Model No. LW108FB

Owner's Manual & Assembly Instructions N01et

Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height

10' x 8' 121" x 92 3/4" 123 1/4" 95 1/4" 81 3/8" 118 1/4" 90" 80 1/8" 55 1/2" 60"

3,0 m x 2,3 m 307,3 cm x 235,6 cm 313,1 cm 241,9 cm 206,7 cm 300,4 cm 228,6 cm 203,5 cm 141,0 cm 152,4 cm

715750909

Missing Parts, Questions on Assembly?Call: 1-800-851-1085

Do not return to dealer, they are notequipped to handle your requests.

Storage Area: 74 Sq. Ft. 440 Cu. Ft. 6,9 m2 12,5 m3

BUILDING DIMENSIONS * Size rounded off to the nearest foot

CAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READSAFETY INFORMATION PROVIDED IN THIS MANUALBEFORE BEGINNING CONSTRUCTION. WEAR GLOVESWHEN HANDLING METAL PARTS.

Page 2: Lw108fb Shed

2

Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand this owner's manual.Important information and helpful tips will make your construction easier and moreenjoyable.

Assembly Instructions: Instructions are supplied in this manual and contain allappropriate information for your building model. Review all instructions before you begin,and during assembly, follow the step sequence carefully for successful results.

Flooring and Anchoring: Your storage building must be anchored to prevent winddamage. A base is necessary to construct a square and level building. Anchoring andbase materials are not included with your building. We recommend the combined use ofan Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method ofsecuring your building to the ground (Available by mail order or at your local dealer) oryou may construct a base and anchoring system of your choice. Your assemblyinstructions provide information on a few methods commonly used to secure and levela storage building.

Parts and Parts List: Check to be sure that you have all the necessary parts for yourbuilding.

•All part numbers can be found on the parts. All of these numbers (before the -) must agree with thenumbers on the parts list. The parts list is located on page 12.

•If you find that a part is missing, include the model number of your building and contact:

Arrow Group Industries, Inc. Customer Service Department1101 North 4th Street Breese, Illinois 622301-800-851-1085

•Separate contents of the carton by the part number while reviewing parts list. The first few stepsshow how to join related parts to make larger sub assemblies which will be used later.

•Familiarize yourself with the hardware and fasteners for easier use during construction. These arepackaged within the carton. Note that extra fasteners have been supplied for your convenience.

BEFORE YOU BEGIN.... A2

Page 3: Lw108fb Shed

3

Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with good drainage.

•Allow enough working space for ease of moving parts into position during assembly. Be sure therewill be enough space at entrance for doors to open fully and enough space around the building tobe able to fasten the panel screws from the outside.

•Before you begin the first steps in assembling your parts, a base should be constructed andan anchoring system should be ready to use.

Watch the Weather: Be sure the day you select to install your building is dry and calm.Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.

Teamwork: Whenever possible, two or more people should work together to assembleyour building. One person can position parts or panels while the other is able to handle thefasteners and the tools.

Tools and Materials: These are some basic tools and materials you will need for theconstruction of your building. Decide which method of anchoring and the type of base youwish to use in order to form a complete list of the materials you will need.

Base Preparation• Hammer and Nails• Spade or Shovel• Hand Saw / Power Saw• Lumber and/or Concrete

Optional Time-Savers• Wrench / Nut Driver• Electric / Cordless Drill• Square• String (for squaring frame)

Required• Work Gloves• Step Ladder• Utility Knife / Scissors• Pliers• Carpenter's Level• Tape Measure

Required• Eye Goggles• No. 2 Phillips Screwdriver(With Hardened Magnetic Tip)Note: A power screwdriver or vari-able speed drill with Phillips-tip at-tachment can speed assembly byas much as 40%.

PLAN AHEAD.... A3

Page 4: Lw108fb Shed

4

Safety precautions are important to follow throughout the construction of your building.

•Care must be taken when handling variouspieces of your building since some containsharp edges. Please wear work gloves, eyeprotection and long sleeves when assemblingor performing any maintenance on your build-ing.

•Practice caution with the tools being used in theassembly of this building. Be familiar with theoperation of all power tools.

•Never concentrate your total weight on theroof of the building. When using a step laddermake sure that it is fully open and on evenground before climbing on it.

•Keep children and pets away from worksite toavoid distractions and any accidents whichmay occur.

•Do not attempt to assemble the building if partsare missing because any building left partiallyassembled may be seriously damaged by lightwinds. Call 1-800-851-1085

•Do not attempt to assemble the building on awindy day, because the large panels acting as a"sail", can be whipped about by the wind makingconstruction difficult and unsafe.

SAFETY FIRST.... A4

safety edge

safety edge

sharp edge

sharp edge

Page 5: Lw108fb Shed

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area witha wire brush; wash it and apply touch-up paint per manufacturer's recommendation.

Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavyamounts of snow on roof can damage building making it unsafe to enter. In snow country,Roof Strengthening Kits are available for most Arrow Buildings for added protectionagainst heavy snow accumulation.

Doors: Always keep the door tracks clear of dirt and other debris that prevent them fromsliding easily. Lubricate door track annually with furniture polish or silicone spray. Keepdoors closed and locked to prevent wind damage.

Fasteners: Use all washers supplied to protect against weather infiltration and to protectthe metal from being scratched by screws. Regularly check your building for loosescrews, bolts, nuts, etc. and retighten them as necessary.

Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with goodventilation will reduce condensation.

Other Tips....• Wash off inked part numbers on coated panels with soap and water.• Silicone caulking may be used for watertight seals throughout the building.

Do not store swimming pool chemicals in your building. Combustibles andcorrosives must be stored in air tight approved containers.

Keep this Owner's Manual and Assembly Instructions for future reference.

5

CARE & MAINTENANCE.... A5 Web

Page 6: Lw108fb Shed

ACCESSORIES.... A6 WEB

6

* Some drilling required to fit buildings without mid-wall bracing.

Model No. SS404• Makes 8" to 12" (20,3-30,5 cm) wide shelves in any length.• Brackets, braces, hardware included. Lumber is not included.

Model No. SS900-A• Grey color• 3 shelves• Holds up to 85 lbs. (38 kg) (even weight distribution)

Heavy-duty, galvanized steel shelf units help organize storagespace. They easily mount on the wall or sit on the floor. Fits allArrow buildings.*

SHELF UNITS

ATTIC KIT / WORKBENCH KITModel No. AT101Heavy-duty galvanized steel bars thatfit all 10' (3,0 m) wide Arrow buildings.They install quickly and easily tohelp organize space and createmore useable space as an attic orworkbench. Will hold up to 250 lbs.(113 kg) evenly distributed.

Some drilling required to fit buildings without mid-wall bracing.

Model No. AK100New concrete anchor system permitsanchoring any size Arrow buildingdirectly to a concrete slab. Each kitcontains heavy-duty, hot-dippedgalvanized steel corner gussets andperimeter clips which fit over the floorframe and lag bolt into a concrete slab.Full assembly instructions and a 1/4"masonary drill bit are included.

