State of Michigan [email protected] Official Request #: 870 Requestor: Grand Valley State University Project Description: A/V Video Conferencing Upgrades at CHS Project Number: Kent County Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 1 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision =================================================================================================== Asbestos & Lead Abatement Laborer Asbestos & Lead Abatement Laborer MLDC 10/1/2014 $40.25 $53.64 $67.03 H H H X X X X D Y 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive Asbestos & Lead Abatement, Hazardous Material Handler Asbestos and Lead Abatement, Hazardous AS207 10/1/2014 $40.25 $53.58 $66.90 H H H X X X X D Y Material Handler 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive Boilermaker Boilermaker BO169 2/17/2015 $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates: 1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21 Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 1 of 31

Upload: others

Post on 31-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

State of Michigan [email protected]

Official Request #: 870 Requestor: Grand Valley State University Project Description: A/V Video Conferencing Upgrades at CHS Project Number:

Kent County

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 1 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Asbestos & Lead Abatement Laborer Asbestos & Lead Abatement Laborer MLDC 10/1/2014 $40.25 $53.64 $67.03 H H H X X X X D Y 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive

Asbestos & Lead Abatement, Hazardous Material Handler Asbestos and Lead Abatement, Hazardous AS207 10/1/2014 $40.25 $53.58 $66.90 H H H X X X X D Y Material Handler 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive

Boilermaker Boilermaker BO169 2/17/2015 $54.70 $81.08 $107.45 H H H H H H H D Y

Apprentice Rates:

1st 6 months $40.31 $59.49 $78.67

2nd 6 months $41.45 $61.21 $80.95

3rd 6 months $42.57 $62.88 $83.19

4th 6 months $43.69 $64.57 $85.43

5th 6 months $44.81 $66.24 $87.67

6th 6 months $48.63 $72.50 $96.36

7th 6 months $49.32 $73.01 $96.69

8th 6 months $51.58 $76.40 $101.21

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 1 of 31

Page 2: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 2 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Bricklayer Bricklayer & Block Masonry BR-9-1-B 5/7/2015 $39.83 $52.71 $65.59 H H H H H H H D Y 4 10s allowed M-F Make up day allowed comment Saturday for bricklayer only No make up day for block

Apprentice Rates:

0-749 hours $29.53 $37.26 $44.99

750 - 1,499 hours $30.81 $39.18 $47.55

1,500 - 2,249 hours $32.10 $41.11 $50.13

2,250 - 2,999 hours $33.39 $43.05 $52.71

3,000 - 3,749 hours $34.68 $44.99 $55.29

3,750 - 4,499 hours $35.97 $46.92 $57.87

4,500 - 5,249 hours $37.25 $48.84 $60.43

5,250 - 6,000 hours $38.54 $50.77 $63.01

Stone Mason and Artificial Masonry BR-9-1-BL 5/7/2015 $39.83 $52.71 $65.59 H H H H H H H D Y 4 10s allowed M-F

Apprentice Rates:

0-749 hours $30.81 $39.18 $47.55

750 -1499 hours $32.10 $41.11 $50.13

1500-2249 hours $33.39 $43.05 $52.71

2250-2999 hours $34.68 $44.99 $55.29

3000-3749 hours $35.97 $46.92 $57.87

3751-4499 hours $37.25 $48.84 $60.43

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 2 of 31

Page 3: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 3 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Carpenter Carpenter CA-100 6/6/2014 $36.95 $46.78 $56.60 X X H H H H H D N Make up day allowed comment Saturday Apprentice Rates:

1st year $29.09 $34.98 $40.88

2nd year $31.06 $37.94 $44.82

3rd year $33.02 $40.88 $48.74

4th year $34.00 $42.35 $50.70

Floor Layer CA-100FL 6/6/2014 $39.16 $50.08 $61.00 X X H H H H H D N Make up day allowed comment Saturday Apprentice Rates:

1st year $30.42 $36.97 $43.52

2nd year $32.61 $40.26 $47.90

3rd year $34.79 $43.52 $52.26

4th year $35.88 $45.16 $54.44

Cement Finisher Cement Finisher & Plasterer BR-9-1-CF 3/17/2015 $35.28 $46.63 $57.98 X X H X X X H D Y 4 10s allowed M-F; plasterer OT schedule is HHHHHHHDY

Apprentice Rates:

0-749 hours $27.34 $34.72 $42.10

750-1499 hours $28.47 $36.42 $44.36

1500-2249 hours $29.60 $38.11 $46.62

2250-2999 hours $30.74 $39.82 $48.90

3000-3749 hours $31.87 $41.52 $51.16

3750-4499 hours $33.01 $43.22 $53.44

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 3 of 31

Page 4: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 4 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Cement Mason Cement Mason PL16-8 10/23/2012 $33.93 $44.51 $55.08 H H H H H H H D Y Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked. Make up day allowed comment Friday or Saturday for inclement weather Apprentice Rates:

1st year $26.53 $33.40 $40.28

2nd year $28.64 $36.57 $44.50

3rd year $30.76 $39.75 $48.74

Drywall Drywall Taper and Finisher PT-845-DF 7/8/2014 $37.39 $49.64 $61.89 H H H H H H H D N

Apprentice Rates:

