m. naseer aamer

8
` 1 INTRODUCTION I am a mechanical engineer with +10 years of exceptional track record in project management ,quality control ,Piping Installations ,Equipment erection, maintenance and alignment, Commissioning, Material Inspection, Internal Auditing of Subcontractors for fertilizer& chemical industries, Oil & Gas with specific proficiency in welding ,Inspection, NDT technology, Pipelines Construction ,involving estimation ,fabrication and construction environment. Ability to liaise and co-ordinate with client, consultant, authorities, sub-contractors and suppliers on-site technical matter. Ensuring smooth implementation and complete the project within the budget and specified time frame with desired quality. Technically have valuable experience in Client Specification/code and Procedure, welding process, Knowledge in NDT & welding Inspection, Radiographic Interpretation ,hot tapping, Cross Country Pipeline, Flow Lines, Storage tanks, Familiar With all construction and QA/QC activities of Pipeline, Piping system and Storage tanks Responsible for the QA/QC activities for the erection of Steam Turbines ,Surface Condensers, Generator, Boilers, Safety valve, different types of vertical & horizontal Pumps, Static & Rotating equipments, Such as compressors, Turbines, Fans, Blowers etc. Overhead Cranes, Water screening systems, heat exchangers also includes fabrication and erection of Storage Tanks according to(UL 142),Steel Structures, several metallic Material For Power Plant(CS,SS,P11,P22,P91)-also inspection and repairs of all types of static Equipments(Furnaces, Converters, waste heat boilers and power boilers) and it is internals. I am seeking a managerial position with to amalgamate skills into a synergy of change, growth and profit. As my CV demonstrates, I have chalked an exponential growth curve till date, and my mastery in almost all aspects of project management, Planning, Execution the Pipeline activity, Plan, Set, Follow & achieve the mile stone dates with respect to program chart, also represent the organization and enhance relationship in dealings with client consultants and regulatory authorities to ensure all

Upload: aamer-naseer

Post on 12-Apr-2017

157 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: M. NASEER AAMER

`

1

INTRODUCTION I am a mechanical engineer with +10 years of exceptional track record in project management ,quality control ,Piping Installations ,Equipment erection, maintenance and alignment, Commissioning, Material Inspection, Internal Auditing of Subcontractors for fertilizer& chemical industries, Oil & Gas with specific proficiency in welding ,Inspection, NDT technology, Pipelines Construction ,involving estimation ,fabrication and construction environment. Ability to liaise and co-ordinate with client, consultant, authorities, sub-contractors and suppliers on-site technical matter. Ensuring smooth implementation and complete the project within the budget and specified time frame with desired quality. Technically have valuable experience in Client Specification/code and Procedure, welding process, Knowledge in NDT & welding Inspection, Radiographic Interpretation ,hot tapping, Cross Country Pipeline, Flow Lines, Storage tanks, Familiar With all construction and QA/QC activities of Pipeline, Piping system and Storage tanks Responsible for the QA/QC activities for the erection of Steam Turbines ,Surface Condensers, Generator, Boilers, Safety valve, different types of vertical & horizontal Pumps, Static & Rotating equipments, Such as compressors, Turbines, Fans, Blowers etc. Overhead Cranes, Water screening systems, heat exchangers also includes fabrication and erection of Storage Tanks according to(UL 142),Steel Structures, several metallic Material For Power Plant(CS,SS,P11,P22,P91)-also inspection and repairs of all types of static Equipments(Furnaces, Converters, waste heat boilers and power boilers) and it is internals. I am seeking a managerial position with to amalgamate skills into a synergy of change, growth and profit.

As my CV demonstrates, I have chalked an exponential growth curve till date, and my mastery in almost all aspects of project management, Planning, Execution the Pipeline activity, Plan, Set, Follow & achieve the mile stone dates with respect to program chart, also represent the organization and enhance relationship in dealings with client consultants and regulatory authorities to ensure all agreements are implemented, Identify potential variances which could impact on milestone dates and investigate remedial measures. Monitoring of the project Schedule and tracking logs as construction progresses. Discipline deliverables in the following areas: Analysis of piping design Criteria, Definition of Basic Engineering inputs and welding as enabled me to affect highly strategic inputs to enhance the financial solidity of my organization. I have also handled several construction projects for my current employers. My key skills include Welding, fabrication of Boilers, vessels, exchangers, Piping, Pipeline construction materials, client interaction, reverse engineering, quality control, weld inspections and conducting several safety tests for the organization. I am well aware of ASME B31.1, ASME31.3, ASME 31.4, ASME B31.8, ASME Sec-IX, API1104, API5Lstandards, fabrication of materials, Welding Process (SMAW, GTAW, oxyacetylene welding) and (ANSI/ASME B 16.5)

Muhammad Naseer AamerCell no. 03214820393

03034820393

Page 2: M. NASEER AAMER

`

2

M UHAMM AD NASEE R AAME R(S/O Chaudhary Muhammad Shafi)Tel. +923214820393, +923034820393, +971502972128E-mail: aa mer9 nasee r@ gmai l. comSkype ID: aamer9naseer

PIPING & PIPELINE ENGINEER CAREER SYNOPSIS

Offering over 10 years of experience in EPC Projects with leading organizations (Oil & Gas, Power sector etc.)Currently associated with TUV Austria Bureau of Inspection & Certification (PVT) LTD, as Project Engineer (Mechanical).