TOOL HANGING RACKModel No. TH100The perfect tool organizer. Twin25 1/2" (64,8 cm) steel channelsplus five heavy-duty snap-inhangers and a small tool holder forscrewdrivers, pliers, etc. Holdersslide along channel for fullyadjustable spacing. Great forgarage, basement, or the backof any door. Fits all Arrowstorage buildings.

ROOF STRENGTHENING(heavy snow load) KITSExtra roof beams and gable bracesdesigned for added protection againstheavy snow accumulation. Increasesthe strength of your roof by 50%.

ANCHOR KITSModel No. AK4Anchor Kit contains heavy-duty steelaugers, 60' (18 m) of steel cable and4 cable clamps. No digging or concretepouring, just insert cable under roof,over roof beams, into augers and twistaugers into the ground. For buildingslarger than 10'x9' (3,0 m x 2,6 m), use 2 kits.

FLOOR FRAME KITS

MODELS FB47410, FB5465, FB106-AFB109-A and FB1014-A

A simple new floor frame system made of heavy-duty, hot-dippedgalvanized steel. Use as base for plywood, sand or stone.

Model No. AK600Earth Anchor Kit anchors any sizeArrow building to the ground.Each kit contains heavy duty,hot-dipped galvanized steelcorner gussets and 4 earth anchors.

Page 7: Lw108fb Shed

THIS

PAGE

WAS

LEFT

BLANK

INTENTIONALLY

7

Page 8: Lw108fb Shed

THIS

PAGE

WAS

LEFT

BLANK

INTENTIONALLY

8

Page 9: Lw108fb Shed

The Base For Your Building

9

FRONT(DOOR)

FRONT(DOOR)

Base A09hw

Note: Finished Slab dimensions, with lumber removed.

OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB109-A or 68385-A)

Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.This kit should be used with one of the following:A. To support a plywood deck B. To be filled with sand. We recommend the combined use of1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.These are the recommended materials for your base:● 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber ● 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade● 10 & 4 penny Galvanized Nails ● Concrete Blocks (optional)

The platform should be level and flat (free of bumps, ridges etc.)to provide good support for the building. The necessary materialsmay be obtained from your local lumber yard.

To construct the base follow instructions and diagram.Construct frame (using 10 penny galvanized nails)Measure 16"/24" (40,6 cm/61,0 cm) sections to constructinside frame (see diagram)Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and flat to provide good support for the frame.The following are the recommended materials for your base.● 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)● Concrete ● Sheet of 6 mil plastic● We recommend for a proper strength concrete to use a mix of: 1 part cement ● 3 parts pea sized gravel ● 2 1/2 parts clean sand

Prepare the Site/Construct a Base1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).2. Fill up to 4" (10,2 cm) in the square with gravel and tamp firm.3. Cover gravel with a sheet of 6 mil plastic.4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm) lumber.5. Pour in concrete to fill in the hole and the frame giving a total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

Note: Platform/Slab will extend 9/16" (1,4 cm) beyondfloor frame on all four sides. Seal this 9/16" (1,4 cm) ofwood with a roofing cement (not included), or bevel

this 9/16" (1,4 cm) of concrete when pouring,for good water drainage.

16"/24"40,6 cm/61,0 cm

121"307,3 cm 92 3/4"

235,6 cm

121"307,3 cm 92 3/4"

235,6 cm

Page 10: Lw108fb Shed

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring.

Anchoring Down The Building

AnchoringA10

Arrow Anchoring Kit: (Model No. AK100 or 68383)Recommended for use with the concrete base.Contains: Corner gussets, perimeter clips, hardware,1/4" masonary drill bit and installation instruction.

Anchoring into Concrete:1. For poured concrete slab or footing or patio blocks:Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.2. For Anchor Post of Concrete poured after building iserected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.

Arrow Anchoring Kit: (Model No. AK4 or 60298)Recommended for use with any suggested base.Contains: 4 Anchors with Cable, Clamps andinstallation instruction.

Anchoring into Wood/Post:Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)dia. holes provided in the frames for proper anchoring.

10

OVER THE BEAMSAND INTO THE GROUND

1. 2.

1. 2.

Page 11: Lw108fb Shed

11

Remove from bag of screwsand save for the last step

67545Weather Stripping (1)

66382Lower Door Guide (4)

66183Roof Trim Cap(2 right & 2 left)

66045Handle (2)

66646Washer (373)

(10 sheets of 40)

65109#8-32 Acorn Nut (4)

(Packed with Screws)

67468Peak Cap (2)(Arrow Logo)

65004#8Ax5/16" (8 mm)

Screw (338)

65923#8-32x3/8" (10 mm)

Bolt (169)

65900A#10Bx1/2" (13 mm)

Black Screw (8)(Packed with Screws)

65103#8-32 Hex Nut (169)

Hardware N11hw

6228Track Support (2)

66769Door Slide (4)

Page 12: Lw108fb Shed

Parts List N12et

12

Assembly Part Part Quantity CheckKey No. Number Description in Carton List

1 3719 Door Handle Brace 2 2 7332 Wall Panel (Side) 4 3 9373 Front Wall Panel 2 4 9365 Front Wall Channel 2 5 5986 Rear Wall Angle 2 6 8576 Right Gable 2 7 8577 Left Gable 2 8 10497 Horizontal Door Brace 4 9 6278 Vertical Door Brace 210 6403 Door Track Splice 111 9366 Door Track 212 6515 Wall Panel 613 7743 Roof Panel 214 9009 Gable Brace 215 10475 Right Door 116 10475 Left Door 117 7571 Roof Panel 418 9369 Door Jamb 219 9917 Rear Wall Channel 220 8578 Right Roof Panel 221 8579 Left Roof Panel 222 8485 Left Side Roof Trim 223 8840 Ridge Cap 124 10470 Roof Beam 825 8836 Right Side Roof Trim 226 9922 Side Wall Channel 427 8841 Side Wall Angle 428 8486 Ridge Cap 129 8934 Ramp 130 9367 Front Floor Frame 231 8936 Rear Floor Frame 232 8937 Side Floor Frame 433 8470 Corner Panel 434 6635 Roof Beam Bracket 435 9204 Roof Beam Brace 236 69835 Edge Trim (Green) 4

Page 13: Lw108fb Shed

13

Assembly by Key No. N13et

20

20

17

17

17

13

13

21

21

22

22

25

25

23

28

24

24

2424

2424

24

24

34

34

34

34

36

36

36

14

1435

35

6

6

7

7

33

33

33

33

2

2

12

2

2

12

12

12

12

12

27

27

27

27

3

3

4

4

11

11

10

18

18

329

916

11 15

8

8

29

30

30

32

32

32

3126

26

5

5

19

19

31

26

26

8

8

17

Page 14: Lw108fb Shed

The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will align when the pieces arepositioned with correct amount ofoverlap. The illustrations below showthe proper overall length for the sides,rear and front. Proceed as follows:

1 Place the front floor frames asshown. Center the ramp, with drainholes facing outside, on top of the twofront floor frames. Join the frames byinserting eight screws.

