kct profile
TRANSCRIPT
FINAL
We Build Trust . . .
. ................................................................
FINAL
CONTENTS
Foreword.............................................................................Mission & Vision.................................................................. Profile...................................................................................Key Activities.......................................................................
KCT Orgenization Chart & Personnel..............................
KCT Owned Machinery And Equipment List..................
Ready Mixed Concrete Dept. ..................................... Machinery & Reinforcement Dept. .............................
Global Trade & Supplying Dept. ......................................
QA / QC / HSE.....................................................................
Why KCT ?...........................................................................Contacts Information.......................................................
4
5
6
7
Certificates 8
13
20
77
81
85
88
90
92
93
KCT Projects. ................................................................
4
Chairman Word
FINAL
To move AL KHAYYAT COTRACTING TRADING from a local establishment in Syrian Arab Republic to a leader regional and international one capable to execute all kind of projects even in the hardest circumstances, armed with confidence, knowledge, and long experience in our field.
To rise the real estate and projects local market up to an international levels to commensurate the exceptional building renaissance that takes place in Syrian Arab Republic during last few years, through applying the highest professionalits , creativity and commitment criterias in whole business fields matching the top of perfection levels.
Mission & Vision
OUR VISION
OUR MISSION
FINAL
6
KCT is a Syrian establishment was formed by Mr. Mouhamad Resslan Al Khayyat. Ever since it started operating in 1983, KCT has grown to assume a leading role in the field of construction for the quality and timely completion of its projects.
KCT is classified by the Ministry of Housing & Construction in Syrian Arab Republic as an “A” class contractor in the field of construction of all types of projects and all related components such as roads, bridges, buildings, water & sewage and electromechanical works.
concrete products, foundation, reinforcement, and real estate investments.
KCT offers turn key engineering and construction projects in Syria. A large measure of its success has come from its use of qualified technical & engineering staff, owned building machinery, equipment and management systems to tackle the most difficult jobs.
KCT has earned a reputation in the Syrian market through executing huge number of projects (Bridges & Tunnels, Reinforcement Works, Hospitals, Factories, Hotels & Residentel Cities, Universities & Instituts and Palaces ....etc) in ideal time with best quelity criterion Such as (ready mixed concrete, cement products, piles, anchors, shot-crete and precast bridges).
KCT est. is a full service construction firm offering a broad menu of specialized services to our national and local clients.
Our professional leadership and many years of experience allow us to focus on special customer needs. .
We believe that there are “five critical” factors that determine the project’s success:• Responsiveness• Timeliness• Quality & Safety• Flexibility• Cost Awareness
We are dedicated to spending an extra time understanding each project as not only sticks and bricks but as a business catering to our clients’ goals. The management team understands that the highest level of “trust and confidence” awarded by a client is the responsibility of building the next project. We take great pride in this confidence and trust.
Profile
turnover rate was 42000,000 USD in 2007 , 45500,00 USD in 2008 ,
while our estimated turnover rate for 2010 is 100,000,000 USD.KCT
Other activities of the company are engineering services, ready mixed
65350000 USD in 2009
Concrete ,
FINAL
KCT through its Projects Department involved in the General Constructions & Turne Key Projects; commercial and educational buildings, Residential complexes, bridges, industrial buildings, which include site development, infrastructure and utilities all types of construction, structural works, plant infrastructural civil works, and surveying services. i.e; KCT executes all civil, mechanical, electrical, sanitary, telecommunication, renovation, beautification works.
CIVIL WORKS: Site Development, Road Works, Bridges Works, Earth Works, and Water Treatment Works.
MECHANICAL WORKS: Water Treatment Plants, Plumbing, Drainage Installations, Vacuum
Systems, Fire Protection Systems, Air Conditioning & Heating Systems, Ventilation Piping Networks,…etc.
ELECTRICAL WORKS: Supply and Install all those of Light Points & Lightening Devices, Cabels, Panel Boards, Power Generators, Audiovisual Systems, Alarm System, Operator & Phone Devices, Controling Systems,…etc.
KCT also carried out study, design and build projects, besides to engineering and consulting services.KCT established other departments in addition to the Projects Department specialized in differnet fields mentioned below:
Ready Mixed Concrete Dept.
Ownership of lands, Intergrated Cities, Buildings, and Apartments completed with all services and furnishings.
Real Estate Projects Dept.
Specialized in producing concrete and other Cemented Products with best modern machineries through four owned automated concrete plants and concrete patching machines up to 64 m height provided by 43 trans-mixers with different capacities .
Machinery and Foundations Dept.Specialized in the design and installation of foundation Systems for construction projects, Piling, and reinforcing works using a professional machineries up to 28 ones for various types of excavations.
