l.mandelli csn1 trieste 20 settembre 061 overall atlas status – september 06 status of the...

44
L.Mandelli CSN1 Trieste 20 Settembre 06 1 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization toward the Data Taking period ATLAS – It 2007 Budget • Conclusions

Upload: timothy-mathews

Post on 22-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 1

Overall ATLAS Status – September 06

• Status of the detector and schedule

• ATLAS financial situation

• Atlas organization toward the Data Taking period

• ATLAS – It 2007 Budget

• Conclusions

Page 2: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 2NB: It’s the first cryogenic magnet operated underground at LHC !

Central Solenoid

All cryogenic and control connections done.

Cooled down first at 75K with shield refrigerator and after at 4K with the main refrigerator (17/23 May- 5 days)

Preliminary exitation tets done in July at 1kA (0.26T))

After closing the EC ( 26 July) the solenoid was excited in steps up to the nominal I=7330 A (2T)A limit of 8 kA was reached followed by a Slow Dump (discharge on the RDU without quench)

The Field Mapping followed in August (2-8/08)

The solenoid is commissioned

connections

Page 3: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 3

7995 A7330Asd

current Voltage

Solenoid: cooling down excitation

Page 4: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 4

Solenoid Field Mapping

oThe field is mainly due to the coil. The effect of the Tile Cal iron is of the order of 4.5% and slowly varying with z

oThe tracker need a precision of 5 10-4 on the bending power requiring a precision of 10 G on the field

oTwo arms at 90° rotating and moving in z bring 48 Hall probes

o4 NMR probes are fixed on the warm wall of the cryostat for permanent monitor (BT field)

o181 (z) X 16(phi) x 48 = 139k meas ( 6/dm3 + special runs (middle and end) + runs at 5kA,7kA and 7.85kA

Page 5: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 5

Solenoid Mapping - Preliminary

Z position

R=12cm

R=120 cm

Bc-Bm

Bc-Bm

10G

20G

• The mapping campaign worked very well, in all together 50 hours the magnetic field was measured on 250.000 points inside the solenoid volume (4 different current values)

• Dispersion of measurments is of few Gauss

• Furthermore results are compared with models of coils + magnetized iron

• Preliminary results with an idealised coil gives already agreement < 20G

• The aim to deliver a field map of the ATLAS solenoid with an absolute precision of 5 10-4

will certainly be reached after an extensive analysis of the data

Page 6: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 6

Page 7: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 7

Barrel Toroid Status

Vacuum < 5 10-5mbar reached after leaks repair Cooling down. At 4K 30 Aug

11 16 21 26 31 36 41 46 51 56 61 66 71Timedays50

100

150

200

250

300

350

TemperatureK 1st Cool Down

Max DT ~ 40 K

Guasto a una turbina del

refrigeratore

Ripresa raffreddamento

Temperatura schermi termici

Temperatura bobine

60 d

Page 8: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 8

Barrel Toroid test programRemind: all new items: Cryoring, Current Lead Cryostat, bottom Valve box, need to be tested!Phase 1:  BT Characterization & commissioning test 1 week ( from 23d September)1- RRR measurement and Self inductance measurement - Ramp up current to 200 A    - 2- Magnetic measurement on BT - steady state at 300 A           - 4 - Commissioning test of main USA15 power supplyPhase 2: Commissioning test / current 1kA - 5kA Phase 2: Commissioning test / current 1kA - 5kA : : 2.5 weeks - Beginning October1- Current up to 5 kA2- Check Quench Heaters3- Check Magnet Safety System4- Check mechanics deformationPhase 3:  Full power BT current test  / current 10kA to 20.5kA by steps : over 1 month from end October1.Current uo 20.5KA only after accurate cavern cleaning (20 ottobre) 2.Current raised in steps 10, 15 kA, 20kA3.Check mechanics and quench system

  -

Page 9: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 9

ECT-A Status July

• Story• Design and engineering by RAL• Vessel and cold mass contracted

by Nikhef• The firm in charged failed• Peaces at CERN in 04 with 2 years

delay

At present cold mass inserted in vacuum vessel.

• Next: transfer load on vessel, Complete mechanics and cryo (turret & services, thermal shield on end plate, JT shielding)

• Close and vacuum test• Test at 80K in front of B180• Transport and lower in cavern

middle Sept. An adventure in itself !