2 Overlap the side floor frames andthe rear floor frames as shown. Theholes in these pieces will align whenthe pieces are positioned with cor-rect amount of overlap. See the illus-trations below for the proper overalllength of the side and rear floor frames.Join the frames by inserting four/fivebolts into each frame set as shown.

3 Double check the length of eachand set these pieces aside for lateruse.

Step 1A14hw

● Parts Needed For ●Floor Frame Assemblies

●●●●● 8934 Ramp (1)●●●●● 9367 Front Floor Frame (2)●●●●● 8936 Rear Floor Frame (2)●●●●● 8937 Side Floor Frame (4)

14

9367

STEP

18934

9367

DRAIN HOLES FACEOUTSIDE

Front FloorFrame Assembly

119 3/8" 303,2 cm

89368937

9367

8934

9367

8937

8937

Side Floor Frame 91 1/8" 231,5 cm

8936 8936

Rear Floor Frame 119 3/8"303,2 cm

STEP

2

STEP

3

91 1/8" 231,5 cm91 1/8" 231,5 cm

119 3/8" 303,2 cm

Front & Rear

119 3/8" 303,2 cm

(8) (13)

Page 15: Lw108fb Shed

Step 2D15hw

15

● Parts Needed For ●Frame Assemblies

The main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at the topedge of the side walls and the rearwall. Proceed as follows:

1 Overlap the rear wall channelpieces as shown in the figure andfasten the two pieces together withone bolt in the center hole (threeholes will align).

2 Make two side wall channels byoverlapping the side wall channelpieces as shown. Fasten each settogether with one bolt in the centerhole of each set.

3 Overlap the rear wall anglepieces as shown in the figure andfasten them together with one bolt inthe center hole.

4 Make two side wall angles byoverlapping the side wall anglepieces as shown. Fasten each settogether with one bolt in the centerhole.

5 Double check the length of eachand set these pieces aside for lateruse.

●●●●● 5986 Rear Wall Angle (2)●●●●● 9917 Rear Wall Channel (2)●●●●● 9922 Side Wall Channel (4)● ● ● ● ● 8841 Side Wall Angle (4)

STEP

1

118 1/8" 300,0 cm9917

STEP

2

9917

9922

Side Wall Channels89 7/8" 228,3 cm

9922

Rear Wall Angle118 1/8" 300,0 cm

59865986

8841 8841

Side Wall Angles89 7/8" 228,3 cm

STEP

3 4

Rear Wall Channel118 1/8" 300,0 cm

Side Wall Channels89 7/8" 228,3 cm

Side Wall Angles89 7/8" 228,3 cm

Rear Wall Angle118 1/8" 300,0 cm

STEP

5STEP

Rear Wall Channel(6)

Page 16: Lw108fb Shed

16

The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. The left and right roof beam as-semblies are made up of two pieces.Hint: These pieces are force-fitted,so you may have to press hard to jointhem together.

1 Place the end of one roof beaminside a second roof beam so that thesix holes in each piece align. Makefour sets of roof beams by repeatingthis procedure. Do not insert boltsyet.

2 Take two of the pressed-togetherroof beams and join them as shownto form the main roof beam assembly.Hold the assembly together and fas-ten with 14 bolts. Build only oneDoubled Beam Assembly.

3 Fasten the other two pressed-together roof beams with eight boltsto make the left and right roof beamassemblies.

4 Double check the length of eachand set these pieces aside for lateruse.

Step 3D16hw

● Parts Needed For ●Roof Beam Assemblies

●●●●● 10470 Roof Beam (8)

10470

STEP

1Roof Beam 91 7/8" 233,4 cm

Build one Doubled Main RoofBeam Assembly for Peak in Roof

ENDVIEW

10470

Build two Single Beam Assemblies

STEP

2

STEP

3

10470

10470

10470

10470

ASSEMBLED

91 7/8" 233,4 cm

91 7/8"233,4 cm

(30)

Page 17: Lw108fb Shed

17

NOTE:Door Track Splice (painted part)

Step 4A17hw

● Parts Needed For ●Door Track Assembly

●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)

66769

STEP

3STEP

4

END VIEW

STEP

1

9366

STEP

2

6403

9366

Long Legon Top

Short Legon Bottom

93669366

6403

66769

118 1/8" 300,0 cm

The door track assembly supportsthe sliding doors and reinforces thefront wall. It is made up of three pieces.

1 Using the door track splice,(painted), join the door track(galvanized) pieces end-to-end asshown.

2 Insert four screws from the under-side only.

Hint: The holes in the top side of thedoor track assembly are for fasteningthe gable to the top of the front wall ina later step.

3 Position door slides onto thelegs, from the end of door trackassembly, as shown in the end view.

4 Set this piece aside for later use.118 1/8" 300,0 cm

118 1/8" 300,0 cm

(4)

Page 18: Lw108fb Shed

●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)

● Parts Needed For ●

Floor FrameStep 5A18hw

The floor frame must be squareand level or holes will not align.

18

1 Assemble the four corners of thefloor frame using two screws at eachcorner as shown. At the front cornersfasten bolts through fromthe bottom with nuts on top.

2 Measure the floor frame diago-nally. When the diagonal measure-ments are equal, the floor frame issquare.

NOTEIf using a wood platform or

concrete slab do not fasten thefloor frames to your base at this

time. You will anchor thebuilding after it is erected.

STEP

1

8937

RIGHTREAR

8936

Level

8937

RIGHTFRONT

9367

STEP

2

When Diagonal Measurementsare Equal the Floor Frameis Square.

FRONT

(8) (2)

Page 19: Lw108fb Shed

●●●●● 6515 Wall Panel (2)●●●●● 9373 Front Wall Panel (2)●●●●● 8470 Corner Panel (4)Step 6

L19hw

● Parts Needed For ●Corners

19

STEP

1

6515

9373 9373

8470

8470REAR

FRONT

9373

Panels rest onframe as shown

8470

SIDE TOP VIEW

NarrowSide

8470

6515

Wide Side

STEP

3

STEP

2

STEP

48470

8470 9373

6515

6515

8470

Washer

Crimped RibUnderneath

8470

SIDE

(26) (4)

1 Position a corner panel at thecorner of the floor frame as shown.The widest part of each corner panelmust be placed along the side of thebuilding for all four corners. Fastenthe corner panel to the floor framewith one screw.

Support the corner panel with a stepladder until a wall panel is attached.

2 Attach the front wall panels to thefront corner panels, as shown. A smallgap will exist between front wall paneland ramp.

3 Attach the wall panels to the rearcorner panels, as shown.

NOTEBe careful to install the correct

panel in each position as shown

NOTEThe remainder of the building assemblyrequires many hours and more than one

person. Do not continue beyond this pointif you do not have enough time to com-

plete the assembly today. A partiallyassembled building can be severely

damaged by light winds.

Each screw and bolt in the wallrequires a washer.

4 Double-check the part numbers ofthe wall panels, before proceeding.

The floor frame must be square and level or holes will not align.

CORRECT INCORRECT

Page 20: Lw108fb Shed

The main frame pieces give rigidity tothe side walls and provide a surfacefor attaching the gables which sup-port the roof.

1 Fasten the rear wall angle as-sembly across the inside top of therear wall using screws.

2 Fasten the rear wall channel as-sembly across the middle of the rearwall using screws.

3 Fasten the side wall angles acrossthe inside top of the side panels us-ing screws. Side wall angles mustoverlap rear wall angle in corners.

4 Fasten the side wall channelassemblies across the middle of theside panels using screws. Fastenoverlaps in rear corners with screws.

5 Fasten the door track assembly(holes on top) across the top of thefront wall panels using screws. Seethe figure.

NOTEThe wall channels behind the

front wall panels will be installedin a later step.

●●●●● Door Track Assembly (1)●●●●● Rear Wall Angle Assembly (1)●●●●● Side Wall Angle Assemblies (2)●●●●● Rear Wall Channel Assembly (1)●●●●● Side Wall Channel Assemblies (2)

● Parts Needed For ●FramesStep 7

D20hw

20

5

Short Legon Bottom

STEP

3

OpeningFacing in

STEP

4

Long Legon Top

STEP

FRONT

9366

FRONT

9922

8841

FRONT

Wall AnglesMust FaceInsideBuilding 9917

5986

1STEP

2STEP

Door Track Assembly

(30) (2)

Page 21: Lw108fb Shed

Step 8D21hw

● Parts Needed For ●Wall Panels

●●●●● 7332 Wall Panel (4)●●●●● 6515 Wall Panel (4)

The wall panels come in two widths.Each wall panel has a crimped rib onone side. The crimped rib should gounder the rib of the panel that followsit.

1 Locate all of the wall panels andset each one alongside the building.

2 Be sure that you have the correctpanels in each position. Do this byoverlapping the panels and deter-mining if the holes line up with theholes in the frame.

3 Fasten the wall panels at the topand bottom with screws.

4 Fasten the center of each panel tothe wall channel with screws. Fastenoverlapping ribs as before.

5 When you have attached all wallpanels in the correct positions, thebuilding will look like this.

21

STEP

1

7332

STEP

2

7332

STEP

4

Bolt and nutdoes not go thruwall channelat overlap

STEP

3

Crimped RibUnderneath

STEP

5

Use bolts andnuts thru wallangle overlapsat the top ofpanel at sidesand rear.

6515

7332

73326515

Detail ShowingCenter of Panel Screwedto Wall Channel

6515 6515

Panels rest onframe as shown

(112) (17)

Page 22: Lw108fb Shed

●●●●● 9369 Door Jamb (2)●●●●● 9365 Front Wall Channel (2)

● Parts Needed For ●Front Channel/Door JambStep 9

D22hw

The door jambs reinforce the dooropening and provide an attractivetrim. Follow these steps for bothdoor jambs.

1 Fasten the front wall channelsin their positions between the end ofthe side wall channel and the cor-ner panel using screws. Do not puta screw in the hole at the end be-hind the door opening at this time.

2 Fasten a door jamb to the frontpanel with two bolts, nuts and acornnuts, as shown.

3 Fasten the center of the doorjamb to the front wall panel and thefront wall channel with two screws.

4 Fasten the top of the door jamb tothe door track with two screws. Dothe same for the bottom into frame.

Repeat steps 2 through 4 for theopposite door jamb.

22

Acorn Nut

Hex Nut

9369

FRO

NT

ScrewScrew

TOP VIEW

TOP VIEW

Door Track

9369

Front Wall Channel

Front Wall ChannelCross-SectionTop View

(2) bolts

Bolt

INSIDE OFBUILDING

9365

FRONT

TOP VIEW

Screw Screw

Door Track

STEP

4

STEP

3

STEP

2

STEP

1

Acorn Nut

(18) (4)

Page 23: Lw108fb Shed

23

The gables go on top of the front andrear walls to support the roof beams.

NOTEThe gables are packed nestedtogether and might be mistakenas one piece. Carefully separate

them before continuing.

1 Apply edge trim to the top edge ofthe right gables and left gables.

2 Attach the four roof beambrackets to the gables using twobolts, washers and nuts.

NOTEMounting leg of bracket mustface toward center of gable

● Parts Needed For ●Gable AssembliesStep 10

N23et

●●●●● 8576 Right Gable (2)●●●●● 8577 Left Gable (2)●●●●● 6635 Roof Beam Bracket (4)

STEP

2

(8)

6635Roof BeamBrackets

8577

FRONT

8577

8576

To avoid mishap on the sharpedge the edge trim must remainin place on the top edge of thegable until right and left roof

panels are in place.

Washer

Edge Trim(plastic piece)

STEP

1

CAUTION:

Page 24: Lw108fb Shed

● Parts Needed For ●Gables/BracesStep 11

N24hw

●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● 9009 Gable Brace (2)

24

1 Lift and fasten a right and leftgable, under angle at corner, to thedoor track with screws.

Hint: On the rear gable, use a boltand nut at the overlapping rear wallangle. On the front gable, leave out 2screws closest to center gable leg.

2 Join the left and right gablestogether with a gable brace using abolt in the second hole from the bot-tom only.

Repeat Steps 1 & 2 for the oppositeside of building.

3 Fasten the track supports to thefront gable assembly, as shown.

STEP

3

Track Supports 6228

STEP

1Gable

STEP

2

9009 Gable Brace

(32) (5)

Page 25: Lw108fb Shed

● Parts Needed For ●Roof Beam/BracesStep 12

N25hw

●●●●● Main Roof Beam (1)●●●●● Single Roof Beam (2)●●●●● 9204 Roof Beam Brace (2)

25

1 Wrap the weather stripping tapearound the two joined edges of theleft and right gables. See diagram.Cut the weather stripping to length.

2 Spread the two halves of the mainroof beam and fasten the roof beamto the gable brace of the front gable.

Roof Beam Brace 9204

STEP

2

Roof Beam Brace 9204

STEP

5

Single Roof Beam Assembly

3 Fasten the other end of the mainroof beam to the gable brace of therear gable.

4 Fasten the single roof beam,small holes on top, as shown usingbolts and nuts.

5 Fasten a roof beam brace to themain roof beam behind the front gableby placing the tab on the end of thebrace between the roof beams. Alignthe tab with the second hole andfasten the brace with a bolt and nut.

6 Fasten the lower end of the roofbeam brace to the track supportwith a bolt and nut.

7 Fasten a roof beam brace be-tween the rear gable and the roofbeam at the first hole, as shown.

STEP

7

STEP

4

STEP

3

Spread Two HalvesOf Roof Beams

1

67545 Weather Stripping

STEP

6

STEP

Main Roof BeamAssembly

(16)

Page 26: Lw108fb Shed

26

Step 13N26et

● Parts Needed For ●Right Roof Panel ●●●●● 8578 Right Roof Panel (1)

Installing the roof panels is best donewith a step ladder. Begin installingroof panels at the back right corner ofthe building. Each screw and bolt inthe roof requires a washer.

NOTEMeasure the building diagonallyagain and make adjustments to

make sure the building is square.This will make the roof panels fit

better, and holes will align.

NOTEIf a Roof Beef-Up Kit was

purchased, assemble prior to

attaching the roof panels.

