local needs, global solution
DESCRIPTION
TRANSCRIPT
Local needs, Global solution
Business Turnaround Business Turnaround of of
Baby Products Manufacturer in ThailandBaby Products Manufacturer in ThailandPartha BhattacharyyaPartha Bhattacharyya
Director, Enterprise ConsultingDirector, Enterprise ConsultingJSG Co., Ltd. , ThailandJSG Co., Ltd. , Thailand
SCOR Users Seminar, Denver CO, 27SCOR Users Seminar, Denver CO, 27thth Sep 2006 Sep 2006
SCOR In Action
© JSG Co., Ltd.
Nexus System ResourcesLocal needs, Global solution 2
Royal Industries (Thailand) Public Company Limited (RI) is a 37-year old Baby Products manufacturer in Thailand, with 800 employees
RI exports 90% of its own brand and OEM products to EU and US, and has Tier 1 capabilities for Product Development.
In January 2006, RI was facing imminent threat of closure due to financial instability and operational interruptions from internal and external factors in its supply chain.
A New RI Management Team took charge with strong focus on Financial and Operational turnaround. The RI Team prepared itself for the challenge.
JSG was appointed Consultant for IT and Business Process Improvement for RI
JSG performed a 3-month Business Consulting exercise analyzing, improving and measuring the related business & operating processes…..
Introduction & Background
Nexus System ResourcesLocal needs, Global solution 3
Contents
Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 4
Financial Issues Summary
• Highly leveraged state, AP>>>AR
• Long order to cash lead time (80 days)
• Non cooperation of suppliers & vendors (due to AP)
• Delayed & incomplete shipment (Supplier non-delivery, QC
rejections)
• Quality related issues (Tooling, Lack of visibility of RM
standards, manufacturing defects)
• Inadequate capacity utilization (Lack of proper scheduling)
• High supply chain cost (Lack of Bargaining Power due to
poor cash-flow)
• Improper Product Costing data
Nexus System ResourcesLocal needs, Global solution 5
Customer Issues Summary
• Fail to deliver on time to the customer
• Fail to the deliver the correct quantity
• High rejection on quality
• Lack of full Tier I capability (Engineering, Tooling)
• Lack of Marketing and new product development
capability
• Lack of KPI on customer satisfaction
Nexus System ResourcesLocal needs, Global solution 6
• Lack of visibility of operational cost (material, MFG, labor, overhead)
• Cost of non delivery from vendor • Insufficient in-house injection capacity for components• No customer order visibility till shipment plan• Inadequate capacity utilization• Inadequate raw material availability on time• Obsolete production scheduling legacy system• High machine down time• High non value added activities• High accumulation of semi-FG/ FG inventory• High defects/ rejects and scraps• 80% wasted time consumed by the follow up actions as a
result of error and problem
Operations Issues Summary
Nexus System ResourcesLocal needs, Global solution 7
• Undefined Roles & Responsibility• Adhoc assignment of the right people to the right job• Inadequate resource capacity and capability utilization• Lack of resource development planning • Lack of resource management planning• Lack of ability to rotate worker in the production line• Lack of ability to develop internal resource to fulfill the
requirement• High turn over of skilled and good people• Low resource productivity as a result of high non value
added activities• Lack of the accountability of business process owner• Lack of skilled resources for the right job
Human Resources Issues Summary
Nexus System ResourcesLocal needs, Global solution 8
Contents
Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 9
Rapid Supply Chain Process Optimizer (RSCPO) Vision
SCOR based innovative tool and methodology to analyze SCOR based innovative tool and methodology to analyze each Supply Chain node ‘Asset’, consisting of:each Supply Chain node ‘Asset’, consisting of:
• Business Processes (Processing Inventory into Throughput)Business Processes (Processing Inventory into Throughput)• Systems (Machines, application software)Systems (Machines, application software)• PeoplePeople
Apply SCOR Best Practices and KPIs to each Asset to Apply SCOR Best Practices and KPIs to each Asset to optimize:optimize:• Asset Utilization & Effectiveness, for SystemsAsset Utilization & Effectiveness, for Systems• Asset Efficiency, for Throughput and InventoryAsset Efficiency, for Throughput and Inventory• Asset Integration, with other Assets. In addition, SCOR Asset Integration, with other Assets. In addition, SCOR KPIs for each individual Asset is linked to overall Supply KPIs for each individual Asset is linked to overall Supply Chain KPIsChain KPIs
This approach enables visibility, flexibility and This approach enables visibility, flexibility and manageability of the supply chain Assets and benefits all manageability of the supply chain Assets and benefits all stakeholders by imparting industry best practices in stakeholders by imparting industry best practices in improved business processes to achieve ready ROI improved business processes to achieve ready ROI
Nexus System ResourcesLocal needs, Global solution 10
Bridging the Disconnect: RSCPOVision, Mission
Business Goals, Scorecards
KPI’s
Business Process Optimization
Best Practices
Business Blueprint
The DisconnectRSCPO
(using SCOR andIndustry
Best Practices)
‘Rapid Supply Chain Process Optimizer’ methodology, provides an automated link between performance measurement criteria and business process improvement applying SCOR best practices. A SAP template-based solution can be configured downstream to achieve ‘Proof of Concept’ of implementing key processes.
