MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/146 Jabalpur, dated:18.01.2019 To As per distribution list Sub: Minutes of 67 th meeting of Operation and Coordination Committee of MP. The Minutes of 67 th meeting of the Operation and Coordination Committee of MP held on 04 th January 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Upload: others

Post on 02-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/146 Jabalpur, dated:18.01.2019

To

As per distribution list

Sub: Minutes of 67th meeting of Operation and Coordination Committee of MP. …

The Minutes of 67th meeting of the Operation and Coordination Committee of MP held on

04th January 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been

uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Page 2: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected],

26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

Page 3: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

The 67th meeting of Operation & Coordination Committee of MP was held on 04th January 2019 at 11:00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0.

Shri K.K.Parbhakar C.E.(SLDC) & Chairman OCC welcomed all the guests & participants for 67th OCCM of MP. Chairman OCC stated that the demand trend has slightly changed compared to previous years. In 2017-2018 the peak demand was met in the month of December and by January the demand starts decreasing whereas this year in January-19 the demand is in increasing trend and Maximum Demand is being met in January for 2018-2019. There is an increase of 3032 MW in demand compared to previous year and till date maximum demand met is 13988MW. He has also mentioned that the energy supply is 17% more in this year. He emphasized that it has been possible to fulfill this demand with the cooperation of all stockholders, MPPTCL, MPPGCL, NHDC & JP BIna. He further underlined that the same support & cooperation are expected all entities in upcoming days as demand is expected to increase further till mid of January 2019 , therefore the outage of any units is not warranted during this period.

Chairman OCC further stated that the new DSM Regulation is implemented from 1st January 2019, wherein sign reversal of deviation is to be done after every 6th time block by each entity, failure to which will cause a heavy penalty of 20% of the base DSM of the concerned entity. He informed that the generating company can regulate its generation and can comply with the regulation for sign reversal but it is difficult for Discoms to reverse its sign after every 6th time block as they do not have any variable/controllable quantum and will be liable to pay a heavy penalty. Hence Discoms shall take up the matter with MPPMCL and shall vary their schedule in coordination with MPPMCL.. Thereafter he requested Member Secretary to take up the agenda points. Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and participants for 67th OCCM and requested all the participants for formal introduction. He informed the committee that recently in a meeting, Hon. Energy Minister of GOMP, has instructed to ensure uninterrupted supply to consumer along with quality supply i.e., to provide consumer supply 24X7 with proper voltage and adequate power to Agriculture consumer.. The Discoms and MPPTCL has been requested to provide adequate capacity of capacitor banks in low voltage pockets. Thereafter the agenda points were taken up which are narrated here under: -

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 66th meeting of Operation & Coordination Committee of MP held on 17th November 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/3786 Jabalpur dated 31.12.2018. No comments have been received.

[OCC may confirm the minutes] ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCTOBER 2018 TO NOVEMBER 2018. 2.1. Frequency Particulars: The committee was apprised that during October 2018 the system frequency was below 49.90 Hz for 12.05% of time against 10.92% of time during November 2018. The system frequency was above 50.05 Hz for 8.75 % of time during October 2018 against 9.21 % of time during November 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 79.20 % of the time during October 2018 against 79.87 % of time during November 2018. The average monthly frequency was 49.97 Hz during month of October 2018 and 49.97 Hz during month of November 2018.

The detailed frequency particulars for the month of October 2018 and November 2018 are enclosed

at Annexure-2.1. The brief detail of frequency profile is given here under:-

MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 04th JANUARY 2019 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL,

NAYAGAON, JABALPUR.

Minutes of 67th OCCM of MP 1

Page 4: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

OCTOBER 2018 49.97 Hz 49.82 Hz 50.07 Hz 49.69 Hz 50.20 Hz

NOVEMBER 2018 49.97 Hz 49.85 Hz 50.09 Hz 49.70 Hz 50.25 Hz

Member Secretary OCC informed the committee that the new frequency band for DSM framework is

49.85-50.05 Hz. applicable from 1st January 2019 as per CERC DSM Regulation 2018.

2.2 Operational Matters

2.2.1 Operational Discipline : The committee was apprised that the system operation in terms of

frequency profile for the months OCTOBER 2018 and NOVEMBER 2018 is as given below for discussion by

the committee :

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50.05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

OCTOBER 2018 12.05% 8.75% 79.20% 49.97 Hz

NOVEMBER 2018 10.92% 9.21% 79.87% 49.97 Hz

2.2.2 Voltage Profile: The committee was apprised that during the months OCTOBER 2018 and NOVEMBER 2018 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

Sr. No.

Name of 400 KV

Substation

OCTOBER 2018 NOVEMBER 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage

Observed Observed Observed Observed

Voltage KV Date Voltage

KV Date Voltage KV Date Voltage

KV Date

1 Indore 415 25.10.18 391 12.10.18 419 15.11.18 396 10.11.18

2 Itarsi 420 12.10.18 398 28.10.18 421 15.11.18 399 10.11.18

3 Bina 415 28.10.18 396 17.10.18 418 22.11.18 395 10.11.18

4 Gwalior 414 20.10.18 394 03.10.18 416 15.11.18 393 21.11.18

5 Nagda 422 31.10.18 394 12.10.18 426 15.11.18 393 10.11.18

6 Satpura 422 21.10.18 403 13.10.18 423 13.11.18 406 10.11.18

7 Birsinghpur 421 29.10.18 405 03.10.18 423 22.11.18 409 04.11.18

8 ISP 424 13.10.18 396 12.10.18 425 21.11.18 401 06.11.18

9 Bhopal 416 28.10.18 395 03.10.18 418 22.11.18 395 10.11.18

10 Ashta 420 18.10.18 394 15.10.18 423 13.11.18 392 10.11.18

11 Pithampur 422 30.10.18 393 12.10.18 422 15.11.18 402 09.11.18

Minutes of 67th OCCM of MP 2

Page 5: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

12 Singhaji 425 18.10.18 411 04.10.18 425 20.11.18 406 10.11.18 Member Secretary OCC stated that the low voltages were observed in Indore, Pithampur & Ashta area. The Generators were requested to provide requisite MVAR support in order to maintain voltage. 2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised about the updated information of the status of capacitor banks in sub-transmission system as on 31th NOVEMBER 2018 as submitted by DISCOMs is detailed below:

It is pointed out that Central Discom is being not furnishing data as per prescribed format and the ‘Capacitor Banks healthy but not in service due to control ckt problem’ have not been included in the details submitted by Central Discom. Member Secretary OCC stated that Discoms shall provide information of minimum voltage reached and the low voltage pockets identified at distribution level so that planning at EHV level could be done accordingly and needed remedial steps could be ensured.

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: : The committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 30.11.2018 as submitted by MPPTCL is given below:-

The committee has noted the same.

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVAR

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 407 140 46 14 07 01 27 07 0 25 - - - - - -

CZ 3 686 795 - - - 1 0 0 3 0 0 0 0 0 0

WZ 624 554 716 0 0 0 26 08 17 166 08 16 - - - 3

Voltage Class

Capacitor bank installed as on

31.09.18(MVAR)

Capacity Added after Last OCC

Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 30.11.18

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 5176.50 36.00 - 5212.50 Total 6514.50 0.00 - 6550.50

Minutes of 67th OCCM of MP 3

Page 6: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: : The committee was apprised about the various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to NOVEMBER 2018) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: : The committee was informed that the frequency did not touch 49.20 Hz

during OCTOBER 2018 and NOVEMBER 2018. There was no df/dt operation during the same period. (ii) Defective u/f, df/dt relays: : The committee was apprised that MPPTCL has informed that all the df/dt

and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & at 132KV S/S Chapda the df/dt protection is provided through df/dt feature of DPR. All U/F stages are in good/ healthy & working condition.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders:

(i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic

categories during the period OCTOBER 2018 and NOVEMBER 2018 is enclosed at Annexure 2.3(i).

Member Secretary OCC informed the committee as directed by Hon. Energy Minister of MP, the Supply

Hours for Agriculture should be at least 10 Hrs. & other than Agriculture supply should be 24 Hrs. Hence all

the Discoms are requested to ensure the supply hours to consumers along with quality of supply as per

directives of Govt. of MP.

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised

about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV

substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details

of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 02 02 Sagar 00 03 Rewa 01 04 Total 03 05

WEST Indore 09

06 Ujjain 03 07 Total 12 08

CENTRAL Bhopal 11

09 Gwalior 10 10 Total 21

TOTAL Grand Total 38

Minutes of 67th OCCM of MP 4

Page 7: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Representative from East Discom informed the committee that the 02 no. 33 KV feeders in Jabalpur region have been allocated group & the group allocation for 01 no. 33KV feeder is under process and will be done at the earliest.

Representative from West Discom informed the committee that the group allocation for 33KV Mittal Corp-2 feeder has been done and the proposal for group allocation of 09 no. 33 KV feeders in Indore Region & 01 no. 33 KV feeder in Ujjain region is under final stage.

Representative from Central Discom informed the committee that the efforts are being made to expedite the process of group allocation of 33 KV feeders and shall be completed within a month . ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The committee was apprised about the annual maintenance /outages of thermal generating units of MPPGCL during December 2018 to January 2019 is NIL as intimated by ED(O&M:Gen.).The details of hydel unit planned outage was submitted by representative from (O&M:Hydel), MPPGCL in the meeting.

3.2 Proposed shutdown programme of Transmission lines / Transformers: The committee was apprised about the proposed shutdown of transmission elements for the period 01.01.2019 to 28.02.2019 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss] 3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 16MVA BBL make X’mer at 132KV S/S Berasiya. 10.06.2018

X’mer tripped on Differential & Buchholz

Trip Indications

MPPTCL informed that X‘mer is declared faulty & replacement is expected in Jan-19.

2. 20MVA EMCO X’mer at 132KV S/S Chicholi. 27.06.2018 Tripped on Buchholz trip

indications. X’mer replaced by another 20MVA transformer on dt 26-11-2018.

3. UAT-7B, STPS, Sarni 30.06.2018 Differential relay & bucholz relay operated.

Order placed to M/s Shree Abirami Engineering works Chennai, Tamil Nadu on dtd-24.12.2018. MPPGCL informed the committee that work is under progress and will be in service at the earliest.

4. 500 MVA, 400/220 KV X’mer at STPS. 19.04.2018

X’mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from

21.04.18 to 05.05.18 for CPRI oil filtering and

RLA testing work.

MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted. Chairman OCC stated that the matter is under dispute, as MPPTCL has shown reluctance for decommissioning of ICT looking to

Minutes of 67th OCCM of MP 5

Page 8: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

system constrain and proposed to commission GIS at STPS with 500 MVA ICT in service in review meeting of Energy department. Therefore MPPGCL & MPPTCL shall discuss the matter with each other and resolve the matter at the earliest & intimate to SLDC.

5. 50 MVAR (Make GE) Line Reactor at 400KV Sarni-Asta Ckt-I.

31.03.2018

Under outage since 31.03.18 due to concentration of

Acetylene gas. DGA test of transformer oil of

reactor was carried out by M/s CPRI, Bhopal.

To carry out the internal inspection of reactor, NIT will be opened on 15th September 2018 and certain queries on techno commercial issues have been sought from M/s GE(T&D) India (OEM). Price bid opened on 5th December 2018 and under security.

Any transmission element/ EHV element under outage, which has not been intimated/included under

aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same.

The matter was discussed in the meeting.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF OCTOBER 2018 AND NOVEMBER

2018: The committee was apprised about the details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2.i Power Supply Position(Energy Balance Sheet). 4.2.ii. Power Supply Position Scenario:-

The matter was discussed in the meeting and the committee was briefed the Generation, Demand

management scenario in moth of Oct & Nov 19

POWER SUPPLY POSITION FOR THE MONTH : Oct 18 All Fig in MW

Particulars Max Dem Met on :

31-Oct-18 AT : 08-45

Average 01-10 Oct

Average 11-20 Oct

Average 21-30 Oct

Average Monthly

Total Energy

(LU)

STATE PEAK DEMAND MET 12268 8854 9953 10440 9749

BREAKUP :-

STATE THERMAL (Actual Gen) 3362 3084 3087 3108 3093 22867 STATE THERMAL (RSD) Total MW 0 31 16 3 16