1 Locate the roof panels and find theright roof panel.

2 Position a right roof panel at theback right corner and fasten to the toproof beam using a screw.

FRONT Washer

Bolt

Gab

leSTEP

1

Nut

1

2 34

56

7

8579

7571

7571

8578 8579

7571

7571

8578

8

6

2

4

1

5

7

3FRONT

7743 7743

10 9

8

(2) (6)

3 Remove edge trim from the left gable underthe roof panel.

4 Continue fastening the right roof panel tothe gable and lower roof beam using screws,bolts and nuts as shown. Do not fasten thelower end of the panels to the side wall anglesat this time.

Hint: Follow the fastener sequence shown for proper alignment.

STEP

2Right Roof Panel

8578

STEP

3STEP

4

Page 27: Lw108fb Shed

1 Install a left roof panel at the leftrear and right front corner of the roof.Install a right roof panel at the leftfront corner of the roof.

3 Install 2 narrow and 2 wide roofpanels in the sequence and posi-tions shown on previous page. Donot fasten the lower end of the panelsto the side wall angles at this time.Continue weather stripping the ridgeopening.

NOTENarrow roof panel crimped rib is

overlapped by wide rib ofadjacent panel where possible.

Step 14N27hw

● Parts Needed For ●Roof Assembly

27

●●●●● 8578 Right Roof Panel (1)●●●●● 8579 Left Roof Panel (2)●●●●● 7571 Roof Panel (2)●●●●● 7743 Roof Panel (2)

2 Cut 4 short 2" (5,1 cm) strips off theroll of weather stripping tape, andput them aside. Cover the joint at thepeak with weather stripping tape.Unroll the tape and press it downover the opening at the ridge as youinstall each roof panel. Do not cut thetape at this time.

NOTEIf roof beam holes do not line up

with the roof panel holes, shift thebuilding from left to right.

If this does not help, your buildingmay not be level. Shim thecorners until holes line up.

Do not fastenat this time

Fasten AtOverlap with

Bolt

Fasten AtOverlap with

Bolt

Screws ToRoof Beam

STEP

STEP

Screws ToRoof Beam

3

8579 Left Roof Panel7571 Roof Panel

7743 Roof Panel

8578 Right Roof Panel

Weather StrippingTape Roll

7571 Roof Panel

FRONT

7743 Roof Panel

1

STEP

2(38) (22)

Page 28: Lw108fb Shed

28

Step 15N28hw

● Parts Needed For ●Ridge Caps & Panels

●●●●● 8840 Ridge Cap (1)●●●●● 7571 Roof Panel (2)●●●●● 8486 Ridge Cap (1)

1 Install the first ridge cap on thecompleted roof section using boltsand nuts. Fasten roof panel overlapsnot used for ridge cap. Cover thehead of bolt with the 2" (5,1 cm) pieceof weather stripping tape. Do notfasten the ends of the ridge cap at thistime.

2 Install the second ridge cap over-lapping the first ridge cap while in-stalling the remaining narrow roofpanels. Continue weather strippingthe ridge.

3 Fasten the lower end of the panelsto the side wall angles using screwsand washers. Use bolts and nutsthrough wall angle overlaps at thebottom of the panel.

STEP

1

8840

Strips

STEP

2

7571

8486Cut WeatherStripping andFold Under

7571

3STEP

(40) (16)

Page 29: Lw108fb Shed

1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.

NOTEA single screw fastens both trim

pieces at the overlap.

2 Using your thumb and index fin-ger, overbend the bottom flange ofthe side roof trim at the corner inwardenough so the right and left roof trimcaps fit onto right and left corners.

3 Fasten the roof trim caps to theside trim using a screw.

4 Fasten the roof panel ribs, peakcaps and ridge caps together usingbolts and nuts.

29

Step 16A29hw

● Parts Needed For ●Roof Trim

●●●●● 8485 Left Side Roof Trim (2)●●●●● 8836 Right Side Roof Trim (2)

STEP

4Peak Cap

STEP

3

Tuck FlangeInward to Fit

Inside ofRoof Trim CapSTEP

2

Roof Trim Cap

STEP

1

8485Roof Trim

8836

8485

8836

(8) (4)(4)

Page 30: Lw108fb Shed

●●●●● 3719 Door Handle Brace (2)●●●●● 10475 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6278 Vertical Door Brace (2)

● Parts Needed For ●Door AssemblyStep 17

D30hw

30

The steps on this page tell how toassemble the right door. You willperform exactly the same proceduresfor the left door. Each bolt and screwin the door requires a washer. Pro-ceed as follows:

1 Attach the door handle brace andhandle to the door with 1 bolt asshown. Don't tighten the bolt yet.

2 Swing the door handle brace up tothe hole on the center of the door andinsert a screw.

3 Hold the vertical door braceagainst the center of the inside sur-face of the door and turn the screw tohold the vertical door brace and doorhandle brace in place. Fasten todoor above and below centerconnection using 2 screws.

4 Insert a second bolt in the doorhandle and tighten both bolts.

5 Put a horizontal door brace ontothe top edge and bottom edge andfasten with 1 bolt in the center.

6 Attach the lower door guides andbolts as shown.

7 Repeat steps 1 through 6 for theleft door.

STEP

5

4

STEP

3

10475 Right Door

66382

66382

1049766045

3719

66382

END VIEWSHOWING:

HorizontalDoor Brace Door

Washer

Guide

6278

6278

(4)(6) (12)

3719

10475Left Door

66045

660453719

STEP

1

STEP

2

STEP

6

10497

STEP

10497

10497

Page 31: Lw108fb Shed

31

Step 18A31hw

● Parts Needed For ●Door Installation & Adjustment

●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)

Keep this Owner's Manual and Assembly Instructions for future reference.

1 From inside the building, put thebottom of the right door assembly (onyour left when you are inside thebuilding) behind door jamb into thefront frame track.

2 Position the top of the door so thatthe holes in the door line up with theholes in the door slides.

3 Fasten the door to the door slidesusing two #10Bx1/2" (13 mm) screwsper door slide.

NOTEThe holes in the door slides allowyou to adjust the doors. Place the

door in the middle holes.

4 Repeat steps 1 through 3 for theleft door.

Horizontal Door Brace

STEP

1

Gable

#10Bx1/2" (13 mm) Screw

Door Slide

Adjustment Holes

Adjustment Holes AllowDoors to Meet Evenly

Along Their Length

Right Door Left Door

Front Floor Frame Assembly

Door Track

Door Slide

Doo

r

(8)

STEP

2

STEP

3

STEP

4

Page 32: Lw108fb Shed

Anchoring

Anchor your building at this time.

Floor Frame

If you have purchased a Floor Frame Kit you need to install it at this time.

32

Anchoring and Floor Frame XC32hw

Page 33: Lw108fb Shed

10193 5

10192 2

10196 2

1019310193

1019310193

1019310193

10192

10192

10192

10192

10194

10194

10196

10196A

ssem

bly M

anua

lFB

109-A 697.68385-A

Floor Frame K

it

Kit co

nta

ins e

xtra p

arts.

