Page 1: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

Virtual Open House

May 2020

LINDENSHIRE AVENUE PEDESTRIAN ACCESS MAPLE GO UPGRADES

Page 2: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

MORE SERVICE COMING TO VAUGHAN

Page 3: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

WHAT WE‘RE BUILDING IN VAUGHAN

• Upgrades to Rutherford GO, including 1200 net-new parking spaces, new pedestrian tunnels, platforms, bus loops, Passenger Pick-up and Drop-off and bicycle facilities.

• Upgrades at Maple GO including more parking, new platform, expanded bus loop, improved Passenger Pick Up and Drop Off and western station access off Lindenshire Avenue.

• Grade separations at Rutherford Road and McNaughton Road.

• Noise walls along the Barrie corridor to mitigate noise from construction and train operations.

• Proposed GO Station at Kirby Road through market driven Transit Oriented Development strategy.

Page 4: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

UPGRADES TO MAPLE GO

Upgrades to Maple GO Station are currently in design and procurement.

• New west platform and second track, facilitating improved two-way service

• Expanded bus loop with 4 bus bays

• Expanded Passenger Pick-up and Drop-off

• Bicycle connections and facilities

• Western pedestrian access point off Lindenshire Avenue

Page 5: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

NEW STATION SITE PLAN

Page 6: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

• When it comes to accessing our stations, it’s important to create convenient options to connect our customers to our stations.

• In particular, we want to create opportunities for local residents to access public transit without needing to use their cars.

• Pedestrian access at Lindenshire Avenue provides a convenient connection

for those west of Maple GO to access our station.

WHY A NEW ENTRANCE ON LINDENSHIRE AVENUE?

Page 7: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

WHAT WE HEARD FROM YOU LAST TIME

• Preference for the southern alignment at Lindenshire Avenue and Stonebriar Drive

• Concerns about increased vehicular traffic on Lindenshire Avenue • Soften the design of entranceway footings

• Be mindful of local wildlife when in construction

• Ensure CCTV cameras are not pointed at neighbouring houses

• Mitigate excessive lighting as part of your design

Page 8: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

PROCEEDING WITH SOUTHERN ALIGNMENT

Based on feedback from our last meeting we are proceeding with the alignment at Lindenshire Avenue and Stonebriar Drive

Page 9: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

NEW DESIGNS: SOFTENED ENTRANCE FOOTINGS

Updated designs to soften entranceway by: • Minimizing overall

footprint with slighter promenade area

• Moving PRESTO machine

inside the enclosure

• Installing more minimalist signage

• Pointing CCTV cameras away from homes

Page 10: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

NEW NIGHT-TIME RENDERING

New evening rendering shows how more subtle lighting will better fit the character of surrounding residential street

Page 11: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

PROPOSED TIMELINES AND NEXT STEPS

• Summer 2020 – Tender issued

• Winter 2021 – Contract awarded

• January 2021 - Anticipated construction start

• Spring 2023 - Construction completion

Procurement Construction Upgraded Station

2021 - 2023 2023 Present - 2021

Page 12: LINDENSHIRE AVENUE PEDESTRIAN ACCESS€¦ · UPGRADES TO MAPLE GO Upgrades to Maple GO Station are currently in design and procurement. • New west platform and second track, facilitating

STAY INFORMED

Join our email distribution lists to stay up to date on this project by signing up at the registration table. You can also view and comment on these boards online at our Metrolinx Engage page www.metrolinxengage.com

Questions? Contact: