Lithuanian energy independence strategy: main achievements and remaining challenges Rokas Masiulis Minister of Energy 2015-05-15

Upload: others

Post on 10-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Lithuanian energy independence strategy: main achievements and remaining challenges

Rokas Masiulis Minister of Energy

2015-05-15

Page 2: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Achievements: • Renewable energy sources • LNG Terminal • Electricity interconnections

Challenges • Synchronization • Energy efficiency • Decommissioning of Ignalina NPP

Contents

2/11

Page 3: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Achievements (I): Renewable energy sources

3/11

Lithuania is well on track to reach its RES target of 23% in 2020

Page 4: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Achievements (I): Renewable energy sources

Lithuania is well on track to reach its RES target of 23% in 2020

3/11 FSRU Independence coming into the Port Gate in Klaipeda

Page 5: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

LNG regasification markets

Baltic-connector

GIPL

LNG ship reloading markets LNG auto-trailer markets

Markets accessible starting the 1st of January, 2015

Markets accessible after regional interconnections are finished

Markets accessible after on-shore LNG reloading station is finished

LNG terminals (5.000-30.000m3) in development

Lithuania must become a regional natural gas trade hub

Achievements (II): LNG terminal

5/11

Page 6: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Achievements (III): Electricity interconnections

These power links will eliminate energy island status of Baltic States

• One of the longest underwater electricity cables in the world – more than 450 km

• Capacity – 700 MW

• Voltage – 300 kV

• CAPEX – over 552 mln. EUR (LT share – 215 mln. EUR, SE – 337 mln. EUR; EU financial support – 131 mln. EUR; +44 mln. EUR – to LV)

NordBalt (2015)

• Total length – 160 km

• Capacity (2015) – 500 MW

• Capacity (2020) – 1000 MW

• Voltage – 400 kV

• CAPEX – over 234 mln. EUR (LT share 2015 – 109 mln. EUR, EU financial support for the LT first stage – 4,4 mln. EUR)

LitPolLink (2015)

6/11

Page 7: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Synchronization is mandatory for the creation of Energy Union

Challenges (I): Synchronization

7/11

Page 8: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Challenges (II): Energy efficiency

Lithuania puts all effort to improve energy efficiency, however it requires substantial financial resources

[Mto

e]

primary energy consumption final energy consumption

8/11

Page 9: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Challenges (III): Decommissioning of Ignalina NPP

Additional financial support after 2020 is vital

9/11

Page 10: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Three main challenges • Synchronization - mandatory for the creation of Energy Union

• Energy efficiency - all effort is put, substantial resources required • Decommissioning of Ignalina NPP – continuity of EU financial

support after 2020 is vital

Conclusion

10/11

Page 11: Lithuanian energy independence strategy: main achievements ... · Achievements (III): Electricity interconnections These power links will eliminate energy island status of Baltic

Thank you

Rokas Masiulis Minister of Energy

[email protected]