STATE HYDEL 1383 622 558 512 564 4365

IPP (STATE) 312 269 319 307 298 2069

Minutes of 67th OCCM of MP 6

Page 9: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

CENTRAL SECTOR (Schedule) 2948 2614 3036 3039 2896 22060

CENTRAL SECTOR (Surrender) 64 188 141 93 139

IPP (INTER STATE) 2520 2070 2302 2388 2254 17759

RAILWAY 185 177 191 171 180 1612

RENEWABLE ENERGY 998 369 485 523 459 3914

OTHERS -36 -47 -43 -46 -45 -365

BANKING / PURCHASE / SALE 388 -286 75 456 82 704

DEVIATION 206 -19 -58 -19 -32 -102

DEVIATION (AVERAGE) 206 Between (-648 to 772)

Between (-834 to 414)

Between (-802 to 579)

Between (-834 to 772) -3

ENERGY SUPPLY STATE (LU) 2548.90 74882

POWER SUPPLY POSITION FOR THE MONTH : Nov 18 All Fig in MW

Particulars Max Dem Met on :

27-Nov-18 AT : 09-00

Average 01-10 Nov

Average 11-20 Nov

Average 21-30 Nov

Average Monthly

Total Energy

(LU)

STATE PEAK DEMAND MET 13304 10543 10832 10820 10732

BREAKUP :-

STATE THERMAL (Actual Gen) 3304 2796 3193 3259 3083 22093 STATE THERMAL (RSD) Total MW 0 27 17 64 36

STATE HYDEL 1153 478 424 487 463 3565

IPP (STATE) 312 326 303 304 311 1678

CENTRAL SECTOR (Schedule) 2882 2948 2911 2663 2841 20962

CENTRAL SECTOR (Surrender) 0 132 137 122 130

IPP (INTER STATE) 2550 2259 2382 2460 2367 18007

RAILWAY 227 206 198 223 209 1564

RENEWABLE ENERGY 933 434 367 467 423 3211

OTHERS -40 34 13 41 29 -420

BANKING / PURCHASE / SALE 2054 1214 1234 1226 1225 8759

DEVIATION -72 -75 -96 -122 -98 -502

DEVIATION (AVERAGE) -72 Between (-727 to 544)

Between (-781 to 477)

Between (-904 to 510)

Between (-904 to 544) -17

ENERGY SUPPLY STATE (LU) 2629.27 78917

Minutes of 67th OCCM of MP 7

Page 10: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF OCTOBER 2018 AND NOVEMBER 2018: The committee was apprised about the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5. ITEM NO.6 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status

regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

Bus reactor test charged on 21.09.2018. However for final charging telemetry compliance required to be completed. In 66th OCC ISP informed the committee that the reactor cannot be configured in the existing RTU as the RTU is of old configuration, hence purchase of new RTU is being processed. In the multifunction meter is under repair thereafter the existing RTU can be used to integrate telemetry. NHDC is requested to provide the expected date of commissioning.

2. Line Reactor on 400 kV Sapura–ISP line at STPS

50 MVAR MPPGCL

In 66th OCC MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by June 2019. Chairman OCC stated that MPPGCL shall install the reactor on priority basis due to system requirement.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. Chairman OCC stated that MPPGCL shall install the reactor on priority basis due to system requirement.

The matter was discussed in the meeting.

6.2 GENERATOR DATA SHEET OF SINGHAJI TPS UNIT # 1, 2, 3 & 4:- The committee

was apprised that as per clause – 11, 12, 13 of Manual on Transmission Planning Criteria Of CEA the

generator data is required for modeling the generators for simulation studies. It is also to mention that due to

integration of RE Generators in the grid & its variable generation for which the precise simulation studies have

Minutes of 67th OCCM of MP 8

Page 11: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

to be done for proper grid management. Further vide e-mail dtd- 12.12.2018 & 21.12.2018 Singhat TPS was

requested to submit the generator data of Singhaji TPS Unit #1,2,3&4 including following details:-

1. Generator Datasheet provided by OEM for all the units (to model generator).

2. Technical Datasheet of the Generator transformers for Unit-1,2,3,4.

3. Open circuit magnetization curve/Open circuit and short circuit test results performed during the

commissioning (for validation of system study model at our end), type of saturation to be provided.

4. Excitation system-

a. Type of excitation system its block diagram(transfer function) and adopted parameters

(commissioning report for model validation)

b. PSS- Block diagram(transfer function) and its adopted

parameter, commissioning report( to validate the model).

5. Turbine Governor system-

a. Turbine and Governor system datasheet.

b. Block diagram(transfer function) of Turbine governor system and its parameters (commissioning

report for model validation).

The committee was informed that despite of several e-mail & telephonic conversations made with

Singhaji TPS, the above data has not been furnished to SLDC/WRLDC. Hence seeing to the security of

the grid the modeling of generators for precise simulation studies has to be done, therefore Singhaji

TPS, MPPGCL is requested to comply with CEA regulations and kindly furnish the required details for

modeling of generators for simulatuion studies at the earliest to this office for further submission to

WRLDC.

The matter was discussed and representative from MPPGCL informed that the data will be provided at

the earliest.

6.3 ABNORMAL DELAY IN CONVEYING TRIPPING DETAILS TO SLDC CONSEQUENT UPON TRIPPING OF 63 MVA 132/33KV TRANSFORMER AT MANSAKRA SUB STATION: The committee was apprised that 63MVA, 132/33KV transformer at 132

KV S/s Mansakra tripped on 29.12.2018 at 08:25 hrs on buchholz indication. The tripping details were

conveyed to SLDC at 13:11 hrs, approximately laps of five hours of incidence took place. As per provisions of

Grid Code, keeping the EHV elements out of service without knowledge of SLDC is violation of Grid Code.

More over whenever such incidence of tripping took place, it should have intimated to SLDC immediately. It is

therefore requested that report on the matter may be furnished to the SLDC and concerned officials may

please be instructed suitably to avoid reoccurrence of such incidence and strictly adhered with grid code.

The matter was discussed in the meeting and Representative from T&C ensured that suitable

instructions have been issued to concerned officials and such incidences shall not be repeated in future. During discussion, another similar case was pointed out and committee was apprised that on

19.12.2018 Pench HPS took outage on one of the units and stopped the unit without obtaining code

from SLDC. Such incidents should not be repeated to avoid threat to grid security and officials shall be suitably instructed to avoid such reoccurrence.

