landwarnet initial capabilities document netops tools convergence strategy update

12
1 LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update 11 September 2013 Al Morrison TCM GNE Signal CDID

Upload: others

Post on 09-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

1

LandWarNet Initial Capabilities Document

NetOps Tools Convergence Strategy

Update

11 September 2013

Al Morrison TCM GNE

Signal CDID

Page 2: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

2

UNCLASSIFIED

UNCLASSIFIED 2

1. LandWarNet Initial Capabilities Document

(LWN ICD)

LandWarNet ICD is the Army Enterprise

requirements package!

Page 3: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

3

UNCLASSIFIED

UNCLASSIFIED

LWN ICD Scope

The LWN ICD describes the direct and supporting

capabilities of the Army Enterprise Network at and above the

Combined/Joint Task Force (C/JTF), “outside the tactical

formation.”

The Network Enabled Mission Command (NeMC) ICD

describes how a networked capability for information

exchange integrates warfighting and generating force

functions below the C/JTF, “inside the tactical formation.”

Page 4: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

4

UNCLASSIFIED

UNCLASSIFIED

GIG 2.0 ICD 29 MAY 2009

GIG IA ICD 6 MAR 2006

LWN ICD Scope (updated)

LWN – “Above the

seam”

Enterprise Services,

Installation Capabilities,

Authoritative Data

Sources, Enterprise

transport, universal ID

management,

messaging, collaboration

services…

WfF

Requirement

Documents

Nested Army Unified NETOPS and

Network Policies/Standards

LWN ICD “En

ab

les th

e E

dg

e”

“The E

dge”

NeMC ICD

WIN-T CDD

JTRS ORD

NT, NETOPS,

C/EM

Contest,

Intelligence

CBAs

Page 5: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

5

UNCLASSIFIED

UNCLASSIFIED

LWN ICD GAPs:

Sources

GIG 2.0/GIG IA ICD

C/EM CBA (NetOps Gaps)

• GAP 1 (Common Standards)

• GAP 2 (C2)

• GAP 11 (Enterprise Network)

• GAP 15 (MC Transition)

• GAP 17 (Single Identity)

• GAP 19 (JIIM Integration)

• GAP 20 (Defense in Depth)

• GAP 24 (Information Services)

LWN ICD (updated annually)

• GAP 1 (Common Standards)

• GAP 2 (Enterprise Network)

• GAP 3 (MC Transition)

• GAP 4 (Single Identity)

• GAP 5 (JIIM Integration)

• GAP 6 (Defense in Depth)

• GAP 7 (Information Services)

• Gap 8 (SCI Network Services)

NETOPS

CBA

NT

CBA

EMSO

CBA

NeMC

CBA

Intelligence CBA

• Gap 6 (Intelligence

Enterprise (IE)

•Gap 7 (Information Collection

Sync.

Page 6: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

6

UNCLASSIFIED

UNCLASSIFIED

LWN ICD Current Staffing Timeline

LWN ICD to

ARCIC

TBD 04 Mar 2011

3-Star

AROC

Review

11 Jun –

14 Aug 13

AROC

Published

TRADOC/ ARCIC

Validation

ARCIC G3

Gatekeeper

Review

07 Mar – 07 Apr 11

25 Oct – 09 Feb 12

HQDA Review-1Star

ARCIC

Adjudication

Review

06 Jul – 11 Jul

12

08 – 21 Apr 11

TCM GNE

Adjudicate

Comments

AROC Approval/Validation

24 Oct 11 – 30 Aug 12

HQ TRADOC/ARCIC Validation

04 Mar 11 – 23 Oct 11

JROC Validation

TBD

ARCIC Dir.

Validation

22 Apr –

23 Oct 11

G3 Gatekeeper

2nd Review /

TRADOC Re-

adjudication

12 Jul 12 – 09

Apr 13

As of 15 August 2013

TCM GNE

Adjudicate

Comments

13 Feb – 05 Jul 12

Page 7: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

7

UNCLASSIFIED

UNCLASSIFIED

Enterprise

Management

IS CDD

DCO IS

ICD

Enterprise

Information

Services IS

CDD

Electromagnetic

Battle

Management

CDD

LWN ICD

One or

more

RDPs

One or

more

RDPs

One or

more

RDPs

• Host Security CD •Joint Security Arch CD • CD…

• Core Data Centers CD • Thin/Zero Client CD • CD…

Requirements Document Strategy (notional)

NeMC

ICD

Infrastructure

Business Case

Business

Case

Documents

•ICAN • Installation Processing Nodes •WAN •WAN Diversity •Land Mobile Radio

COLOR CODE:

Approved Document - Black

> HQDA Staffing - Blue

< SIGCoE Development– Red

C-IED Joint

Capability

Technology

Demo (JCTD)

Multiple

CPDs

• Spectrum Sensing • EW Integration • CPD…

• Network Mgmt CD •SATCOM Mgmt CD • CD …

Two CDDs and an IS ICD will refine LWN ICD capability requirements. The IS ICD points to the NeMC and LWN ICDs as well as GIG ICDs. The EMBM CDD points to the JCTD.