0 - 1,000 hours $26.37 $33.11 $39.85

1,001 - 2,000 hours $27.59 $34.94 $42.29

2,001 to 3,000 hours $29.55 $37.88 $46.21

3,001 to 4,000 hours $31.27 $40.46 $49.65

4,001 to 5,000 hours $33.71 $44.12 $54.53

5,001 to 6,000 hours $36.17 $47.81 $59.45

Electrician Sound and Communication Journeyman EC-275 SC 10/1/2014 $34.32 $47.25 $60.18 H H H H H H H D Y Technician Make up day allowed comment Four consecutive 10s allowed M-Th/Friday may be used as a make-up day Apprentice Rates:

1st period $18.88 $26.64 $34.39

2nd period $21.63 $30.68 $39.73

3rd period $24.37 $34.71 $45.05

4th period $27.12 $38.75 $50.39

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 4 of 31

Page 5: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 5 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Inside Wireman EC-275-IW 10/1/2014 $45.14 $64.28 $83.42 H H H H H H H D Y Make up day allowed comment 4 consecutive 10s allowed M-Th Friday may be used as a make-up day

Apprentice Rates:

0-1000 hours $18.14 $24.03 $29.92

1000-2000 hours $19.62 $26.25 $32.88

2000-3500 hours $22.78 $31.12 $39.45

3500-5000 hours $24.29 $33.38 $42.47

5000-6500 hours $27.93 $38.84 $49.75

6500-8000 hours $31.05 $43.52 $55.99

Elevator Constructor Elevator Constructor Mechanic EL-85 4/8/2013 $70.77 $116.32 D D D D D D D D Y comment 4 tens allowed M-TH Apprentice Rates:

1st year $50.27 $75.32

2nd year $54.83 $84.44

3rd year $57.10 $88.98

4th year $61.66 $98.10

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 5 of 31

Page 6: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 6 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Glazier Glazier GL-826 7/16/2014 $43.53 $58.26 $72.98 H H H H H H H D Y 4 tens allowed on consecutive days

Apprentice Rates:

1st 6 months $31.04 $39.87 $48.71

2nd 6 months $32.60 $42.17 $51.74

3rd 6 months $34.17 $44.48 $54.79

4th 6 months $35.73 $46.78 $57.82

5th 6 months $37.28 $49.06 $60.84

6th 6 months $38.84 $51.35 $63.87

7th 6 months $40.40 $53.65 $66.90

8th 6 months $41.97 $55.96 $69.95

Heat and Frost Insulator Spray Insulation AS25S 3/5/2007 $20.14 $29.14 H H H H H H H H N

Heat and Frost Insulator and Asbestos Worker Heat and Frost Insulator and Asbestos Worker AS47 3/11/2013 $44.40 $58.76 $73.12 H H H H H H H D Y 4 ten hour work days shall be either Monday thru Thursday or Tuesday thru Friday Make up day allowed comment Friday for missed time during M-Th 4 ten schedule Apprentice Rates:

1st year $25.78 $32.96 $40.14

2nd year $29.50 $38.11 $46.73

3rd year $33.22 $43.27 $53.32

4th year $36.95 $48.44 $59.93

5th year $40.68 $53.61 $66.53

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 6 of 31

Page 7: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 7 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Ironworker Pre-engineered Metal Work IR-25-PE-Z2 6/3/2015 $44.27 $53.95 $63.62 X X H X X X X D Y Make up day allowed comment 4 tens allowed M-Th with Saturday make up day Apprentice Rates:

1st Year $27.36 $32.83 $38.31

3rd 6 month period $29.48 $35.71 $41.93

4th 6 month period $31.61 $38.60 $45.58

5th 6 month period $33.73 $41.46 $49.20

6th 6 month period $35.86 $44.35 $52.84

Fence, Sound Barrier & Guardrail IR-340-F2 5/6/2015 $30.65 $40.65 $50.65 X X H X X X H D Y erection/installation and Exterior Signage work Four ten hour work days may be worked during Monday-Saturday.

Apprentice Rates:

60% Level $21.85 $27.85 $33.85

65% Level $22.95 $29.45 $35.95

70% Level $24.06 $31.06 $38.06

75% Level $25.15 $32.65 $40.15

80% Level $26.25 $34.25 $42.25

85% Level $27.35 $35.85 $44.35

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 7 of 31

Page 8: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 8 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Reinforcing: any work in connection with field IR-340-Ref 9/17/2014 $45.05 $55.39 $65.73 H H H H H H H D Y fabrication, post tensioning, prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction. Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction. The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope. Make up day allowed comment for 4 10s, Fridays for 5 8s, Saturday Both apply if employee loses 4 or more straight time hours in any week because the job is down.

Apprentice Rates:

Registered 1st year $27.16 $33.31 $39.46

Registered 2nd year $28.21 $34.88 $41.56

Registered 3rd year $33.80 $42.05 $50.29

Rigging, heavy machinery moving and related IR-340-RIG 4/4/2013 $37.43 $47.43 $57.43 X X X X X X X D Y tasks Make up day allowed comment Saturday Apprentice Rates:

1st year $22.50 $27.31 $32.11

2nd year $25.61 $33.31 $40.11

3rd year $30.59 $40.17 $48.65

4th year $32.67 $43.52 $53.11

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 8 of 31

Page 9: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 9 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Structural and Finish work: all work related to IR-340-STR 9/17/2014 $45.05 $55.39 $65.73 H H H H H H H D Y the fabrication, erection & construction of all iron, steel, precast and reinforced concrete structures; bolting, decking, siding, glazing and curtain wall, misc steel stairways, handrails; rigging, signaling, loading, unloading, sorting and stacking of all material. The framing and erection or dismantling of all cranes, travelers and derricks. Field & job fabrication cutting, bending, drilling, welding & burning with acetylene torch or electric device; operation of man lifts or equipment to perform work; misc and ornamental iron and metal, including lockers, jail doors, bunks, iron doors, guardhouses, grating, racks, platforms and uni-strut supports; aligning or leveling or surveying in connection with steel or machinery erection. All demolition and dismantling or iron, steel, precast & Make up day allowed comment for 4 10s, Fridays for 5 8s, Saturday Both apply if employee loses 4 or more straight time hours in any week because the job is down.

