jk_bbp_pm_bp_0500

Upload: anonymous-usbzyfagb

Post on 06-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 JK_BBP_PM_BP_0500

    1/9

     

    Project Name

    Title

    JK Cement

    Breakdown Maintenance 

    Version

    Document ID

    1.0s

    JK_BBP_PM_BP_0500_V1.0 

     Author Akhilesh Kumar Singh 

    Reviewed By XXXXXXX XXXXX

    Date 01.11.2012

    T r a n s f o r m i n g E n t e r p r i s e s

    Consulting

  • 8/17/2019 JK_BBP_PM_BP_0500

    2/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 2 of 9

    IMPLEMENTATION_BLUE PRINT

    Business Process Details

    ModulePlant Maintenance

    Process Breakdown Maintenance Sub Process /No

    Breakdown Maintenance & Civil Maintenance JK_BBP_PM_BP_050

    0

    Description Breakdown Maintenance & Civil Maintenance 

    Sr No Business Process Explanation

    1.1 As Is Process General Explanation

    1.2 Explanation of Proposed Process

    In case of any Break down, Production User/CCR/Maintenance Engrr.generates a Maintenance Notification of Notification type M2. He records theBreak down occurrence time, technical object (Equipment/ Function location)affected, & damage or any kind of observation found. Online information ofBreak down & status of technical object will be available to all.

    The maintenance team (Electrical/ Mechanical/Instrumentation) attends thebreak down and records the malfunction end time, causes & activitiesperformed while attending the break down. Here he can also add tasks ifrequired to be performed afterwards, if some temporary arrangements havebeen done.

    He creates a maintenance order of Order type PM01 to issue materials/spareparts if required from their local stores. If the material is not available in theirstore a purchase requisition can be made directly from the maintenance order.In operation list of the maintenance order all operation performed, work center

    used and man power hour utilization is recorded.

    Break down indicator in notification, will be marked if break down occurs.External services can also be utilized from maintenance orderSpare parts planning can be done using Bill of materials.

     Actual/planned/estimated cost incurred on attending break down will besummarized with labor & spares cost separately.

    Failure analysis can be recorded.

  • 8/17/2019 JK_BBP_PM_BP_0500

    3/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 3 of 9

    Refer flowcharts below:1. General Maintenance process (Internal processing)2. General Maintenance process (External processing both Material &Service)

    o

      PROCESS FLOW CHARTS1.1.1 General Maintenance Process (Internal processing)

    Create Notification(Request for maintenanceby plant user/CCR)

    -Description of job-Required Start andEnd times of job

    -Technical object no.

    -Technical findings-Object part, damageetc. (optional) 

    -Tasks to perform

      Notificationreceipt byMaintenance Dept.

      Inspection ofMachine at site bymaint. person

    -Enter additional technical

    findings and tasks in theNotification.-Release the Notification(Put in process)

    Create Maintenance order  for the notification(by Maintenance planner)

    -Description of order-Technical object details

    (transferred from Notification)-Assign Maintenance work

    center (transfers automaticallyfrom the technical objectmaster record)

    -Plan operations in the orderwith number of personsrequired and work times.

    -Plan spare materials with

    required quantities-Assign responsible person

    X Y

  • 8/17/2019 JK_BBP_PM_BP_0500

    4/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 4 of 9

    Schedule the order(for planned start and end timesdepending upon the availability of

    manpower at the Maint. Work center)

    Issue s are materials from stores

    Execute plannedmaintenance work at site

    Completion (time) confirmation(of Maintenance order operations)

    Release the order  

    Y

    Inspection of completedwork at site by authorizedperson

    Technical CompletionOf Maintenance order(by authorized person)

    Settlementof Maintenance order

    (by authorized person)

    Business completionof Maintenance order

    (by authorized person )

    Order closed

    -Complete the technicalFindings in Notification.

    -Complete the tasks

    Notification Completion

    (by authorized person)

    X

  • 8/17/2019 JK_BBP_PM_BP_0500

    5/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 5 of 9

    1.1.2 Maintenance order (External processing)

    Create Maintenance order  

    -Description of order-Technical object details-Plan external service operationinthe order. Enter operation

    details-Service description or selectservice from the standard servicecatalog, service quantity & unit,price and vendor (optional).

    Schedule the order

    1.For Non Stock Materialpurchase requisition is made2.Purchase Order iscreated.

    Execute internal processingwork at site, if any

    Release the order  

    Purchase requisition for theexternal service is createdautomatically.

    Purchase requisitionreceipt by Purchase Dept.

    Create Purchase order  

    Execution of requestedexternal service by vendor

    Create Service Entr sheet 

    Y

    X

  • 8/17/2019 JK_BBP_PM_BP_0500

    6/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 6 of 9

    Notification Processing

    Transaction code for creating Maintenance Notification is: IW21Menu path is : Logistics Plant Maintenance Maintenance ProcessingNotification CreateNotification type for are: M2: Malfunction Report

    1. Identification  of Malfunction by Operation or Maintenance department.2. A Maintenance Notification is created with type M2 in the system depending on

    requirement.3. Specifying the Description of the Notification as per the nature of maintenance

    request or malfunction.4. Mentioning Object Number and time of request with requisitioner identification in

    to the notification screen.5. The initiator of Notification can enter the Technical findings (Object part, Damage

    or cause of damage etc) if he knows the details.6. Saves the notification.7. After the job is completed the production person will put the timing of malfunction

    end and his identification. 8. Maintenance person has to complete any task assigned to notification and enters

    the activities.9. Lastly, the notification has to be completed by the authorized person.

