Keyston Installs last 90 days

Finished work

Page 2: Keyston Install Last 90 Days

Tight Schedules½ tile removal 1/8 mastic machine removal removal procedure was changed from Husqvarna 820 to the El Diablo. Keyston finished ahead of schedule with no challenges. Keyston did isolation , Negative air flow and constant monitor to ensure safety

Difference is in the Details and quality

Page 3: Keyston Install Last 90 Days

PharmaceuticalMarking of patches Blue by Customer additional done by Keyston

Whole area done instead of 100 patches customer very pleased new standard

Page 4: Keyston Install Last 90 Days

Pharmaceutical

Preparation done with Husqvarna 820 Epoxy Grout coat prior to polishing steps due to the poor quality of concrete.

Page 5: Keyston Install Last 90 Days

DetailsCove adhesive on walls prior to Keyston start up

Cove after cut out new steel Cleaned walls

Page 6: Keyston Install Last 90 Days

CovingCondition start- Keyston requested corners to be finished and in fill t Response no time in schedule Keyston suggested a 45% Hospital cove instead of a radius cove. Customer issued a change order for material and labor difference and a new plant standard established.

Custom Coving Borders and walkways

Page 7: Keyston Install Last 90 Days

Expert Project ManagementConcrete elevations off ½” to ¾ over 3’ coves recessed ¾ to 1 “ Finished Floor

Page 8: Keyston Install Last 90 Days

Food Manufacturing

Page 9: Keyston Install Last 90 Days

Food

Page 10: Keyston Install Last 90 Days

Tough Conditions

Husqvarna Prep Urethane with Aluminum oxide

Page 11: Keyston Install Last 90 Days

Containment pit

r

Finished Pit- job was stopped due to steel structure above being unsafe. TM, Plant Manager and Project Manager appreciated the PM brought in a team o support the structure with Steel Cables.

Page 12: Keyston Install Last 90 Days

Thank You

Containment Pit Heavy Duty Flooring with Line Striping