Global Trade & Supplying Dept.Specialized in Supplying all kind of raw material and decorations issue Our mission is to make quality products available to clients at reasonable price on time. Our aim is to cater the needs of the client with adequate support of premier technical and management services in a highly responsible manner.For that all, KCT offeres a wider range of services in the most economic way.
Key Activities
FINAL
8
CERTIFICATES
SINCE 1983
FINAL
40
Orgenization Chart & Personnel
SINCE 1983
ORGANIZATION CHART
FINAL
46
KCT PROJECTS
SINCE 1983
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Yaafour Resort Damascus 27000 sqm 52000 sqm 100% 12,238,000.00 4 stars hotel, playgrounds, sport halls
2 Al Bayt Al Shami Damascus 20500 sqm 90000 sqm 80% 83,200,000.00
residential palace of 3 floors - floor area 3000 sqm including all civil, archtectural, electrical, mechanical and agricultural works , decorationand gardens design - mosaics - site works of 5000 sqm
3 Intradus Resort and Hotel Tartous 37000 sqm 35000 sqm 75% 30,000,000.00 _
4 Prime Minister of Qatar Palace - Sabboura Damascus 15500 sqm 52000 sqm 45% 51,500,000.00 landscape 32000 m2
5 Qatari Prince Palace at Palmyra Palmyra 105000 sqm 18000 sqm 90% 40,200,000.00civil, archtectural, electrical, mechanical , decorationand gardens design
6 Manors/ Palmyra Palmyra 28000 sqm 60000 sqm 100% 2,000,000.00 _
7 Presidential Platform for Camels Track Race Palmyra 7000 sqm _ 100% 3,700,000.00two main divisions Bldg (presidential - platform and auditorium) as well as employees offices - turn key project
8 Fishermen Appartments Lattakia 7280 sqm 17000 sqm 10% 5,300,000.00 104 appartments, 70 sqm each - turnkey project
9 Al Salemlik Bldg / Yaafour Damascus 2600 sqm 600 sqm under execution 3,200,000.00 _
10 Al Jaryan Mosque / Yaafour Damascus 2800 sqm 400 sqm under execution 1,800,000.00 _
11 Al Shamia Villas Project Damascus 6600 sqm 22000 sqm under execution 15,000,000.00 _
12 Al Diyar Al Qataria - Ibn Hani Damascus 8000 sqm 17000 sqm 100% 12,576,000.005 floors Bldg - 104 residences - each residence 70 sqm - turn key
13 Zaman Al Khair Touristic Compound Damascus 25000 sqm 17500 sqm 100% 5,582,000.00restauarants , cars trach race, children entertainment
14Shaikh Bin Hamad Bin Khalifa
Al Atiyya PalaceDamascus 6000 sqm 8000 sqm 100% 2,500,000.00
residential villa of 3 floors, all civil, archtectural, electrical, mechanical , decorationand gardens design - damascene mosaics
Hotels and Palaces Projects
FINAL
Project and LocationClientWork Description
Execution Period Performance Percentage
• Ya'fourResortExpansion-Damascus• Jupiter• Turnkeyproject-Luxurystar hotel capacity27000sq.m• 180Day• 100%
Ya'four Resort Expansion
chalet and resorts.
built up area
residential
FINAL
Execution Period •
Al Bayt al shami Project and Location • Al Bayt Al Shami- YafourClient •Work Description • palace, 4 floors. Civil, Architectural, Mechanical, Electrical and Agricultural
18 Months
Qatari Prince
Performance Percentage: 80%
FINAL
FINAL
Antradous Tartous Project and Location . Client • Al Amer Group & Wahoud Group
Scope of Work: Turn key
Job Description: built up area 37000 sqm, civil, mechanical, MEP works
Execution Period: 8 months
Performance Percentage: 75 %
Antradous Hotel and Resorts
FINAL
Al Saboura PalaceProject and Locatio . Al Saboura Palace - Saboura
Work Description •
Client • Prime Minister of Qatar
Turn Key Project
Execution Period: 18 months
Performance Percentage: 45 %
FINAL
Palmyra Palace Project and Location
•
Palmyra Palace
-
PalmyraClient .