Bausatz enthält zusätzliche Teile * El juego contiene piezas de sobra * Le nécessaire comprend des pièces supplém

entaires

Bodenrahmen-Bausatz * K

it de cadre pour plancher * Kit de entram

ado de pisos

Montagehandbuch * M

anual de ensamblaje

* Guide d’assem

blage

8 x 8 BuildingQ

tyPa

rt Na

me

Bau 2,44 x 2,44* Edificio de 2,44 x 2,44* Rem

ise 2,44 x 2,44

Menge

CantidadQ

uantité

TeilbezeichungN

ombre de la pieza

Désignation de la pièce

711680705

10193 6

10192 4

10194 2

Part Nam

e *Teilbezeichung* N

ombre de la pieza *D

ésignation de la pièce

*Bau 3,05 x 2,44 * Edificio de 3,05 x 2,44

* Remise 3,05 x 2,44

Qty *M

enge*C

antidad *Quantité

Sh

arp

Ed

ge

sCA

UTIO

N

ATTEN

TION

Arê

tes vive

s

Precaución: extremos

y esquinas filosas

*Bau 3,05 x 3,05 * Edificio de 3,05 x 3,05

* Remise 3,05 x 3,05

*Bau 3,05 x 2,74 * Edificio de 3,05 x 2,74

* Remise 3,05 x 2,74

*Bau 3,05 x 2,13 * Edificio de 3,05 x 2,13

* Remise 3,05 x 2,13 10x7, 10x8, 10x9, 10x10 B

uildings

Page 34: Lw108fb Shed

1. Befo

re a

ssem

bling

this kit, the flo

or

fram

es p

ac

ked

with the

build

ing m

ust b

e a

ssem

ble

d.

• Vor dem Zusam

menbau dieses Bausatzes

müssen die m

it dem G

erätehaus mitgelieferten

Bodenrahmen zusam

mengebaut w

erden.• Avant de m

onter ce kit, les cadres de planchersfournis avec le bâtim

ent doivent être montés.

• Antes de armar este kit, se deben ensam

blarlos entram

ados del piso comprim

idos con el edificio.

Antes de empezar/Preparación del sitio

1. Antes de empezar la construcción, verifique los códigos de

construcción locales relativos a cimentación, localización y otros

requisitos. Escudriñe y entienda este manual del propietario.

2. Siga todas las instrucciones y dimensiones con cuidado.

3. Siga la secuencia de pasos con cuidado para realizar resultadoscorrectos.

4. Asegure que todas las piezas se junten apropiadamente antes de

continuar.5. IM

PORTAN

TE: Saque el Manual del Propietario de la caja de

cartón principal de su edificio de almacenaje.

6. LA SEGU

RIDAD

ANTE TO

DO

: Hay que tener cuidado al

manejar las varias piezas de su juego porque algunas tienen

bordes afilados. Póngase guantes de trabajo, protección para losojos y m

angas largas cuando ensamble o cuando dé cualquier

mantenim

iento a su juego.7. H

ERRAMIEN

TAS BASICAS: Destornillador Phillips núm

. 2,alicates, guantes de trabajo, cinta m

étrica, nivel y azada o pala.8. EL SU

ELO D

EBE ESTAR NIVELAD

O: Asegure que los m

arcosdel piso estén planos en el suelo. Para preparar la base de tierra,quite césped y otros escom

bros. Nivele los sitios altos con una pala

plana y apisone la base.9. ¡N

O PISE LO

S CANALES H

ASTA QU

E EL MATERIAL D

E PISOESTE EN

SU LU

GAR!

10. Disponga el contenido de la caja de cartón por el núm

ero de lapieza m

ientras repasa la lista de piezas. Controle para asegurar

que Vd. tenga todas las piezas necesarias de su juego.

Asse

mb

lyM

ontage * Ensamblaje * Assem

blage

1. Befo

re b

eg

inn

ing

co

nstruc

tion

, ch

ec

k loc

al b

uildin

g c

od

es

reg

ard

ing

foo

ting

s, loc

atio

n a

nd

oth

er re

qu

irem

en

ts.Stu

dy a

nd

un

de

rstan

d th

is ow

ne

r’s ma

nu

al.

2. Follo

w a

ll dire

ctio

ns a

nd

dim

en

sion

s ca

refu

lly.3. Fo

llow

the

step

seq

ue

nc

e c

are

fully fo

r co

rrec

t resu

lts.4

. Be

sure

all th

e p

arts fit to

ge

the

r pro

pe

rly be

fore

pro

ce

ed

ing

.5. IM

PORTA

NT: Re

mo

ve O

wn

er’s M

an

ua

l from

ma

in c

arto

n

of yo

ur sto

rag

e b

uild

ing

.6. SA

FETY FIRST: C

are

mu

st be

take

n w

he

n h

an

dlin

g va

riou

s pie

ce

s of

you

r kit sinc

e so

me

co

nta

in sh

arp

ed

ge

s. We

ar w

ork g

love

s, eye

pro

tec

tion

an

d lo

ng

slee

ves w

he

n a

ssem

blin

g o

r pe

rform

ing

an

ym

ain

ten

an

ce

on

you

r kit.7. BA

SIC TO

OLS: N

o. 2 P

hillip

s scre

wd

river, p

liers, w

ork g

love

s, tap

em

ea

sure

, leve

l an

d a

spa

de

or sh

ove

l.8. G

ROU

ND

MU

ST BE LEVEL: Be

sure

Floo

r Fram

es lie

flat o

n g

rou

nd

. To

pre

pa

re e

arth

be

d, re

mo

ve so

d a

nd

oth

er d

eb

ris.Le

vel th

e h

igh

spo

ts with

flat sh

ove

l an

d ta

mp

the

be

d d

ow

n.

9.D

O N

OT STEP

ON

CH

AN

NELS U

NTIL FLO

OR

ING

MA

TERIAL IS IN

PLAC

E!1

0. Se

pa

rate

co

nte

nts o

f the

ca

rton

by th

e p

art

nu

mb

er w

hile

revie

win

g p

arts list. C

he

ck to

be

sure

tha

t you

ha

ve a

ll the

ne

ce

ssary p

arts fo

r you

r kit.

Befo

re Yo

u Beg

in / Site Pre

pa

ratio

n

Bevor Sie anfangen / Vorbereitung der Baustelle1.

Vor Baubeginn überprüfen Sie örtliche Bauvorschriften aufErfordernisse hinsichtlich Fußflächen, Bauplatz und w

eitereErfordernisse. Lesen Sie dieses Besitzerhandbuch sorgfältig undverstehen Sie es.

2.Befolgen Sie alle Anw

eisungen und Abmessungen sorgfältig.

3.Zur Erzielung richtiger Ergebnisse halten Sie die Reihenfolge derSchritte genau ein.

4.Bevor Sie w

eitermachen, vergew

issern Sie sich, daß alle Teilerichtig zusam

menpassen.

5.W

ICH

TIG

: N

ehmen

Sie das

Besitzerhandbuch

aus dem

Hauptkarton Ihres Lagerschuppens heraus.