Qualification & Certifications: B-Tech Mechanical D.A.E (Diploma of Associates Engineering) Piping design and analysis (certificate) Process piping design (certificate) Auto cad (certificate)Engineering Skills Good Exposure to Oil & Gas EPC Projects Project Management Design & Engineering Construction & Commissioning Contract Management Maintenance Supervision

Computer SkillsCan be work on the internet and MS office, Auto cad, 2D and 3D, Plant

design software CadWorx, Bentley Auto plant, and pipe stress Analysis software Bentley Auto pipe and Ceaser II.EXPERIENCE PROFILEOrganization TUV AUSTRIA BUREAU CERTIFICATION & INSPECTION

(UNITED ENERGY PAKISTAN MKK PROJECT TANDUADAM)Position CSI MECHANICALDATE 25-06-2013 to CONTINUEOrganization G LOBAL PROCESS SYSTEMS ABU DHABI LLC . (CCC PROJECT DAS ISLANT AND SHELL) Position Piping SupervisorDATE 16-03-2013 to 16-06-2013. Abu DhabiOrganization TUV AUSTRIA BUREAU CERTIFICATION & INSPECTION

(UNITED ENERGY PAKISTAN MKK PROJECT TANDUADAM)Position CSI MECHANICALDATE 01-06-2009 to 10-03-2013

Organization BULLEH SHAH PAPER MILL PACKAGES PROJECT KASUR Position Mechanical Supervisor (Power Plants, Piping, Water Treatment) DATE 01-12-2005 to 20-11-2009

Page 3: M. NASEER AAMER

`

3

TUV AUSTRIA BUREAU (certification and inspection)(UNITED ENERGY PAKISTAN OIL AND GAS FIELD MKK PROJECT TANDUADAM)

Manage the Well head Piping, Facility Piping and Flow lines Projects in all phases like planning, monitoring, engineering design and construction, commissioning and close out the project packages.

Manage the Process piping, and compressor installation projects inside the Facilities according to P & ID and also its execution.

Ensure the execution of Flow lines according to its investigation map and make the necessary calculations and onsite verifications.

Prepare and made its approval of proposals to make new mid points of flow lines and connection in the oil & gas trunk lines.

Make and execute the pipeline Pigging and Hydro-Testing according to its procedures. Manage the shutdown jobs and TIE-IN connections in the existing facility piping for the new up-

gradation projects Co-ordinates the activities of the dedicated project groups at all different locations, providing cost

control, planning, purchasing, quantity surveying, document and control, ensuring project procedures and systems are implemented and approved. Ensures Project Milestones and targets are identified and included in the overall project plan.

Evaluates and approves third party (subcontractors / vendors) invoices for payment. Supervises preparation of all invoices and milestone payment requests to client. Compile/review all contractual documents of all Sub-contractors / Supplies. Liaison with project accountant to compile and submit invoices and payments.

Negotiating sub-contract orders and monitoring sub-contractors, planning critical dates and organizing labor. Finalizing extra work to be done on a contract, helping to resolve any disputes which come up, and identifying areas for improvement in company’s contracting processes.

Review Construction Documents (Technical Submittals, Engineering designs & calculations) / Shop Drawings / Method Statements / Construction schedules / cash flow charts / manpower allocation charts, RFI, Checklists, Field change requests, Notifications, NCR, KPI, Bills & Invoices, etc.

Monitor Scope changes/ confirm additional work / Implement Project HSE / Implement Project QC/ Controlling inventory & Manpower.

Arrange site mobilization, arranging temporary facilities, finalizing access to site, obtaining site clearance, finalize survey points, levels, tie-in points. Identify and confirm existing service rerouting. Arrange heavy equipment’s and manpower. Close coordination with end users for smooth handover of the project.

Fabrication & Installation of compressors at Remote facilities, mid points, surface piping, shutdown hookup, Pig Launcher & Receiver, manifold skids, pre commissioning & commissioning.

Erection of All Equipment (Column, Vessel, Flare Stack ,Fin fan cooler, Heat Exchanger Hot oil heater, Compressor, Skids & LPG Bullets)

Fabrication & Erection of Tanks as per API-650 code. With All NDT Procedure. Fabrication & Installation of different diameter size SS & CS piping. Prepare the punch list of piping & punch killing should be done. To look out the Hydro testing of different units, and instruct the safely works. Look after the All Equipment Maintenance & Cleaning of (Vessel, Column, Heat Exchanger, Fin fan

cooler, Filters, & LPG Bullets.

