Mack Powertrain Division
Mack T12 Engine Test Update
January 12th 2005
Mack Powertrain Division
•Mack T-12
•Based on Mack T10 & Mack T11
•With ULSD Fuel
•Length - ~ 300 Hours
•Two Phase Test
•Phase 1 100 hr ( 4.0 % Soot )
•Phase 2 200 hr ( EOT of 6 % Soot )
•Phase 2 260 F Oil Temp
•Increased EGR Flow (Heavy EGR) (35% Phase 1 – 15-% Phase 2)
•Precision Matrix Required
Mack Powertrain Division
•Hardware ( External )Same as T10 Except – VGT Turbo replaces
small T10 Turbo2 Production EGR Coolers ( Breadboard ) Replaces Tube Cooler-Test with 3 ?
•80 C EGR Coolant Inlet Temp EGR on/off Valve
•Hardware ( Internal )T11 Power Cylinder ( T10 Top Ring ) & T11 Heads
New Nozzles & Spray Angle
– T12 Conversion Kits Sent to Labs
•T12 TASK FORCE – Numerous Teleconferences, Oct 20 Mtg in San Antonio – Meeting Nov 22nd @ ExxonMobil- Next Mtg Jan 12th in San Antonio
•Test Procedure Available, T12 Parts List Completed
•Completed Test on 820-2 ( T10 Ref Oil ) , 2nd Test to Complete Mid November
•6 Engines in 4 Labs Running week of Jan 10th
•Task Force Recommends the use of dyed PC 10 ULSD
•Task Force Recommends 820-2 Should be Part of Precision Matrix
Mack Powertrain Division
Lubrizol- 2 Coolers – 80 hrs with NO sign of fouling
Perkin-Elmer – 2 Coolers 100 hrs live test (820-2) – Cleaned Coolers @ 77 hrs (Ni 1ppm) 2nd Stand with 3 Coolers – wk of Jan 24th
Afton – Start 3 Coolers wk of Jan 10th 100 hrs
ExxonMobil – Start 3 Coolers wk of Jan 17th – Live Test
SWRI - Continue Running 2 Coolers until 3 Cooler data
Lubrizol- 2 Coolers – 80 hrs with NO sign of fouling
Perkin-Elmer – 2 Coolers 100 hrs live test (820-2) – Cleaned Coolers @ 77 hrs (Ni 1ppm) 2nd Stand with 3 Coolers – wk of Jan 24th
Afton – Start 3 Coolers wk of Jan 10th 100 hrs
ExxonMobil – Start 3 Coolers wk of Jan 17th – Live Test
SWRI - Continue Running 2 Coolers until 3 Cooler data
Mack Powertrain Division
0 100 200 300
0
2
4
6
8
10
12
Test Hours
Bep
CMIR 49086 CMIR 47777 CMIR 43647 CMIR 43646 T-12 820-2
Mack T-10 vs T-12TBN
Mack Powertrain Division
0 100 200 300
-200
0
200
400
600
Test Hours
Abs
/cm
^2
CMIR 49086 CMIR 47777 CMIR 43647 CMIR 43646 T-12 820-2
Mack T-10 vs T-12Oxidation FTIR Area
Mack Powertrain Division
0100200300
0
10
20
30
Test Hoursppm
CMIR 49086CMIR 47777CMIR 43647CMIR 43646T-12 820-2
Mack T-10 vs T-12Used Oil Lead
0 100 200 300
0
10
20
30
Test Hours
ppm
CMIR 49086 CMIR 47777 CMIR 43647 CMIR 43646 T-12 820-2
Mack T-10 vs T-12Used Oil Lead
Mack Powertrain Division
T12 Pb (ppm) DiscriminationT12 Pb (ppm) Discrimination
0
10
20
30
40
50
60
0 50 100 150 200 250 300
820-2
Low SAP Prototype A
Low SAP Prototype B
Pb
GLS 12/06/05
Oil Hours
Mack Powertrain Division
Wear / T12 vs. T10 820-2Wear / T12 vs. T10 820-2T12-820-2 vs. PC10 PrototypeT12-820-2 vs. PC10 Prototype
GLS JAN 12TH 2005
0
0.5
1
1.5
2
2.5
3
Liner Wear Microns x
10
Ring Wt.Loss mg /
10
BearingWeight Loss
mg / 10
T12 820-2T10 820-2T12 PC10 Proto AT12 PC10 Proto BW
ear
Rat
e
Mack Powertrain Division
T12 PC10 Engine Oil Test Development ScheduleJanuary
EGR Mapping
Soot Mapping
TBN Depletion Mapping
Run Demonstration Test
Run Discrimination Test
Deliver Draft Procedure
Deliver Procedure for Matrix Testing
October November DecemberJuly August September