Qatari
Prince
Scope of Work: Turn Key Work Description: Built up area 10500 sqm, Palace, chalet, landscape, Majles
Execution Period: 12 months
Performance Percentage: 90 %
Project and Location: Palmyra Client: Qatari prince Work Description: Turnkey project Execution Period: 4 months Performance Percentage: 100 %
Qatari Prince Manors
Project and Location: Palmyra Client: Qatari prince Work Description: Turnkey project Execution Period: 3 months Performance Percentage: 100 %
Presidential Platform for Camels Track Race
FINAL
Fishermen AppartmentsProject and Location • FishermenAppartments-LattakiaClient • QatariDiarRealEstateInvestmentCompanyWork Description • Constructingbuildingof5floors,
104apartments,70sqmeachTurnKeyProject
Execution Period • 310DayPerformance Percentage • 100%
FINAL
64
Project and LocationClientWork Description
Execution Period
• SihnayaVilla-Damascus• Private• StructuringresidentialVilla -TurnKey/7150m2-TheProject
mechanical,decorationworks.Inadditiontogardendesignworks.• 360Day
Sihnaya Villa
REF PROJECT NAME Location (sqm) BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Steel Melt Factory / Adra Industrial AreaDamascus
Countryside175000 sqm 165000 sqm 80% 94,330,000
the project consists of different blocks:1- A.S.P2- W.T.P (Water Treatment Plant)3- R.W.T.P (Rural Water Treatment Plant)4- LPG5- Workshop6- Substation7- F.T.P8- Ferroalloy9- Scrap Yard10- E.A.F11- C.C.M (Continous Cast Machine)12- Slag Area13- Roads and Infrastructure14- Piping Worksin addition to all the mechanical and electrical works
2 Steel Scrap WarehousesDamascus
Countryside68000 sqm 120000 sqm 90% 15,540,000
the project consists of different blocks:1- Admin Bldg: 4 floors2- Workshops Bldg: 4 floors3- Workshops warehouse Bldg: 5000 sqm4- Steel Scrap yards: 8000 sqm5- Oil Station6- Various Service Bldgs7- Special break room on the admin Bldg
3 SHAM PRINTDamascus
Countryside6244 sqm 9573 sqm 50% 35,000,000 MEP,Architectural, structural works - Turn key project
4 Mowaslat Sq Parking Damascus 13500 sqm _ 100% 6,120,000Structural, Architectural, Electrical, Mechanical, and Controling Works / 4 floors under ground parking 13500m2 / 500 cars
5Installing and operating the technical inspection equipment of gas, lights,
replacement and cars brakesAll Syrian Provinces 39000 sqm _ 100% 3,588,936
Supply, install, and commissioning electro-mech. equipments for testing big and small cars. 13 hangars with 2 test lanes each.
6 Wadi Ali Bridge Dei Al Zour 150 ML _ 100% 713,200
Constructing the last bridge to link the Syrian Railways to the Iraqi Railways150 Ml / 6 spans, prestressed girders. 11000m3 concrete based on 4000 Ml pile depth 35 Ml & 100000m3 excavations.
7 Al Na'na' Parking Damascus 10000 sqm _ 100% 3,200,000Structural and Architectural Works10000m2 / 5 floors, 1 under ground and4 above ground parking / 350 cars .
8 Air Planes Parking Aprons Damascus 300000 sqm _ 100% 7,460,000excavation and backfilling from chosen soils in addition to levelling ,compacting, anti-herbal treatment and concrete pavement works
Industrial and Infrastructure Projects
FINAL
Project and LocationClient
Execution Period Performance Percentage
• SteelMeltingFactory-AdraIndustrial Area• SMIGroup
• 360Day• 90%
Steel Melting Factory
FINAL
1- A.S.P2- W.T.P (Water Treatment Plant)
4- LPG5- Workshop6- Substation
7- F.T.P8- Ferroalloy9- Scrap Yard
10- E.A.F11- C.C.M (Continous Cast Machine)
12- Slag Area
PROJECT BLOCKS
FINAL
Steel Scrap WarehousesProject and Location
Work Description Administrationbuilding+warehousessetonatotalClient • SMIGroup
spaceof68000sq.mExecution Period • 360DayPerformance Percentage • 100%
Steel Scrap Warehouses Project - Adra Industrial Area
FINAL
MEP, Architectural, structural works - Turn key project
Project and LocationClientWork Description
Execution Period
Performance Percentage
SHAM PRINTSham Print - Adra Industrial Area
Hamsho International Group
three months and half
50 %
FINAL
Mowaslat Sq ParkingProject and Location • MowaslatSq.Parking-AlHamra'-DamascusClient • DamascusGovernorateWork Description • Structural,Architectural,Electrical,Mechanical,
andControlingWorks/4floorsundergroundparking13500m2/500cars
Execution Period • 1290DayPerformance Percentage • 100%
FINAL
Project and LocationClientWork Description
Execution Period
• CarsTestlanes-AllSyrianProvinces• MinistryofTransportation• Supply,install,andcommissioningelectro-mech.equipmentsfortestingbigandsmallcars.13hangerswith2testlaneseach.• 210Day
Cars Test lanes
FINAL
Project and LocationClientWork Description
Execution Period
• WadiAliBridge-AlBouKamalCity-Iraqi Boarders• SyriaRailWayEst.• 150l.m/6spans,prestressgirders.11000m3concretebasedon4000l.mpilesdepth35l.m&100000m3excavations.• 360Day
Wadi Ali Bridge
FINAL
Project and LocationClientWork Description
Execution Period
• AlNa'na'Parking-Baramekah-Damascus• DamascusGovernorate• StructuralandArchitecturalWorks10000m2/5floors,1undergroundand4abovegroundparking/350cars.• 1080Day
Al Na'na' Parking
FINAL
Airplanes Parking ApronsProject and Location • AirplanesParkingAprons-DamascusAirportClient • GeneralAssociationforCivilAviationWork Description • Excavationandbackfillingfromchoosensoilsin
treatmentandconcretepavementworks.Execution Period • 550DayPerformance Percentage • 100%
additiontoleveling,compacting,anti-herbal
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1Al Doha City
Doha Mall - Hotel - Villas - ResortsDamascus 118900 sqm 400000 sqm 50% 30,000,000.00
International Construction & Building Co.Civil, Architectural, Electrical, and Mechanical
Works / Villas, Apartments, and Commercial Mall
2 Al Salam Mall Damascus 30200 sqm 65000 sqm 80% 14,670,000.00Study and design and installation of new public
lighting, cabling, earthing, and controlling of high-tech designe.
