Lakewood High School Renovations

Download Lakewood High School Renovations

Post on 26-Dec-2015

607 views

Category:

Documents

0 download

Embed Size (px)

DESCRIPTION

NEW CONSTRUCTION & RENOVATION A & B ACADEMIC WING Lakewood, Ohio

TRANSCRIPT

<ul><li><p>Robert P. Madison, International </p><p>Community Meeting #2 October 7, 2014 </p><p>Lakewood High School Renovation and Additions </p></li><li><p>Robert P. Madison, International </p><p>Program of Requirements </p><p>Academics* Classrooms (22 new) Science Room (1 new ) </p><p>Special Education* Self-Contained Classrooms (7 new) </p><p>Music Band / Orchestra Room Vocal Room Piano Lab </p><p>Drama/TV Production Black Box Theater can be shared with Music </p><p>New Media Center Includes Alumni Offices Large Reading Room Media Production Areas Computer Storage Areas *(Currently 30 classrooms in Modulars on Franklin) </p></li><li><p>Robert P. Madison, International </p><p>Program of Requirements </p><p>Dining Hall Student Dining including L Room </p><p>Physical Education 3 Cross Courts or 1 Competition Gym Fitness /Weight Room Wrestling Room Team and PE Locker Rooms Athletic Offices and Training Room Concessions Area Ranger Shop Optional Elevated Track for Recreational Use </p><p>Administration Relocated Main Office Relocated House Principals Offices Relocated Guidance Center </p><p>Student Activity Rooms Collaboration Spaces H2O </p><p>Student Health Center </p></li><li><p>Robert P. Madison, International </p><p>Project Budget </p><p>Existing Building Demolish 264,790 Remain 268,850 New 149,000 Total 417,850 </p><p> Project Budget </p><p>Construction Cost: $45,949,887 </p></li><li><p>Robert P. Madison, International </p><p>Project Schedule 2014-2017 </p><p>Construction Packages Construction Start Completion 1.) Swing Space Transition Package September 2014 January 2015 2.) Existing Building Demo &amp; Abatement Package December 2014 Spring 2015 3.) Early Site &amp; Foundation Package Spring 2015 October 2015 4.) Academic &amp; East Wing Building Package Spring 2015 June 2017 5.) Civic Auditorium &amp; Natatorium MEP Summers of 2015, June 2017 2016 &amp; 2017 </p></li><li><p>Robert P. Madison, International </p><p>TRANSITION PACKAGE: TEMPORARY CAFETERIA &amp; </p><p>WARMING KITCHEN STORAGE &amp; EGRESS </p></li><li><p>Robert P. Madison, International </p><p>Transition Package A Building </p></li><li><p>Robert P. Madison, International </p><p>NEW CONSTRUCTION &amp; RENOVATION A &amp; B ACADEMIC </p><p>WING </p></li><li><p>Robert P. Madison, International </p><p>Existing School Renovations </p><p>First Level Floor Plan </p></li><li><p>Robert P. Madison, International </p><p>Existing School Renovations </p><p>Second Level Floor Plan </p></li><li><p>Robert P. Madison, International </p><p>Existing School Renovations </p><p>Third Level Floor Plan </p></li><li><p>Robert P. Madison, International </p><p>LIFE SAFETY &amp; MEP RENOVATIONS CIVIC AUDITORIUM </p></li><li><p>Robert P. Madison, International </p><p>Access to Workroom and Changing Rooms Civic Basement </p><p>NEW CORRIDOR ACCESS NEW CORRIDOR ACCESS </p><p>NEW RAMP UP </p><p>NEW RAMP UP </p><p>NEW ELEVATOR </p></li><li><p>Robert P. Madison, International </p><p>NEW CONSTRUCTION &amp; RENOVATION </p></li><li><p>Robert P. Madison, International </p><p>South - Site Plan </p></li><li><p>Robert P. Madison, International </p><p>North - Site Plan </p></li><li><p>Robert P. Madison, International </p><p>New Construction &amp; Renovation South Addition Academic Wing </p></li><li><p>Robert P. Madison, International </p><p>Academic South Wing Addition / House Principal / Special Education </p><p>First Level Floor Plan </p><p>POTENTIAL TWO </p><p>CLASSROOM ADDITION </p><p>MOVEABLE WALL </p></li><li><p>Robert P. Madison, International </p><p>Academic South Wing Addition Second Level Floor Plan </p><p>POTENTIAL TWO </p><p>CLASSROOM ADDITION </p><p>MOVEABLE WALL </p></li><li><p>Robert P. Madison, International </p><p>Academic South Wing Addition Academic Core / Science </p><p>Third Level Floor Plan </p><p>POTENTIAL TWO </p><p>CLASSROOM ADDITION </p><p>MOVEABLE WALL </p><p>SCIENCE CLASSROOM &amp; LAB </p></li><li><p>Robert P. Madison, International </p><p>Site Section Looking West Academic South Wing Addition </p><p>EX</p><p>IS</p><p>TIN</p><p>G R</p><p>ES</p><p>ID</p><p>EN</p><p>TIA</p><p>L </p><p>ALO</p><p>NG</p><p> R</p><p>OB</p><p>IN</p><p>WO</p><p>OD</p><p> A</p><p>VE</p><p>LEVEL 3 </p><p>LEVEL 2 </p><p>LEVEL 1 </p><p>EX</p><p>IS</p><p>TIN</p><p>G H</p><p>S </p><p>PR</p><p>OP</p><p>OS</p><p>ED</p><p>AC</p><p>CE</p><p>SS</p><p> D</p><p>RIV</p><p>E </p><p>42 14 </p><p>CLA</p><p>SS</p><p>RO</p><p>OM</p><p>EX</p><p>PA</p><p>NS</p><p>IO</p><p>N A</p><p>RE</p><p>A </p><p>208</p><p>PR</p><p>OP</p><p>ER</p><p>TY</p><p>LIN</p><p>E </p></li><li><p>Robert P. Madison, International </p><p>South Addition View from east side of Robinwood Avenue </p></li><li><p>Robert P. Madison, International </p><p>South Site Plan </p></li><li><p>Robert P. Madison, International </p><p>New Construction East Addition L Room / Dining / Music / </p><p>Theater / Physical Education </p></li><li><p>Robert P. Madison, International </p><p>East Addition L Room / Dining / Music / Theater / Physical Education </p><p>First Level Floor Plan </p></li><li><p>Robert P. Madison, International </p><p>East Addition Media / Alumni Foundation / Alternate Track / House Principal </p><p>Second Level Floor Plan </p><p>BID ALTERNATE: UPPER LEVEL WALKING TRACK </p></li><li><p>Robert P. Madison, International </p><p>L Room Dining &amp; Media Spaces East Addition </p></li><li><p>Robert P. Madison, International </p><p>L Room Dining &amp; Media Spaces East Addition </p></li><li><p>Robert P. Madison, International </p><p>View from Bunts &amp; Franklin East Addition </p></li><li><p>Robert P. Madison, International </p><p>View of Student Dining and Gymnasium East Addition </p></li><li><p>Robert P. Madison, International </p><p>MAIN OFFICE &amp; HEALTH CENTER ENTRY CAREER TECH ENTRY CIVIC AUDITORIUM ENTRY RANGER SHOP &amp; DINING ROOM / PRE-FUNCTION SPACE ENTRY </p><p>Front Doors High School Entry </p></li><li><p>Robert P. Madison, International </p><p>CONSTRUCTION PHASING </p></li><li><p>Robert P. Madison, International </p><p>During Construction Site Plan </p></li><li><p>Robert P. Madison, International </p><p>Construction Staging Plan Turner / Regency / AKA (Construction Manager) </p><p>Pot ent ial </p></li></ul>