Apprentice Rates:

1st Year Registered $27.16 $33.31 $39.46

2nd Year Registered $28.21 $34.88 $41.56

3rd Year Registered $33.80 $42.05 $50.29

4th Year Registered $35.90 $45.19 $54.49

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 9 of 31

Page 10: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 10 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Laborer Class A Laborer - all construction on buildings, l355-2-a 6/27/2014 $31.25 $40.48 $49.70 X X H H H H H D Y pumps, well wheels, air, electric or gasoline tools, motor driven buggies, fire watch duty, working on swing scaffolds, heavy construction work, carpenter tender, cement finisher tender, heater tender & flagperson. Cleaning and clearing of all debris, including wire brushing of windows, scraping of floors, removal of surplus material from all fixtures within confines of structure and cleaning all debris in building and construction area. The general cleanup, including sweeping, cleaning, washdown and wiping of construction facility, equipment and furnishings and removal and loading or burning of all debris including crates, boxes, packaging waste material. Washing and cleaning of walls, partitions, ceilings, windows, bathrooms, kitchens, laboratory, and all fixtures and facilities therein. Cleanup, mopping, washing, waxing and polishing or dusting of all Make up day allowed comment Monday - Saturday Apprentice Rates:

0 - 1,000 work hours $26.64 $33.56 $40.48

1,001 - 2,000 work hours $27.56 $34.94 $42.32

2,001 - 3,000 work hours $28.48 $36.32 $44.16

3,001 - 4,000 work hours $30.33 $39.10 $47.86

Class B Laborer - jackhammer operators, L355-2-B 6/27/2014 $31.50 $40.85 $50.20 X X H H H H H D Y crocklayers and caisson worker in buildings. Make up day allowed comment Monday - Saturday Apprentice Rates:

0-1,000 work hours $26.82 $33.83 $40.84

1,001-2,000 work hours $27.76 $35.24 $42.72

2,001-3,000 work hours $28.70 $36.65 $44.60

3,001-4,000 work hours $30.56 $39.44 $48.32

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 10 of 31

Page 11: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 11 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class C Laborer - top men on chimneys or L355-2-C 6/27/2014 $32.00 $41.60 $51.20 X X H H H H H D Y towers over thirty feet in height, material mixers, portable mixer operator, plasterer tender, mason tender, and demolition burner. Make up day allowed comment Monday - Saturday Apprentice Rates:

0-1,000 work hours $27.20 $34.40 $41.60

1,001-2,000 work hours $28.16 $35.84 $43.52

2,001-3,000 work hours $29.12 $37.28 $45.44

3,001-4,000 work hours $31.04 $40.16 $49.28

Class D Laborer - concrete specialist when no L355-2-D 6/27/2014 $35.81 $47.27 $58.72 X X H H H H H D Y cement finishers are available; troweling, finishing, screeding, patching, cutting, curing of cast in place or precast concrete by any and all methods. Make up day allowed comment Monday - Saturday Apprentice Rates:

0-1,000 work hours $30.08 $38.67 $47.26

1,001-2,000 work hours $31.23 $40.40 $49.56

2,001-3,000 work hours $32.37 $42.10 $51.84

3,001-4,000 work hours $34.66 $45.54 $56.42

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 11 of 31

Page 12: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 12 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Laborer - Hazardous Class A Laborer - performing work in conjunction LHAZ-Z9-A 11/7/2014 $31.79 $44.79 $57.78 H H H H H H H D Y with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal , handling, or containment of hazardous waste substances when use of personal protective equipment level " D" is required. Make up day allowed comment 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Apprentice Rates:

0-1,000 work hours $27.04 $37.66 $48.28

1,001-2,000 work hours $27.99 $39.08 $50.18

2,001-3,000 work hours $28.94 $40.51 $52.08

3,001-4,000 work hours $30.84 $43.36 $55.88

Class B Laborer - performing work in conjunction LHAZ-Z9-B 11/7/2014 $32.79 $46.29 $59.78 H H H H H H H D Y with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required. Make up day allowed comment 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Apprentice Rates:

0-1,000 work hours $27.79 $38.78 $49.78

1,001-2,000 work hours $28.79 $40.28 $51.78

2,001-3,000 work hours $29.79 $41.78 $53.78

3,001-4,000 work hours $31.79 $44.78 $57.78

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 12 of 31

Page 13: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 13 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Laborer Underground - Tunnel, Shaft & Caisson Class I - Tunnel, shaft and caisson laborer, LAUCT-Z2-1 10/30/2014 $35.67 $47.07 $58.47 X X X X X X X D Y dump man, shanty man, hog house tender, testing man (on gas), and watchman.

