TRANSCRIPT

  • 7/29/2019 Lohia Law Univercity Estimate

    1/20

    yks0fu0fo0] y[ku yks0fu0fo0] y[ku yks0fu0fo0] y[ku

    voj vfHk;Urk lgk;d vfHk;Urk vf/k'kklh vfHk;Urkvuqj{k.k [k.M vuqj{k.k [k.M vuqj{k.k [k.M

    izfrosnu

    fof'kf"V;kWa%&

    leLr dk;Z yksd fuekZ.k foHkkx ds foLr`r fof'kf"V;ksa ds vuqq:ilEikfnr djk;s tk;saxsA

    :izkfo/kku%& vkx.ku esa fuEufyf[kr dk;ksZa dk izko/kku fd;k x;k gS %&

    1-2-3-

    njsa%& ;g vkx.ku tuin y[ku gsrq Lohd`r orZeku 'ksM~;wy vkWQ jsV~l,oa U;wure cktkj njksa ij vk/kkfjr fo'ysf"kr njksa ij xfBr fd;k x;k

    Flooring by vitrified Tile 600x600mm

    15mm. thick Plaster, Putty on wall and Painting

    Dismantling of Plaster

  • 7/29/2019 Lohia Law Univercity Estimate

    2/20

    Sl.No. Compliance1

    (a)

    Yes/NA(b)

    Yes/NA(c) Yes(d) NA

    (e) Yes

    (f) Er.Vijay Kumar/Er. Pooja Srivastava

    2(a)

    Yes

    (b) es

    3(a) Yes/NA

    (b)Yes/NA

    4(a)

    Yes/NA

    (b) Yes

    5es

    6

    Yes

    7Yes

    8Yes/NA

    91- es

    2-

    Yes

    10

    S.No. Signature

    1

    2

    3

    4Executive Engineer, M.D.-1 (civil), UPPWD,Lucknow.

    Each page of the design, analysis of rates, details of the measurements,bill of quantity and summary of estimated cost should be certified'checked and corrected' by JE(T) of divisional office and circle officewith their signature at the end.

    Designation-Divisional Office:- Construction Division No. 1, P.W.D., Lucknow

    Name Designation

    Er. Vijay Kumar Junior Engineer, M.D.-1 (civil), UPPWD, Lucknow.

    Er. Pooja SrivastavaAssistant Engineer, M.D.-1 (civil), UPPWD,Lucknow.

    Er. R.M. SharmaJunior Engineer(T), M.D.-1 (civil), UPPWD,Lucknow.

    Er. Satyavir Singh

    These have been signed by J.E., A.E., E.E. & S.E.

    Plans-These have been signed by J.E., A.E., E.E. & S.E.

    General-Name and designation should exist, below all signature and corrections.

    Details of measurements-Each page has been signed by J.E.,A.E. & by E.E. in the end of each set.

    Bill of Quantity-

    Each page has signature of J.E. , A.E. and E.E. at the end of each set.

    Summary of estimated cost-

    These have been prepared as per standard practices and C.E's

    Each design has been signed by E.E. & S.E. in the end, and importantdesigns by C.E. as well.

    Analysis of Rates-Analysis of non-schedule items are based on the market rates is attachedor not.

    Each analysis have been signed by J.E.,A.E., E.E. & S.E. in the end.

    Specifications-Detailed specifications for each item of work are included in the estimate.

    Signatures of A.E., E.E., & S.E. exist.Designs-

    CHECKING PROFORMAPreliminary and Detailed Estimate

    Particulars

    Report-Proper reference have been quoted and attested copies attached with theestimate.

    In case of revised estimate the amounts of excess has been given Item

    wise in the comparative statement with detailed reasons.Signatures of A.E., E.E., & S.E. exist.Details of forest land with name of village & chainage.

    Required certificates are mentioned or not.

    Name of JE/AE who surveyed the work for preparaion of estimate.