Minutes of 67th OCCM of MP 9

Page 12: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

6.4 THREE HOURS AND 33 MINUTE INTERRUPTION TO BIRSINGHPUR & UMARIYA SUBSTATION DUE TO TRIPPING OF 220/132 KV TRANSFORMER AT 220 KV S/s BIRSINGHPUR (PALI):- The committee was apprised that on dtd 29.12.2018 at 06:40 hrs 160MVA

220/132 KV transformer EMCO make tripped on OSR indication, this caused total interruption to

Birsinghpur(Pali) and Umariya substation. As reported in flash report, the reason of operation of OSR relay

indicated therein, is low oil level in the transformer due to oil leakage. In this context, it is desired that the

remedial measures taken for avoiding reoccurrence of such incidence may please be appraised to SLDC. The

detailed report of tripping was also soughed from T&C.

6.5 PROTECTION AUDIT OF HYDEL POWER STATIONS OF MPPGCL:- The committee

was apprised that MPPGCL vide letter No. 07-10/601-PSDF, dtd 21/02/2018 has conveyed that protection

audit of switchyard associated with 10 hydro power plants of MPPGCL is required to be carried out by WRPC.

Further, it was decided that work or protection audit of all switchyard carried by a team constituted by WRPC

accordingly nominations were invited from utilities for protection audit team. Vide this office email dtd

11.07.2018 the name of officers from MPPTCL, NHDC and MPPGCL was conveyed to WRPC. MPPGCL is

insisting for early completion of aforesaid protection audit, considering provisions of MOM of TESG meeting of

PSDF regarding the observations for PSDF grant on MPPGCL proposal in 37th meeting held on 19.01.2018. As a sequel to above, SE (Protection), WRPC has intimated that looking to difficulties at WRPC level to

constitute a committee for aforesaid work, it has been directed that committee may be constituted MP- SLDC.

However, detailed programme for Protection Audit to be carried out be intimated to WRPC, so that WRPC may

depute one member from WRPC their end. MPPGCL is therefore requested to furnish detailed programme for

conducting Protection Audit along with data required in this regard as requested by WRPC earlier, so that

proposed Protection Audit could be carried out.

It is mentioned that the matter has been discussed in 66th Meeting of OCCM , thereafter the matter has

been perused with C.E. (Hydel) , however requisite details of Hydel Power Station of MPPGCL have not been

provided yet. Therefore, the Protection Audit Activities still could not initiate further. The matter may please be

expedited and needed information be provided to SLDC without further delay.

Representative from MPPGCL ensured that the desired details will be submitted at the earliest.

6.6 REAL TIME OPERATIONAL DIFFICULTIES DUE TO NON AVAILABILITY OF TELEMETRY DATA OF ISP HPS UNIT#2:- The committee was apprised that the telemetry of ISP

HPS Unit #2 is out since long. The matter has been persuaded number of times with ISP Authority, however

the telemetry of Unit # 2 has not been made available, this cause lot of difficulties in real time operation of

system. It is therefore desired that telemetry of above unit may be rectified and made available immediately.

Member Secretary OCC stated that telemetry availability is a regulatory requirement and ISP shall

ensure the telemetry of ISP Unit#2 as SLDC will be liable to put the unit under outage in case of non

availability of telemetry.

Minutes of 67th OCCM of MP 10

Page 13: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

6.7 MODIFICATION/SHIFTING OF 220 KV SUKHI-SEVANIA-ASHTA LINE FROM LOC. NO. 87 TO 90 FOR LOWERING DOWN THE LINE FOR MAINTAINING CLEARANCE BETWEEN THE E/W OF 220 KV LINE WITH BOTTOM CONDUCTOR OF NEWLY CONSTRUCTED 765 KV BHOPAL-INDORE S/C LINE OF M/S BHOPAL DHULE TRANSMISSION CO. LTD. (M/S AS BDTCL) UNDER CONSUMER CONTRIBUTION WORK: The committee was apprised that MPPTCL has conveyed approval for crossing of 765 KV Bhopal-

Indore S/C line with various transmission lines of MPPTCL vide letter No. 04-02/B-3132/P&D-TLD/389 dated

15.01.2013 based on the proposal and profile submitted by M/s Bhopal Dhule Transmission Co Ltd. However,

after completion of erection work, BDTCL has observed that the electrical clearance of 765 KV line with 220

KV SukhiSevania-Ashta line between location No. 87 to 90 was not adequate. It had probably happened due

to negligence workmanship as line was not erected exactly as per provisions of profile. Thereafter the BDTCL

has submitted their request to MPPTCL vide letter dated 07.11.2014 wherein request was made for

modification / shifting of 220 KV SukhiSevania-Ashta line (crossing loc. No. 88 & 89) in order to maintain

adequate electrical clearance along with consent for bearing the cost of work. Based on the request of M/s

BDTCL, looking to target date ofcharging of 765 KV Bhopal –Indore Single ckt line an agreement between

MPPTCL and BDTL was executed and MPPTCL has accorded permission for lowering down the E/W of 220

KV line as a special case as an interim arrangement till 220 KV line is modified or shifted. After lapse of about

2 years, M/s BDTCL has not undertaken the required modification/ shifting work, evenafter persisting

pursuance at different level.The E/W of 220 KV line is still in lowered position due to which the conductors are

unprotected against lightening. Moreover, in case of snapping of conductor of 765 KV on 220 KV line would

initiate serious fault. In above scenario, it is felt that BDTCL may be advised to complete modification/ shifting

work of 220 KV SukhiSevania- Astha line immediately under consumer contribution as per mutual agreement

looking to protection issue of 220 KV SukhiSevania-Ashta line.

Representative from EHT-M&I informed the committee that BDTCL has submitted the amount for

supervision work and also hired a consultant who has visited the site. Further the proposal by consultant for

work to be done has been put up to P&D, MPPTCL for approval.

Member Secretary OCC stated that EHT-M&I and P&D, MPPTCL shall take up the matter with BDTCL

and expedite the work.

6.8 LOAD DROPPING SCHEME AT 400KV & 220 KV SUBSTATIONS TO HANDLE EMERGENCY CONDITION: - The committee was apprised that on dtd. 27.12.2018 at 09:55 Hrs.