Apprentice Rates:

0-1,000 work hours $30.52 $39.35 $48.17

1,001-2,000 work hours $31.55 $40.90 $50.23

2,001-3,000 work hours $32.58 $42.44 $52.29

3,001-4,000 work hours $34.64 $45.53 $56.41

Class II - Manhole, headwall, catch basin LAUCT-Z2-2 10/30/2014 $35.76 $47.21 $58.65 X X X X X X X D Y builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder

Apprentice Rates:

0-1,000 work hours $30.58 $39.44 $48.29

1,001-2,000 work hours $31.62 $41.00 $50.37

2,001-3,000 work hours $32.66 $42.56 $52.45

3,001-4,000 work hours $34.72 $45.65 $56.57

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 13 of 31

Page 14: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 14 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class III - Air tool operator (jack hammer man, LAUCT-Z2-3 10/30/2014 $35.86 $47.36 $58.85 X X X X X X X D Y bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).

Apprentice Rates:

0-1,000 work hours $30.66 $39.56 $48.45

1,001-2,000 work hours $31.70 $41.12 $50.53

2,001-3,000 work hours $32.74 $42.68 $52.61

3,001-4,000 work hours $34.82 $45.80 $56.77

Class IV - Tunnel, shaft and caisson mucker, LAUCT-Z2-4 10/30/2014 $36.02 $47.60 $59.17 X X X X X X X D Y bracer man, liner plate man, long haul dinky driver and well point man.

Apprentice Rates:

0-1,000 work hours $30.78 $39.74 $48.69

1,001-2,000 work hours $31.83 $41.32 $50.79

2,001-3,000 work hours $32.88 $42.89 $52.89

3,001-4,000 work hours $34.97 $46.02 $57.07

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 14 of 31

Page 15: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 15 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class V - Tunnel, shaft and caisson miner, drill LAUCT-Z2-5 10/30/2014 $36.28 $47.99 $59.69 X X X X X X X D Y runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)

Apprentice Rates:

0-1,000 work hours $30.98 $40.04 $49.09

1,001-2,000 work hours $32.04 $41.63 $51.21

2,001-3,000 work hours $33.10 $43.22 $53.33

3,001-4,000 work hours $35.22 $46.40 $57.57

Class VI - Dynamite man and powder man. LAUCT-Z2-6 10/30/2014 $36.59 $48.45 $60.31 X X X X X X X D Y

Apprentice Rates:

0-1,000 work hours $31.21 $40.38 $49.55

1,001-2,000 work hours $32.28 $41.99 $51.69

2,001-3,000 work hours $33.36 $43.61 $53.85

3,001-4,000 work hours $35.51 $46.84 $58.15

Class VII - Restoration laborer, seeding, LAUCT-Z2-7 10/30/2014 $28.86 $36.86 $44.85 X X X X X X X D Y sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

Apprentice Rates:

0-1,000 work hours $25.41 $31.68 $37.95

1,001-2,000 work hours $26.10 $32.72 $39.33

2,001-3,000 work hours $26.79 $33.76 $40.71

3,001-4,000 work hours $28.17 $35.82 $43.47

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 15 of 31

Page 16: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 16 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Landscape Laborer Landscape Specialist includes air, gas, and diesel LLAN-Z2-A 6/26/2014 $27.85 $38.49 $49.12 X X H X X X H D Y equipment operator, skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs. Sundays paid at time & one half. Holidays paid at double time.

Skilled Landscape Laborer: small power tool LLAN-Z2-B 6/26/2014 $23.65 $31.06 $38.47 X X H X X X H D Y operator, lawn sprinkler installers' tender, material mover, truck driver on when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs Sundays paid at time & one half. Holidays paid at double time.

Operating Engineer Class C- Regular equipment operator, crane, stiff EN-324-BH1C 8/5/2014 $50.15 $64.32 $78.49 H H H H H H H D Y leg derrick, scraper dozer, grader, front end loader, hoist, job mechanic, head grease man, concrete pump truck & hydro excavators Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Apprentice Rates:

0 - 999 hours $40.75 $50.67 $60.59

1,000 - 1,999 hours $42.17 $52.80 $63.43

2,000 - 2,999 hours $43.58 $54.91 $66.25

3,000 - 3,999 hours $45.00 $57.05 $69.09

4,000 - 4,999 hours $46.42 $59.17 $71.93

5.000 - 5,999 hours $47.83 $61.29 $74.75

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 16 of 31

Page 17: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 17 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class D- Air tugger (single drum), material hoist, EN-324-BH1D 8/5/2014 $45.05 $56.67 $68.29 H H H H H H H D Y boiler operator, sweeping machine, winch truck, Bob Cat & similar equipment, elevators (when operated by an operating engineer), and fork truck over 20' lift Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Class E- Pump 6" or over, well points, freeze EN-324-BH1E 9/12/2013 $44.45 $55.77 $67.09 H H H H H H H D Y systems, boom truck (non-swinging), end dumps and laser/power screed, concrete wire saw 20 h.p. and over, & brokk concrete breaker Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Class F- Air compressor, welder, generators, EN-324-BH1F 8/5/2014 $42.00 $52.10 $62.19 H H H H H H H D Y conveyors, pumps under 6", Grease man, and fork truck 20' or less lift Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Class G- Oiler, fireman and heater operator EN-324-BH1G 8/5/2014 $40.35 $49.62 $58.89 H H H H H H H D Y Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 17 of 31

Page 18: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 18 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class A- Crane w/ main Boom & Jib 220' or EN-OSA 8/5/2014 $50.90 $65.45 $79.99 H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-

Class A- Crane w/ main Boom & Jib 300' or EN-OSA3 8/5/2014 $52.40 $67.70 $82.99 H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-

Class A- Crane w/ main Boom & Jib 400' or EN-OSA4 8/5/2014 $53.90 $69.95 $85.99 H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday

Class B- Crane Operator with main boom and EN-OSB 8/5/2014 $50.65 $65.07 $79.49 H H H H H H H D Y jib 140' or longer, tower cranes, gantry crane, whirley derrick Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday- Thursday may be scheduled on Friday.

