Floating  Foundations:  Opening  Up  Deeper  Waters  In  the  U.S.

Knut  M.  Aanstad,  Statoil

Sacramento,  CaliforniaMarch  2nd  2017 2  mars  2017Classification:  Internal

©  Statoil  ASA

Page 2: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

2  mars  20172 Classification:  Internal ©  Statoil  ASA

Page 3: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Attractivemarket• Attractive  risk/return• Predictable  revenue• OECD  countries• High  entry  barriers

Playing  toour strengths

Providing  offshore  wind to  >1M  homes

Offshore  wind  projects  currently  in  progress  delivering  >1100  MW,  and  potential for  >5m  homes

SheringhamShoal

Hywind  demo

2009-­ 2012-­ 2017 2017   2020-­

Dudgeon Dogger  Bank

Hywind  pilot

Hywindlarge  scale

North  West  Europe

In  operation In  operation In  development In  development Consented

2.3  MW 317  MW 402  MW 30  MW 4  x  1.2  GW

*  All  capacity  figures  on  100%  basis

2019

Arkona

385  MWIn  development

2024-­?  

New  York

United  States  East  Coast

Auction  won

1-­2  GW

Japan

US  West  Coast

2  mars  20173 Classification:  Internal ©  Statoil  ASA

Page 4: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

The  Hywind  ConceptProven  technology  in  a  new  setting

• Simple  spar-­type  substructure

• Standard  offshore  wind  turbine

• Conventional  3-­line  mooring  system

• Blade  pitch  control  system  for  motion  damping

• Suitable  for  harsh  conditions

Demo Pilot  Park Large  parks

2  mars  20174 Classification:  Internal ©  Statoil  ASA

Page 5: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Hywind  Demo    Experience

Øyvind  Hagen/Statoil

• In  operation  since  2009

• Located  10km  off  Norwegian  coast  at  600ft  water  depth

• Produced  55  GWh since  start-­up

• Production  as  good  as  or  better than  other  2.3  MW  Siemens  wind  power  turbines

• Experienced  storms  with  wind  speed  over  44  m/s  and  maximum  wave  height  of    60  ft

2  mars  20175 Classification:  Internal ©  Statoil  ASA

Page 6: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Realising  the  Hywind  Scotland  pilot  park

• Investing  around  $  300  million  • Owners:  

− Statoil  75%− Masdar 25  %

• 60-­70%  cost  reduction  from  the  Hywind  Demo  project  in  Norway

• Installed  capacity:  30  MW• Water  depth:  3  – 400  ft• Avg.  wind  speed:  10.1  m/s

• Average  wave  height:  6  ft• Export  cable  length:  ~20  miles• Operational  base:  Peterhead• Start  power  production:  2017

2  mars  20176 Classification:  Internal ©  Statoil  ASA

Page 7: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Main  Characteristics

• Turbine:  Siemens  SWP-­6.0-­154

• Steel  Spar  Substructure

• Mooring  bridles  &  mooring  chains  

• Suction  anchors

• Offshore  cables  – dynamic  and  static

• Onshore  Substation

• Total  Displacement:  11  500  tonnes

2  mars  20177 Classification:  Internal ©  Statoil  ASA

Page 8: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Hywind  Scotland  -­ Status

2  mars  20178 Classification:  Internal ©  Statoil  ASA

Page 9: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Stord  BaseMain  Contractors

2  mars  20179 Classification:  Internal ©  Statoil  ASA

Page 10: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Hywind  – Assembly  methodology

2  mars  201710 Classification:  Internal ©  Statoil  ASA

Page 11: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Challenges  – Technical

• Main  challenges  for  Hywind  installation

− Water  depth

− Waves  and  swell  during  assembly

• Alternative  installation  methods  under  consideration

2  mars  201711 Classification:  Internal ©  Statoil  ASA

Page 12: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

Challenges  -­ Bringing  down  the  costCost reduction  of  40-­50%  by  2030  a  realistic  target

Basecase

Opera-­tions

Yield Sub-­structure

Supplychain

Infra-­structure Instal-­lation

WTG Target2020

Target2030

LCOE  (NB:  Illustrative)

Scale  effects,  new  technology,  design  optimisation

Industrialisation,  new  technology

2  mars  201712 Classification:  Internal ©  Statoil  ASA

Page 13: Knut Aanstad March 2 2017 Sacramento · Knut Aanstad March 2 2017 Sacramento Created Date: 20170309200421Z

This  presentation,  including  the  contents  and  arrangement  of  the  contents  of  each  individual  page  or  the  collection  of  the  pages,  are  owned  by  Statoil.  Copyright  to  all  material  including,  but  not  limited  to,  written  material,  photographs,  drawings,  images,  tables  and  data  remains  the  property  of  Statoil.  All  rights  reserved.  Any  other  kind  of  use,  reproduction,  translation,  adaption,  arrangement,  any  other  alteration,  distribution  or  storage  of  this  presentation,  in  whole  or  in  part,  without  the  prior  written  permission  of  Statoil  is  prohibited.  The  information  contained  in  this  presentation  may  not  be  accurate,  up  to  date  or  applicable  to  the  circumstances  of  any  particular  case,  despite  our  efforts.  Statoil  cannot  accept  any  liability  for  any  inaccuracies  or  omissions.  

www.statoil.com

©  Statoil  ASA