• Many unknown. Critical. If delay Big Wheel-A will delay

Page 10: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 10

End Cap Toroid A- 2 Severe proble found in the engeeniring

of the mechanics which trasfers the forces acting on the cold mass to the cryostat

ECT cold mass is pulled into the BT with ~260 tons taken by 16 tie rods that transfer load to the vessel and then to the 8 BT vessels trough the 8 AFT connection points

Design assumed infinite stiffness of vessel during integration and 0.5mm tolerances. Impossible to align and furthermore they would brake!

Redesign to make them adjustable after closing, transport, cooling down in cavern

Bring the AFT connections through the end plate to the outside, 32 new feed-troughs

Problem solved, But takes time…….

Tie rods

Page 11: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 11

ECT – New Schedule

ECT-AECT-A• Closing vessel Oct-Dec 06• Vacuum test during X-mass• Transport to 80K test (outside B180) on 1 Feb• Transport to point 1 in March 07. Connections in cavern Mar-Jun 07

Details of installation, shield & muon chambers to be studied

ECT-CECT-C• Cold mass ready by Dec 06 in B191; vessel opening can not be done

before ECT-A is out of B191• Cryostat integration Feb-Apr 07• Vacuum test and preparations for transport May 07• 80K test in May-June• Transport to point 1 by end of Jun 07

• This totally upset the Mu-EC assembly. New planning under study

Page 12: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 12

Mu End Caps and End Caps Toroids – First thoughts

Page 13: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 13

Status of Barrel chamber installation• 424 out of 656 barrel chambers

installed

• -> 65% . It was foreseen 72% end of August

• Main problem has been either access and crane availability or the actual installation of the chambers on the rails than the chamber availability.

• Lot of problems inside the detector when moving the chambers to their final positions: services out of envelope, poor access, scaffolding in front of the chambers, etc.

• During the last two months an average rate of 3.5 chambers per day was reached.

• RPC BOL completed- About 10 BML remain to be retrofitted

Muon barrel chambers (all)

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

14-Dec-05 02-Feb-06 24-Mar-06 13-May-06 02-Jul-06 21-Aug-06 10-Oct-06 29-Nov-06 18-Jan-07

Extrapolation assumes 3.7 ch/d

End November

Page 14: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 14

LV1 Trigger ( only Mu)

All 800 Splitter boxes and PAD processors produced

LV1 work ongoing in BB5 in parallel to stations commissioning. All chamber tested with test–pulses before installation

PAD integration on chambers previously installed brought forward

Common data taking with LV1 ( RPC; MuCTPI;MUCTP) , RPC and MDT performed with 3 middle and 3 outer stations.

Laboratory tests of LV1 RPC Sector Logic and ROD ongoing

Page 15: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 15

Page 16: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 16

Night 14.08.06

RPC provided trigger from sector 13A at ~ 40Hz coincidence between two middle planes (yellow) in both eta and phi

Large RPC (green) is also read out

Tile reads

ROS + event building

Muons +Tile Combined

Page 17: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 17

Page 18: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 18

Mu spectrometer EC

staged

Big wheel1 MDT3 TGC

Inner/Small Wheel EOWall Wheel

Page 19: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 19

Mu wheels

Sectors assembly was on critical path. Now ok thanks to extra manpower (3 sector/w)

Side-C SectorsSide-C Sectors

TGC-1, TGC-2, MDT completed

TGC-3 4/12 sectors done. Completed in November

Side-A Sectors Side-A Sectors

MDT-1 3/16 sectors done. Completed mid October tooling for TG’s

TGC-1 1/12 sectors done. Completed in parallel wit TG-C-3

Assembly of sectors in wheels on the end wall (HO). Wheel1 Completed

Once one wheel completed put on chariot.

Assembly of small wheels started in B191 and will be mounted in front of the ECT’s in summer 07

EO Wheels is following

Page 20: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 20

Installation of TGC-1-C

TGC-C-1 completed !

Page 21: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 21

Calorimetry – Barrel-LArIn June barrel was cooled down and filled with LAr

Calo:HV test gave 18 single sided and 1 double sided shorts. Upsetting ! ( were 7 in B180)

Presampler: 15 single side shorts (like B180)

Attempt of burning only partly succesfull: 4/4 on preshower 1/8 Calo

Decision to empty and refill with condensation (to move “dust”). Done

At present at 16 KV: Calo: 10ss and 2ds – Preshower 7s

Commissioning Phase1 completed

CR taken with tile trigger

Tiles Follow well. Phase1 terminated

LVPS still on critical path. Phase2 and 3 Commissioning started

A double side short gives a 0.2% acceptance loss

Page 22: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 22

Calo End Caps (LAr+Tiles)

Both EC are in the pit with the Tile EB assembled.