Operating Engineer - DIVER Diver/Wet Tender/Tender/Rov Pilot/Rov Tender GLF D 4/2/2014 $52.80 $79.20 $105.60 H H H H H H H D N

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Statewide Page 18 of 31

Page 19: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 19 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Operating Engineer - Marine Construction Diver/Wet Tender, Engineer (hydraulic dredge) GLF-1 2/12/2014 $65.00 $84.85 $104.70 X X H H H H H D Y

Make up day allowed

Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters

Crane/Backhoe Operator, 70 ton or over Tug GLF-2 2/12/2014 $63.50 $82.60 $101.70 X X H H H H H D Y Operator, Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender Holiday pay = $120.80 per hour, wages & Make up day allowed

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Friction, Lattice Boom or Crane License GLF-2B 2/12/2014 $64.50 $84.10 $103.70 X X H H H H H D Y Certification Holiday pay = $123.30 Make up day allowed

Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters

Deck Equipment Operator, Machineryman, GLF-3 2/12/2014 $59.30 $76.30 $93.30 X X H H H H H D Y Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery Holiday pay = $110.30 per hour, wages & Make up day allowed

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Deck Equipment Operator, GLF-4 2/12/2014 $53.60 $67.75 $81.90 X X H H H H H D Y (Machineryman/Fireman), (4 equipment units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator Holiday pay = $96.05 per hour, wages & fringes Make up day allowed

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Statewide Page 19 of 31

Page 20: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 20 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Operating Engineer Steel Work Class A- Crane w/ main Boom & Jib 220' or EN-324-SWW1220 8/5/2014 $51.25 $65.97$80.69H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday

Class A- Crane w/ main Boom & Jib 300' or EN-324-SWW1300 8/5/2014 $52.75 $68.22$83.69H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday

Class A- Crane w/ main Boom & Jib 400' or EN-324-SWW1400 8/5/2014 $54.25 $70.47$86.69H H H H H H H D Y longer Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday

Class B- Crane Operator with main boom and EN-324-SWW1B 8/5/2014 $51.00 $65.60$80.19H H H H H H H D Y jib 140' or longer, tower cranes, gantry crane, whirley derrick Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates

Page 21: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Project Number: prescribed in a contract. County: Kent Page 20 of 31

Page 22: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 21 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class C- Regular equipment operator, crane, EN-324-SWW1C 8/5/2014 $50.50 $64.85$79.19H H H H H H H D Y dozer, grader, loader, hoist, straddle wagon, job mechanic & hydro excavator Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Apprentice Rates:

0 - 999 hours $40.99 $51.03 $61.07

1,000 - 1,999 hours $42.43 $53.19 $63.95

2,000 - 2,999 hours $43.86 $55.33 $66.81

3,000 - 3,999 hours $45.30 $57.49 $69.69

4,000 - 4,999 hours $46.73 $59.64 $72.55

5,000 - 5,999 hours $48.17 $61.80 $75.43

Class D- Air tugger (single drum), material hoist, EN-324-SWW1D 8/5/2014 $45.40 $57.20$68.99H H H H H H H D Y pump 6" or over, elevators (when operated by an operating engineer) and brokk concrete breaker Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday

Class E- Air compressor, welder, generators and EN-324-SWW1E 8/5/2014 $43.75 $54.72$65.69H H H H H H H D Y conveyors.

Class F- Oiler and Fireman EN-324-SWW1F 8/5/2014 $41.15 $50.82$60.49H H H H H H H D Y Four 10 hour days may be scheduled Monday- Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent

Page 23: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Page 21 of 31

Page 24: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 22 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Operating Engineer Underground Class I Equipment - Backfiller Tamper, Backhoe, EN-324A2-UC1 10/14/2014 $50.03 $64.42 $78.80 H H H H H H H D Y Batch Plant Operator, Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hydro excavator, power shovel, roller asphalt, scraper self- propelled or tractor drawn, side boom tractor, slip form paver, slope paver, trencher over 8 ft. digging capacity, well drilling rig, concrete pump

Apprentice Rates:

0-999 hours $40.60 $50.67 $60.74

1,000-1,999 hours $42.04 $52.83 $63.62

2,000-2,999 hours $43.48 $54.99 $66.50

3,000-3,999 hours $44.92 $57.15 $69.38

4,000-4,999 hours $46.36 $59.31 $72.26

5,000-5,999 hours $47.80 $61.48 $75.14

Class II Equipment - Boom Truck, Crusher, EN-324A2-UC2 10/14/2014 $45.14 $57.08 $69.02 H H H H H H H D Y Hoist, Pump 6 inch discharge or larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck

Class III Equipment - Air Compressors 600 cfm EN-324A2-UC3 10/14/2014 $44.64 $56.33 $68.02 H H H H H H H D Y or larger, Air Compressors 2 or more less than 600 dfm, Boom Truck non-swinging non- powered type boom, Concrete Breaker self- propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other than passenger, Pump 4 inch to 6 inch discharge, pumpcrete machine, wagon drill, welding machine or generator 2 or more 300 amp or

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 22 of 31

Page 25: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 23 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Class IV Equipment - Boiler, Concrete Saw 40 EN-324A2-UC4 10/14/2014 $44.36 $55.91 $67.46 H H H H H H H D Y hp or over, curing machine self propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps up to 4 inch discharge, roller other than asphalt, stump remover, sweeper wayne type, trencher, vibrating compaction equipment self propelled 6 ft. wide or over, water wagon.