    Completion (time) confirmation

    (of Maintenance order operations)

    Settlement

    Business com letion

    Confirm/Accept Services(By entering exact quantityof received services in theService Entry sheet by anauthorized person)

    Technical Completion

    Invoice receipt

    Bill payment

    Cost

    Y

    X

  • 8/17/2019 JK_BBP_PM_BP_0500

    7/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 7 of 9

    Order Processing

    The transaction code for creating order is IW31.

    Menu path : Logistics Plant Maintenance Maintenance ProcessingOrder Create

    SrNo.

     Activities Description TCode

    1 MaintenanceOrder Cycle

    Maintenance order is created from the MaintenanceNotification.Planning operations, Labor resource and materials (ifrequired) in the maintenance order.Check Material Availability.Save Maintenance order and note the OrderNumber.

    IW31

    2 Permits If permits are assigned then those permits has to beissued by the authorized person.

    IW32/IPM2

    3 PhysicalMaterialWithdrawnfrom Main

    Stores

    If required material is available in main storesthen the material needs to be withdrawn fromthe store for executing the maintenance activity.

    (The Maintenance Planner will not haveauthorization to post Goods issue from mainstores)

    MIGO

    4 Execution ofMaintenanceWork

    Maintenance team will perform the maintenance taskand restore the Object in Ideal condition.Required material (Spares) will get changed.

    NA

    5 CompletionConfirmation

    Confirms the actual duration and man-hours for theindividual operation.Records the measurement readings from completionconfirmation screen.

    IW41

    6 Completion ofNotification

    Using the Notification tab button, updates thecatalogs on notification screen.

    IW22

    7 Creation of

    settlement rule

    For other order types the settlement rule is

    automatically created, for them rule has to bechecked for its correctness.

    IW32

    8 TechnicalCompletion ofOrder

     After completion of maintenance notification andentry of tech. Findings, measurement readings themaintenance order has to be completed technicallyto prevent further processing

    IW32

    9 Settlement ofOrder

     After completion of all the activities, maintenanceorder carries all the maintenance cost; these have tobe settled to the proper cost receiver (Cost Center). Accounts department will run the settlement of all themaintenance order periodically to settle themaintenance orders.

    KO88/KO8G

  • 8/17/2019 JK_BBP_PM_BP_0500

    8/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 8 of 9

    10 BusinessCompletion ofMaintenanceOrder

     After settlement of order, the maintenance plannercan close the maintenance order.

    IW32

    Civil Maintenance: For jobs related to civil maintenance the Plant User will raise

    notification of type M1, Maintenance request, for Civil Function locations & alsomentioning the job description required.

    The Concerned Civil Planner & Work center will plan for the job in terms ofmaterial & manpower availability.

    He will create Order of type PM03 i.e. General maintenance/Request order & getthe material issued.

    Remaining all procedures is of same as Break down Maintenance.

    1.3 Special Organizational Considerations

    None

    Sr No Topics3.1 Changes Management Issues

    Not Applicable.3.2 Description of Improvements

    1. Online information will be available for breakdown and current status of atechnical object.

    2. Effective and clear communication of Break down by end user.

    SrNo

    Gap Analysis

    2.1 Gap Identified in proposed solution against Requirements & Expectations

    Not applicable

    2.2 Impact of Requirement 

    Not applicable

    2.3 Solution Proposed 

    Not applicable

  • 8/17/2019 JK_BBP_PM_BP_0500

    9/9

     

    Business Blue Print- Business Process- PlantMaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 9 of 9

    3. All record related to technical objects are available at any time for analysis anddecision-making.

    4. No separate paper work required to maintain equipment history SrNo

    Topics

    4.1 Interface / Enhancements considerations

    Not Applicable4.2 Reporting considerations

    S

    No

    Reports T Code

    1 Breakdown report MCI7, IW29,IW39, IW30,IW40

    2 Order operations report IW49

    3 Preventive maintenance report IP19, IP24

    4 Maintenance cost report MCI8

    5 Maintenance report logbook IW676 Equipment history card IE03

    7 Defect List MCI5, IW69

    8 MTTR/MTBF Equipment MCJB

    9 MTTR/MTBF Functional Location MCJC4.3 Authorization considerations

     As per organizational needs, not finalized yet. Authorization matrix is being preparedseparately.

    Business Process Signoff

    ModulePlant Maintenance 

    Process Breakdown Maintenance 

    Sub Process /No Breakdown Maintenance & Civil Maintenance  JK_BBP_PM_BP_0500

    Description Breakdown Maintenance & Civil Maintenance