EC-A ( lowered in the pit in March) will be the first to becooled down (Oct 06)Comm. Phase1 well advanced

EC-C will start cool down in Jan. 07

Gap, cryo and MBS mounted on both EC

EC-C in parking position

Page 23: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 23

Prev | Index | Next

ID-B Status Pixel

Congratulations !

Layer 2 half shell

Page 24: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 24

ID-B Status SCT & TRT Insertion of SCT in TRT already reported

From then intensive test and commissioning of services

All reported leakage problems solved

CR run in SR1 with 1/8 of TRT and 1/4 SCT. 450k events collected with combined read out. No Xtalk and noise increase observed.

SCT+TRT inserted in August after B field measurement

Connections of services and commissiong phase1 will take about 4 months.

Delicate since when EC inserted almost unaccessible

Page 26: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 26

Prev | Index | Next

                                                                                                                         

                                          

Page 27: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 27

Prev | Index | Next

                                                                                                                                                                                                     

                             Congratulations !!!

Page 28: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 28

ID- EC StatusID-C and ID-A will be tested and commissioned in SR1

Both EC’s RFI in December

Pixel insertion aroud April

ECT problem requires to define schedule details

Page 29: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 29

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

ID B

ID A J

N

Cold tests

Limited access (ECT partially inside, half truck)

ID C

Pix

el

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Endcap Cal. A services

Cold tests

ID Barrel connection and testing (side C access via lift only!)

Sep '07 Oct '07

EO, side A

Oct '07

JF

Sep '07Oct '06

Jun '07

Big Wheels in park position

JD

Tru

ck

clos

ing

Big Wheel tooling

Endcap Cal. services

Muon Barrel C

LAr C cool down

Aug '07

Jul '07 Aug '07

VT

VT

JF

VJ

Barrel

Muon Barrel C completion

VA

Global Commissioning

EO, side CSmall

Wheel C

Jul '07

Side A

Glo

bal C

omm

issi

onin

g

glob

al te

sts,

pum

p do

wn

& b

ake

out

Side C

VJ

JF

Limited access

JFSide C

Barrel

Side A

ID services along Barrel & through Muons

Chains

May '07 Jun '07

VA

Small Wheel A

Big Wheel A (TGC1 +MDT+TGC2+TGC3)

Mar '07Feb '07Jan '07 Apr '07

ECT on beam line, partially inside (half truck)

Dec '06Nov '06

Nov '06 Jan '07Dec '06

Tru

ck

JT

Mar '07

Endcap Toroid A cooldown

& test

May '07Jul '06 Feb '07Sep '06 Oct '06Aug '06 Apr '07Jun '06

Sep '06Jul '06

Services 1st fix

open

clos

e

Jun '06 Aug '06

open

ing

Barrel Calo testing and commissioning

ID access via lift only

map

ping

Fie

ld

Cable chains

BT pumping, cooling, testing

Endcap Toroid C cooldown & test

(Park pos.)

Endcap Toroid C

open

ing

TGC1

Endcap Cal. C testing & commissioning

ID A connection and testingPixel connection and testing

Endcap Toroid A

Muon Barrel AJT

Big Wheels C (TGC1+MDT +TGC2 +TGC3)

IDC connection and testing

LAr A cool down

BT test Magnet test

Page 30: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 30

SDX1

USA15

UX15

ATLAS Trigger / DAQ Data Flow

ATLASdetector

Read-Out

Drivers(RODs) First-

leveltrigger

Read-OutSubsystems

(ROSs)

UX15

USA15

Dedicated links

Timing Trigger Control (TTC)

1600Read-OutLinks

Gig

abit

Eth

erne

t

RoIBuilder

pROSR

egio

ns O

f Int

eres

t

VME~150PCs

Data of events acceptedby first-level trigger

Eve

nt d

ata

requ

ests

Del

ete

com

man

ds

Req

uest

ed e

vent

dat

a

stores LVL2output

Event data pushed @ ≤ 100 kHz, 1600 fragments of ~ 1 kByte each

Second-leveltrigger

LVL2Super-visor

SDX1CERN computer centre

DataFlowManager

EventFilter(EF)

pROS

~ 500 ~1600

stores LVL2output

dual-CPU nodes

~100 ~30

Network switches

Event data pulled:partial events @ ≤ 100 kHz, full events @ ~ 3 kHz

Event rate ~ 200 HzData

storage

LocalStorage

SubFarmOutputs

(SFOs)

