LANCE GILES SERVICE CENTER FACILITY PROJECT SHEET 5101 E. 51st St. Austin, TX 78727 Building Area: 53,984 Square Feet Site: 17 Acres Date of First Construction: 1991 About the Campus The Service Center houses Austin ISD’s building maintenance operations: air conditioning, refrigeration, building operators, carpentry, locks and hardware, electrical, electronics, energy management, environmental safety, facility condi- tion assessment, grounds, housekeeping services, painting, plumbing, vehicle services and welding. For more detailed information about the district’s long-term Facility Master Plan and recommendations for this facility, please visit www.aisdfuture.com. Proposed Projects Districtwide Fire and Intrusion Alarm Upgrades Districtwide Security Camera Replacements Technology: Network System Improvements Facility Condition Assessment (FCA) This Facility District Average - Special Facility 67 62 Fail < 30 Poor 30 - 49 Average 50 - 69 Good 70 - 89 Excellent 90 - 100 Estimated Cost of Proposed Projects $137,000 Projects may include funding from additional sources. 6/26/17

Upload: others

Post on 10-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LANCE GILES SERVICE CENTER FACILITY PROJECT SHEET - Austin … · 2018-04-20 · LANCE GILES SERVICE CENTER FACILITY PROJECT SHEET 5101 E. 51st St. Austin, TX 78727 Building Area:

LANCE GILES SERVICE CENTERFACILITY PROJECT SHEET

5101 E. 51st St.Austin, TX 78727

Building Area: 53,984 Square FeetSite: 17 AcresDate of First Construction: 1991

About the CampusThe Service Center houses Austin ISD’s building maintenance operations: air conditioning, refrigeration, building operators, carpentry, locks and hardware, electrical, electronics, energy management, environmental safety, facility condi-tion assessment, grounds, housekeeping services, painting, plumbing, vehicle services and welding.

For more detailed information about the district’s long-term Facility Master Plan and recommendations for this facility,

please visit www.aisdfuture.com.

Proposed Projects

• Districtwide Fire and Intrusion Alarm Upgrades

• Districtwide Security Camera Replacements

• Technology: Network System Improvements

Facility Condition Assessment (FCA) This Facility District Average - Special Facility

67 62Fail < 30

Poor 30 - 49

Average 50 - 69

Good 70 - 89

Excellent 90 - 100

Estimated Cost of Proposed Projects

$137,000

Projects may include funding from additional sources.

6/26/17