Multiple CPDs or RDPs (as needed) further refine ICD/CDD requirements for procurement. CDs/CPDs are written and updated incrementally in line with CIO/G6, NETCOM, CERDEC and ARCYBER priorities.

All CPDs/RDPs/CDs require synchronization within the

Signal CDID to ensure interoperability.

One or

more

CDs

Page 8: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

8

UNCLASSIFIED

UNCLASSIFIED 8

PROBLEM STATEMENT: The Expeditionary Force lacks the ability to plan,

operate, and defend a responsive network with end-to-end transparency due to a

nonintegrated approach to Network Operations (NetOps).

2. NetOps Convergence

Page 9: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

9

UNCLASSIFIED

UNCLASSIFIED

NetOps Convergence (Terms of Reference)

WIN-T NMS

WIN-T NMS

WIN-T NMS

WIN-T NMS

WIN-T NMS

• Convergence: Consolidation to a single

set of “tools;” packaging of toolset based

on required function and DOTMLPF.

• Integration: Items/tools included as inherent

elements within larger WIN-T application;

common user interface

• Federation: Items/tools run on WIN-T

hardware, but preserve their native interfaces.

They “appear” and are accessed as services

on the network.

• Assimilation: Items here are allocated SWAP in

the NOSC (i.e., 2 separate laptops, just co-

located )

• Absorption: Functionality is achieved using a

different tool.

9

NetOps Convergence will reduce the number of NetOps tools at the BCT level.

Page 10: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

10

UNCLASSIFIED

UNCLASSIFIED

Converge

Expeditionary Force NetOpTools

NIE 12.2 NIE 13.1 NIE 13.2

Capability Set 13-14 13-14 14-15

IOC Date 3QFY12. (WIN-T Inc 2) NMS 1QFY14 (TSS/LUT) NMS 1QFY15 (LUT) NMS

Net

Management

ENP/ENM MCPTI/CNMPS

SNMPc NetMRI

NetFlow SolarWinds

Putty *JENM

HCI (NCW) SXXI

EZ Radio Mfr

BSM

NCW Eng Tool/PT

RAPTer

ENP/ENM MCPTI/CNMPS

SNMPc NetMRI

NetFlow SolarWinds

Putty *JENM

HCI (NCW) SXXI

EZ Radio Mfr BSM

NCW Eng Tool/PT

RAPTer

ENP/ENM MCPTI/CNMPS

NetFlow Putty

JENM

Content

Management

vSphere

SCOM/SCCM

vSphere

SCOM/SCCM

vSphere

IA/CND SKL

CS-MARS Nitro ESX

HBSS MGR Retina

Hercules REM/Retina

Microsoft IAS

SKL

CS-MARS Nitro ESX

HBSS MGR Retina

Hercules REM/Retina Microsoft

IAS

SKL

HBSS MGR Retina

Hercules

REM/Retina Microsoft IAS

Integrated, Federated, Assimilated, Absorbed

*Does not include non-proponent tools e.g. Trogan, CSS VSAT, etc.

COMSEC GEMX SLVD

LCMS

TKMS JACS/ACES

GEMX SLVD

LCMS TKMS

JACS/ACES

GEMX SLVD

LCMS TKMS

JACS/ACES KMI

EMSO SXXI

CJSMPT

BSM

SXXI

CJSMPT

BSM

BSM

Start Point

32 toolsets

under

review

10

Page 11: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

11

UNCLASSIFIED

UNCLASSIFIED

• Team effort:

– SIGCoE

– ASA(ALT) PEO’s & PM’s

– CIO/G-6

– LWN MC/Rand

– CERDEC

– TRAC-WSMR

– ATEC

• Objectives

– Functional analysis/evaluation of iSEP recommendations

• Analyze capabilities within existing tools; identify redundancies and tools that overlap

• Providing an operationally based systems engineering supportable recommendation

– Assess MOS training and implementation

• Completing a workload analysis by MOS

• Make informed recommendation for future FSR Requirements

• NIE 12.2 assessment completed awaiting formal release of RAND Study results.

NetOps Convergence informed by NIE 12.2 results

11

NIE 12.2 NetOps Tools Assessment

Page 12: LandWarNet Initial Capabilities Document NetOps Tools Convergence Strategy Update

12

Al Morrison TCM GNE

Signal CDID

LandWarNet Initial Capabilities Document

NetOps Tools Convergence Strategy

Update

11 September 2013