160MVA 220/120 KV X’mer no-2 at 220 CT No.-II at 220 KV S/s Malanpur tripped on on PRV indication due to

cable fault. Consequently following X’mers and circuits also tripped:-

S.NO ELEMENT NAME INDICATION TRIPPING TIME 1 160 MVA X’MER – 1 at

220 KV S/s Malanpur. 132 KV side tripped due to over loading.

09:55 Hrs.

2 160 MVA X’mer-1 at 220 KV S/s Mehgaon.

O/C 09:55 Hrs.

3 160 MVA X’mer-2 at 220 KV S/s Mehgaon.

O/C 09:55 Hrs.

Minutes of 67th OCCM of MP 11

Page 14: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

4 160 MVA X’mer at 220 KV S/s Morena.

O/C, E/F 09:55 Hrs.

5 132 KV Banmore – Motijheel Ckt - 1

O/C from Banmore end. 09:55 Hrs.

6 132 KV Banmore – Motijheel Ckt - 2

O/C from Banmore end. 09:55 Hrs.

Due to above tripping interruption occurred at 15 no. sub stations causing the load loss of about 615 MW as

detailed below:-

1. 220 KV Malanpur. 2. 220 KV S/s Morena. 3. 220 KV S/s Mehgaon. 4. 132 KVS/s Bhind. 5. 132 KV S/s Seondha. 6. 132 KV S/s Lahar. 7. 132 KV S/s Ron. 8. 132 KV S/s Porsa. 9. 132 KV S/s Pratpura. 10. 132 KV S/s Barnmore. 11. 132 KV S/s Ambah. 12. 132 KV S/s Morar. 13. 132 KV S/s Gohad. 14. 132 KV S/s Morena. 15. 132 KV S/s Badgaon Dimni. 16. 132 KV Hitampur Railway Traction.

In view of above it becomes necessary that in every 400KV & 220KV substation, load dropping scheme

invariably made functional so that in case of any emergency situation under N-1 condition, the loading on ICT

should not crossed dangerous level. It is gathered that the existing load drop scheme at 220 KV S/s Malanpur

is provided on 220 KV Malanpur – Gwalior(PG) Ckt- I & II and does not cover the 160 MVA, 220/132 KV X’mer

– I & II at 220 KV S/s Malanpur. Therefore to avoid overload tripping of transmission elements at Malanpur,

Mehgaon & Morena it is proposed to review the load drop scheme installed at at these sub stations. However,

if load dropping scheme have not been made, so far, it is requested to formulate suitable load dropping

scheme to handle sudden emergency as elaborated above in Gwalior area & as well as other important nodes

of MP Grid. The Committee may discuss the matter.

Representative from MPPTCL informed the committee that the load dropping scheme has been revised

and implemented on 160 MVA, 220/132 KV X’mer-I & II along with the 220 KB Malanpur – Gwalior Ckt- I & II

and 132 KV Badagaon Ckt, 132 KV Gohad Ckt-I&II and 132 KV Mehgaon Ckt has been included in the

revised load drop scheme.

Member Secretary OCC requested MPPTCL to provide the updated status of load dropping scheme

installed at MPPTCL substations.

6.9 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that

for safe & secure operation of integrated system, the under-frequency relay should be connected in the

system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of

Minutes of 67th OCCM of MP 12

Page 15: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the

same. Vide this office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide

status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so

that same may be communicated to WRPC. Inspite of repeated request vide various correspondence,

moreover the matter had been raised in OCC meeting of MP in time to time, however the desired information

are still awaited from utilities.

It is therefore desired that the above matter may be treated as urgent and status of healthiness of

Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested

periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall

visit the sub-stations to ascertain the healthiness of under frequency relay.

6.10 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL

AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization

facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV

sub-stations in the path of black start. In 60TH OCC meeting MPPTCL representative informed the committee

that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been

delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has

been discussed. However, no any fruitful progress has been observed so far. In the above context it is

indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every

Hydel Power station should be equipped with synchronization facilities invariably for system reliability and

Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is

requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is

requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly

provide status of making synchronization facility in aforesaid HPS. The matter was discussed with the committee and MPPTCL has been requested to provide the

status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether synchronization facility could be provided at Karera & Pichhore

substation on priority basis. The matter has been discussed with officers of T&C wing, it has been

ensured that they are making arrangement for installation of synchronizing trolley at Pichhore and

Karena S/s at the earliest.

. 6.11 DELAY IN SUBMISSION OF DOCUMENTS FOR FIRST TIME CHARGING OF ELEMENTS:- The committee was apprised the procedure for interconnection of new transmission elements

is briefly narrated hereunder:- • Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date

of first time charging.

• Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days.

• Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days

prior to anticipated date of first time charging.

Minutes of 67th OCCM of MP 13

Page 16: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

• RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of

interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line

charging approval shall be conveyed by SLDC: (within 2 days).

• Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to

read the SEM data from the new meters.

• Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code

shall be issued keeping view of grid reliability.

• Transmission Licensee submit Post Charging documents (Annexure C1 to C4).

• RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional

lines / ISTS lines.

• The respective testing department shall furnish regarding measures taken to take care new element

interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be

provided.

It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first

time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. It

may also be ensured that FTC formalities should have completed before availing outage for integration of

element. The authority submitted FTC document should ensure compliance of protection/ metering/Telemetry

issue in coordination with T&C official. It is also desired that all necessary data should have made available to

all adjacent s/s for relay coordination well before targeted date. The authority submitted FTC document should

ensure all formalities have been completed otherwise it would be difficult to obtain clearance from WRLDC. In

general, non-attachment of requisite papers/ SLD/ document of standing committee approval /approval of

Electrical inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly

caused delay in obtaining FTC approval. Therefore, it is desired that FTC document completed in all respect

may be provided in stipulated time schedule so that FTC formalities could be completed within targeted date of

charging .The committee was apprised that WRLDC has developed web based FTC software for submitting

FTC document / application to WRLDC for first time charging approval . The software is ready for

registration and processing of FTC and trial operation applications. Hence, all concerned department have

requested to register on the web based FTC software and initiate all the applications / requests through

software only. A manual has also been forwarded to all utilities to understand the workability of

FTC software. The matter was discussed with the committee.