LVL2 farm

Network switches

EventBuilderSubFarm

Inputs

(SFIs)

Page 31: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 31

HLT/DAQ – Where we are

All Read-Out System (ROS) bought and in advanced phase of installation and commissioning

Purchasing of other components in an advanced state taking into account the new LHC schedule ( in particular LV2 and EF farm)

Pre-Serie (10%) installed and very useful for debugging and understanding the system the Algoritms to be used and a realistic trigger Menu

Continous interactions with SW, Performance and Physics Groups needed- Trigger& Physics Weeks very useful- CSC notes will contain detailed trigger simulation

Page 32: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 32

SW and Computing seen from farSw and computing will be a major effort toward Data Taking

complementary to the Detector CommissioningThe present line of activity is:1- Simulate O(20M) events with the “ as installed misaligned/miscalibrated

geometry “. To:- Prepare the CSC notes equivalent to revising/updating the Physics TDR. Step one will use a “ as installed detector with known distortions/miscalibrations.- Calibration Data Challenge (CDC) exercise to demonstrate the capabilty to calibrate/align the detector and understand systematic effects ( B-field, materials etc.)

2- Before start of data taking try “ Dress Reharsal Exercise” O(10M) to : Simulate a data stream as from the EF to completely exercise the full chain of distributed analysis ( data streaming- calibrations-Tier1-Tier2- ESD-AOD etc) Very ambitous !

3- Stress the distributed computing infrastructure and gradually bring it towards the 40Hz goal. Will require more simulations. Useful also for particular physics channels

NB. At 200 Hz 10M events will be collected in 1d (5 104s). 2M to be simulated

Page 33: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 33

Physics

top cross-section Cobal h->gamma gamma Carminati h->4l Nisati A/H->tau tau Resconi Inclusive SUSY Polesello Exclusive SUSY Lari mu from pi/K Di Mattia Btag: HLT Schiavi pion CTB Cavasinni Jet Calib Vivarelli In situ Jet Calib Roda Etmiss Cavalli mucomb: Trigger Biglietti egamma: HLT track Parodi

It’s difficult to summarise the very intense effort which is going on in preparing to data analyses. On a short range the main activity will concentrate on the mentioned CSC notes( 82 ). The italian community is very active as shown by the number of notes with italian editors. To this of course one has to add a rilevant number of contributions to the other notes

Page 34: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 34

Atlas Comments on the new LHC machine schedule

The presented ATLAS schedule V8.0 fits the new schedule presented at the SPC and CERN Council which foresees the beam pipe closure at the end of August 07 with the following remark:

The schedule strategy should be such that the useful integrated luminosity at 14 TeV at the end of 2008 will be maximized (1-3fb-1 ??).

Primarily the run in 2007 will be a detector and computing commissioning run, and not a physics run

Page 35: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 35

Page 36: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 36

Overall financial situation

ATLAS construction budget initial MoU 1995475 MCHF

Updated baseline contributions 468 MCHF

Cost-to-Completion (CtC) evaluation for the initial detector 68 MCHF

Main funding issues today

There are remaining outstanding contributions to the baselineCommon Fund (Russia; JINR;Canada;...) 9 MCHF

Pledged CTC contributions 62.7 MCHF. Missing 5.3 MCHF (NB: Situation only looks rather good due to 5 MCHF more given by CERN; Missing pledged contribution from USA; Russia...)

Page 37: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 37

Unfortunately as already warned at the April 2006 RRB there are new extra cost for a total of 4.4 MCHF.

CB chair ha nominated an audit Committee ( Bethke; Mandelli; Oram) who looked into the overcosts (report available)

System Item

Item Over Run

System Over Run

System Total Cost

System Over Cost

    MCHF MCHF MCHF %

Magnet     1.76 158.2 1.1%

Technical Coordination     2.39 49.6 4.8%

  Muon Big Wheels 1.39      

 TCn installation manpower efforts at Point 1. 1.00      

LArCC project     0.25 38.7 0.6%

ATLAS     4.40 536 0.8%

Further delays in installation work beyond August 2007 could require additional resources for manpower to be paid.