Painter Painter PT-845-BR 7/17/2014 $33.74 $44.69 $55.63 H H H H H H H D Y A 4-10s workweek allowed Monday-Thursday.

Apprentice Rates:

0-1000 hours $23.89 $29.91 $35.93

1001-2000 hours $24.98 $31.55 $38.11

2001-3000 hours $26.74 $34.19 $41.63

3001-4000 hours $28.27 $36.48 $44.69

4001-5000 hours $30.46 $39.77 $49.07

5001-6000 hours $32.65 $43.05 $53.45

Pipe and Manhole Rehab General Laborer for rehab work or normal TM247 4/17/2015 $28.20 $38.20 H H H H H H H H N cleaning and cctv work-top man, scaffold man, CCTV assistant, jetter-vac assistant

Tap cutter/CCTV Tech/Grout Equipment TM247-2 4/17/2015 $32.70 $44.95 H H H H H H H H N Operator: unit driver and operator of CCTV; grouting equipment and tap cutting equipment

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Statewide Page 23 of 31

Page 26: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 24 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

CCTV Technician/Combo Unit Operator: unit TM247-3 4/17/2015 $31.45 $43.07 H H H H H H H H N driver and operator of cctv unit or combo unit in connection with normal cleaning and televising work

Boiler Operator: unit driver and operator of TM247-4 4/17/2015 $33.20 $45.70 H H H H H H H H N steam/water heater units and all ancillary equipment associated

Combo Unit driver & Jetter-Vac Operator TM247-5 4/17/2015 $33.20 $45.70 H H H H H H H H N

Pipe Bursting & Slip-lining Equipment Operator TM247-6 4/17/2015 $34.20 $47.20 H H H H H H H H N

Plasterer Plasterer PL16-1 10/23/2012 $33.61 $44.20 $54.79 H H H H H H H D N

Apprentice Rates:

1st year $26.20 $33.09 $39.97

2nd year $28.31 $36.25 $44.19

3rd year $30.43 $39.43 $48.43

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 24 of 31

Page 27: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 25 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Plumber, Pipefitter, Welder, HVAC & Refrigeration Plumber, Pipefitter, Welder, HVAC & PL-174-PP 10/10/2014 $50.63 $71.63 $92.62 H H D H H H D D Y Refrigeration 4 tens may be worked M-Thursday or Tuesday- F @ the straight time rate. 4 tens may also be worked M-F on a holiday

Apprentice Rates:

1st year $23.94 $31.59 $39.24

2nd year $30.78 $41.85 $52.92

3rd year $32.79 $44.87 $56.94

4th year $36.81 $50.89 $64.98

5th year $40.83 $56.93 $73.02

Pointer, Cleaner and Caulker Pointer, Cleaner and Caulker BR-9-1-C 3/17/2015 $36.86 $48.73 $60.59 H H H H H H H D Y Four 10s allowed M-F

Apprentice Rates:

0-749 hours $28.55 $36.26 $43.97

750-1499 hours $29.74 $38.05 $46.35

1500-2249 hours $30.93 $39.83 $48.73

2250-2999 hours $32.11 $41.60 $51.09

3000-3749 hours $33.30 $43.39 $53.47

3750-4499 hours $34.49 $45.17 $55.85

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 25 of 31

Page 28: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 26 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Roofer Commercial Roofer RO-70-Z4 9/17/2014 $29.16 $38.34 $47.51 X X H H H H H D Y

Apprentice Rates:

1st Class $21.88 $27.80 $33.72

2nd Class $22.88 $29.24 $35.60

3rd Class $23.87 $30.66 $37.45

4th Class $25.60 $33.18 $40.76

5th Class $26.52 $34.51 $42.51

6th Class $27.53 $35.90 $44.28

7th Class $28.29 $37.04 $45.80

Sewer Relining Class I-Operator of audio visual CCTV system SR-I 11/3/2014 $42.76 $57.75 $72.74 H H H H H H H D N including remote in-ground cutter and other equipment used in conjunction with CCTV

Class II-Operator of hot water heaters and SR-II 11/3/2014 $41.23 $55.46 $69.68 H H H H H H H D N circulation system; water jetters; and vacuum and mechanical debris removal systems and those assisting.

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Statewide Page 26 of 31

Page 29: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 27 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Sheet Metal Worker Sheet Metal Worker SHM-7-2 9/25/2014 $41.42 $55.55 $69.67 H H H H D D D D Y 4 10s allowed as consecutive days, M-Th or T-F

Apprentice Rates:

1st 6 months $19.90 $26.25 $32.61

2nd 6 months $21.31 $28.37 $35.43

3rd 6 months $22.73 $30.50 $38.27

4th 6 months $24.14 $32.61 $41.09

5th 6 months $31.53 $40.71 $49.89

6th 6 months $32.94 $42.83 $52.71

7th 6 months $34.36 $44.95 $55.55

8th 6 months $35.77 $47.07 $58.37

Sprinkler Fitter Sprinkler Fitter SP 669 9/17/2009 $46.51 $61.99 $77.47 H H H H H H H D Y Make up day allowed