6.12 TEN DAILY RESERVOIR OPERATION TABLE OF MPPGCL HPS: - In the meeting held in

Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP

& OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation

table from WRD and NVDA for their operation of their hydro generators. In last 54th, 55th & 56th OCCM, request

has been made to MPPGCL for furnishing the same to SLDC within a week.

It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of hydel power stations in

coordination with NVDA and WRD for optimum utilization of available water in the reservoirs during the summer

season.

Minutes of 67th OCCM of MP 14

Page 17: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2018-2019 the black start mock drill

successfully carried out at Hydel power station as mentioned below:-

S.NO. NAME OF HPS DATE OF MOCK DRILL

1 Pench & Bargi HPS Joint Mock Drill 11.04.2018

2. Gandhi Sagar HPS 06.07.2018

3. Rajghat HPS 29.08.2018

4. Manikheda HPS 18.12.2018

MPPGCL may apprise the same in the meeting.

The Black Start Mock Drill at Birsinghpur HPS was conducted on 20.12.2018 but the mock drill was

suspended due to abnormal sound observed from generator side during mock drill. The detailed report from

Birsinghpur HPS, MPPGCL is still awaited.

It to inform that the dates proposed to conduct the Black Start Mock Drill of various HPS is as below:-

S.NO. NAME OF HPS DATE OF MOCK DRILL

1 ISP 22.01.2019

2. OSP 23.01.2019

In view of the above all the concerned entities were requested to confirm the proposed dates.

Representative from NHDC confirmed the above dates for conducting the Black Start Mock Drill.

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 TESTING & CALLIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR DATA:

1. SLDC representative already requested CE(T&C) office in previous OCCMs to apprise the status of

testing / calibration of interface meters as per Regulations 10 and 18 of Central Electricity Authority

(Installation and operation of meter) Regulation 2010 to the committee. CE(T&C) office representative

informed that calibration testing kit not available to all circles. Further, they have informed that

telephonic disscution to ERDA & offer to contract testing / calibration of all interface meters and also

contact to CPRI for testing and celibration of interface meters.

2. SLDC representative informed that inspite of the repeated requests made by SLDC in the previous

OCCMs to issue instructions to all circle office for furnishing the JMR data in standard format is not

received by SLDC by 7th of every month and requested CE(T&C) office to furnish the same by 7th of

every month. CE(T&C) office has assured that instructions will be issued to all circle offices for

furnishing the JMR data in standard format by 7th of every month at email id - [email protected].

3. SLDC representative already informed that CE(T&C) office in 66th OCCM to provide list of 150 Nos

newly commissioned interface points as per order no. 5859 dated 25.08.2018 and subsequent

Minutes of 67th OCCM of MP 15

Page 18: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

amendment no. 8260 dated 27.10.2018 placed on M/s Secure Meters Ltd. by CE(Procurement) office

for AMC of 150 Nos AMR system (modem, optical cable, Yagi antenna, configuration). In the order it is

mentioned the list of 150 Nos interface points shall be provided CE(T&C) office. Futher, SLDC vide

letter No.07-05/SG-11/SEM/3504 on date 03.12.2018 requested CE(T&C) office to provide list of 150

interface points to M/s Secure Meters Ltd. so that integration of meters could be done. However, till

date the list has not been issued by CE(T&C) office. He further informed that in the absence of list the

meters are not integrated with AMR system of SLDC and thus the data is not being received by SLDC.

Every month SLDC is assessing the data of around 100Nos of ABT meters due to non-availability of

data. He requested CE(T&C) office to immediately issue the list of 150 nos. meters installed at the

interface points to M/s Secure Meters Ltd. so that same are integrated with AMR System of SLDC.

CE(T&C) office representative informed that two working days the final list of 150 nos. newly

commissioned interface points provided to SLDC.

4. SLDC representative already inform that CE(T&C) office in 66rd OCCM the data of ABT meters installed

at the interface points of Open Access Customers ( M/s SEL, M/s Prism Cement Unit-2 & M/s Maihar

Cement) is not being downloaded through AMR System of SLDC and site officials are also not

furnishing the load survey data of these meters. He requested the CE(T&C) office to issue instructions

to field offices for data downloading and furnishing the same to SLDC. CE(T&C) office assued that

instructions shall be issued to site officials.

8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM:

SLDC representative already informed that in 66th OCCM the ABT meter data of following TSS of

Railways is not being received through AMR system.

1. Railway TSS Bordhai.

2. Railway TSS Umreth.

3. Railway TSS Mansakra.

Railway representative informed that Sim replacement procurement under process and Railways will

coordinate with M/s Secure Meters Ltd. and MPPTCL for resolving the problems related with downloading of

meter data of above TSS through AMR installed at SLDC.

8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL :

SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed

at the interface points and all the meters were successfully integrated with AMR server. He also informed that

ABT meter data of 53 Nos meters were not received through AMR system in the month of November 2018, the

status of data received through AMR system was also emailed to GCC, MPPGCL on 3rd December-2018. He

requested MPPGCL to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the

problems related with non readability of meters integrated successfully and provide AMC of AMR facility to M/s

Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL representative intimated that matter

is being taken up with M/s Secure Meters Ltd for providing AMC of AMR system.

Minutes of 67th OCCM of MP 16

Page 19: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

SLDC representative requested MPPGCL to furnish the meter master of ABT meters installed at the

interface points as standy meters and provide AMR facility on standby and check meters. MPPGCL assured

that instructions will be issued to site officials for providing the meter master of standby meters. MPPGCL also

assured to look into the matter for providing AMR facility on check and standby meters.

SLDC representative requested MPPGCL to issue instructions to officials of SSTPS PH-I & II for furnishing

the JMR data of Secure meters where AMR is provided and data is downloaded by SLDC. MPPGCL assured

that instructions will be issued to site officials. He also informed that the 15 minutes blockwise data recorded in

the meter no. XD435287 installed at GT of SSTPS PH-II unit-III do not match with midnight data i.e monthly

injection data. MPPGCL representative intimated that the matter take up M/s Secure Meters Ltd. for resolving

the problem.

SLDC representative informed that, Sanjay Gandhi Thermal Power Stations of MPPGCL, the injection

recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation

recorded at Generator end and requested MPPGCL to advise the site officials for monthly checking /

verification of feeder wise data with Generator and Station Xmer wise data.