Nexus System ResourcesLocal needs, Global solution 11
Classic ERP Roadmap
1 2 3 4 5
Project Preparation
Business Blueprint Realization
Final Preparation
Go-live and Support
0
BPR / Best Practice
Nexus System ResourcesLocal needs, Global solution 12
RSCPO Replaces the First Two Phases
1 2 3 4 5
Project Preparation
Business Blueprint Realization
Final Preparation
Go-live and Support
0
BPR / Best Practice
Nexus System ResourcesLocal needs, Global solution 13
RSCPO : The New Phase 1
1 2 3 4 5
Business Blueprint Realization
Final Preparation
Go-live and Support
RSCPO
Nexus System ResourcesLocal needs, Global solution 14
Contents
Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 15
Overview of RSCPO Methodology
Measure ‘As-Is’ Process Model
Measure ‘As-Is’ Process Model
2
Build ‘As-Is’ Process Model
Build ‘As-Is’ Process Model
1
Identify Best Practices from SCOR
Identify Best Practices from SCOR
3 Derive ‘To Be’ Process Model
Derive ‘To Be’ Process Model
4 Business Blueprint from Process Change Form
Business Blueprint from Process Change Form
5
Business Goals and Target KPI’sBusiness Goals and Target KPI’s0
Nexus System ResourcesLocal needs, Global solution 16
Target KPI’sTarget KPI’s0 Management defines Business Goals. Using SCOR and
ASAP database, RSCPO enables quick selection of relevant performance attributes and target KPIs.
Business Goals and Target KPIs
Nexus System ResourcesLocal needs, Global solution 17
Build ‘As Is’ Process Model
Build ‘As Is’ Process Model
1RSCPO provides SCOR-standard templates and process segments, which can be dragged and dropped to build ‘as is’ process model
Analyze process diagrams for each Asset in the Supply Chain
Build ‘As Is’ Process Model
Nexus System ResourcesLocal needs, Global solution 18
RSCPO helps to measure performance of the different Assets in the supply chain. User can use a spreadsheet, or can interface to Simulation Software for faster simulation
Measure ‘As Is’ Process Model
Measure ‘As Is’ Process Model
2
Measure Performance
SupplierA
SupplierB
MFGC
DCD
SCCustomer
Days of Supply
Cycle Time
Simulate Asset Efficiencies
Days of Supply
Cycle Time
or
Process Measurement & Benchmarking
Nexus System ResourcesLocal needs, Global solution 19
Identify Relevant Best Practices
RSCPO shows list of SCOR Best Practices and KPIs that can improve business process and measure performance. User selects the ones that are most suitable.
