Project Name
Title
JK Cement
Breakdown Maintenance
Version
Document ID
1.0s
JK_BBP_PM_BP_0500_V1.0
Author Akhilesh Kumar Singh
Reviewed By XXXXXXX XXXXX
Date 01.11.2012
T r a n s f o r m i n g E n t e r p r i s e s
Consulting
-
8/17/2019 JK_BBP_PM_BP_0500
2/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 2 of 9
IMPLEMENTATION_BLUE PRINT
Business Process Details
ModulePlant Maintenance
Process Breakdown Maintenance Sub Process /No
Breakdown Maintenance & Civil Maintenance JK_BBP_PM_BP_050
0
Description Breakdown Maintenance & Civil Maintenance
Sr No Business Process Explanation
1.1 As Is Process General Explanation
1.2 Explanation of Proposed Process
In case of any Break down, Production User/CCR/Maintenance Engrr.generates a Maintenance Notification of Notification type M2. He records theBreak down occurrence time, technical object (Equipment/ Function location)affected, & damage or any kind of observation found. Online information ofBreak down & status of technical object will be available to all.
The maintenance team (Electrical/ Mechanical/Instrumentation) attends thebreak down and records the malfunction end time, causes & activitiesperformed while attending the break down. Here he can also add tasks ifrequired to be performed afterwards, if some temporary arrangements havebeen done.
He creates a maintenance order of Order type PM01 to issue materials/spareparts if required from their local stores. If the material is not available in theirstore a purchase requisition can be made directly from the maintenance order.In operation list of the maintenance order all operation performed, work center
used and man power hour utilization is recorded.
Break down indicator in notification, will be marked if break down occurs.External services can also be utilized from maintenance orderSpare parts planning can be done using Bill of materials.
Actual/planned/estimated cost incurred on attending break down will besummarized with labor & spares cost separately.
Failure analysis can be recorded.
-
8/17/2019 JK_BBP_PM_BP_0500
3/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 3 of 9
Refer flowcharts below:1. General Maintenance process (Internal processing)2. General Maintenance process (External processing both Material &Service)
o
PROCESS FLOW CHARTS1.1.1 General Maintenance Process (Internal processing)
Create Notification(Request for maintenanceby plant user/CCR)
-Description of job-Required Start andEnd times of job
-Technical object no.
-Technical findings-Object part, damageetc. (optional)
-Tasks to perform
Notificationreceipt byMaintenance Dept.
Inspection ofMachine at site bymaint. person
-Enter additional technical
findings and tasks in theNotification.-Release the Notification(Put in process)
Create Maintenance order for the notification(by Maintenance planner)
-Description of order-Technical object details
(transferred from Notification)-Assign Maintenance work
center (transfers automaticallyfrom the technical objectmaster record)
-Plan operations in the orderwith number of personsrequired and work times.
-Plan spare materials with
required quantities-Assign responsible person
X Y
-
8/17/2019 JK_BBP_PM_BP_0500
4/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 4 of 9
Schedule the order(for planned start and end timesdepending upon the availability of
manpower at the Maint. Work center)
Issue s are materials from stores
Execute plannedmaintenance work at site
Completion (time) confirmation(of Maintenance order operations)
Release the order
Y
Inspection of completedwork at site by authorizedperson
Technical CompletionOf Maintenance order(by authorized person)
Settlementof Maintenance order
(by authorized person)
Business completionof Maintenance order
(by authorized person )
Order closed
-Complete the technicalFindings in Notification.
-Complete the tasks
Notification Completion
(by authorized person)
X
-
8/17/2019 JK_BBP_PM_BP_0500
5/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 5 of 9
1.1.2 Maintenance order (External processing)
Create Maintenance order
-Description of order-Technical object details-Plan external service operationinthe order. Enter operation
details-Service description or selectservice from the standard servicecatalog, service quantity & unit,price and vendor (optional).
Schedule the order
1.For Non Stock Materialpurchase requisition is made2.Purchase Order iscreated.
Execute internal processingwork at site, if any
Release the order
Purchase requisition for theexternal service is createdautomatically.
Purchase requisitionreceipt by Purchase Dept.
Create Purchase order
Execution of requestedexternal service by vendor
Create Service Entr sheet
Y
X
-
8/17/2019 JK_BBP_PM_BP_0500
6/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 6 of 9
Notification Processing
Transaction code for creating Maintenance Notification is: IW21Menu path is : Logistics Plant Maintenance Maintenance ProcessingNotification CreateNotification type for are: M2: Malfunction Report
1. Identification of Malfunction by Operation or Maintenance department.2. A Maintenance Notification is created with type M2 in the system depending on
requirement.3. Specifying the Description of the Notification as per the nature of maintenance
request or malfunction.4. Mentioning Object Number and time of request with requisitioner identification in
to the notification screen.5. The initiator of Notification can enter the Technical findings (Object part, Damage
or cause of damage etc) if he knows the details.6. Saves the notification.7. After the job is completed the production person will put the timing of malfunction
end and his identification. 8. Maintenance person has to complete any task assigned to notification and enters
the activities.9. Lastly, the notification has to be completed by the authorized person.