Page 4: M. NASEER AAMER

`

4

Global Process Systems Abu Dhabi and Bulleh Shah Power Project Ensure that the piping hook up personnel adhere to the company quality policy,

objectives, procedures, specification and also the requirement of any project of project specific procedure, instructions are fully implemented and maintained.

To lead a team of technical manual personnel and maintain harmonious working relationship. Handled activities involving working out various requirements and monitoring overall

project operation for ensuring timely completion. Received instruction from superior, for the construction and assembly of Documents,

check coordinate and check the work carried out by personnel directly acting during more difficult stages.

To plan and carryout all site activities as per shop drawings, method statements, specification and work plan.

Coordinated projects for the set up standards with accountability for strategic utilization and deployment of available resources to achieve organizational objectives.

Monitoring inspection at implementation of project procedure, specification and method statement.

Prepared BOM and coordinated for the selection of suitable materials for various components to meet design reliability and quality goals.

Checking of isometric and related drawings that does not confirm to piping general arrangement, P&IDs, PEFs (Process Engineering Flow Scheme), DEP (Design Engineering Practice), specification and project Standards.

Prepare as built drawings all modifications made during works, giving the superior all data inspected.

Verify the availability and adequacy of the material and drawing Coordinates the construction contractor ensuring the compliance with applicable

standard specification Evaluate the construction contractor work contractor work capability according to programs

to be implemented and promote corrective action where necessary Inter-connection of various Process piping to Vessel, Columns, Furnace, Pumps and

PackageBoiler. Test package & Hydro Test Final inspection of piping system based on approved P&IDs Interpret P&IDs, piping drawings such as GA, isometric drawings Review and turnover of Construction Dossier and as-built documentations Established and prepare comprehensive Database for monitoring of piping progress

including database of test packages Dossier of piping systems. Punch list handling to correct items and preparing a list of missing materials for request,

also attend and supervised bolt tensioning activities Review of piping test packages and dossiers (weld history, P&ID marked up &limits,

isometrics weld mapping, inspection reports of orifice flange, cleanliness, PRV valves etc. Familiarization / review of project drawings project standards and other pertinent

document related to piping work. Carry out line checking / punch listing prior to pressure test Supervision of final reinstatement of all piping components including valves inline

instruments which have been removed or not install during or before pressure test. Carry out and witness flushing and blowing of pipelines as required by commissioning

& operation. Control and co-ordination of all inspection and test activities Witness piping pressure test and inspection of the line during test whether is any leakage on

the line (every joints ) Safety and Quality:

Page 5: M. NASEER AAMER

`

5

Well conversant with the project HSE plan, proactively participate in achieving the highest possible international standards of HSE implementation.

Maintaining standards of safety and comply with company, s Health, Safety & Environment management system requirements.

Taking reasonable care of own health and safety and that of others in the workplace. Following and maintaining company standards of Quality in accordance with company

quality system requirements Ensure safe work environment. Observe housekeeping and follow all safety rules and regulation Monitor the Fabrication, erection activities meet the schedule. Supervision of Hydro Test, Flushing, Air blowing, Gravity test, barcol test and Reinstatement. Fabrication and erection of pipe supports

MILL RIGHT EXPERIENCE

in bulleh shah power plant we erected the two steam turbines, and a gas turbine generator, and multistage pumps and turbine accessories according to the engineering drawings.

The alignment has been done according to its given alignments criteria of turbines suppliers completed the Erection of 65 & 200TPH boilers with the collaboration of “Descon

engineering company” Supervise the “Royal Engineering Company” for high pressure steam lines successfully commissioned the Bulleh Shah Paper Mill 41MW and 15MW power plants. Prepare the Estimate of the pipe racks and piping material and quantity of material. Handle the structure work like pipe racks, and operating plate forms fabrication work. erected the five centrifugal atlas copco compressors for the air distribution system for the

board mill. Erected and commissioned the centrifugal multistage sterling pumps for boiler feed water

and other process pumps. In waste water treatment plant i have erected the Rack System of primary clarifiers. In waste water treatment we have erected Rack System of secondary clarifiers. Erected the underground piping of Effluent collection sumps and its related pumps.

Languages:Language Spoken Reading Written

English Well Fluent FluentUrdu Well Fluent FluentPunjabi Well Fluent Fluent

Identification:Religion IslamMarital Status MarriedPass port # AT1222562 (Expiry Date: 05 March 2017)ID card # 35202-8792256-1Date of Birth 09-09-1984Nationality PakistaniDomicile Lahore (Punjab)