8.4 NON RECEIPT OF ABT METER DATA OF ISP & OSP HPS THROUGH AMR SYSTEM:

SLDC representative already informed that in 66th OCCM the ABT meter data of ISP & OSP HPS is not

being received through AMR system installed at SLDC and requested ISP & OSP to coordinate with M/s

Secure Meters Ltd. & SLDC for resolving the problems related with downloading of meter data through AMR.

ISP & OPS assured to coordinate with M/s Secure Meters Ltd and SLDC for downloading of meter data.

8.5 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF NEWLY COMMISSIONED WIND & SOLAR POWER PROJECT FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT :

SLDC representative informed that the concerned SE(O&M)’s do not furnish the monthly injection data of

following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is

incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done.

i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. having (Simcom(1MW), Eastman(4MW) , Made

Easy(10MW) connected through 33KV Ctk-I and 4 MW Solar Project of M/s Ramesh Steels

connected through 33 Ckt-II at 220KV Ganjbasoda. – SE(O&M) Vidisha.

ii) 15MW Wind Power Project of M/s Tirupati Dhar Renewable Power Pvt. Ltd. connected at 33KV

Jaitpura Dhar. – SE(O&M) Dhar.

iii) 15MW Wind Power Project of M/s Dhar Wind Power Projects Pvt. Ltd. connected at 33KV Dashera

Maidan – SE(O&M) Dhar.

iv) 30MW Wind Power Project of M/s Sudheer Projects Pvt. Ltd. connected at 132KV Berchha –

SE(O&M) Sahajapur

Minutes of 67th OCCM of MP 17

Page 20: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

SLDC representative requested DDCs, Bhopal and Indore to take up the matter with their CE(Comml),

office for issuance of directives to concerned SE(O&M) to furnish the JMR generation data by 3rd or 4th of

every month. DCCs Bhopal and Indore assured to take up the matter with CE(Comml).

Further, SLDC representative informed that inspite of the repeated request the SE(O&M) Dewas

is not furnishing the monthly wind & solar injection data timely, the data for the month of September 18

was received on 7th Octo18. SLDC representative requested DDC, Indore to take up the matter with

CE(Comml), office for issuance of directives to SE(O&M) Dewas to furnish the JMR generation data by 3rd

or 4th of every month. DCC, Indore has assured to take up the matter with CE(Comml), Indore.

Further, SLDC representative informed that monthly injection data of the following wind & solar generators

connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the

data received through AMR or through MRI by site official in monthy SEA, but verification of data could not be

done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar

substation through 132KV Ckt.

ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through

132KV Ckt.

iii) 150MW Wind Power Project of M/s Gamesha Wind Turbine P Ltd. connected at 220KV Dewas substation

through 132KV Ckt.

iv) 108MW Wind Power Project of M/s Gamesha Renewable Pvt Ltd. connected at 220KV Dewas substation

through 132KV Ckt

SLDC representative requested CE(T&C) office to issue necessary instructions to field offices for

furnishing the JMR data of the above RE Projects. CE(T&C) office have assured to issue instructions to field

offices for furnishing the JMR data of above mentioned RE Projects connected at 132KV level and above.

8.6 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC representative

already informed that in 66th OCCM, the following ABT meters installed at Pooling Stations of Wind & Solar

Power Projects has time drift and thus not recording the correct data. He also informed that SLDC has already

requested to Generators with copy to concerned licensee vide letter no. 3142 dated 29/10/2018 for time

synchronization of the ABT meters with GPS so that correct DSM account of these Wind and Solar Projects is

issued by SLDC.

Sr.No. FEEDER NAME LOCATION NAME Location VOLTAGE

LEVEL Meter No

1 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652

2 33 KV UJAS -2 132KV S/S Grid S/s End 33 MPC59975

Minutes of 67th OCCM of MP 18

Page 21: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ICHHAWAR ICHHAWAR

3 GLOBUS STEEL &

POWER 132KV S/s SITAMOU Generator End 33 XC562469

4(i) CLEAN SOLAR -1 ALOT 132KV S/S ALOT Grid S/s End 33 XC502298

4(ii) CLEAN SOLAR -2 ALOT 132KV S/S ALOT Grid S/s End 33 XC502300

5 33KV

BHADRESH_SUSNER 132KV S/S SUSNER Grid S/s End 33 XB593639

6 UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595

7 UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596

SLDC representative further already informed that in 66th OCCM that ABT meters installed at the

following Solar Generating Stations are recording the 15 minutes block wise data on slinding window principal

thus blockwise data do not match with midnight data. These meters needs immediate replacement.

i. 5MW Designco Manufacturer & Exporter connected at 132KV S/s Arniyakala. ii. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.

SLDC representative requested to DDCs, Indore & Bhopal take-up the issue with concerned officials for

time synchronization and replacement of ABT meters. DCC Indore & Bhopal assured to take up the issue with

concerned officials of Discoms.

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS-

It was informed during the meeting that integration of 157 RTUs has been completed & integration of telemetry of Six RTUs (132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Dabra, 132 KV Udaipura, 132 KV Ghatabillod) with SLDC SCADA is pending.

Further, SLDC informed that telemetry of Birsingpur HPS and Zinna HPS is also not

available and same needs to be provided by MPPGCL.

MPPTCL informed that telemetry of 132 KV Dabra has been integrated & procurement of RTUs for 132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura,132 KV Udaipura is under progress. SLDC requested MPPTCL to expedite the progress & depute an engineer from O/o CE Procurement (MPPTCL) in next OCC meeting so that the current status in the matter may be known to SLDC.

MPPGCL informed regarding telemetry of Birsingpur HPS and Zinna HPS that order for

procurement of 7 RTUs will be placed by end of Jan-19. SLDC informed MPPGCL that arranging data channel upto nearest wideband node is responsibility of MPPGCL & thus MPPGCL was requested to finalise the data channel plan in coordination with SLDC and MPPTCL at the earliest. SLDC informed that no.of panel requirement has already been intimated to MPPGCL & thus

Minutes of 67th OCCM of MP 19

Page 22: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

requested MPPGCL to initiate procurement of PLCC cabinet /outdoor equipments/ VFT modems so that the data channel shall be available before commissioning of RTU.

SLDC informed that MPERC regularly monitors & enquires about the reason of RTUs

pending for integration & thus SLDC requested MPPTCL & MPPGCL to take up this matter on topmost priority.

