  • 8/10/2019 JHA Valve Leak Test and Repair

    1/16

    Work Order No.:90008313

    Revision: 0

    Work Order Description:

    Summary of Scope:

    Specific Requirements:

    Schedule:

    Prepared by:

    Job Hazard Analysis Form

    Review Required By:

    30HICA-102 Valve leak test and repair

    Work Order Details:

    Non stock Material

    Crane Required

    Permit Required Work Order Only

    Shipping

    External Resources

    Shutdown

    Isolation Required

    Potential Clash with Other Activities

  • 8/10/2019 JHA Valve Leak Test and Repair

    2/16

    Work Order No.: 90008313 Revision: 0

    Work Order Description:

    i. Isolation

    1. Schedule Control Sheet

    2. Gant chart of work order operations schedule

    c. Task Risk Assessment

    d. Certificates (As Applicable)

    IPS Rejuvenation Project Work Pack

    Index:

    30HICA-102 Valve leak test and repair

    Work Order Details:

    3. Photographs of Equipment / Work Site

    4. Work Site Controls

    a. Permit to Work

    b. Job Hazard Analysis Sheet

  • 8/10/2019 JHA Valve Leak Test and Repair

    3/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action

    Erect scaffolding Shifting / Mobilize ofScaffolding Material

    Injury to personnel. Scaffoldingcontractorstaff

    2 C low

    #Secure the materialwhile shifting onvehicle or trolley.

    # Shifting of thescaffold clamps fromground level to topplatform through liftingbag with secured ropeonly.# Ensure that shiftingof the scffolding pipeby one person at a timeon one staircase.

    Civil supand Jobsuperviso

    Un-inspectedscaffolding material

    Injury to personnel adjacentwork groups

    3 C-Incidenthas

    medium

    # Ensure that allscaffolding material isbeing inspected andtested by SMDS. ( civil)

    Civil supand Jobsuperviso

    Fal ling object Injury to personnel adjacentwork groups

    4 C medium

    # Use basket orappropriate bag fortransporting smallitems to / from height.

    Civil supand Jobsuperviso

    Injury to personnel adjacentwork groups

    4 C medium

    # Ensure items to behoisted up or down areproperly rigged and

    Civil supand Jobsuperviso

    Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

  • 8/10/2019 JHA Valve Leak Test and Repair

    4/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Inappropriate methodof erection

    Collapse of Scaffolding Any staffworking on

    the platform

    1 D

    low

    # Ensure thescaffolding supervisoris present during time

    of erection.# Ensurethat scaffolding isbeing erected as perthe work requirement.# Ensure thatscaffolding is "fit forpurpose"

    Civil supand Jobsuperviso

    Non compliance of theprocedure

    Injury to Personnel Any staffworking on

    the platform

    4 c mediu

    m

    # Follow the standardprodedure of erection

    of scaffolding and workat height.

    Civil supand Job

    superviso

    Fall from height Injury to personnel Scaffoldingcontractorstaff /Companystaff

    3 D medium

    # Ensure the use ofthree point contactswhile using the ladder.

    Civil supand Jobsuperviso

    Un-inspected scaffold. Injury to personnel Scaffoldingcontractorstaff /Company

    staff

    3 D medium

    # Check and confirmthat scaffolding iscertified safe foraccess. Green tag (

    Safe to use tag to bedis la

    Civil supand Jobsuperviso

    Foul weather Injury to personnel. ALL STAFF 2 C low

    # Stop the workimmediately.

    Civil supand Jobsuperviso

  • 8/10/2019 JHA Valve Leak Test and Repair

    5/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Short circuit Damage to property 2 C

    low

    # Ensure that cable isisolated frommarshelling rack.

    Instrumensupervisoinstrumen

    contractoRemoval of heat tracing (EHT) Live electrical cables Electrocution Electrical

    contractor 4 B me

    dium

    # Ensure a valid permitto work is obtained forthe job .#Ensure electrical heattracing has beenisolated# Ensure usage ofproper PPEs for the

    job.

    MME/53

    Unbolting Trap pressure/ Overexertion

    Injury to personnel Mechanicalcontractorstaff

    2 C-Incidenthasoccur redin

    company

    low

    # Ensure no trappressure is in system.# Check and ensureright tools are used.# Check and ensurethe distance betweenthe work platform andwork is appropriate(sufficient reach).# Ensure the follow up

    of " Bolting procedure".

    Job super

    l & d h i l ff h i l 3 C l h k

  • 8/10/2019 JHA Valve Leak Test and Repair

    6/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Offset centre gravity Damage of propertyand Injury to personnel

    Mechanicalcontractorstaff/

    companystaff

    3 c

    medium

    # Ensure the operationis carried out in a well-coordinated manner.

    # Ensure onlyexperienced craneoperator is used orunder closesupervision.# Ensure the crane isadjusted such that itscenter of gravity isdirectly below the hookused.# Ensure the liftingplan is placed andfollowed properly.

