june, 2018 opportunities for digitalization in power sector

12
JUNE, 2018 Opportunities for Digitalization in Power Sector Asia Clean Energy Forum , Manila Yogendra Patwardhan

Upload: others

Post on 18-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

JUNE, 2018

Opportunities for Digitalization in Power Sector

Asia Clean Energy Forum , Manila

Yogendra Patwardhan

June 6, 2018 Slide 2

Field to Board room

Digitalization

Control Room

FieldOperations

CenterBoard Room

Time horizon

Business processesGridDevices Business strategy

Digitalization is key for the necessary agility and speed of decision-making

Milliseconds Seconds Minutes Hours Days Weeks Months Years

The need for faster decisions and increased business agility requires greater visibility of the entire business

June 6, 2018 Slide 3

New challenges for utilities and suppliers

– Increasing demand on refurbishment of substations

– Project execution under increasing cost and time pressure

– Better utilization of existing assets

– Increased expectations on transmission system availability

– Safeguard investment over the entire life cycle

Substation automation challenges

Digital substation respond to today’s utility challenges

Digital substation

June 6, 2018 Slide 4

Control RoomIncluding automation, Protection and Control IEDs, and IEC 61850 station bus.

MPLS-TP NetworkRemote connectivity.

Transformer with Electronic Control Monitoring and diagnostics.

Integrated Non conventional Instrument Transformers. Increasing safety and reducing the substation footprint..

Merging Units & Process I/O. Bridging the gap between analogue and digital world. Compliant to IEC 61850.Process Bus. Connecting the

switchyard to the protection and control system.

Basic concepts-Overview

Fiber optic substitutes copper signaling wires

Digital substation

June 6, 2018 Slide 5

Benefits of Digital substation

June 6, 2018 Slide 6

Overview

– Safety

– Reduced substation footprint

– Interoperability

– Reduces copper cabling

– Ease of configuration

– Maximum reliability and availability

– Real-time performance

– Smart Grid communications capabilities

– Reduces cost of ownership

Digital substations are safer to operate, future proof and require less

space

Main benefits

Digital Substation - Migration strategies

June 6, 2018 Slide 7

Life enhancement through retrofit

Existing

IEDs

with

support

for only

station

bus

IEDs with

support for

both station

and

process

bus

Up to

80% copper cable

reduction

Factory tested solution

40% shorter

installation time of P&C

system

40%outage time

reduction during P&C

retrofit

Benefits

Digital solutions

June 6, 2018 Slide 8

Communication Networks

Power line carrier

Fiber optical cables

Wireless solutions for

distribution networks and other

applications: TropOS,

ArcheOS, TeleOS

AFS family

NSD570

FOX family

TransmitterReceiver

TransmitterReceiver

Data

Voice

Teleprotection

Data

Voice

Teleprotection

“Narrowband”

(some 10 … 100 kbit/s)

“Broadband”

(some 100 …. 10‘000 Mbit/s)

AFS family

NSD570

ETL600

Digital solutions

June 6, 2018 Slide 9

Highly available and reliable utility communication

Technology shifts in utility communication

IEC 61850 instead of copper wires for truly digital integration of utility communication equipment

Using the benefits of IEC 61850 to communicate across substations

Move from TDM to packet-switched communication for operational, maintenance and protection data

Click for more about communication

Utility-grade equipment to ensure the reliable operation of the power grid is required

Asset Performance Management (APM)

Increased number of assets with fixed operation & maintenance budget

Assets Asset Management Drivers Asset Management Challenges

•Digital workforce less attracted to Asset Intensive Industries

•Younger Workforce have different expectations and a lower threshold

Aging Workforce

• Regulatory pressures to improve environmental, reliability and safety standards

Aging Assets

•Need to do more with less

• Improve return on assets without impacting production/service delivery

Cost Pressures

Asset Performance ManagementWhy Do Utilities Need Asset Performance Management

June 6, 2018 Slide 10

Trxf. 1

Trxf. 2

Trxf. 3…

Trxf. n

Ga

s S

en

so

r

H2O

Se

ns

or

Bu

sh

ing

LT

C

PD FR

A/

Tra

ns

ien

ts

Off

lin

e D

GA

Ro

uti

ne

te

sts

FR

A,

DF

R,

Z,

etc

Ma

inte

na

nc

e a

cti

on

s

MT

MP

Ris

k o

f F

ail

ure

Static data or information

Dynamic data/information

On going development

Offline Databases

Online Sensors

Kelman Minitrans Hydran M2Kelman Transfix

Off

lin

e S

OT

, F

ura

ns

SC

AD

A

Enterprise

ReportRecommend ActionsUpdate Risk of Failure

Statistics

Equations

ExpertiseComputation

PerformanceModels

Load

Events, alarms

Top Oil

T. amb

Tap pos.

Trxf. fingerprint

Risk of failure (RoF) of Transformer

June 6, 2018 Slide 11

Asset Performance ManagementPower Transformer