Malls Projects
FINAL
Project and LocationClientWork Description
Execution PeriodPerformance Percentage
• DawhaCity-Damascus• InternationalConstruction&BuildingCo.• Civil,Architectural,Electrical,andMechanicalWorks/Villas,Apartments,andCommercialMallTurnKey• 900Day• 50%
Dawha City
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Rehabilitation & Development of Omayyad Sq. Damascus N/A N/A 100% 6,300,000
Execution of beautifying, renovating, Civill,Mechanical, Electrical, and Tanks for deposition, Balancing / filtering. maintenance, Inspecting, and servicesAgricultural Works with best europian lighting devices / Under ground Rooms for pumps, computers, control panels
2Rehabilitation & Development of Conference
PalaceDamascus N/A N/A 100% 5,775,000
Reconstruction, Renovating The Periphery of the Palace in addition to supplying mechanical and electrical equipments. Water Fountain / Squares / Lightening / Pavements by using luxury materials.
3 Al Jalaa Park Damascus N/A N/A 100% 140,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designe.
4 Al Manshiya Park Damascus N/A N/A 100% 180,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designs.
5 Al Samaka Park Damascus N/A N/A 100% 159,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designs.
Rehabilitation & Development Projects
FINAL
Project and LocationClientWork Description
Execution Period
• BeautifyingOmayadSq.-Damascus• DamascusGovernorate• Executionofbeautifying,renovating,Civill,Mechanical,Electrical,and
AgriculturalWorksbesteuropianlightingdevices/UndergroundTanksfordeposition,Balancing/filtering.Roomsforpumps,computers,controlpanalsmaintenance,Inspecting,andservices• 90Day
Rehabilitation & Development of Omayyad Square
FINAL
58
Project and LocationClientWork Description
Execution Period
• ReconstructionforConventionsPalacePeriphery-AirportRoad• DamascusGovernorate• Reconstruction,RenovatingThePeripheryofthePalacein
additiontosupplyingmechanicalandelectricalequipments.WaterFountain/Squares/Lightening/Pavementsbyusingluxurymaterials.• 150Day
Rehabilitation & Development of Conferences Palace
FINAL
60
Project and LocationClientWork Description
Execution Period
• AlJalaaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day
Al Jalaa Park
FINAL
62
Project and LocationClientWork Description
Execution Period
• AlManshiyaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day
Al Manshiya Park
FINAL
Project and LocationClientWork Description
Execution Period
• AlSamakaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day
Al Samaka Park
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION
RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Dental Institute Hama 15000 sqm 25000 sqm 45% 4,656,754
construction and architectural works, turn key, auditoriumaccomodates 300 persons - 5 halls, Labs,service library and a dome
2 Social Care Institute Damascus 23200 sqm 40000 sqm 60 % 6,980,000 turn key, construction and architectural works
3 Computer Science Institute Damascus 14000 sqm 27000 sqm 50% 5,297,1206 floors +a basement, construction and architectural works, accomodates for 4000 students
4Skeleton works execution for the Engineering
Bldgat Al Kalamoun University
Damascus Countryside
15800 sqm _ 50% 1,300,000 Skeleton works only - 4 floors
5 Administrative Works Institute Homs 21000 sqm 35000 sqm 50% 9,500,0005 floors +a basement, construction and architectural works, turn key
6Constructing and finishing the commercial
and the secretariat institute Damascus 10500 sqm 31000 sqm 50% 4,000,000
6 floors , construction and architectural works, along with 40000 sqm site works
Educational Bldgs Projects
FINAL
Project and LocationClientWork Description
Execution Period Performance Percentage
• DentalInstitute-Hama• MinistryofHighEducation• StructuralandArchitecturalWorks/Turnkey/15000sq.m/stadiumfor300Per./5halls/Labs/Library/andbasementforservices.• 730Day• 45%
Dental Institute
FINAL
66
Project and LocationClientWork Description
Execution Period Performance Percentage
• SocialCareInstitute-Damascus• Ministryofwork&SocialAffairs• StructuralandArchitecturalWorksTurnKeyProject/23200m2• 720Day• 60%
Social Care Institute
FINAL
Computer Science InstituteProject and Location • ComputerScienceInstitute-DamascusClient • MinistryofHighEducationWork Description • StructuralandArchitecturalWorks
TurnKey/14000m2/1Basement6Floors/Capacityfor4000Student
Execution Period • 720DayPerformance Percentage • 95%
FINAL
52
Project and LocationClientWork Description
Execution Period
• CivilEngineeringBuilding-DamascusRural• QalamonUniversity• ConstructionWorksonly15800m2/4Floors• 100Day
Civil Engineering Building
FINAL
Project and LocationClientWork Description
Execution Period
• Commercial&SecretaryInstitute-Damascus• MinistryofHighEducation• StructuralandArchitecturalWorksTurnKey/12500m2/5Floors10500m2/6Floors• 1000Day