Page 38: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 38

What to do:

Make all efforts such that all FAs would provide the full approved contributions (baseline + CtC). There are indications that about 50% of the baseline missing contributions could be recovered.

Otherwise:

Extend the Institute fees (12.5kCHF/y) up to three years

Atlas will present the situation at the October RRB and will ask for a decision at the April one

OTSMOU

– Last but not least. A group is working to define in details all the tasks needed to operate and mantain ATLAS, to study a mechanism to share the duties and costs between the agencies and to understand the implications with the M&O.

Page 39: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 39

Executive Board

ATLAS management: SP, Deputy SP, RC, TCCollaboration Management, experiment execution, strategy, publications, resources, upgrades, etc.

PublicationCommittee,Speaker Committee

CB

Detector Operation (Run Coordinator)Detector operation during data taking, online data quality, …

Trigger (Trigger Coordinator)Trigger data quality,performance, menu tables, new triggers, ..

Data Preparation (Data Preparation Coordinator)Offline data quality, first reconstruction of physics objects, calibration, alignment (e.g. with Zll data)

Computing (Computing Coordinator)Core Software, operation of offline computing, …

Physics (Physics Coordinator)optimization of algorithms for physics objects, physics channels

(Sub)-systems:Responsible for operation and calibration of their sub-detector and for sub-system specific software

TMB

New Atlas Organization toward the Data Taking EraCB approved the guidelines but not the formal document. Implementation step by step

I.HinchliffeK.Jacobs (D)

C.GuyotA. Hoecker (D)

L. Mapelli

N.Ellis

Page 40: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 40

BILANCIO 2007- Richiesta (DB)

• MI ME Cons Trasp Inv CA Tot

• 2007 223.9 3255.2 1687.9 11 323.2 2707.2 8208.4

• 2006 296.6 3186 2095 48 450 5458.4 11443

• Di Cui:•

2007 MOF-A 715 (with Core Comp.)

• 2007 MOF-B 435 (was 490.6)

• 2007 CtC 1471• 2007 Calcolo (Tier2) 600

Ric.: 205 (167 FTE ; 117 100%) Tecn.: 47( 25.7 FTE ; 14 100%)Total 2007 252 ( 192.7 FTE) Total 2006 : 245 (185 FTE)

Page 41: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 41

Conclusioni

ATLAS sta andando bene. Molte luci e un’ ombra (ECT) Comunque nei primi mesi del 2007 avremo la parte

centrale (IDB;ID-EC, CaloB;Calo-EC, MuB) assemblati ed in fase di commissioning con CR.

Gli EC Mu (camere) procedono bene. Con il commissioning dei rivelatori il TDAQ passa dalla fase

di test alla messa in funzione. Nel 2006-07 si dovrebbe avere un test significativo del CM Una presa dati è possibile nel 2007 eventualmente senza

gli ECT eccitati L’ organizzazione della Collaborazione verso il periodo di

presa dati è in atto La situazione economica non è floridissima ma attenzione

con ATLAS si potrebbe anche tentare di guadagnare......!

Page 42: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 42

Page 43: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 43

SPARESSPARES

Page 44: L.Mandelli CSN1 Trieste 20 Settembre 061 Overall ATLAS Status – September 06 Status of the detector and schedule ATLAS financial situation Atlas organization

L.Mandelli CSN1 Trieste 20 Settembre 06 44

H

L

T

DATAFLOW

40 MHz

75 kHz

~2 kHz

~ 200 Hz

120 GB/s

~ 300 MB/s

~2+4 GB/s

Event Building N/workDataflow Manager

Sub-Farm Input

Event Builder

EB

SFI

EBNDFMLvl2 acc = ~2 kHz

Event Filter N/work

Sub-Farm Output

Event FilterProcessors EFN

SFO

Event FilterEFP

EFPEFP

EFP

~ sec~

4 G

B/s

EFacc = ~0.2 kHz

Trigger DAQ

RoI BuilderL2 Supervisor

L2 N/workL2 Proc Unit

Read-Out Drivers

FE Pipelines

Read-Out Sub-systems

Read-Out Buffers

Read-Out Links

ROS

120 GB/s

ROB ROB ROB

LVL1

DE

T R/O

2.5

s

Calo MuTrChOther detectors

Lvl1 acc = 75 kHz

40 MHz

RODRODROD

LVL2 ~ 10 ms

ROIB

L2P

L2SV

L2N

RoI

RoI data = 1-2%

RoI requests

Trigger, DAQ and Detector Control