6.SIC

HE

RH

EIT K

OM

MT ZU

ER

ST: Verschiedene Teile IhresBausatzes m

üssen vorsichtig gehandhabt werden, da sie scharfe

Kanten haben. Tragen Sie beim

Zusamm

enbau oder bei derD

urchführung von

Wartungsarbeiten

an Ihrem

B

ausatzArbeitshandschuhe, Augenschutz und lange Ärm

el.7.

GRU

ND

WERKZEU

GE: N

r. 2 Kreuzschlitzschraubenzieher, Zange,

Arbeitshandschuhe, Maßband, W

asserwaage und ein Spaten oder

eine Schaufel.8.

DER BO

DEN

MU

SS EBEN SEIN

: Vergewissern Sie sich, daß die

Bodenrahmen flach am

Boden liegen. Zur Vorbereitung desErdbetts entfernen Sie die G

rasdecke und anderen Schutt. EbnenSie höhere Flächen m

it einer flachen Schaufel ein und stampfen

Sie das Bett nieder.9.

STE

IGE

N SIE

ER

ST A

UF

DIE

KA

LE

, WE

NN

DA

SB

OD

EN

MA

TER

IALIST!

10.Sortieren Sie den K

artoninhalt nach der Teilenumm

er, während

Sie die Teileliste überprüfen. Vergewissern Sie sich, daß Sie alle für

Ihren Bausatz notwendigen Teile haben.

Avant de comm

encer/Préparation du terrain1. Avant de com

mencer la construction, réviser les norm

es lo-cales de sécurité de construction relatives aux em

pattements,

à l‘emplacem

ent et aux autres exigences.2. Suivre attentivem

ent toutes les directives et les dimensions.

3. Suivre attentivement la séquence des étapes pour obtenir les

résultats désirés.4. Avant de poursuivre, s‘assurer que toutes les pièces sont

correctement ajustées.

5. IMPO

RTANT : Retirer le G

uide du propriétaire qui se trouvedans l‘em

ballage principal de la remise.

6. SÉCURITÉ D

‘ABORD

: Manipuler soigneusem

ent les diversespièces du prêt-à-m

onter puisque certaines d‘entre elles ont desangles coupants. Porter des gants de travail, une protectionoculaire et des m

anches longues pour assembler le prêt-à-

monter ou pour effectuer des travaux d‘entretien.

7. OU

TILS ESSENTIELS : tournevis Phillips n

o 2, pinces, gantsde travail, m

ètre à ruban, niveau, bêche ou pelle.8. ÉG

ALISER LE TERRAIN : S‘assurer que les pièces de la

charpente du plancher reposent à plat sur le sol. Pour préparerle lit de terre, enlever le gazon et les autres débris. Égaliser lespoints plus élevés avec une pelle plate et taper le lit de terre.

9. NE PAS M

ARCHER SU

R LES TRAVERSES AVANT D

‘AVOIR

POSÉ LE REVÊTEM

ENT D

U PLAN

CHER!

10. Déballer les pièces selon leur num

éro de pièce tout enconsultant la liste des pièces. S‘assurer que toutes les piècesnécessaires se trouvent dans l‘em

ballage.

or w

rite * O

der schreiben Sie an * o escriba * ou écrireA

rrow

Gro

up

Ind

ustrie

s 1101 N

orth

4th Stre

et, Bre

ese

, Illino

is 62230Inc

lude

Mo

de

l Num

be

r, Part N

umb

er a

nd Pa

rt Na

me

• Bitte geben Sie Ihre Modellnum

mer, Teilenum

mer und

Teilebezeichnung an.• Proporcione núm

ero del modelo, núm

ero de la pieza ynom

bre de la pieza.• Indiquer le num

éro de modèle, le num

éro de pièce et ladésignation de la pièce.

• Si encuentra que le hacen falta piezas, llame al 1-800-851-1085

If you find

a p

art m

issing c

all 1-800-851-1085

Page 35: Lw108fb Shed

10 x 7, 10 x 8, 10 x 9 & 10 x 10

4. Fram

e m

ust be

squa

re a

nd le

vel.

• Montieren Sie über lappende Teile.

• Ensamble las piezas que solapan.

• Assembler les pièces en recouvrem

ent.

8 x 8

Bend

Tab

sAsse

mb

le

• Biegen Sie dieEndstücke• D

oble las lengüetas• Plier les languettes

• Montieren

• Ensamble

• Assembler

10192

10192

10196

10196

10193

10193

10193

10193

10193

1019210192

1019210192

10193

10194

10194

10193

10193

10193

10193

10193IM

PORTA

NT :

Ma

ke su

re o

verla

ps a

re p

ositio

ne

d o

nsa

me

side

of b

uild

ing

fram

e.

WIC

HTIG

: Stellen Sie sicher, daß sich dieÜ

berlappungen auf

derselben Seite

desG

ebäuderahmens befinden.

IMPO

RTANTE: Asegure que los solapos se coloquen

en el mism

o lado del marco del edificio.

IMPO

RTANT : Les trous doivent être orientés vers

le centre.

• Der Rahm

en muß rechtw

inkelig und eben sein• El m

arco del piso debe ser cuadrado y nivelado• La charpente du plancher doit être d’équerre et

de niveau.

The p

erim

ente

r is the flo

or

fram

e fro

m the

build

ing.

Der Bodenrahm

en desG

erätehauses ist die Eingrenzung.Le périm

ètre est le cadrede plancher du bâtim

ent.El perím

etro es el marco

del piso desde el edificio.

Plyw

oo

d R

eq

uire

me

nts

Plyw

oo

d R

eq

uire

me

nts

Plyw

oo

d R

eq

uire

me

nts

Plyw

oo

d R

eq

uire

me

nts

Plyw

oo

d R

eq

uire

me

nts

• Erfordernisse für das Sperrholz • Madera m

ultilaminar requerida

• Exigences en matière de contre-plaqué

Three

(3) Shee

ts 4’ x 8’ for 10 x 9, 10 x 8 &

10 x 7Tw

o (2) She

ets fo

r 8 x 8Fo

ur (4) Shee

ts for 10 x 10

• Drei (3) Platten zu (1,22 m

x2,44 m) für 3,05m

x2,74m und 3,05m

x2,44mund 3,05m

x2,13m.

Zwei (2) Platten zu (1,22 m

x2,44 m) für 2,44m

x2,44m.

Vier (4) Platten zu (1,22 mx2,44 m

) für 3,05mx3,05m

.• Tres (3) hojas de 4’ x 8’ (1,22 m

x 2,44 m) para 10 x 9 y 10 x 8 y 10 x 7

Dos (2) hojas de 4’ x 8’ (1,22 m

x 2,44 m) para 8 x 8

Cuatro (4) hojas de 4’ x 8’ (1,22 m

x 2,44 m ) para 10 x 10

• Trois (3) panneaux de 4’ x 8’ pour 10 x 9 et 10 x 8 et 10 x 7D

eux (2) panneaux de 4’ x 8’ pour 8 x 8Q

uatre (4) panneaux de 4’ x 8’ pour 10 x 10 5/8” M

inimum

Thickne

ss. Exterio

r Gra

de

• 1,6 cm M

indestdicke. Qualitätsgrad für Außenanw

endungen• U

n mínim

o de 5/8” (1,6 cm) de grueso. C

alidad apropiada para el exterior• Épaisseur m

inimale : 5/8”. Q

ualité extérieure

Insta

lling

Plywo

od

• Einbau des Sperrholzes • Instalación de la madera m

ultilaminar

• Installation du contre-plaqué

1. Cut Plyw

oo

d to

dim

ensio

ns show

n.• Schneiden Sie das Sperrholz auf die gezeigten M

aße zu.• Corte la m

adera multilam

inar según las dimensiones que se m

uestran.• Couper les panneaux de contre-plaqué selon les dim

ensions indiquées.