Commercial & Secretary Institute
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Civil Affairs Governorate Homs 8000 sqm 12000 sqm 80% 2,210,000.00civil, electrical, mechanical, architectural and
construction works - turn key
2 Civil Affairs Governorate Dar'a 5000 sqm 9500 sqm 45% 1,557,608.006 furnished floors +a basement, construction
and architectural works, turn key
3 Operations Bldg at Al Basel Hospital Damascus 11000 sqm _ 65% 11,900,000.00Operations Bldg at Al Basel Hospital - Dummar -
Damascus along with medical equipment
4 Patriot Block Building Damascus 2400 sqm 3000 sqm 100% 5,200.004 floors +2 underground floors, construction
and architectural works, Garage and other services
5constructing and finishing
Aleppo Transport Governorate Bldg Aleppo 12500 sqm 40200 sqm 100% 3,460,000.00
5 floors, floor area 12500 sqm, turn key, construction and architectural works as well as
40000 sqm of site works
7 Al Qunaytra Finance Governorate Qunaytra 6850 sqm 13880 sqm 100% 2,340,000.006 floors, construction and architectural works,
turn key
Governmental Bldgs Projects
FINAL
74
Project and LocationClientWork Description
Execution Period Performance Percentage
• CivilAffairs -Homs• MinistryOf• StructuralandArchitecturalWorksTurnKey/5000sq.mOnebasementand4furnishedfloors.• 420Day• 80%
InteriorAdministration
Civil Affairs Administration
Administration
Civil Affairs Administration
FINAL
Project and LocationClientWork Description
Execution PeriodPerformance Percentage
• CivilAffairs -Daraa• MinistryOfInteriol• Civil,Architectural,Electrical,andMechanicalWorks/TurnKey• 540Day• 45%
FINAL
68
Project and LocationClientWork Description
Execution PeriodPerformance Percentage
• AlBaselHospitalOperationsBuilding-Domar-Damascus• MinistryofHealth• StructuralandArchitecturalWorksTurnKeyProjectWithSupplyingMedicalInstrument.• 1080Day• 65%
Al Basel Hospital Operations Building
FINAL
54
Project and LocationClientWork Description
Execution Period
• PatriotBloc.Building-AlRawdha-Damascus• PresidencyAttainMinistry• StructuralandArchitecturalWorksTurnKey/7150m22 /4Floor• 540Day
Patriot Bloc. Building
Basements
FINAL
Project and LocationClientWork Description
Execution Period
• TransportationAdministration-AleppoCity• MinistryofTransportation• StructuralandArchitecturalWorksTurnKey/12500m2/5Floors4000sq.msiteworks.• 1100Day
Transportation Administration
FINAL
48
Project and LocationClientWork Description
Execution Period
• FinancialAdministrationBuilding-QunaitrahCity• MinistryofFinance• StructuralandArchitecturalWorksTurnKey/6850m2/6floors.• 1020Day
Financial Administration Building
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE Contract Value GLIMPSE ABOUT THE PROJECT
3Resdential Bldgs at Al Yarmouk + commercial
marketsDamascus 51000 sqm 75500 sqm Completed 5,800,000
turn key projectconstruction and architectural works - 360 residential units - 2 commercial markets 2000 sqm
5 University Residences Homs 13000 sqm 3500 sqm Completed 2,210,0002 towers/ 12 floors (for each tower) construction and architectural works, turn key
4 Resdential Bldgs at Al Barzeh Damascus 20800 sqm _ Completed 4,700,000
2 towers/ 12 floors / 144 apartments (for each tower) construction and architectural works, turn key project
1New Residences - Jadidah Artouz -
phase 1 - 1253 residential unitDamascus 188000 sqm 125000 sqm Completed 83,533,000
Turn Key project including all the architectural and construction works
2New Residences - Jadidah Artouz - phase 2
(advanced) - 2200 residential unit Damascus 330000 sqm 175000 sqm Completed 146,670,000Turn Key project including all the architectural and construction works
Residential Bldgs Projects
FINAL
Project and LocationClientWork Description
Execution Period
• ResidencesBuildings-Alyarmouk-Damascus• DamascusGovernorate• StructuralandArchitecturalWorksTurnKey/24Buildings/4Flooreach51000m2/360Apartment.• 720Day
Residences Buildings
FINAL
The begining was since 1983…
• All our real estates are void from checks and claims on the cadastre and are sectioned into partitions and then authorized in order to erect buildings on them.• Buildings are constructed together with their complete overall facilities up to a high quality standard, exactness and aestheticism.• We perform public services
pavements, asphalts and street lighting. - Finishing unification and standardization through overlaying the four frontages of each building with granite or natural stone, fitting and assembling stairs and walls marble, as well as a wooden front door and balcony banisters and ceiling lights, all form unified to all built partitions.• We carry out the registry of all built partitions at the Real Estate Directorates then, buildings are finally allotted to buyers.