Identify Best Practices from SCOR
Identify Best Practices from SCOR
3
Nexus System ResourcesLocal needs, Global solution 20
The ‘To Be’ Model is drawn after identifying the required Best Practices. The same is then translated into a simple high-level process diagram, with mapping to relevant SCOR elements
Derive ‘To Be’ Process Model
Derive ‘To Be’ Process Model
4
High level Process Map with SCOR elements
Derive ‘To Be’ Process Model
SupplierA
SupplierB
MFGC
DCD
SCCustomer
Link Assets
Nexus System ResourcesLocal needs, Global solution 21
The Process Change Form generated by RSCPO is used to prepare the Business Blueprint, containing the “To-be” process. This is mapped to SAP or other ERP systems
Use Process Change Form generated by RSCPO to prepare Business Blueprint
Use Process Change Form generated by RSCPO to prepare Business Blueprint
5
Create SCOR Process Change Form A listing of each process element in the supply chain with the change that has been identified, estimated benefits (in relation to the metrics to improve) and cost of implementing the change.
Prepare Business Blueprint
Nexus System ResourcesLocal needs, Global solution 22
Contents
Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 23
RI managed two basic value chains • Own brand Products• OEM Products
Value Chains
Own brand products
OEM-products
•Product BOM
planning •ATP, order
confirmation•Supplier
collaboration•Channel
inventory
visibility, VMI
•Supply visibility•Supplier
collaboration•Quick update
of demand
changes•Demand-
supply
management
•Production
flexibility•Short mfg
turnaround
time
•Bundling
services, supply
synchronization
merge-in-transit• order visibility,
delivery reliability•wide delivery
network
Su
pp
ly Ch
ain
Cap
ability
Req
uirem
ents
RI co
ord
inated
pro
cesses
PLAN SOURCE MAKE DELIVER
PLAN SOURCE MAKE DELIVER
RI managed processes
Nexus System ResourcesLocal needs, Global solution 24
Contents Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 25
Recommendations: Strategic Topics Summary Reduce cycle times
• Dispute between departments and with suppliers• Setup In-house injection capacity for components
Improve cash-flow by improved planning
Challenge current supply chain structure to optimize cost, service and cycle time
Where Make-To-Stock is required, implement proper MTS planning systems to
avoid manual transactions
Improve integration with suppliers through collaborative planning, forecasting and replenishment
Improve integration with channel customers to smooth demand, improve availability, and reduce channel’s working capital
Improve forecasting and fulfillment processes to avoid ad-hoc processes
Implement pull-fulfillment both with end consumers and channel partners based on
market required lead times and cost requirements
Nexus System ResourcesLocal needs, Global solution 26
Reduce cycle times Analysis indicated that RI was operating with longer cycle times than key Analysis indicated that RI was operating with longer cycle times than key
competitors in several parts of the supply chaincompetitors in several parts of the supply chain
• Disagreements between different parts of RI on the ability to ship on time.
Unbalanced and improperly scheduled Procurement, Production, Assembly &
Packing capacities resulting in incomplete shipment
• Longer cycle time caused by material shortages, peaks in demand, quality issues.
• Material shortages and demand peaks should be addressed by implementing
improved planning systems and planning on a collaborative basis, more frequently
with suppliers.
Requires implementation of an advanced planning system such as SAP
Requires involving suppliers in the planning cycle
Requires giving suppliers earliest possible warning of demand changes
Requires direct planning relationship between engineering, sales and suppliers.
Need “Available to promise” functionality in the advanced planning system
Nexus System ResourcesLocal needs, Global solution 27
Reduce cycle times Long cycle times are already built into the process because of built times, Long cycle times are already built into the process because of built times,
ship times and material procurement timesship times and material procurement times• Either accept long lead times or hold inventory depending on the product range.
Where inventory is held, a proper make-to-stock planning system should be used with updates to reflect changes in actual demand at the production centers.
• The existing supply chain structure should be challenged to see if shipment can be achieved at short notice to reduce final assembly and delivery lead times.
• Adopting a postponement strategy means that inventory could be held as module level, not at finished goods level, thereby reducing overall inventory holding for any given cycle time
It is possible to hold product in module form or in semi-finished state so as to reduce the number of SKUs when compared with finished goods. The demand for modules and semi-finished goods should be smoother and more predictable therefore reducing the requirements for very short cycle times.