Apprentice Rates:

Class 1 & 2 $23.44 $31.31 $39.17

Class 3 $29.35 $37.75 $46.15

Class 4 $30.93 $40.12 $49.31

Class 5 $35.50 $45.47 $55.45

Class 6 $37.07 $47.83 $58.59

Class 7 $38.65 $50.20 $61.75

Class 8 $40.22 $52.55 $64.89

Class 9 $41.79 $54.91 $68.03

Class 10 $43.36 $57.27 $71.17

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 27 of 31

Page 30: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 28 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Tile, Terrazzo and Mosiac Finisher - Four 10s allowed M-F BR9-31-TF 3/24/2015 $32.19 $41.31 $50.43 H H H H H H H D Y

Apprentice Rates:

0-749 hours $25.81 $31.74 $37.67

750-1,499 hours $26.72 $33.11 $39.49

1,500-2,249 hours $27.63 $34.47 $41.31

2,250-2,999 hours $28.54 $35.83 $43.13

3,000-3,749 hours $29.45 $37.20 $44.95

3,750-4,499 hours $30.37 $38.58 $46.79

Setter - Four 10s allowed M-F BR9-31-TS 3/24/2015 $37.56 $48.33 $59.09 H H H H H H H D Y

Apprentice Rates:

0-749 hours $30.02 $37.01 $44.01

750-1499 hours $31.10 $38.63 $46.17

1500-2249 hours $32.18 $40.25 $48.33

2250-2999 hours $33.25 $41.86 $50.47

3000-3749 hours $34.33 $43.48 $52.63

3750-4499 hours $35.41 $45.10 $54.79

Truck Driver of all trucks of 8 cubic yd capacity or over TM-RB2 8/8/2013 $41.92 $37.85 H H H H H H H H Y

of all trucks of 8 cubic yard capacity or less TM-RB2A 8/8/2013 $41.82 $37.70 H H H H H H H H Y (except dump trucks of 8 cubic yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)

on euclid type equipment TM-RB2B 8/8/2013 $41.35 $38.08 H H H H H H H H Y

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 28 of 31

Page 31: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 29 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Underground Laborer Open Cut, Class I Construction Laborer LAUC-Z4-1 10/30/2014 $32.52 $42.35 $52.17 X X X X X X X D Y

Apprentice Rates:

0-1,000 work hours $28.17 $35.83 $43.47

1,001-2,000 work hours $29.04 $37.13 $45.21

2,001-3,000 work hours $29.91 $38.43 $46.95

3,001-4,000 work hours $31.65 $41.05 $50.43

Underground Laborer Open Cut, Class II Mortar and material mixer, concrete form man, LAUC-Z4-2 10/30/2014 $32.65 $42.54 $52.43 X X X X X X X D Y signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

Apprentice Rates:

0-1,000 work hours $28.27 $35.97 $43.67

1,001-2,000 work hours $29.14 $37.28 $45.41

2,001-3,000 work hours $30.02 $38.60 $47.17

3,001-4,000 work hours $31.77 $41.23 $50.67

Underground Laborer Open Cut, Class III Air, gasoline and electric tool operator, vibrator LAUC-Z4-3 10/30/2014 $32.76 $42.71 $52.65 X X X X X X X D Y operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.

Apprentice Rates:

0-1,000 work hours $28.35 $36.09 $43.83

1,001-2,000 work hours $29.23 $37.41 $45.59

2,001-3,000 work hours $30.11 $38.73 $47.35

3,001-4,000 work hours $31.88 $41.39 $50.89

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 29 of 31

Page 32: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 30 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Underground Laborer Open Cut, Class IV Trench or excavating grade man. LAUC-Z4-4 10/30/2014 $32.83 $42.81 $52.79 X X X X X X X D Y

Apprentice Rates:

0-1,000 work hours $28.40 $36.17 $43.93

1,001-2,000 work hours $29.29 $37.51 $45.71

2,001-3,000 work hours $30.17 $38.83 $47.47

3,001-4,000 work hours $31.94 $41.48 $51.01

Underground Laborer Open Cut, Class V Pipe Layer LAUC-Z4-5 10/30/2014 $32.95 $42.99 $53.03 X X X X X X X D Y

Apprentice Rates:

0-1,000 work hours $28.49 $36.31 $44.11

1,001-2,000 work hours $29.38 $37.64 $45.89

2,001-3,000 work hours $30.28 $38.99 $47.69

3,001-4,000 work hours $32.06 $41.66 $51.25

Underground Laborer Open Cut, Class VI Grouting man, top man assistant, audio visual LAUC-Z4-6 10/30/2014 $30.17 $38.82 $47.47 X X X X X X X D Y television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenances.