  • 7/29/2019 Lohia Law Univercity Estimate

    3/20

    Sl. No. Particulars Amount1 Officer Gym 1414381.762 Multipurpose Hall 1357196.903 Gym Equipment 2425800.004 Electrical Work 1755191.00

    Total 6952569.661 Add Contingency Charges 2% 139051.39A Total 7091621.052 Add Labour Cess 1% on A 70916.213 Add Establishment charges @ 12.50% on A 886452.63

    Total = Rs. 8048989.89

    Executive Engineer

    Maint. Division No.-1(Civil)P.W.D. Lucknow

    Summarey of Estimated Cost

    Maint. Division No. 1(Civil) Maint. Division No. 1(Civil)P.W.D. Lucknow P.W.D. Lucknow

    :

    Junior Engineer Assistant Engineer

  • 7/29/2019 Lohia Law Univercity Estimate

    4/20

    dz0la0 en dk fooj.k i`"B la[;k

    1 'kh"kZd i`"B 1

    2 tkap izi= 2

    3 fo"k; lwph 3

    4 izfrosnu 4

    5 lUnHkZ

    6 fof'kf"V;kW

    7 nj fo'ys"k.k

    8 ekiksa dk fooj.k ,oa ek=kvksa dk ns;d

    9 ykxr dk lkjka'k

    10 ekufp= --------

    fo"k; lwph

  • 7/29/2019 Lohia Law Univercity Estimate

    5/20

    fof'kf"V;kW

    leLr dk;Z yksd fuekZ.k foHkkx dh foLr`rfof'kf"V;ksa ,oe~ izeq[k vfHk;Urk] yks0fu0fo0 dsuohure ifji=ksa ds vuq:i lEikfnr djk;s tk;saxsA

    voj vfHk;Urk lgk;d vfHk;Urk flfoy vf/k'kklh vfHk;Urkvuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1 flfoy vuqj{k.k [k.M ua0&1 flfoy

    yks0fu0fo0] y[ku yks0fu0fo0] y[ku yks0fu0fo0] y[ku

  • 7/29/2019 Lohia Law Univercity Estimate

    6/20

    SL.No

    Ref. ofItem/Pageno.

    PARTICULARS LENGTH BREATH

    HEIGHT QUANT

    AnalysedRate

    Providing and laying in cement concrete floor of 40mmthick with 1:2:4 (1cement :2 course sand :4 graded stoneaggregate stone grit 20mm size) with waterproofingcompound and finished with a flooting coat of neat

    cement including cost of all material, labour, T&P etc.required for proper completion of work.

    Officer Gym 1 1 14.35 14.50 208Less 1 1 3.85 8.55 -32

    1 1 1.72 2.15 -3171

    DSR-2012- 11.13.1

    Providing and fixing glass strips in joints of terrazo/cement concrete floors. 40 mm wide and 4 mm thick

    Officer Gym 144 1 4.80 691691

    AnalysedRate

    Providing and laying multi- layered vinyl/rubber Flooring infloors in Gym with different sizes (thickness to bespecified by the manufacturer but not lesss than 6 mm) ofapproved brand & manufacturer, in all colours and shade,laid with cement based high polymer modified quick set

    tile adhesive (water based) and finishing complete as perdirection of Engineer-in-charge.

    Officer Gym 1 1 14.35 14.50 208Less 1 1 3.85 8.55 -32

    1 1 1.72 2.15 -3171

    4 AnalysedRate

    15 mm Cement plaster in single coat on rough side ofsingle or half brick wall for interior plastering upto floor twolevel including internal rounded angles chamfers, androunded angles not exceeding 80 mm. in girth andfinished even and smooth. 1 Cement :4 coarse sandWall . .

    . .

    . .

