lng refit “eiger – nordwand”€¦ · company profile. adn, geneva, august 27 2013 ben...

13
ADN, Geneva, August 27 2013 1 Ben Maelissa LNG REFIT “EIGER – NORDWAND” Ben Maelissa, ADN, Geneva, August 27 2013

Upload: others

Post on 22-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

ADN,  Geneva,  August 27 2013  1Ben Maelissa

LNG REFIT“EIGER – NORDWAND”

Ben Maelissa,ADN,  Geneva,  August 27  2013

Page 2: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

ADN,  Geneva,  August 27 2013  2Ben Maelissa

o Privately owned companyo Founded in 1982o Headquarters in Sliedrechto Branch offices :

o Sliedrecht (NL)o Antwerp (B)o Brussels (B)o Basel (CH)o Strasbourg (F)o Ottmarsheim (F)o Lille (F)

o Number of employees  : 140 o Danser owned vessels : 5 o Danser chartered vessels : 50 o Transported in 2012 : > 1,0 million TEU

Company profile 

Page 3: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

ADN,  Geneva,  August 27 2013  3Ben Maelissa

Operating Area 

Page 4: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

ADN,  Geneva,  August 27 2013  Ben Maelissa 4

“ Eiger‐Nordwand” 

Built  2000Overall lenght 177 meterWidth 11,45 meterDraft 2,56 meterTonnage 5300 tonnesCapacity (4 layers)   348 TEUEngines  2x  900 kW

Vessel particulars

Page 5: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

Project Targets

• Meet customer demand; green transportation• Meet upcoming legislation by ports and governments • Meet Danser Group strategy:  Frontrunner in clean & safe 

transportation • Realisation first LNG refit on Inland vessel• Emission meeting (expected) CCR4 requirements• Pilot for LNG refit on 4 more container vessels 

How:• Installation Dual‐Fuel propulsion system (Wärtsilä Engine, Tank/ 

Coldbox)• Turn‐key installation & commissioning• Increased performance; fully redundant • Safety leading parameter in overall design 

ADN,  Geneva,  August 27 2013  Ben Maelissa 5

Page 6: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

Project planning 

• Feb 2012• Jun 2012• July 2012• Dec 2012• Feb 2013• Mar 2013• Aug 2013• Sept 2013• Oct 2013• Feb 2014• Apr 2014

• Start project,  initial discussions• Conceptual design by project team • Presentation to LRoS• Introduction to Ministery of Infrastructure (IL&T, I&M)• Submission call for TEN‐T project• Start detailed design • Presentation at ADN meeting in Geneve• Presentation at CCR meeting in Strassbourg• HAZID study by LROS• Start refit• Tests, commissioning & trials 

ADN,  Geneva,  August 27 2013  Ben Maelissa 6

Page 7: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

Actual Arrangement 

ADN,  Geneva,  August 27 2013  Ben Maelissa 7

Page 8: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

REFIT Arrangement

ADN,  Geneva,  August 27 2013  Ben Maelissa 8

Page 9: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

REFIT Arrangement

ADN,  Geneva,  August 27 2013  Ben Maelissa 9

• Proven design of all major components, based on multiple years of experience • Dual‐Fuel Engine: automatic switch over to gasoil in case of failure/ alarm• Dual‐Fuel Engine: designed for LNG as main fuel• Dual‐Fuel Engine with a/o double wall piping; gas safe Machinery Room ! • Gas detection and auto shut down of main LNG valve • Double redundant ventilation• Bunkering at starboard side• Trained crew & management 

Page 10: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

REFIT Detailed design 

ADN,  Geneva,  August 27 2013  Ben Maelissa 10

Page 11: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

Project Partners

ADN,  Geneva,  August 27 2013  Ben Maelissa 11

20ft Container20ft Container           No reefers

Cryonorm LNG TANK  60m3  100%    

Wärtsilä DF  6L20Dual‐Fuel Engine      

Page 12: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

Reduction of Emissions

ADN,  Geneva,  August 27 2013  Ben Maelissa 12

IMO Tier III and CCR4/5 compliance on LNGGasoil backup capabilityDF engines suitable for mechanical drive

Wärtsilä DF  6L20

CO2

NOx

SOx

Particulates

Dual‐Fuel enginein gas mode

Dieselengine

0

10

20

30

40

50

60

70

80

90

100

Emissionvalues [%]‐20%

‐80%

‐99%

‐99%

Page 13: LNG REFIT “EIGER – NORDWAND”€¦ · Company profile. ADN, Geneva, August 27 2013 Ben Maelissa 3 Operating Area. ADN, Geneva, August 27 2013 Ben Maelissa 4 “ Eiger‐Nordwand”

ADN,  Geneva,  August 27 2013  Ben Maelissa 13

ADN and CCR approval requested to realise this LNG refit project 

THANK YOUQUESTIONS ?

www.danser.nl