Apprentice Rates:

0-1,000 work hours $26.41 $33.19 $39.95

1,001-2,000 work hours $27.16 $34.31 $41.45

2,001-3,000 work hours $27.91 $35.43 $42.95

3,001-4,000 work hours $29.42 $37.70 $45.97

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 30 of 31

Page 33: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015 Page 31 of 31 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ===================================================================================================

Underground Laborer Open Cut, Class VII Restoration laborer, seeding, sodding, planting, LAUC-Z4-7 10/30/2014 $28.51 $36.33 $44.15 X X X X X X X D Y cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

Apprentice Rates:

0-1,000 work hours $25.16 $31.31 $37.45

1,001-2,000 work hours $25.83 $32.31 $38.79

2,001-3,000 work hours $26.50 $33.32 $40.13

3,001-4,000 work hours $27.84 $35.33 $42.81

Official Request #: 870 Official Rate Schedule Requestor: Grand Valley State University Every contractor and subcontractor shall keep posted Project Description: A/V Video Conferencing Upgrades at CHS on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: prescribed in a contract. County: Kent Page 31 of 31

Page 34: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

RICK. SNYDER STATE OF MICHIGAN

GOVERNOR Prevailing Wages PO Box 30476

Lansing, MI 48909 517-322-1825

Informational Sheet: Prevailing Wages on State Projects

(06/11) Page 1 of 1

REQUIREMENTS OF THE PREVAILING WAGES ON STATE PROJECTS ACT, PUBLIC ACT 166 OF 1965

The State of Michigan determines prevailing rates pursuant to the Prevailing Wages on State Projects Act, Public Act 166 of 1965, as amended. The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects for which the state or a school district is the contracting agent and which is financed or financially supported by the state. By law, prevailing rates are compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. The official prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. Prevailing wage is satisfied when wages plus fringe benefits paid to a worker are equal to or greater than the required rate. State of Michigan responsibilities under the law:

• The department establishes the prevailing rate for each classification of construction mechanic requested by a contracting agent prior to contracts being let out for bid on a state project.

Contracting agent responsibilities under the law: • If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re-

determination of rates must be requested by the contracting agent. • Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts

being let out for bid on a state project. • The contracting agent, by written notice to the contractor and the sureties of the contractor known to the contracting

agent, may terminate the contractor's right to proceed with that part of the contract, for which less than the prevailing rates have been or will be paid, and may proceed to complete the contract by separate agreement with another contractor or otherwise, and the original contractor and his sureties shall be liable to the contracting agent for any excess costs occasioned thereby.

Contractor responsibilities under the law: • Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all

prevailing rates prescribed in a contract. • Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual

wages and benefits paid to each construction mechanic employed by him in connection including certified payroll, as used in the industry, with said contract. This record shall be available for reasonable inspection by the contracting agent or the department.

• Each contractor or subcontractor is separately liable for the payment of the prevailing rate to its employees. • The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to

commencement of work. • The prime contractor is secondarily liable for payment of prevailing rates that are not paid by a subcontractor. • A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of

Labor, Bureau of Apprenticeship and Training and the rate is included in the contract. Enforcement: A person who has information of an alleged prevailing wage violation on a state project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with Section 5 of Act 166, the investigation will be concluded and a referral to the Office of Attorney General for civil action will be made. The Office of Attorney General will pursue costs and fees associated with a lawsuit if filing is necessary to obtain records.

Page 35: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

RICK. SNYDER STATE OF MICHIGAN

GOVERNOR Prevailing Wages PO Box 30476

Lansing, MI 48909 517-322-1825

Informational Sheet: Prevailing Wages on State Projects

(06/11) Page 1 of 1

General Information Regarding Fringe Benefits

Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate: o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract

or policy o If a fringe benefit is paid into a fund, for a construction mechanic

When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week). The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated: Vacation Dental insurance Vision insurance Health insurance Life insurance Tuition Bonus 401k Employer Contribution Total Hourly Credit

40 hours X $14.00 per hour = $560/2080 = $31.07 monthly premium X 12 mos. = $372.84 /2080 = $5.38 monthly premium X 12 mos. = $64.56/2080 = $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $27.04 monthly premium X 12 mos. = $324.48/2080 = $500.00 annual cost/2080 = 4 quarterly bonus/year x $250 = $1000.00/2080 = $2000.00 total annual contribution/2080 =

$.27$.18$.03

$1.33$.16$.24$.48$.96

$3.65

Other examples of the types of fringe benefits allowed: Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums

The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate:o Legally required payments, such as:

Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions)

o Reimbursable expenses, such as: Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment

o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as: Industry advancement funds Financial or material loans

Page 36: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

State of Michigan

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS MICHIGAN OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

MARTHA B. YODER DIRECTOR

OVERTIME PROVISIONS for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE

LARA is an equal opportunity employer. Auxiliary aids, services and other reasonable accommodations are available upon request to individuals with disabilities.

Wage & Hour Division 7150 HARRIS DRIVE P.O. BOX 30476 LANSING, MICHIGAN 48909

www.michigan.gov/wagehour Phone : (517) 322-1825

1. Overtime is represented as a nine character code. Each character represents a certain period of time after the first 8 hours Monday thru Friday.

Monday thru Friday Saturday Sunday & Holidays Four 10s

First 8 Hours 4

9th Hour 1 5

10th Hour 2 6

Over 10 hours 3 7

8

9

Overtime for Monday thru Friday after 8 hours: the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond)

Overtime on Saturday: the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond)

Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday

Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.

2. Overtime Indicators Used in the Overtime Provision: H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek can not be worked without paying overtime after 8 hours worked

3. EXAMPLES: HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.

XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek.

Page 37: Kent County Official 2015 Prevailing Wage Rates for State ... · Official 2015 Prevailing Wage Rates for State Funded Projects Issue Date: 6/29/2015 Contract must be awarded by: 9/27/2015

ENGINEERS - CLASSES OF EQUIPMENT LIST

UNDERGROUND ENGINEERS HAZARDOUS WASTE ABATEMENT ENGINEERS CLASS I Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator. CLASS II Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck. CLASS III Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered). CLASS IV Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.

CLASS I Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig. CLASS II Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.