• Issues raised during the workshop included: out source production to a supplier which has lower overhead or is already
outsourcing for other people so that they can afford to have more production capacity at short notice
simplify the product range so that final assembly is less complex
Nexus System ResourcesLocal needs, Global solution 28
Improve integration with channel customers Channel customers currently serve their customers either through holding Channel customers currently serve their customers either through holding
inventory or by ordering from RI as customers place orders on theminventory or by ordering from RI as customers place orders on them• When customers hold inventory they run the risk of obsolescence, and higher costs• When they order from RI, they run the risk that the lead times they offer are too long for
their customers and they run the risk of losing customers• Collaborative planning, forecasting and replenishment (CPFR) process for main channel
customers. Requires visibility of the customer’s sales out plus their inventory, normally achieved
through an internet-based communications system linked to the customer’s in-house management system.
In return RI undertakes to maintain superior levels of product availability at the customer level whilst maintaining low levels of inventory
Forecasting is a collaborative process between RI and the channel customer• This approach has many benefits:
improves product availability at the channel customer and therefore increases sales reduces working capital in the channel customer’s business, making RI products
easier to sell provides RI with better intelligence of end sales and therefore increases forecast
accuracy smoother demand flow & reduces the peak loading on supply chain volumes & costs allows proactive marketing of incentives based on sell out rather than sell in
Nexus System ResourcesLocal needs, Global solution 29
Implement new forecasting & demand fulfillment processes If the supply chain structure is optimized in terms of work centers, assembly If the supply chain structure is optimized in terms of work centers, assembly
centers, inventory holding and lead times, new forecasting and demand centers, inventory holding and lead times, new forecasting and demand fulfillment processes should be introducedfulfillment processes should be introduced
• Existing separation between forecasting, planning and fulfillment identified
• Need capability to forecast at multiple levels and to allow orders to consume the
forecast according to business rules
• Reduce the level of manual processes and work-around solutions, making the
business smoother and easier to manage
• Better planning to enable rapid fulfillment at short notice as the orders come in
• If it is necessary to hold inventory because of cycle time constraints, the planning
system should manage the replenishment of the inventory so that the cost of
holding inventory, service levels, manufacturing and distribution efficiencies are
all optimized
• Link planning system to suppliers’ systems so as to reduce overall planning cycle
time and to allow more frequent planning
Nexus System ResourcesLocal needs, Global solution 30
Implement new pull-fulfillment strategies Pull-fulfillment strategies both for end customers and for channel customersPull-fulfillment strategies both for end customers and for channel customers
• Service level expectations: Currently a blanket 60 days is given, but is this right?
Is this what all customers are demanding? What is the optimum time? Define
target lead times by product group by market/customer group.
• Implement pull-fulfillment approach for the end customer market based on the
right balance of cost and service, closer to the markets within cost constraints
• Implement pull-fulfillment approach for channel customers. If cycle times are
short enough, channel customers may be able to eliminate inventory.
• To implement a pull-fulfillment approach, the customer interface should be linked
in to “Available to promise” and order tracking functionality, since reliability of
lead time is frequently as important, if not more important, as quoted lead time.
• The “available to promise” system should be updated of changes made to supply
allocation to customers, & immediately notify changes to agreed delivery dates.
Nexus System ResourcesLocal needs, Global solution 31
Contents Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 32
Conduct Focus Group workshopConduct Focus
Group workshop
List and Classify the current issues and concerns
List and Classify the current issues and concerns
As-is KPIAs-is KPI
Prioritise the change action needs
Identify Business Opportunities &
Recommend Solutions
Identify the change action needsIdentify the change action needs
Assess an Issue Status Identify Opportunities
Review Enterprise Business
Analysis and Validation
BusinessBusiness
System & processesSystem & processes
Business Issue & Root Cause Analysis
Business Issue & Root Cause Analysis
System Issue & Root Cause Analysis
System Issue & Root Cause Analysis
Objectives:
Strategy WorkshopStrategy
Workshop
Business Process Improvement Workshop Road Map
Transition plan
Nexus System ResourcesLocal needs, Global solution 33
Business Process Improvement workshop plan
Week 1 Week 2 Week 5 Week 6
Review Enterprise Business
Analysis and Validation
Recommendation
Business Process Assessment Week 8
Key Supply Chain Process RI Initiative Ref No. Reviews Phase Analysis Phase
In-house Production & Capacity Planning 8,11, 13,14 9 & 12 Jun 06 22 June, 18 July 06
Order to Cash 5,17,18,19 13 & 14 Jun 06 26 June, 19 July 06
Procurement to Pay 6,7,9,12 15 & 16 Jun 06 28 June, 14 July 06
Accounting Cycle & Closing process 10,20 19-Jun-06 20-July-06
Demand Management & Operation Planning
3, 4, 15,16 20 & 21Jun 06 25,27 July, 1Aug 06
Nexus System ResourcesLocal needs, Global solution 34
Item Issues
Impacted process cycle
O2C P2PProductio
n
Demand &
PlanningAccountin
g
1Delay work completion led late response &
submission
2High rework, revised, duplicated work, manual work, reconciliation, cancellation, unnecessary work
3Wasted time, high unnecessary cost, high defect &
rejection
4Inconsistent quantity, quality of work, product,
services
5Take long lead time, unpredictable expected date &
time
6 Communication, human, work error
7Incorrect information and or unreliable information (Low accuracy and untimely info.)
