kit 826-1950 includes: new sprocket new upper bracket new stickers new ground wires toaster speed...
TRANSCRIPT
Kit 826-1950 includes:
• New Sprocket
• New Upper Bracket
• New Stickers
• New Ground Wires
Toaster Speed Conversion Kit
• Remove cover.
• Remove compression knobs.
• Remove side panel.
• The bracket and the sprocket shown by arrows are changed with this kit.
• Ensure bolt securing large drive gear is positioned so it is accessible.
• Remove power from unit.
• Cut wire tie on diagonal brace and remove brace.
• Depress idler and lift chain from sprockets.
• If too tight, remove upper idler bracket to remove chain.
• Loosen bolt securing drive sprocket and use a straight-arm wheel puller to remove the sprocket.
• Remove upper idler bracket, remove sprocket from bracket and install on new bracket.
• The new drive sprocket, shown here on top of the older drive sprocket, is smaller and slows the toaster slightly. Install it in the same plane as the spring-loaded idler.
• Install the new ground wires and route from the ground position near the idler bracket to the higher ground position (shown above).
• Route the chain as shown and loop onto the upper idler before positioning the upper idler bracket on its mounting studs.
• Bolt the new upper idler bracket into place.
• Cut the provided bushings with wire dikes.
• Slip the cut bushing over an element wire...
• … and press it into place on the housing protecting the element ends.
• Replace diagonal brace and attach wiring with a wire tie, ensuring it stays out of the drive train.
• Apply the new crown and heel sticker to the bun guide.
• Replace the side and apply the new bun-compression sticker and replace the knobs.
• Attach the unit to power.
• Ensure proper operation.
• File all paperwork, being careful to include the serial numbers of the toasters modified and the store address.