Completion (time) confirmation
(of Maintenance order operations)
Settlement
Business com letion
Confirm/Accept Services(By entering exact quantityof received services in theService Entry sheet by anauthorized person)
Technical Completion
Invoice receipt
Bill payment
Cost
Y
X
-
8/17/2019 JK_BBP_PM_BP_0500
7/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 7 of 9
Order Processing
The transaction code for creating order is IW31.
Menu path : Logistics Plant Maintenance Maintenance ProcessingOrder Create
SrNo.
Activities Description TCode
1 MaintenanceOrder Cycle
Maintenance order is created from the MaintenanceNotification.Planning operations, Labor resource and materials (ifrequired) in the maintenance order.Check Material Availability.Save Maintenance order and note the OrderNumber.
IW31
2 Permits If permits are assigned then those permits has to beissued by the authorized person.
IW32/IPM2
3 PhysicalMaterialWithdrawnfrom Main
Stores
If required material is available in main storesthen the material needs to be withdrawn fromthe store for executing the maintenance activity.
(The Maintenance Planner will not haveauthorization to post Goods issue from mainstores)
MIGO
4 Execution ofMaintenanceWork
Maintenance team will perform the maintenance taskand restore the Object in Ideal condition.Required material (Spares) will get changed.
NA
5 CompletionConfirmation
Confirms the actual duration and man-hours for theindividual operation.Records the measurement readings from completionconfirmation screen.
IW41
6 Completion ofNotification
Using the Notification tab button, updates thecatalogs on notification screen.
IW22
7 Creation of
settlement rule
For other order types the settlement rule is
automatically created, for them rule has to bechecked for its correctness.
IW32
8 TechnicalCompletion ofOrder
After completion of maintenance notification andentry of tech. Findings, measurement readings themaintenance order has to be completed technicallyto prevent further processing
IW32
9 Settlement ofOrder
After completion of all the activities, maintenanceorder carries all the maintenance cost; these have tobe settled to the proper cost receiver (Cost Center). Accounts department will run the settlement of all themaintenance order periodically to settle themaintenance orders.
KO88/KO8G
-
8/17/2019 JK_BBP_PM_BP_0500
8/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 8 of 9
10 BusinessCompletion ofMaintenanceOrder
After settlement of order, the maintenance plannercan close the maintenance order.
IW32
Civil Maintenance: For jobs related to civil maintenance the Plant User will raise
notification of type M1, Maintenance request, for Civil Function locations & alsomentioning the job description required.
The Concerned Civil Planner & Work center will plan for the job in terms ofmaterial & manpower availability.
He will create Order of type PM03 i.e. General maintenance/Request order & getthe material issued.
Remaining all procedures is of same as Break down Maintenance.
1.3 Special Organizational Considerations
None
Sr No Topics3.1 Changes Management Issues
Not Applicable.3.2 Description of Improvements
1. Online information will be available for breakdown and current status of atechnical object.
2. Effective and clear communication of Break down by end user.
SrNo
Gap Analysis
2.1 Gap Identified in proposed solution against Requirements & Expectations
Not applicable
2.2 Impact of Requirement
Not applicable
2.3 Solution Proposed
Not applicable
-
8/17/2019 JK_BBP_PM_BP_0500
9/9
Business Blue Print- Business Process- PlantMaintenance
File Name: Release: ECC 6.0
Responsibility: PM Status: Closed
Copyright © 2011 JKT Page 9 of 9
3. All record related to technical objects are available at any time for analysis anddecision-making.
4. No separate paper work required to maintain equipment history SrNo
Topics
4.1 Interface / Enhancements considerations
Not Applicable4.2 Reporting considerations
S
No
Reports T Code
1 Breakdown report MCI7, IW29,IW39, IW30,IW40
2 Order operations report IW49
3 Preventive maintenance report IP19, IP24
4 Maintenance cost report MCI8
5 Maintenance report logbook IW676 Equipment history card IE03
7 Defect List MCI5, IW69
8 MTTR/MTBF Equipment MCJB
9 MTTR/MTBF Functional Location MCJC4.3 Authorization considerations
As per organizational needs, not finalized yet. Authorization matrix is being preparedseparately.
Business Process Signoff
ModulePlant Maintenance
Process Breakdown Maintenance
Sub Process /No Breakdown Maintenance & Civil Maintenance JK_BBP_PM_BP_0500
Description Breakdown Maintenance & Civil Maintenance