  • 8/3/2019 Kaizen in CAPARO

    1/25

    Dept. Name Weld Shop Kaizen Idea

    Zone No. SUMAN

    Kaizen Theme Counter Measures Trolley to be Made

    Problem Status Before

    Qualitative Quantitativ

    AfterProblem Analysis :

    Root Cause : Result

    Sr. No. Where who

    Plan for Horizontal Deployment

    S OK

    M

    Cminor

    D OK

    PNo Proble

    Q OK

    Benefits:-Reduce Production Time

    Completion Date:- 22th Aug;05

    Lead time of the is more Bench Mark:-Nil

    Target:-

    Kaizen - Sheet

    Team:-WELD SHOP

    Idea By :-LEELADHAR THAKRE

    Start Date:- 22 Jun'04

    25 nos. of Components can be kept from beforeBecause Shortage of Trolley we Have

    to make the Components when there is

    TROLLEYS

    Preventive Action

    Make A Trolley

    Reducing of JIT

  • 8/3/2019 Kaizen in CAPARO

    2/25

  • 8/3/2019 Kaizen in CAPARO

    3/25

    Dept. Name Weld Shop Kaizen Idea

    Zone No. Suman

    Kaizen Theme Counter Measures

    Problem Status Before

    Qualitative Quantitativ

    After

    Problem Analysis :

    Result

    Root Cause : Sr. No. Where who

    Setting Time More

    ONE FIXTURES REMOVED

    One Fixture can be used instead of two

    fixture as there profiles has negligibledifference

    S

    M

    Q

    Plan for Horizontal De

    CSetting t

    D

    Changeover time more due to bring of

    Fixture

    Bench Mark:-Nil

    Target:-

    Benefits:-Reduce Set up time

    TO REDUCE THE set

    up time

    Idea By :-Raghu Shinswar

    Start Date:- 4 Aug 05

    Completion Date:-

    Qualitywise No Problem

    Space Utilisation And

    Change to reduce

    Kaizen - Sheet

    Team:-Weld Shop

    P

  • 8/3/2019 Kaizen in CAPARO

    4/25

  • 8/3/2019 Kaizen in CAPARO

    5/25

  • 8/3/2019 Kaizen in CAPARO

    6/25

    Before After

    Benefits- 1.Quality improved.

    2. Time save for putting the nut inthe bolt

    Suggested by- Manoj

    Month-may-05

    Cargo body Mtg

    Problem-No Fixture was there to guide the nut

    for entering spatter inside the nut

  • 8/3/2019 Kaizen in CAPARO

    7/25

  • 8/3/2019 Kaizen in CAPARO

    8/25

  • 8/3/2019 Kaizen in CAPARO

    9/25

  • 8/3/2019 Kaizen in CAPARO

    10/25

    BeforeAfter

    Benefits- Lead time save &

    approx cost saving20,000/annum

    Suggested by- MAHESH BHAGEL

    Month-may-05

    HSG HEAD LAMP LH /RH -- HCV

    Problem- NO FOOLPROOFING WASTHERE.

    Locator not there

    Guage

    LOCATOR PIN PROVIDED

    TO AVOID HOLE MISSING

  • 8/3/2019 Kaizen in CAPARO

    11/25

    Before

    Benefits-Production Increased

    without any Quality Problem.

    Suggested by- Leeladhar

    Month-May-05

    BRACE REAR PILLAR-HCV

    Problem- Gun used to be taken out inexisting fixture for four spot.

    One Clamp DeletedC/Measure-

    After

  • 8/3/2019 Kaizen in CAPARO

    12/25

    Dept. Name Kaizen Idea Productivity

    Zone No. 2

    Counter Measures

    Problem Status Before

    Qualitative Quantitativ

    AfterProblem Analysis :

    Chances of Accidents

    Result

    Root Cause : Sr. No. Where who

    1 u/centre R Kamal

    25 secs saved per Component

    Kaizen - Sheet

    Team:-Weld Shop

    Fixture to be

    Developed

    Fixture to be developed Idea By :-Kamal

    Start Date:- 08 July'05

    Weld ShopSuman

    Completion Date:- 09July'05

    Cycle time Reduced Bench Mark:-Nil

    Target:-

    Benefits:- Productivity Increased

    C50,000 Rs

    PIncreased t

    Q OK

    OK

    SGOOD

    Plan for Horizontal De

    No Fixture Available

    Fixture to be developed

    Kaizen Theme

    M

    D

  • 8/3/2019 Kaizen in CAPARO

    13/25

    Date 20-06-05

    Dept. Name Kaizen Idea

    Zone No.