8Lack of visibility, traceability, reliability, transparency both of internal & external process cycle
9
Insufficient or inadequate quality, capability, capacity of
resource (skilled people, machine, equipment, system,
working environment)
10 Cannot achieve the target or hit the KPI
11High turnover (lose skilled people then get unskilled
people)
Process cycle team are impacted by respective issue
Finding of Common Issues
Nexus System ResourcesLocal needs, Global solution 35
Item Root Cause
Cause occurred in the process cycle
O2C P2PProductio
n
Demand &
PlanningAccountin
g
1
People related (inactive, uncommitted, unresponsive, high turn over of skilled resource, human error,communication error, unskilled people)
2Unclear, criteria, policy and direction and or lack ofownership of decision maker
3
Lacking of good system support, non-integrated system,
No any support tool, system provided to the people
4
People are not strictly follow the process, policy and procedure and lack of the internal control and audit
process
5
Complexity of work (high dependency, constraint) pressure
from external factor
6
Old/traditional management style led no strategic and KPI
measurement
7
Inadequate assign and manage the people on the job and
Inadequate well manage the employee salary package,
benefit and motivation program
8
Internal capacity resource constraints, old machine, people,
low reliability of machine, people, unskilled, low skilled, no
people/knowledge development, no machine maintenance
9Unbalance workload, lack of tool to support workload management
10
Business process are not well designed and are not update
to support new requirement/issue
Analysis of Common Root Cause
Nexus System ResourcesLocal needs, Global solution 36
Item Issues
Root Cause Type
PeopleProces
sSyste
m Policy
Organization &
Com. Cultur
e
1Delay work completion led late response &
submission
2High rework, revised, duplicated work, manual work, reconciliation, cancellation, unnecessary work
3Wasted time, high unnecessary cost, high defect &
rejection
4Inconsistent quantity, quality of work, product,
services
5Take long lead time, unpredictable expected date &
time
6 Communication, human, work error
7Incorrect information and or unreliable information (Low accuracy and untimely info.)
