DESCRIPTION

NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC WING Lakewood, Ohio

TRANSCRIPT

  • Robert P. Madison, International

    Community Meeting #2 October 7, 2014

    Lakewood High School Renovation and Additions

  • Robert P. Madison, International

    Program of Requirements

    Academics* Classrooms (22 new) Science Room (1 new )

    Special Education* Self-Contained Classrooms (7 new)

    Music Band / Orchestra Room Vocal Room Piano Lab

    Drama/TV Production Black Box Theater can be shared with Music

    New Media Center Includes Alumni Offices Large Reading Room Media Production Areas Computer Storage Areas *(Currently 30 classrooms in Modulars on Franklin)

  • Robert P. Madison, International

    Program of Requirements

    Dining Hall Student Dining including L Room

    Physical Education 3 Cross Courts or 1 Competition Gym Fitness /Weight Room Wrestling Room Team and PE Locker Rooms Athletic Offices and Training Room Concessions Area Ranger Shop Optional Elevated Track for Recreational Use

    Administration Relocated Main Office Relocated House Principals Offices Relocated Guidance Center

    Student Activity Rooms Collaboration Spaces H2O

    Student Health Center

  • Robert P. Madison, International

    Project Budget

    Existing Building Demolish 264,790 Remain 268,850 New 149,000 Total 417,850

    Project Budget

    Construction Cost: $45,949,887

  • Robert P. Madison, International

    Project Schedule 2014-2017

    Construction Packages Construction Start Completion 1.) Swing Space Transition Package September 2014 January 2015 2.) Existing Building Demo & Abatement Package December 2014 Spring 2015 3.) Early Site & Foundation Package Spring 2015 October 2015 4.) Academic & East Wing Building Package Spring 2015 June 2017 5.) Civic Auditorium & Natatorium MEP Summers of 2015, June 2017 2016 & 2017

  • Robert P. Madison, International

    TRANSITION PACKAGE: TEMPORARY CAFETERIA &

    WARMING KITCHEN STORAGE & EGRESS

  • Robert P. Madison, International

    Transition Package A Building

  • Robert P. Madison, International

    NEW CONSTRUCTION & RENOVATION A & B ACADEMIC

    WING

  • Robert P. Madison, International

    Existing School Renovations

    First Level Floor Plan

  • Robert P. Madison, International

    Existing School Renovations

    Second Level Floor Plan

  • Robert P. Madison, International

    Existing School Renovations

    Third Level Floor Plan

  • Robert P. Madison, International

    LIFE SAFETY & MEP RENOVATIONS CIVIC AUDITORIUM

  • Robert P. Madison, International

    Access to Workroom and Changing Rooms Civic Basement

    NEW CORRIDOR ACCESS NEW CORRIDOR ACCESS

    NEW RAMP UP

    NEW RAMP UP

    NEW ELEVATOR

  • Robert P. Madison, International

    NEW CONSTRUCTION & RENOVATION

  • Robert P. Madison, International

    South - Site Plan

  • Robert P. Madison, International

    North - Site Plan

  • Robert P. Madison, International

    New Construction & Renovation South Addition Academic Wing

  • Robert P. Madison, International

    Academic South Wing Addition / House Principal / Special Education

    First Level Floor Plan

    POTENTIAL TWO

    CLASSROOM ADDITION

    MOVEABLE WALL

  • Robert P. Madison, International

    Academic South Wing Addition Second Level Floor Plan

    POTENTIAL TWO

    CLASSROOM ADDITION

    MOVEABLE WALL

  • Robert P. Madison, International

    Academic South Wing Addition Academic Core / Science

    Third Level Floor Plan

    POTENTIAL TWO

    CLASSROOM ADDITION

    MOVEABLE WALL

    SCIENCE CLASSROOM & LAB

  • Robert P. Madison, International

    Site Section Looking West Academic South Wing Addition

    EX

    IS

    TIN

    G R

    ES

    ID

    EN

    TIA

    L

    ALO

    NG

    R

    OB

    IN

    WO

    OD

    A

    VE

    LEVEL 3

    LEVEL 2

    LEVEL 1

    EX

    IS

    TIN

    G H

    S

    PR

    OP

    OS

    ED

    AC

    CE

    SS

    D

    RIV

    E

    42 14

    CLA

    SS

    RO

    OM

    EX

    PA

    NS

    IO

    N A

    RE

    A

    208

    PR

    OP

    ER

    TY

    LIN

    E

  • Robert P. Madison, International

    South Addition View from east side of Robinwood Avenue

  • Robert P. Madison, International

    South Site Plan

  • Robert P. Madison, International

    New Construction East Addition L Room / Dining / Music /

    Theater / Physical Education

  • Robert P. Madison, International

    East Addition L Room / Dining / Music / Theater / Physical Education

    First Level Floor Plan

  • Robert P. Madison, International

    East Addition Media / Alumni Foundation / Alternate Track / House Principal

    Second Level Floor Plan

    BID ALTERNATE: UPPER LEVEL WALKING TRACK

  • Robert P. Madison, International

    L Room Dining & Media Spaces East Addition

  • Robert P. Madison, International

    L Room Dining & Media Spaces East Addition

  • Robert P. Madison, International

    View from Bunts & Franklin East Addition

  • Robert P. Madison, International

    View of Student Dining and Gymnasium East Addition

  • Robert P. Madison, International

    MAIN OFFICE & HEALTH CENTER ENTRY CAREER TECH ENTRY CIVIC AUDITORIUM ENTRY RANGER SHOP & DINING ROOM / PRE-FUNCTION SPACE ENTRY

    Front Doors High School Entry

  • Robert P. Madison, International

    CONSTRUCTION PHASING

  • Robert P. Madison, International

    During Construction Site Plan

  • Robert P. Madison, International

    Construction Staging Plan Turner / Regency / AKA (Construction Manager)