBULATORY HEALTHCARE CENTRE REVISION MAIN CONTRACTOR: CPC DATE: 1 MEP CONTRACTOR: VERGER ET DELPORTE STARTER PANEL Motor Electric heater Interface BMS AL YAHAR 1 AHU-3 (Supply Fan) Single 3.8 5.5 VFD - - - - - YES TOP TOP 54 2 AHU-3 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES 3 AHU-4 (Supply Fan) Single 9.2 11 VFD - - - - - YES TOP TOP 54 4 AHU-4 (Electric Heater) - 8 - 3 2.7 2.7 2.7 - YES 5 AHU-5 (Supply Fan) Single 6.1 7.5 VFD - - - - - YES TOP TOP 54 6 AHU-5 (Electric Heater) - 6 - 3 2 2 2 - YES 7 AHU-6 (Supply Fan) Single 4.6 5.5 VFD - - - - - YES TOP TOP 54 8 AHU-6 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES 9 AHU-7 (Supply Fan) Single 3.8 5.5 VFD - - - - - YES TOP TOP 54 10 AHU-7 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES 11 AHU-8 (Supply Fan) Single 3.6 5.5 VFD - - - - - YES TOP TOP 54 12 AHU-8 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES 13 AHU-9 (Supply Fan) Single 4.5 5.5 VFD - - - - - YES TOP TOP 54 14 AHU-9 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES 15 AHU-10 (Supply Fan) Single 6.9 9.2 VFD - - - - - YES TOP TOP 54 16 HU-10 (Electric Heater - 6 - 3 2 2 2 - YES EXF-21A TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP 10 EXF-21B TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP 11 CHWP-1 Single 11 FULL - - - - - YES TOP TOP 54 12 CHWP-2 Single 11 FULL - - - - - YES TOP TOP 54 13 CHWP-3 Single 11 FULL - - - - - YES TOP TOP 54 SWEIHAN 1 EXF-14 TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP 2 EXF-15A TWIN 0.588 - - - - YES - BOTTOM BOTTOM GRP 3 EXF-15B TWIN 0.588 - - - - YES - BOTTOM BOTTOM GRP Note Final Electrical Load shall be based on approved equipments details. SL. No. Equipment Reference Motor Input Power (Kw) Installe dPower (Kw) Motor Speed Cable Entry Cable Out IP Ratin g No. Stages Stage -1 (KW) Stage -2 (KW) Stage -3 (KW) Fire Alarm (1- DUTY / 1-STANBY) (1- DUTY / 1-STANBY) (1- DUTY / 1-STANBY) (1- DUTY / 1-STANBY) (1- DUTY / 1-STANBY)

Upload: rommel-duran

Post on 25-Aug-2014

43 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jc-360-Mechanical Equipment Schedule for Electrical Panel(20!04!12)-Rev1

1 of 1

PROJECT: AMBULATORY HEALTHCARE CENTRE REVISION 1MAIN CONTRACTOR: CPC DATE: 15/April/2012MEP CONTRACTOR: VERGER ET DELPORTE

STARTER PANEL

Equipment Reference MotorElectric heater Interface

BMS

AL YAHAR

1 AHU-3 (Supply Fan) Single 3.8 5.5 VFD - - - - - YES TOP TOP 54 Form 2

2 AHU-3 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES

3 AHU-4 (Supply Fan) Single 9.2 11 VFD - - - - - YES TOP TOP 54 Form 2

4 AHU-4 (Electric Heater) - 8 - 3 2.7 2.7 2.7 - YES

5 AHU-5 (Supply Fan) Single 6.1 7.5 VFD - - - - - YES TOP TOP 54 Form 2

6 AHU-5 (Electric Heater) - 6 - 3 2 2 2 - YES

7 AHU-6 (Supply Fan) Single 4.6 5.5 VFD - - - - - YES TOP TOP 54 Form 2

8 AHU-6 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES

9 AHU-7 (Supply Fan) Single 3.8 5.5 VFD - - - - - YES TOP TOP 54 Form 2

10 AHU-7 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES

11 AHU-8 (Supply Fan) Single 3.6 5.5 VFD - - - - - YES TOP TOP 54 Form 2

12 AHU-8 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES

13 AHU-9 (Supply Fan) Single 4.5 5.5 VFD - - - - - YES TOP TOP 54 Form 2

14 AHU-9 (Electric Heater) - 5 - 3 1.7 1.7 1.7 - YES

15 AHU-10 (Supply Fan) Single 6.9 9.2 VFD - - - - - YES TOP TOP 54 Form 2

16 AHU-10 (Electric Heater) - 6 - 3 2 2 2 - YES

EXF-21A TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP -

10 EXF-21B TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP -

11 CHWP-1 Single 11 FULL - - - - - YES TOP TOP 54 Form 4 EMCC-1

12 CHWP-2 Single 11 FULL - - - - - YES TOP TOP 54 Form 4 EMCC-1

13 CHWP-3 Single 11 FULL - - - - - YES TOP TOP 54 Form 4 EMCC-1

SWEIHAN

1 EXF-14 TWIN 0.737 - - - - YES - BOTTOM BOTTOM GRP - -

2 EXF-15A TWIN 0.588 - - - - YES - BOTTOM BOTTOM GRP - -

3 EXF-15B TWIN 0.588 - - - - YES - BOTTOM BOTTOM GRP - -

Note: Final Electrical Load shall be based on approved equipments details.

SL.No.

Motor Input

Power (Kw)

InstalledPower (Kw)

Motor Speed

Cable Entry

Cable Out

IP Rating

Panel TypeNo.

StagesStage-1 (KW)

Stage-2 (KW)

Stage-3 (KW)

Fire Alarm

FULL (1-DUTY / 1-STANBY)

FULL (1-DUTY / 1-STANBY)

FULL (1-DUTY / 1-STANBY)

FULL (1-DUTY / 1-STANBY)

FULL (1-DUTY / 1-STANBY)