And we still carry on …
Real Estate Dept.
- Non portable water lines, potable water, electricity and telephone networks as well as
FINAL
FINAL
University ResidencesProject and Location • UniversityResidences-HomsCityClient • MinistryofHighEducationWork Description • StructuralandArchitecturalWorks
TurnKey/13000sq.m2Towers/12Floorseach.
Execution Period • 945DayPerformance Percentage • 95%
FINAL
Project and LocationClientWork Description
Execution Period
• BarzehTowers-Damascus• DamascusGovernorate• StructuralandArchitecturalWorks/TurnKey/20800m2/Towers12Floorseach/144Apartment.• 820Day
Barzeh Towers
REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value
(USD)GLIMPSE ABOUT THE PROJECT
1 Reinforcement works for Marabaa Hangar Damascus _ N/A 100% 400,000 soil shoring works by using nails and shotcrete system
2 Reinforcement works for Ghardenia Hotel Homs 8000sqm N/A 100% 2,800,000Soil Shoring Works by using nails and Shotcrete system at depth of 18 metres
3shoring and constructing retaining walls
at Dummar, Island 4Damascus _ N/A 100% 350,000
Constructing a retaining wall of 17 metres height with concrete piles no 52, dim 90 cm through using nails and shotcrete system
Reinforcement and renovation Projects
FINAL
82
Project and Location
Work Description
Execution Period
• ReinforcementWorksforMarabaaHanger
• SoilShoringWorksbyusingnailsandShotcretesystem• 90Day
Reinforcement Works for Marabaa Hangar
Client • InternationalHamshoGroup
FINAL
Project and LocationClientWork Description
Execution Period
• ReinforcementWorksforGardeniaHotel-Homs• AlGadriniaRealEstateInvestmentCompany• SoilShoringWorksbyusingnailsandShotcretesystem8000sqm,Depth18m• 120Day
Reinforcement Works for Gardenia Hotel
FINAL
Project and LocationClientWork Description
Execution Period
• RetainingWall-Domar-Damascus• DamascusGovernorate• Retainingwall/hight17mbyusingnailsandshotcretesystem.• 45Day
Retaining Wall In Domar
FINAL
Ready Mixed Concrete Dept.
SINCE 1983
FINAL
84
FINAL
It is a division for producing all types of mixed concrete with its all forms (normal, resistant, cast….etc) and cement products (edges, tiles, bricks and interlock) which we produce automatically.Khayyat Contracting & Trading has established several mixing plants throughout Damascus and Damascus countryside besides the movable ones in order to provide the demands of its projects and to provide a part of the local market demands. Moreover, these weighted mixing plants are equipped with the latest technologies and automated systems by computer which meet the highest international quality standards and with total production capacity exceeded 3800 m3/day. This division is also equipped with wide range of modern and developed machines which ensure the proper work flow without any hindrance, delay or without any delay towards the customers under all circumstances and at all sites. It also includes the capability to meet the demands in quantities without delay.
Since the evolution of this division and in order to satisfy customers and maintain their great confidence in the Establishment, Khayyat Contracting & Trading has established a laboratory to control and monitor quality. This laboratory was equipped with the latest international test equipments of high reliability. These tests include:
• Test the granules grades of supplies through screens ASTM C136.• Test measurement and chemical analysis for very fine substances and which pass through
screens (200) micron 75- C117 ASTMN.• Test the qualitative weight and pebbles and sand absorption ASTM C127/C128.• Chemical tests to define impurities in sand ASTM C40.• Los Angles Test to define pebbles resistance (anti-collision).
