kappa workgroup meeting | bessy | nov 28-29, 2011session 4: beamline guis 1 beamline guis at alba...

Download Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 1 Beamline GUIs at ALBA Guifre Cuni on behalf of the Controls Group

If you can't read please download the document

Upload: clemence-jefferson

Post on 18-Jan-2018

218 views

Category:

Documents


0 download

DESCRIPTION

Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 3 Common GUI elements Taurus (core + Qt) on top of PyTango Taurusgui with custom ‘perspectives’ and panels Macro execution GUI and/or CLI Basic Acquisition definition (for scans) with channels, predefined plots, saved in Nexus

TRANSCRIPT

Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 1 Beamline GUIs at ALBA Guifre Cuni on behalf of the Controls Group Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 2 Common Controls Components Networked equipments IPCs, VMs, Workstations, Terminal, Icepaps, EPS, electrometers Vacuum Gauges and IPs controllers, Pneumatic Valves, Tango DSs EPS Tango DSs Archiving Tango DSs Alarms Tango DSs Device Pool Tango DS Motors, counters, pseudos, acquisitions MacroServer Tango DS Procedures CCDs Basler, Tango DS ImgGrabber Detectors LIMA Tango DS Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 3 Common GUI elements Taurus (core + Qt) on top of PyTango Taurusgui with custom perspectives and panels Macro execution GUI and/or CLI Basic Acquisition definition (for scans) with channels, predefined plots, saved in Nexus Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 4 Some Screenshots (I) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 5 Some Screenshots (II) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 6 Some Screenshots (III) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 7 Some Screenshots (IV) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 8 Some Screenshots (V) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 9 Some Screenshots (VI) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 10 Some Screenshots (VII) Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 11 Experiment applications Two beamlines have bought a complete End- Station setup with their own application Two beamlines have said that current GUIs are enough for their experiments One beamline is happy with the CLI and the macro framework provided One beamline has not yet specified the needs And BL13 XALOC would like to have all available tools for mx experiments Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 12 Next steps for XALOC: Integrate omega, musst card and Pilatus Detector in the control system in order to perform a data collection Define particular perspectives to mimic each mxCuBE tab Define functional panels that can be arranged depending on the experiment Integrate CATs in the data collection Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 13 Questions arise We think that we have to split the hardware objects logic in: Tango + Taurus for status and notifications Macros for the procedures or operations What else do we need to start with STAC+EDNA Is ISPyB widely used outside the ESRF? Will be mxCuBE migrated to Qt4? from the last meeting my feeling is that there was no need