Page 1: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

LARISSA

27-28 September 2007

Page 2: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

PROVINCIAL CIVIL PROTECTION PROVINCIAL CIVIL PROTECTION PLANPLAN

Hydraulic riskHydraulic risk Landslide riskLandslide risk Seismic riskSeismic risk

Adopted by DCP 127 18/07/05

Adopted by DCP 89 18/09/06

Adopted by DCP 79

17/09/07

Page 3: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

CIVIL PROTECTION PLAN

SEISMIC HAZARDfunded by MEDACTHU

www.provincia.terni.it/protezionecivile

Page 4: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

PLAN STRUCTURE

DAMAGE SCENARIOS EVALUATION

DATABASE OF

AVAILABLE RESOURCES

INTERVENTION MODELOrganizational structureProcedures

Seismic hazardSeismic classification

Anthropic arrangment items and

their vulnerability

Expected seismic event

scenario

TerritorialInformations

CARTOGRAFIA OPERATIVAOperating

cartography

Page 5: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

DAMAGE SCENARIOS EVALUATION

Census of high risk buildings and of infrastructural strategic works.

Study of the vulnerability of the public structures, in particular of schools, in function of the characteristic parameters of every building: period of construction, constructive and typologic characteristics.

Development of one methodology of analysis of statistical type

Page 6: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

PLAN STRUCTURE

Organizational structure

Command and Control System

Operating centres

14 Support Functions

Monitoring system

Comunication system

ProceduresIntervention phases

INTERVENTION MODEL

33 Municipal Operating 33 Municipal Operating CentreCentre

4 Intermunicipal 4 Intermunicipal Operating CentreOperating CentreFor each function there is

one or more functional foreman

National Monitoring National Monitoring systemsystem -INGV-INGV

PREFECTURE OF PREFECTURE OF TERNITERNI

Page 7: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

Specific meetings have been organized with all municipality with the aim to analyze the city structure of every municipal territory, therefore to characterize the exact positioning of meeting point in case of an earthquake for people and the ways of exodus.

Several meetings have been organized with all the subjects interested (about 100) for the definition of common procedures to adopt in an earthquake emergency, reaching to a shared model.

A protocol of understanding among the Province of Terni, Prefecture, local and regional authorities and volunteers has been signed for the definition of the modalities of a management after an earthquake sharing standardized procedures.

Page 8: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

I<V

I>VII

EARTHQUEARTHQUAKEAKE

V<I<VII

TIM

E=

0ALLARMALLARM

PHASEPHASEEMERGENCY EMERGENCY

PHASEPHASE

SCENARIO SCENARIO TYPE 1TYPE 1

SCENARIO SCENARIO

TYPETYPE 22SCENARIO SCENARIO

TYPETYPE 11

Page 9: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

ALLARMALLARMPHASEPHASE

EMERGENCY EMERGENCY PHASEPHASE

SCENARIO TYPESCENARIO TYPE 22

Seism >VII Mercalli Scale - Magnitude > 5Seism >VII Mercalli Scale - Magnitude > 5

LIKE Umbria-Marche Earthquake 26.09.97 (10 years ago)First main shock = VIII Mercalli (5,6 R) time: 02:33Second main shock = IX Mercalli (5,8 R) time: 11:40Over 2.000 aftershock in 15 daysOver 20.000 homeless

SCENARIO TYPE 1SCENARIO TYPE 1

Seism V - VII (Mercalli scale)- Magnitude 3,5 - 5.Seism V - VII (Mercalli scale)- Magnitude 3,5 - 5.

•This phase begins after an earthquake This phase begins after an earthquake •Each authority puts the procedures into Each authority puts the procedures into

practicepractice•Each authority communicates to Each authority communicates to

Prefecture about the damages further to Prefecture about the damages further to eartyhquakeeartyhquake

•Prefecture establishes the real seismic Prefecture establishes the real seismic effecteffect

Page 10: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

Like Vulcain scenario, a second mainshock (IX Mercalli -5,8 R), during rescue activities, caused a lot of damages and death of 4 persons during an inspection to assess damages on the Abbey

ASSISI ABBEYASSISI ABBEY26.09.07 - 11:4026.09.07 - 11:40

Page 11: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

FOLIGNOFOLIGNO

Page 12: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

The emergency plan contains each action The emergency plan contains each action for each authorityfor each authority

Prefecture, local and regional authorities and volunteers know what they have to do

thanks to a set of forms

Page 13: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

ALLARMALLARMPHASEPHASE

EMERGENCY PHASE EMERGENCY PHASE SCENARIO TYPE 1SCENARIO TYPE 1

EMERGENCY PHASE EMERGENCY PHASE SCENARIO TYPE 2SCENARIO TYPE 2

Page 14: LARISSA 27-28 September 2007. PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89

WHO SIGNED THE PROTOCOL OF UNDERSTANDING

•Province of Terni •Prefecture of Terni•Region of Umbria •Firebrigades•Municipalities•Local Authorities•Italian Red Cross•Volunteers•Police•Traffic Police•Provincial Headquarters of Carabinieri•Local health authorities•Road operator•Railway operator