    . . cer ym e ng . .

    ess . . -

    1 1 1.72 2.15 -3367

    5 AnalysedRate

    Providing and applying white cement based putty ofaverage thickness 1 mm, of approved brand andmanufacturer, over the plastered wall surface to preparethe surface even and smooth complete.Wall 1 2 14.50 3.00 87

    1 2 14.35 3.00 861 2 1.72 3.00 101 2 2.15 3.00 12

    Officer Gym Ceiling 1 1 14.35 14.50 208

    Less 1 1 3.85 8.55 -321 1 1.72 2.15 -3

    367

    6 UPPWD SOR Extra for Plastering on ceiling

    Officer Gym Ceiling 1 1 14.35 14.50 208Less 1 1 3.85 8.55 -32

    1 1 1.72 2.15 -3171

    7 UPPWD SOR Wall painting (Two coat) with plastic emulsion paint ofapproved brand and manufacture on decorative wallsurface, to give an even shade including thoroughlybrusihig the surface clean of all dirt, grease, loose piecesof scales and sand prepared smooth.Wall 1 2 14.50 3.00 87

    1 2 14.35 3.00 861 2 1.72 3.00 10

    DETAIL OF MEASUREMENT

    :No.

    1

    3

    Officer Gym

    2

  • 7/29/2019 Lohia Law Univercity Estimate

    7/20

    SL.No

    Ref. ofItem/Pageno.

    PARTICULARS LENGTH BREATH

    HEIGHNo.

    8 AnalysedRate

    Providing fitting, Fixing of Aluminium door with OELanodized Aluminium door section of 9202 (Hindalco) asvertical member, 9201 (Hindalco) as top member and9200 (Hindalco) as bottom and middle member and5.5mm thick plain glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame bymeans of taped clip no.-4660 (Hindalco) and the frame tobe completed by means of jointing angle No. 1855

    (Hindalco) including all fixing of hinges, door stopper,mortice lock, aluminium round handels, cost of labour,T&P, Hire charges of drilling machine, labour chargesetc.complete. but excluding cost of hydraulic floor spring.

    Door 1 2 0.75 2.1Vintilator 1 8 0.60 0.3

    9 AnalysedRate

    Providing and Fixing 15 mm thick densified tegular edged ecofriendly light weight false ceiling tiles (Armstrong Mineral FiberAcoustical Suspended Ceiling with Optra Pebble/Pearl TEG/BEVTEG Tile 600x600x15 mm module) of approved texturespintone/cosmos / Hexa or equivalent in true horizontal level,suspended on inter locking metal grid of hot dipped galvanised

    steel sections (galvanising @ 120 grams per sqm including bothside) consisting of main 'T' runner suitably spaced at joints to getrequired length and of size 15x38 mm made from 0.30 mm thick(minimum) sheet, spaced 1200 mm centre to centre, and cross"T" of size 15x38 mm made out of 0.30 mm (Minimum) sheet,1200 mm long spaced between main'T' at 600 mm centre tocentre to form a grid of 1200x600 mm and secondary cross 'T'oflength 600 mm and size 15 x38 mm made of 0.30 mm thick(Minimum) sheet to be inter locked at middle of the 1200x 600 mmpanel to from grid of size 600x600 mm, resting on periphery walls/partitions on a Perimeter wall angle pre-coated steel ofsize(24x19X3000 mm made of 0.27 mm thick (minimum) sheetwith the help of rawl plugs at 450 mm centre to centre with 25 mmlong dry wall screws @ 230 mm interval and laying 15 mm thickdensified edges ceiling tiles of approved texture (Spintone /Cosmos/ hexa) in the grid, including, cutting/ making opening forservices like diffusers, grills,light fittings, fixtures, smoke detectorsetc., wherever required. Main 'T' runners to be suspended fromceiling using Vertical Hanger fixed to ceiling with Anchor fastenerM6, 2.68 mm G.I. adjustable rods with galvanised steel level clips,spaced at 1200 mm centre to centre along main 'T', bottomexposed with 24 mm of all T-sections shall be pre-painted withpolyster baked paint, for all heights, as per specifications,drawings and as directed by engineer-in-charge. Note :- Onlycalcium silicate false ceiling area will be measured from wall towall. No deduction shall be made for exposed frames/opening (cutouts) having area less than 0.30 sqm.The False ceiling tile shallhave NRC. value of 0.50(Minimum), light reflection > 85%, non -combustible as per B.S. 476 part IV, 100% humidity resistance