J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal report intended primarily for internal or limited external distribution. The opinions and conclusions stated are those of the author and may or may not be those of the Laboratory. Work performed under the auspices of tbe U.S. Department of Energy by the Lawrence Livermore National Laboratory under Contract W-7405-ENG-48.

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

J

UCRL-ID- 124989

Letter to J. S. Kelly, AEC on the Project Sulky Concept

G. W. Johnson

This is an informal report intended primarily for internal or limited external distribution. The opinions and conclusions stated are those of the author and may or may not be those of the Laboratory. Work performed under the auspices of tbe U.S. Department of Energy by the Lawrence Livermore National Laboratory under Contract W-7405-ENG-48.

Page 2: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

DISCLAIMER

This mpor~ was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac- turer, or otherwise does not necessarily constitute or imply its endorsement, recorn- mendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

Page 3: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

DISCLAIMER

Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Page 4: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

r- LAWRE KCE RADIATION LARORATORY ". 0. 30s 90s LIVERMORE, CALIFORNIA 94771

"L @&#%.&- - - - I ,/ '/ .:LJ //A-

UNIVERSITY OF CALIFORNIA

pjsz-? June 2 3 , 1964

p Mr. John s. Kel ly

,Yashir,;tof, 2 5 , D. c.

DirectGr, Division of Peaceful Srrcl i U. S . L t o L i c Energy C o m i s s i o n - _

Page 5: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal
Page 6: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

I. rmoDuCrIo?l Since the prepara t ion of the or ig ina l concept l e t t e r add i t iona l

experience with the de t ec t ion and evaluat ion of t he Pike vented f r a c t i o n

has improved our perspec t ive on the problems of d e t e c t a b i l i t y a t long-

range and our confidence t h a t mosr o f the debris is deposited c lose in t o

the poLnt sf detonat ion.

The ob jec t ives of the experimenr remain the same:

1. Experimental determination of the vented f rac t fon .

These data are p a r t i c u l a r l y important to t h e normalization of the t h e o r e t i c a l r e l a t i o n s h i p s which have been derived t o relate depth of

burial t o t h e vented frect,ion for il given medium. A inodification of

the experimental plan will be made to p e r m i t added amphasis on the

deteminat ion of the a i rborne source s t rength wi th in a mile or two

oE ground zero.

s p e c i % i c a l l y t o the quest ion of the percentage of t h e t o t a l r a d i o a c t i v i t y carried t o long range by t h e wind and i t s p r o b a b i l i t y

of de t ec t ion a t long range.

These data w i l l make i t possible t o speak more

The USWl3 w t l l be advised QE this change Ln emphasLs of the program,

s ince i t is p a r t i c u l a r l y pe r t inen t t o t h e d i f f e rence of opinion which

exists between LRL and the USk;B OR t h e p a r t i t i o n of the vented a c t i v i t y between t h a t which readily f a l l s out and t ha t which reaches the ground only through convection end diffurton processes. The Pike results were

insufficiently precise t o shed any d e f i n f t f v e information on the question.

Several addi t ion81 experiments will be required beEore the problem is well understood. reference. 2 . Produce data on c ra&er mechanics a t a scaled depth greater than

An i n t e r p r e t a t i o n of the Bike data f e included for

Dannyboy . High-explosive experiments by their very nature 2re r e s t r i c t e d t o

y i e lds t h a t a r e small compared t o what is r e a d i l y accomplished wllth

Page 7: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

with nuclear explosives. Further, the data will always be suspect because oE (a) the uncertainties in the application of scaling

relationships and (b) the differences in t h e nature of &he explosions conducted with E1E: and NE. 3. Measurement of physical effects of the explosion at intermediate and

long range.

It is always possible that effects other than those attributable to

radioactivity may be the l imit ing feature of some speciffc Plowshare

applicarion. ]In order to reduce the probability of there being surprises

associated with the physical effects OR future applications of nuclear explosives it is important to continue the accumulation of data which

define the limits and the magnitude of suck effects.

XI. C ~ A R I S O N wrm PIKE Pike was not a cratering shot nor was it 8 planned vent; as 8 result any

attempt at camparison of Pike and Sulky must be restricted to comparing the history of the vented radioactive debrfs.

1. The mechanism of release of radioactive material from these two

shots is quite different. Pike is more comparable to the release of material through a long, small diameter pipe than to kt venting of

material through overburden as it wvee upward and outward during the formation of 8 crater. in particle size distribution. The evidence is that the vented fraction from Pike contained a larger percentage of its activity on small particles

than would be expected for Sulky. The result in such a case would be that

Sulky would deposit a larger fraction of the vented activity closer to ground zero, or to put i t another way, t h a t 8 smaller fraction of the

vented activity should be carried to long d€stances.

2. The vented fraction on Sulky i s expected to be a factor of 5 to 10

There is likely to be a considerable difference

smaller than for Pike. Further, Sulky would be shot only under

meteorological conditions which would p r o v i d e the maximum p o s r i b l e

residence time for the a i r b o r n e d e b r i s within the boundariea of the United States. This was not true €or Pike. The winds a t shot t i m e

Page 8: Letter to J. S. Kelly, AEC on the Project Sulky Concept/67531/metadc... · J UCRL-ID- 124989 Letter to J. S. Kelly, AEC on the Project Sulky Concept G. W. Johnson This is an informal

were northerly, with minimum velocity and directional shear, and of appreciable speed. which have been established for conduct of the Sulky experiment.

These are precisely opposite to the conditions

A careful choice of wind structure, combined with Sulky's smaller

vented fraction, should reduce the probability of detection at any border to insignificance; in part because of the di lut ion with distance, and i n part because of the small percentage probability of reaching either Mexico or the Pacific Coast if shooting is restricted to the 235 TO 165 degree sector (see data included in Table I, as extracted from the U W B publication, "A Climatology of 700 mb Trajectories Originating at the Ncvada Test Siteb" dated March 1954).

T A B U I

TRAJECTORY EXIT PROBABILITIES, Dec. Through Peb,+

TlbWECTORY EXIT

West Canada

E. st: Canada Arlantfc Ocean

Gulf: of Plexi.co

Mexico

Pacific Ocean

FROBABILITY ib HKI)W ZiNMBER OF DAYS

50 2.4 0

50 4.0

0

0

0

*?or trajectories originating a t WTS in the 135 to 165 degree sector.

111, COST APJT, TIMF, E S T W T E No changes are anticipated. The modifications to the experimental plan

as outlined above are believed t o be w i t h i n t h e original estimates.