    Counter Measures

    Problem Status Before

    Qualitative Quantitative

    AfterProblem Analysis :

    Result

    Root Cause : Sr. No. Where who when status

    Now working and under observation. 1 inner Suamn aug Stared

    Kaizen - Sheet

    Weld ShopTeam:-Weld Shop

    Suman

    Kaizen ThemeNew Tool to Made in

    India & contingency

    New Tool to Made Idea By :-Suman & makhanlal

    Start Date:- 1 July'05

    Completion Date:- 3rd Aug'05Tool Gets Crack every now and then Bench Mark:-Nil

    Target Date :- 15 July'05

    Benefits:- Cheap And easy to developed in India

    Punder Obseravetion

    Q OK

    Loss of ProductionC

    4750 Rs. Only

    S

    Plan for Horizontal Deployment

    New to be developed localised

    Preventive Act ion

    M

    D

  • 8/3/2019 Kaizen in CAPARO

    14/25

    Dept. Name Weld Shop Kaizen Idea Preventive Action

    Zone No. Suman

    Kaizen Theme Counter Measures Trolley to be Made

    Problem Status Before

    Qualitative Quantitativ

    After

    Problem Analysis :

    Template Fixture to be made

    Result

    Root Cause : No Rejection of Component Sr. No. Where who

    1 FRM u/ce Raghu

    2 FRM u/ce Raghu

    Stacking Problem

    (12 Nos.)

    Due to OverLoading

    Kaizen - Sheet

    Team:-Quality Assurance

    Idea By :-Manish Meshram

    Start Date:- 4 Jun'04

    Completion Date:- 7th jun '04

    Chances of getting Damaged due to

    Overloading

    Bench Mark:-Nil

    Target:-

    Benefits:-Reduce Inspection time

    PNo Proble

    QOK

    CChances

    DOK

    Plan for Horizontal Deployment

    SOK

    M

  • 8/3/2019 Kaizen in CAPARO

    15/25

    Dept. Name Weld Shop Kaizen Idea 5'S activity

    Zone No. Suman

    Kaizen Theme Counter Measures

    Problem Status Before

    Qualitative Quantitativ

    After

    Problem Analysis :

    Result

    Root Cause : Sr. No. Where who

    1 frm floor u Leeladhar

    2 Brace Leeladhar

    3 frm floor u Leeladhar

    Pocket to be Made To avoid such

    Problems

    POCKET MADE & WHEEL

    ADDED

    No pocket was there to keep the

    BOP & Wheels are not there.

    CSearchin

    DOK

    Plan for Horizontal De

    Fixtures are not Designed by putting in

    mind of BOP's

    SOK

    M

    Seaching time of BOP's is ZERO

    P Increased

    QOK

    Benefits:-Reduce Rework

    Completion Date:- 7th july '05

    Searching time More Bench Mark:-Nil

    Target:-

    Kaizen - Sheet

    Team:-Weld Shop

    TO REDUCE THE

    CYCLE TIME OF

    SEARCHING

    Idea By :-Manish Meshram

    Start Date:- 4 jULY'05

    POCKET MADE

    TO PUT THE

    added

    to move

    freely

  • 8/3/2019 Kaizen in CAPARO

    16/25

    BEFORE AFTER

    VISUAL INSPECTION

    WAS USED

    USE TAMEPLATE

    AS SHOWN IN FIG.

    PROBLEM DEDUCTED-24/06/04 IMPLEMENTED DATE-26/06/04

  • 8/3/2019 Kaizen in CAPARO

    17/25

    BEFOREAFTER

    MIG TACK WAS DOING

    HAPAZOURDLY

    RACK HAS BEEN MADE TO

    MINIMISE THE MATERIAL

    MOVEMENT TIME

  • 8/3/2019 Kaizen in CAPARO

    18/25

    IMPROVEMENT-1

    BEFOREAFTER

    CAGE NUT OFFSET

    PROBLEM

    DURING MIG

    WELDING

    STAND BY WELDING

    FIXTURE MADE

  • 8/3/2019 Kaizen in CAPARO

    19/25

    BEFORE AFTER

    EML-FRM FLR UNDR FRT ASSY.

    1.PROCESS UNSAFE.

    2.EXTRA MANPOWER REQ.

    3.HIGH CYCLE TIME.

    WELDING FIXTURE MADE TO

    AVOIDE THESE PROBLEM.

  • 8/3/2019 Kaizen in CAPARO

    20/25

    BEFORE AFTER

    JOB SETTING TIME VERY

    HIGH AS COMP

    IS SET BY C- CLAMP

    WELDING FIXTURE MADE WHICH

    HOLD THE COMP PROPERLY.

  • 8/3/2019 Kaizen in CAPARO

    21/25

    NO PROPER

    STORAGESYSTEM FOR

    KEEPING

    ELECTRODE

    DURING

    WORKING

    HRS.

    BEFORE-AFTER-

    ELECTRODE STORAGE STAND HAS BEEN MADE.