The laboratory controls quality also by designing concrete mixtures through the most modern programs in this regard and it compares it to the reality. The laboratory monitors mixtures produced daily through some field tests and other internal laboratorial ones regularly and continuously. The most important advantages to deal with "Mixed Concrete and Cement Product" Division in Khayyat Contracting & Trading are:
1- Accurate appointments schedule strictly applied as the company ensure an administrative system and excellent organizational structure in addition to several vehicles and three mixing machines distributed around Damascus to allow it to regulate long and accurate appointments schedules without any problems or delay in delivery date and casting.
2- Excellent quality for the mixed concrete for several reasons; most importantly:
-All permitted materials are of all types of sand, granules and cement types, which is excellent raw materials as the company adopts high standards to buy these materials, even if it is from remote sources and with additional cost for transport and loading because the aim is to have best quality types and brands to realize the best quality of mixed concrete in addition to a set of additives to the mixtures to give it high and excellent resistance as per the minimum limit of the Syrian Arab code.
Ready Mixed Concrete
FINAL
86
Mixing plant addressMixing plant description
Capacity
Damascus countryside, industrial area – Adraa
Weight mixing plant automated by computer 2006
100 m3 / h
Sahnaya – Daraa highwayWeight mixing plant automated
by computer 2008150 m3 / h
Movable mixing plants to be installed at projects wherever
Installation within 24 hours ----
-Professional technical team with high competence and experience in this field, starting from the technicians in charge to mix the materials to the laboratory staff who test these materials and to trained drivers and supervising engineers. 3- Very competitive price compared to the quality of the concrete.
4- Extreme care for customers in terms of the after sale service.
5- Possibility to install movable mixing plants at casting sites within 24 hours only. Mixing plants sites of Khayyat Contracting & Trading
FINAL
90
Machinery & Reinforcement Dept.
SINCE 1983
FINAL
FINAL
92
FINAL
Specialized in performing all works of reinforcement, excavation and transportation relative to the establishment projects or the common and/or private sector projects through offering the following services:• Execution of concrete wedge works up to various depths and dimensions by the use of international class most modern wedge borer machines and all related technical accessories.• Carrying out soil lateral reinforcement by using horizontal stud technology with injected concrete or by concrete wedges with horizontal tensors.• Implementing boring works of all types and dimensions.• Effectuating transport works.• welcoming various engineering works.
Machinery & Reinforcement Dept.
1Six Wheel Tipping Lorry, capacity 20 m3, made by Mercedes Benz - Germany
5
2 Truck Towing Head, Six wheel Tipper, capacity 20m3, made by Kamaz 5
3 Wheel Loader 950 Caterpillar 7
4 Wheel Loader 4500, Volvo 4
5 Wheel Loader L 90, Volvo 4
6 Wheel Loader 980, Caterpillar 1
7 Jack Hammer with Air Compressor, Atlas Capco, 10 cylinders, pressure 23 bar, with two impellers
4
8 Electric Generating Set, 60KVA 20
9 Telescopic Crane, 50 tons capacity, made by Kobelco of Japan 1
10Tower Crane, length 44m, full automatic control, with lifting capacity 3.5 tons, jib 75m, made by Liebher - Germany
