What is KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
What is KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
What is KAIZEN? SSmall andmall and un-dramatic improvement and its un-dramatic improvement and its
results are seldom immediately visibleresults are seldom immediately visible, but it is , but it is continuous thus brings good resultscontinuous thus brings good results
KAIZEN employs simple ideas and common senseKAIZEN employs simple ideas and common sense KAIZEN is based on the simple principle that we
need continuous improvement in order to progress and advance
The KAIZEN strategy is that ‘not a single day should go by without some kind of improvement’.
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN is: Making small improvements with little costMaking small improvements with little cost Making small improvements all the time - always Making small improvements all the time - always
thinking of doing something better today than thinking of doing something better today than yesterdayyesterday
Allowing everyone to make improvements
Engr. Abdun Noor, Centre for Management Development, [email protected]
What is KAIZEN?KAIZEN inspire to KAIZEN inspire to Think outside the boxThink outside the box Think in a different wayThink in a different way Bring out CreativityBring out Creativity
Engr. Abdun Noor, Centre for Management Development, [email protected]
How Improvement is Made?
Innovation/ ModernizationInnovation/ Modernization
& & KAIZENKAIZEN
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN and Innovation/ Modernization :
KAIZEN signifies small improvements made in KAIZEN signifies small improvements made in the status quo as a result of ongoing effortsthe status quo as a result of ongoing efforts
Innovation/Modernization involves a drastic improvement in the status quo as a result of a large investment in new technology, product and/or equipment
While KAIZEN is a continuous process, innovation is generally a one-shot phenomenon
KAIZEN does not necessarily require sophisticated technique or call for a large investment to implement it.
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN and Innovation/ Modernization :
TIMETIME
TIMETIME
KAIZENKAIZEN
Innovation/ Modernization Innovation/ Modernization
Engr. Abdun Noor, Centre for Management Development, [email protected]
Why KAIZEN? One of the famous Parkinson’s Laws is that “An
organization, once it has built its edifice, begins its decline.”
Therefore, there must be a continuing effort for improvement to even maintain the status.
Even when modernization / innovation makes a radical improvement in standard of performance, the new performance level will decline unless the standards is constantly challenged and upgraded
Engr. Abdun Noor, Centre for Management Development, [email protected]
Why KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
Why KAIZEN?
What should be What should be (standard)(standard)
What actually What actually isis
Innovation/Innovation/Modernization Modernization
TimeTime
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN & Management Innovation/
Modernization
KAIZEN
Maintenance
Engr. Abdun Noor, Centre for Management Development, [email protected]
Targets of KAIZEN KAIZEN targets for 3Ms for improvementKAIZEN targets for 3Ms for improvement
11stst M MMUDAMUDA
無駄無駄WastageWastage
(Avoid all (Avoid all wastage)wastage)
22ndnd M MMURIMURI
無理 無理 StrainStrain
(Causing (Causing in-efficiency in-efficiency avoid strain, avoid strain,
work work smarter)smarter)
33rdrd M MMURAMURA
斑 斑 ErrorError
(Avoid errors/ (Avoid errors/ Discrepancies, Discrepancies, Think Poka-Think Poka-
Yoke)Yoke)
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN KAIZEN employs simple ideas and common
sense KAIZEN is more a mind-set than a technique
(Positive mind set) A mind-set that “there is always a better way of
doing something.”
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN Checklist (Sample)
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN Checklist (Sample)
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN Checklist (Sample)
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN Checklist (Sample)
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN
Engr. Abdun Noor, Centre for Management Development, [email protected]
KAIZEN Example:Productivity Improvement of Packaging Material in a Biscuit CompanyProductivity Improvement of Packaging Material in a Biscuit Company
Sl No
Name of materials and existing dimensions
Existing cost (Tk.)
Proposed Dimension
Savings (Tk.)
1. Grease Paper (24 no) 25.3 16.6 cm
1.52 25.3 15.24 cm. 0.17
2. Coloured Cellophane (24 no)19.3x16.5 cm
2.39 18.3 16.5 cm. 0.12
3. Polythene bag (1 no)4341cm
0.48 39.5 43 cm. 0.02
4. Batch coupon 1 no 0.01 Ok. - -
5. M.P.P. (Solid) Carton21.7 21.1 12 cm.
2.79 Ok. - -
6. Gum tape 1½ cm. 0.09 Ok. - -
7. Gm Tape 0.08 Ok. - -
Tk. 7.36 per Carton Tk. 0.31 Per cartonYearly production = Yearly production = 469885 Carton469885 CartonYearly Savings Yearly Savings = = Tk. 0.31 Tk. 0.31 46988 = 46988 = Tk. 1, Tk. 1, 45,664.3545,664.35
Engr. Abdun Noor, Centre for Management Development, [email protected]
Before KAIZEN?A pool (Sheep dip) was used to remove insects from the sheep’s A pool (Sheep dip) was used to remove insects from the sheep’s bodies. We had to push the heads of the sheep down to submerge bodies. We had to push the heads of the sheep down to submerge them into the water mixed with insecticide. them into the water mixed with insecticide.
Engr. Abdun Noor, Centre for Management Development, [email protected]
After KAIZEN?A pit was made at the bottom of the pool. This meant the sheep A pit was made at the bottom of the pool. This meant the sheep would submerge their heads by themselveswould submerge their heads by themselves
Engr. Abdun Noor, Centre for Management Development, [email protected]
Before KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
Before KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
After KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
Before KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
After KAIZEN?
Engr. Abdun Noor, Centre for Management Development, [email protected]
More KAIZEN examples?
Few examples from daily life?
Bus supervisor example CNG driver example Coconut leaf-fan example V-belt example
Engr. Abdun Noor, Centre for Management Development, [email protected]
Examples of Poka-Yoke
Engr. Abdun Noor, Centre for Management Development, [email protected]
Examples of Poka-Yoke: KAIZEN
Engr. Abdun Noor, Centre for Management Development, [email protected]
Examples of Poka-Yoke: KAIZEN
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZENBefore KAIZEN:
There was a strain in mounting the Bracket bellow support on to slim3 machine. 2 persons required to assemble the cover
After KAIZEN:Fixture made by using simple frame from in-house parts. Single person can assemble the cover. Easy handling of part since crane will be used
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZENBefore KAIZEN:
The storage of spindle shafts was being done with the help of a wooden V block fixture. This method was prone to damages
After KAIZEN:Special trolley introduced for storage of spindle shafts. Easy handling of spindle shafts. No damages will be caused during transport
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZENBefore KAIZEN:
CMM probe was kept on a surface table. Due to this being a regular working area there were chances of probe getting damaged . The probe is very expensive and costs
After KAIZEN:Probe damage avoided completely. House keeping also improved on CMM surface table
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZENBefore KAIZEN:
There was no fixture for proximity tightening
After KAIZEN:Two holes made on the table so that proximity can be fixed while tightening the connectors
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZEN: Before
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZEN: After
Engr. Abdun Noor, Centre for Management Development, [email protected]
Lower the table
Raise the table
You can’t change the Table height
Few examples of KAIZEN
Footstool
Easy to work.
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZEN
Engr. Abdun Noor, Centre for Management Development, [email protected]
Few examples of KAIZEN