2. Faste

n to fra

me

with d

ry wa

ll scre

ws.

• Befestigen Sie es mit Schnellbauschrauben am

Rahmen.

• Asegúrela al marco con tornillos para cartón-yeso.

• Fixer les pièces à la charpente avec des vis à placoplâtre.

3. Bend

Tab

s and

asse

mb

le re

ma

ining p

arts.

• Biegen Sie die Endstücke um und bauen

Sie die verbleibenden Teile zusamm

en.• D

oble las lengüetas y ensamble las piezas que quedan.

• Plier les languettes et assembler les autres pièces.

2. Asse

mb

le p

arts tha

t ove

rlap

.

Page 36: Lw108fb Shed

Installing

Plywo

od

8 x 8

Shee

t #322 1/8“

x 87 3/4”

Shee

t #148“ x 87 3/4”

Platte 1 * Hoja núm

. 1* Panneau n

o 1121.9 c

m x 222.9 c

m

Shee

t #248“ x 87 3/4”

Platte 2 * Hoja núm

. 2* Panneau n

o 2121.9 c

m x 222.9 c

m

CO

RRECT

INC

ORREC

T

• Richtig• C

orrecto • Correct

• Falsch • Incorrecto• Incorrect

Finish

co

nstru

ctio

n o

f you

r Stora

ge

Build

ing

follo

wing

the A

ssem

bly Instruc

tions.

• Beenden Sie den Bau Ihres Lagerschuppens undbefolgen Sie die M

ontageanleitungen.• C

omplete la construcción de su edificio de alm

acenajesiguiendo las instrucciones para el ensam

blaje.• Finir la construction de la rem

ise en suivant les directives d‘assem

blage.

10 x 9

Shee

t #148“ x 84”

Shee

t #2 16“ x 48”

Shee

t #246 7/8“

x 22 1/8”

She

et #

216“ x 22 1/8”

Platte 2 * Hoja núm

. 2* Panneau n

o 240.6 c

m x 121.9 c

m

Shee

t #2 16“ x 48”Platte 2 * H

oja núm. 2

* Panneau no 2

40.6 cm

x 121.9 cm

Platte 2H

oja núm. 2

Panneau no 2

119 cm

x 56.2 cm

She

et #

237 1/8“ x 22 1/8”

Platte 2 * Hoja núm

. 2Panneau n

o 294.3 c

m x 56.2 c

m

Platte 2 * Hoja núm

. 2Panneau n

o 292 c

m x 56.2 c

m

MO

DEL ES109 O

NLY

Modell ES109 nur

Modèle E

S109 seulement

Modelo E

S109 sólo

Shee

t #148“ x 83 1/16”

Platte 1 * Hoja núm

. 1* Panneau n

o 1121.9 c

m x 211 c

m

MO

DEL ES109 O

NLY

Modell ES109 nur

Modèle E

S109 seulement

Modelo E

S109 sólo

Shee

t #348“ x 83 1/16”

Platte 3* Hoja núm

. 3* Panneau n

o 3121.9 c

m x 211 c

m

Platte 1 * Hoja núm

. 1* Panneau n

o 1121.9 c

m x 213.4 c

m

Platte 3 * Hoja núm

. 3* Panneau n

o 3121.9 c

m x 213.4 c

m

Shee

t #348“ x 84”

10 x 8

Shee

t #148“ x 87 3/4”

Platte 1* Hoja núm

.1* Panneau n

o 1121.9 c

mx 222.9 c

m

Shee

t #246 5/8“ x 87 3/4”Platte 2* H

oja núm.2

* Panneau no 2

118.4 cm

x 222.9 cm

Einbau des Sperrholzes * Instalación de la madera m

ultilaminar * Installation du contre-plaqué

10 x10Sh

ee

t #3 20 3/4“ x 48”

Platte 3 * Hoja núm

. 3* Panneau n

o 352.7 c

m x 121.9 c

m

Platte 2 * Hoja núm

. 2Panneau n

o 240.6 c

mx 56.2 c

m

She

et #

420 3/4“ x 22 1/8”

She

et #

3 20 3/4“ x 48”Platte 3 * H

oja núm. 3

* Panneau no 3

52.7cm

x 121.9 cm

Shee

t #148“ x 88 3/4”

Platte 1 * Hoja núm

. 1* Panneau n

o 1121.9 c

m x 225.4 c

m

Platte 2 * Hoja núm

. 2* Panneau n

o 2121.9 c

m x 225.4 c

m

Shee

t #248“ x 88 3/4”

10 x 7

Shee

t #148“ x 76”

Platte 1* Hoja núm

.1* Panneau n

o 1121.9 c

mx 193.0 c

m

She

et #

322 1/8“x 76”

Platte 3H

oja núm.3

Panneau

no3

56.2 cm

x 190.3 cm

Platte 3H

oja núm.3

Panneau no3

56.2 cm

x 222.9 cm

Platte 4 * Hoja núm

. 4Panneau n

o 452.7 c

mx 56.2 c

m

Shee

t #248“ x 76”

Platte 2* Hoja núm

.2* Panneau n

o 2121.9 c

mx 193.0 c

m

Shee

t #346 7/8“

x 22 1/8”

Platte 3H

oja núm. 3

Panneau no 3

119 cm

x 56.2 cm

She

et #

341 7/8“ x 22 1/8”

Platte 3 * Hoja núm

.3Panneau n

o 3106.4c

m x 56.2 c

m

MO

DEL ES109 O

NLY

Modell E

S109 nur *Modèle E

S109 seulement *M

odelo ES109 sólo

She

et #

236 3/16“ x 22 1/8”

Page 37: Lw108fb Shed

SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfinished edges, orwhere scrapes and nicks occur in the protectivecoating through normal assembly, handling anduse. Identifying these natural rusting problem areasand taking some simple rust protection precautionscan help to stop rust from developing, or stop itquickly as soon as it appears.

1. Avoid nicking or scraping the coating surface,inside and out.

2. Use all the washers supplied. In addition to pro-tecting against weather infiltration, the washers pro-tect the metal from being scraped by the screws.

3. Keep roof, base perimeter and door tracks free ofdebris and leaves which may accumulate and retainmoisture. These can do double damage since theygive off acid as they decay.

4. Touch up scrapes or nicks and any area of visiblerust as soon as possible. Make sure the surface isfree of moisture, oils, dirt or grime and then apply aneven film of high quality touch-up paint.