5
11 Welding Machines, MOSA Italy, with Electric Generating ,10 KVA 10
12 Welding Machines, 999 ,Chaina, 375 Am. 35
13 Electronic Total satation 30
14 Auto Level 60
15 concrete vibrators 150
Project Dept Machinery & Equipment List
1 Concrete Batching Plant, capacity 100m3, made by MEKA - Turkey, located in Addra.
1
2 Concrete Batching Plant,(Mobil system) capacity 100m3, made by MEKA - Turkey, located inYaafor
1
3 Concrete Batching Plant, capacity 120m3, made by B Makena - Turkey, located in Sahnaya.
1
4 Concrete Batching Plant, capacity 200m3, made by B Makena - Turkey, located inTartos city
1
5 Truck Mounted - Mercedes - concrete pump - Schwing. 1
6 Truck Mounted - Daewoo - concrete pump - Putzmeister. 1
7 Concrete Pump,whetzinger mounted on mercedes truk length 37m 2
8 Concrete Pump,,shwing mounted on mercedes truk length 28m 1
9 Concrete Pump, ,pustmister mounted on mercedes truk length 32m 1
10 Concrete Pump, hanwoo mounted on daewoo length 48m 1
11 Concrete Pump, hanwoo mounted onDaewoo length 58m 1
12 Truck Mixer, capacity 8.5m3, made by Kamaz. 17
Ready Mix Concret Dept Machinery & Equipment List
13 Truck Mixer, capacity 9.5m3, made by Kamaz. 12
14 Truck Mixer, capacity 10m3, made by Akor - Mercedes 14
15 Truck Mixer, capacity 12m3, made byActros - Mercedes 3
16 Laboratory Equipment for Batching Plant 1
17 Laboratory Equipment for Batching Plant z
18 Laboratory Equipment for Batching Plant 1
19 Laboratory Equipment for Batching Plant 1
20 Cement Silo, capacity 100 tons each. 4
21 Towing Heads, made by Kamaz. 5
22 Towing Heads, made by Scania. 4
23 Electric Generating Set, Noiseless, 300KVA, Assembled by CTM - Italy 12
24 Air compressor, Atlas Capco, 4 cylinders 11
25 Welding Machines For all type of steel,999 China, ACDC ,260 AM. 5
1Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with metallic sleeves, and all necessary equipment, made by Gasagrandi - Italy
5
2Hydraulic Vibrators for lowering sleeves of 110cm diameter, made by Gasagrandi - Italy
2
3Hydraulic Vibrators for lowering sleeves of 200cm diameter, made by Gasagrandi - Italy
1
4 All equipments for testing of wedges (piles) through Tensile Force. 1
5Hydraulic Pump for aerating the vibrator, pressure 400 bar with Deutz diesel engine of 6 cylinders.
1
6 Injection Machine, pressure of 200 bar, Hani 151 - Switzerland 1
7 Concrete Shooting Machine, Aliva (Sika) 146 - Switzerland 4
8 Horizontal drilling Tensiles Machine, made by Gasagrandgi - Italy 2
9Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with metallic sleeves, and all necessary equipment, made by Sany - China
1
10 Dewatering pump 50
Foundation and Pilling DeptMachinery & Equipment List
1 Bulldozer D9, Caterpillar 3
2 Crawler Loader 977, Caterpillar 2
3 Water Tank Wagon 2
4 Rollers, 8 tons, Dynapac 4
5 Grader, Caterpillar 1
6 Agricultural Tractor 11
7 Loader, capacity 70 tons, made by Mercedes 8
8 Excavator - Poclain C170 - France 2
Roads and Infra Dept Machinery & Equipment List
1 AUDI S08 12 H.VERNA 13 LADA 14 SHANA 15 KIA RIO 26 AVANTI 17 KIA PICANTO 38 SUZUKY 19 PEUGOT 206 1
10 RENAULT KANGO 211 KIA MORNING 512 KIA 113 H.VAN 414 HYUNDAI 1
Service Cars Machinery & Equipment List
FINAL
Global Trade & Supplying Dept.
SINCE 1983
FINAL
96
This dept is specialized in global trading and supplying around the world, we import all equipment and technology from manufacturers to employer.
Our mission is to make quality products available to client at reasonable price and on time, our aim is to cater the needs of the client with adequate support of premier technical and management services in a highly responsible manner.
We are welcoming in any company and manufacturer to be our partner in our successful business.
Global Trade & Supplying Dept.
FINAL
Quality & Safety Philosophy
SINCE 1983
FINALThrough built-in monitoring and implementation procedures, KCT is commitied to
delivering a quality construction projects and final product. The procedures begin during the pre-construction phase with budgeting, value engineering services, and subcontractor selection. The Quality Control proceduers togather through a concentrated effort of teamwork involving KCT Estimators, Project Manager, Safety Director, and field staff to deliver the Client a successful project.At KCT, safety is a prime concern. Our full-time Safety Director visits each individual project site, performs regular staff training and networks with other to insure safe working conditions are being maintained.Weekly safety meetings are held on each project site to stress the importance of jobsite safety and to keep safety in the minds of each individual working on the site.
At KCT, we are always improving...
Quality & Safety Philosophy
FINAL
KCT executes diverse construction projects and has a reputation of being one of the best construction companies, who successfully complete all projects in the shortest time possible.
Our qualified & committed project management team, adequate manpower and sophisticated machinery contribute to our success and continued grwoth.
Our specialization enables us to deliver beyond expectations in markets where technical proficiency is a necessity.
We constantly upgrade our processes and adopt new technologies to retain our competitive edge and maintain our position as market leader in the construction field.
Why KCT ?
FINAL
Contacts Info.
Damascus Rural - SyriaP.O.BOX : 206Tel : +963 11 622 49 96 +963 11 621 61 79 +963 11 621 70 21Mobile : +963 955 88 88 80Fax : +963 11 621 55 79e-mail: [email protected]
Damascus Rural - SyriaP.O.BOX : 13404Fax: +963 11 214 48 45Tel : +963 11 214 55 77 +963 11 214 6002 +963 11 214 6003Mob.+963 949 99 99 96 +963 949 99 99 [email protected]
www.khayyat-sy.com