    MechanicsupervisoJob Supe

    Uncontrolled liftingopearation

    Damage of propertyand Injury to personnel

    Mechanicalcontractorstaff/companystaff

    3 D

    medium

    # Check and ensure aqualified liftingsupervisor is on site tosupervise theoperation.

    MechanicsupervisoJob Supe

    Failure of cranne Delay to operation.Injury to personnel.Damage to property

    Mechanicalcontractorstaff/companystaff

    3 D

    medium

    # Check and ensurethe crane used hasvalid certificate.# Check and ensureall safety devices of thecrane are functioning.# Check and ensure

    MecchansupervisoJob Supe

  • 8/10/2019 JHA Valve Leak Test and Repair

    7/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Swinging of load Damage of propertyand Injury to personnel

    Mechanicalcontractorstaff/

    companystaff

    3 D

    medium

    # Check and ensureonly qualified craneoperator is used.

    # Use tag lines tocontrol the load.# Ensure that area isbarricaded and signageposted to preventaccess to unauthorisedpersonnel.

    MecchansupervisoJob Supe

    and Craneoperator asignal maqualified

    Communicationbreakdown

    Damage of propertyand Injury to personnel

    Mechanicalcontractorstaff/companystaff

    3 D medium

    # Ensure only oneauthorized liftingsupervisor is givinginstructions.# Use walkie-talkie forverbal communication(language used mustbe understood by allparties involved).# Check and ensureonly qualifiedsignalman is used forgiving signals.

    # Perform a pre-jobsafety briefing to allinvolved.

    MecchansupervisoJob Supeand Craneoperator asignal maqualified

    l h b l h ll ff l h l f h

  • 8/10/2019 JHA Valve Leak Test and Repair

    8/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    Action Job Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Transport to workshop Hit by truck, Forklift Injury to personnel ordamage of property

    Mechanicalcontractorstaff /

    Adjacentwork group.

    3 D-Happ

    ens

    sever al

    timesperyearina

    Company

    Medium

    #Check with the personin charge of the routeto be used and road

    closures if any.# Check and ensurethe work areas arebarricaded.#Use signal man as

    and when required.#Check and ensurepersonnel are wellclear of moving truck orforklift.# Ensure during liftingand road transportationin internal process roadshall be guided byoperation.

    Mechanic job superLogistic

    coordinat

    Fire hazard due tospark from vehicle

    Injury to personnel ordamage of property

    Mechanicalcontractorstaff / Adjacent workgroup.

    5 C medium

    # Ensure gas testing isconducted by AGTprior to entry in processroad.

    Mechanic job super

    Un-inspected vehicleentry

    Injury to personnel ordamage of property

    Mechanicalcontractor

    5 B mediu

    # Ensure the vehiclehas been inspected by

    Mechanic job super

  • 8/10/2019 JHA Valve Leak Test and Repair

    9/16

    0

    Barriers

    Hazard Description &Effect

    Hazard / RiskConsequence

    Description

    Populationat Risk

    S e v e r i

    t y

    L i k e

    l i h o o

    d

    R i s k

    R a

    t i n g

    List all controlsRequired

    ActioJob Steps

    90008313 REVISION:

    HAZARD NITIAL RIS

    Majang, Michael Chai, Rudy, Paul Asam

    TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

    WORK ORDER DESCRIPTION:

    GROUP MEMBERS:

    30HICA-102 Valve leak test and repair WORK ORDER NUMBER:

    Falling the blind /bolts/tools

    Injury to personnel Mechanicalstaff andcontractor

    staff

    3

    C-Incide

    nthas

    occur redincompan

    medium

    #Ensure the tools aresecured.#Barricade the

    underneath area ifwork at height is inprogress.# Ensure the grating iscovered withTarpouline to preventthe falling object.

    Mechansupervisupervi

    Install heat tracing (EHT) Live electrical cables Electrocution Electricalcontractor

    4 B medium

    # Ensure a valid permitto work is obtained forthe job .#Ensure electrical heattracing has beenisolated# Ensure usage ofproper PPEs for the

    job.

    MME/5

    Install back instrument parts # Seprate procedurecover the risk

    Install insulation # Please follow theabove the " Removal of

    job supe

  • 8/10/2019 JHA Valve Leak Test and Repair

    10/16

    Work Order No.: Revision: 0

    Work Order Description:

    IPS Rejuvenation Project Work Pack

    Description Of Equipment As Found:

    30HICA-102 Valve leak test and repair

    Activities Performed:

    Equipment / Materials Used:

    Testing / Calibration Results:

    Work Order History:

    90008313

  • 8/10/2019 JHA Valve Leak Test and Repair

    11/16

    1. Work Order No.:

    2. Work Order Description:

    90008313

    - attached?