8Lack of visibility, traceability, reliability, transparency both of internal & external process cycle
9
Insufficient or inadequate quality, capability, capacity of
resource (skilled people, machine, equipment, system,
working environment)
10 Cannot achieve the target or hit the KPI
11High turnover (lose skilled people then get unskilled
people)
Root cause type led by respective issue
Cause Type Analysis of Common Issues
Nexus System ResourcesLocal needs, Global solution 37
Lose opportunity of cashLose opportunity of cash as a result of long order to cash lead time as a result of long order to cash lead time Lose sales opportunitiesLose sales opportunities as a result of delay, incomplete, incorrect as a result of delay, incomplete, incorrect
delivery delivery Sales declineSales decline led by the decrease of customer satisfaction led by the decrease of customer satisfaction Less profitabilityLess profitability as a result of higher cost and under customer as a result of higher cost and under customer
claim situationclaim situation UncompetitiveUncompetitive in the market as a result of high operation cost in the market as a result of high operation cost Capital Lock upCapital Lock up from the high accumulate inventory investment from the high accumulate inventory investment Lose customer loyalty Lose customer loyalty Lose market coverage and shareLose market coverage and share Lose capital utilization opportunityLose capital utilization opportunity Lose product and company creditability, image and reputationLose product and company creditability, image and reputation Lose opportunity of business expansion or new market/product Lose opportunity of business expansion or new market/product
penetrationpenetration Poor business performance and low shared holder valuePoor business performance and low shared holder value Barrier to achieve “Market Leader” positionBarrier to achieve “Market Leader” position
Key Business Impact Caused by the issues
Nexus System ResourcesLocal needs, Global solution 38
Contents Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 39
Issue List
Process Improvements Implemented
Plan: Demand management and forecasting process Demand management and forecasting process (New)(New) Sales & operation planning Sales & operation planning (New)(New) Pricing Pricing
Source:Source: Procurement processProcurement process Replenishment planning both of RI and RI’s business partnerReplenishment planning both of RI and RI’s business partner Credit & collection process (cash in & cash out)Credit & collection process (cash in & cash out)
Make:Make: New Product Introduction process (NPI) New Product Introduction process (NPI) Master Production Scheduling process Master Production Scheduling process (New)(New) Manufacturing Resource Planning process Manufacturing Resource Planning process (New)(New) Production execution and sales operation execution alignmentProduction execution and sales operation execution alignment
Deliver:Deliver: Order and product allocation management processOrder and product allocation management process Shipping and transportation thru billing processShipping and transportation thru billing process
Nexus System ResourcesLocal needs, Global solution 40
Issue List
Benefits Realized so far…
Order to Cash cycle time of 35 days (down from 80 days)Order to Cash cycle time of 35 days (down from 80 days) Production volume more than doubled, without addl cash-injection for Production volume more than doubled, without addl cash-injection for
RMRM Sales Revenues up from $0.9m to $1.6m per month, better cash-flowSales Revenues up from $0.9m to $1.6m per month, better cash-flow 90% On-time delivery (shipping)90% On-time delivery (shipping) 50% reduction of FG Inventory through Sales ($3m)50% reduction of FG Inventory through Sales ($3m) 100% reduction in obsolete semi FG Inventory through scrap sales100% reduction in obsolete semi FG Inventory through scrap sales JIT Procurement of Silicone and Pigments (Supplier collaboration)JIT Procurement of Silicone and Pigments (Supplier collaboration) Acquired 50% in-house injection capacityAcquired 50% in-house injection capacity Reduction of Suppliers’ AP by 70% (currently at 45 days)Reduction of Suppliers’ AP by 70% (currently at 45 days) Individual Project Teams dedicated for each Customer Group from Individual Project Teams dedicated for each Customer Group from
Sales Order through Delivery ProcessesSales Order through Delivery Processes Recruitment of Engineering and Tooling team Recruitment of Engineering and Tooling team Implementing New SAP systemImplementing New SAP system Financial Restructuring with Private Equity in progressFinancial Restructuring with Private Equity in progress
Nexus System ResourcesLocal needs, Global solution 41
Contents Strategic Issues Summary
Vision of Rapid Supply Chain Process Optimizer
The RSCPO Concept & Methodology
Prototype Demonstration
Recommendations: Strategic Topics Summary
Progress of Implementation
Benefits Realized so far…
Conclusion
Nexus System ResourcesLocal needs, Global solution 42
ConclusionSupply chain and related strategic opportunities were utilized RI’s operational Supply chain and related strategic opportunities were utilized RI’s operational
performance. performance. • Potential to restructure the supply chain
-Pull manufacturing, streamline inventory holding-BTO/BTS balance-lead-time reduction
• Policy and process changes-Emphasis and support for forecasting, demand management, and customer management-Fulfillment policies consistent with forecasted demand and to allocation-Sharing information and collaboration with channel partners and key suppliers-Product management strategy and clear supply strategy-Monthly inventory planning
• System changes-Application of SAP to enable collaboration effort, ATP, and other constraint planning requirements
• Stakeholder commitment and KPI-KPIs that holistically measure and are aligned to corporate targets
Nexus System ResourcesLocal needs, Global solution 43
For further information:For further information:Contact Us: Contact Us:
www.jsg.co.thwww.jsg.co.th
Harvest &
Flourish!
Identify & Plan
Deploy & Change
Thank You