    - sufficient and correct?

    6. Is the Shutdown Code correct?

    7. Is the Responsibility Code correct?

    Routine Work Order Validation Sheet

    Note: Complete required information

    30HICA-102 Valve leak test and repair

    4. Are Tag Numbers referenced and correct?

    5. Procedure - required?

    3. Is Description adequate?

    8. Are additional resources required - e.g. Specialist?

  • 8/10/2019 JHA Valve Leak Test and Repair

    12/16

  • 8/10/2019 JHA Valve Leak Test and Repair

    13/16

    A B C

    0 No healtheffect/injury No damage No Effect No impact 0A 0B 0C

    1Slight healtheffect/injury

    Slight Damage Slight Effect Slight impact 1A 1B 1C

    2 Minor healtheffect/injury

    Minor Damage Minor Effect Minor impact 2A 2B 2C

    3Major healtheffect/injury

    Localised Damage Localised EffectConsiderable

    impact 3A 3B 3C

    4 PTD* or 1 to 3fatalities

    Major Damage Major Effect National impact 4A 4B 4C

    Risk Assessment Matrix

    S e v e r i t y

    CONSEQUENCE INCREASING LIKELIHOO

    People Asset Environment Reputation Never heard ofin industry

    heard of in industry

    Has happenedin the

    Organizationor more thanonce per yearin the industry

  • 8/10/2019 JHA Valve Leak Test and Repair

    14/16

    0 No injury or health effect 0

    1

    Slight injury or health effects not affecting work performance and not affecting dailylife activities. Examples: First aid cases and medical treatment cases. Exposure tohealth hazards that give rise to noticable discomfort, mild irritation or transient effectsreversible after exposure stops.

    1

    2

    Minor injury or health effects (Lost Time injury) - Affecting work performance, such asrestriction to activities (Restricted Work Case or Occupational Illness) or a need totake a few days to fully recover (Lost W orkday Case). Minor health effects, which arereversible, e.g. skin irritation, food poisoning.

    2

    3

    Major injury or health effects (including Permanent Partial Disability and OccupationalIllness). Affecting work performance in the longer term, such as a prolongedabsence from work. Irreversible health damage without loss of life, e.g. noiseinduced hearing loss chronic back injuries, sensitisation, hand/arm vibrationsyndrome, repetitive strain injury.

    3

    4Permanent Total Disability or one to three fatalities - From an accident oroccupational illness. Irreversible health damage with serious disability or death, e.g.corrosive burns, heat stroke, cancer (small exposed population)

    4

    5Multiple fatalities - From an accident or occupational illness (e.g. chemicalasphyxiation or cancer (large exposed population) 5

    0 Zero damage 0

    1 Slight damage - No disruption to operation (costs less than 10,000) 1

    Ris k A ss es sm en t Mat rix Co ns eq u

    Harm to People E

    Asset Damage and other Consequential Business Losses (100% costs, USD) I

  • 8/10/2019 JHA Valve Leak Test and Repair

    15/16

    2 Minor damage - Brief disruption (costs less than 100,000) 2

    3 Local damage - Partial shutdown (can be restarted but costs up to 1,000,000) 3

    4 Major damage - Partial operation loss (2 weeks shutdown costs up to 10,000,000) 4

    5Extensive damage - Substantial or total loss of operation (costs in excess of10,000,000) 5

    The figures in the tables above should not be combined for deriving the value of a human life!

  • 8/10/2019 JHA Valve Leak Test and Repair

    16/16

    Zero effect - No environmental damage. No financial consequences.

    Slight effect - Slight environment damage, within the fence and within the systems.Negligible financial consequences.

    Minor effect - Sufficiently large contamination or discharge to damage to attack theenvironment, but no lasting effect. Single breaches of statutory or prescribed limit, orsingle complaint.

    Localised effect - Limited discharges affecting the neighbourhood and damaging theenvironment. Repeated breaches of statutory or prescribed limit, or manycomplaints.

    Major effect - Severe environmental damage. The company is required to takeextensive measures to restore the damage environment. Extended breaches ofstatutory or prescribed limit, or widespread nuisance.

    Massive effect - Persistent severe environment damage or severe nuisanceextending over a large area. Loss of commercial, or recreational use or natureconservancy resulting in major financial consequences for the company. Ongoingbreaches well above statutory or prescribed limits.

    Zero effect - No public awareness.

    Slight impact - Public awareness may exist, but there is no public concern.

    ence - Category Definit ion

    vironmental Effect

    pact of Reputation