9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS SLDC informed that the telemetry discrepancies pertaining to MPPGCL generating stations is detailed below :-

1. Satpura TPS :- Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-7 GT MVAR More than 1 year

- MPPGCL informed that the unit is to be dismantled, so procurement of transducer is not possible. SLDC requested MPPGCL to utilize the spare transducers, if any, for replacement.

2. 400 KV Astha 1 & 2

Line Reactor

Commissioning

MPPGCL informed that signals of reactor are configured in database of Satpura SCADA system but values are not being conveyed to SLDC. NIT has been issued for configuration of point & it shall be completed within one month.

MPPGCL informed that engineer of service provider will visit the site & it will be configured at the earliest.

2. Singhaji Phase II TPS :-

3. SGTPS :-

Sr.No Description Unit Pending since MPPGCL response in 67th OCC 1. Gen-3 MW/MVAR Commissioning SLDC informed that telemetered values of Gen-

3,4 & Station transformer is not available since its commissioning & no action in the matter has been taken by MPPGCL despite constant pursuance by SLDC. SLDC informed MPPGCL that commercial operation of Generator-4 shall not be permitted until telemetry of Gen-3, 4, Station Transformer & RGMO/FGMO signal status is provided by MPPGCL.

2. Gen-4 MW/MVAR Commissioning 3. Station

Transformer MW/MVAR Commissioning

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. 400 KV STN TRANSFORMER

MW More than 4 months

MPPGCL informed that order has been placed for purchasing transducers &

MPPGCL informed that the work is under progress

Minutes of 67th OCCM of MP 20

Page 23: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

4. Gandhi Sagar HPS :-

5. Rajghat HPS :-

SLDC informed that MPPGCL vide letter dtd.31.12.18 stated that “Upgradation of existing RTUs in TPS is not required & suitable measures have been taken to remove discrepancies as & when required”. However as mentioned above large no. of discrepancies pertaining to MPPGCL

5A shall be restored within one month. In response SLDC informed that transducers may be arranged from the HPS where new RTUs are installed or from T&C where several RTUS having these type of transducers are replaced with new RTUS.

& it shall be completed at the earliest.

2. STN TR 1 ,2 (220 KV)

CB More than one year

MPPGCL informed that cabling work of breaker upto RTU panel is required to be done & shall be done within one month.

MPPGCL informed that no work has been done in response to which SLDC requested MPPGCL to expedite the work.

3. 220 KV Bus Tie CB More than one year

4. 220/33 KV Transformer

CB/MW/MVAR

More than one year

MPPGCL informed that it shall be provided within one month.

MPPGCL informed that all the discrepancies will be rectified after procurement of transducers.

5. Gen-1 CB More than four months

MPPGCL informed that it shall be restored after unit shutdown

6. 400 KV Bus 1 Freq More than eight months

MPPGCL informed that corrective action including testing of transducer/arrangement of new transducer shall be completed within a month.

7. 220 KV Bus 2 Voltage More than eight months

MPPGCL informed that procurement of transducer is under process & it shall be commissioned by March-19. SLDC informed that recently RTU of Rajghat & Devlond has been replaced, so transducers can be arranged from Rajghat & Devlond till procurement of new transducers.

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-4 CB More than 8 months

MPPGCL informed that it shall be rectified within 15-20 days. Further SLDC informed that it is gathered from Gandhisagar HPS that when CMR is kept ON it leads to tripping of Unit. MPPGCL informed that they will check the wiring.

MPPGCL informed that these discrepancies shall be rectified after upgradation of RTUs.

2. 33 KV Rajasthan(Kuakheda) feeder

MW/MVAR

Commissioning

SLDC informed that the telemetry of this feeder is of utmost importance as it is an inter-regional feeder. MPPGCL informed that they will arrange for the telemetry of this feeder on priority.

Sr.No.

Description Unit Pending since

MPPGCL response in meeting dtd.30.10.18

MPPGCL response in 67th OCC

1. Gen-1 CB Commissioning of new RTU

MPPGCL informed that it shall be rectified at the earliest.

Minutes of 67th OCCM of MP 21

Page 24: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

generating stations are persisting since long time. SLDC thus requested MPPGCL to arrange & expedite rectification of discrepancies /upgradation of RTUs in MPPGCL TPS. SLDC informed the list of telemetry discrepancies pertaining to MPPTCL/IPP substations is detailed below:- Sl

No. Name of Substation

whose RTU is required to be upgraded

Name of feeders/transformers required to be included in telemetry

01 400 ISP

1.Gen-2 MW, MVAR not available 2.Telemetry of 125 MVAR Bus Reactor not available. 4. CB of entire substation. 4.Telemetered values of 400 KV Nagda MVAR is 10 times of actual value. 5. Telemetered values of 400 KV Bus-1,2 Voltage & Frequency, 400 KV Indore-1 MVAR. 6. MVAR Values of Gen-3 & Gen-6

02 400 KV Kirnapur Wrong MW/MVAR value of 132 KV Dongargarh

03 220 KV Seoni i.Wrong CB status of 160 MVA Xmer II (Secondary side) ii.Wrong value of 220 KV Bus II Voltage iii.132 KV Bus Voltage & Frequency (In last meeting, it was decided that telemetry of 220KV Seoni shall be shifted to Dongfeng RTU to rectify the above issues. However, action for shiting /rectification in existing RTU is still pending)

04 400 KV Bhopal 1.315 MVA Xmer-IV Main & Tie CB

05 400 KV Astha CB status of 220 KV Mugaliyachhap

06 220 KV Rajgarh Biaora (i) 220 KV TBC CB status (ii) 220 KV Voltage & Frequency

07 400 KV Indore 400 KV ISP-II line reactor CB wrong status

08 400 KV Chhegaon Wrong CB status of :- i. 132 KV IC I & II ii. 220/132 KV Xmer II (Sec side)

09 400 KV Julwaniya All 132 KV CB status showing open

09 220 KV Satna Wrong CB status of 132 KV Kymore, 132 KV Interconnector II , 132/33 KV Xmer II, 220/132 KV

Minutes of 67th OCCM of MP 22

Page 25: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Xmer-II(Sec Side)

10 220 KV Kotar Wrong CB status of 220 KV Satna 1, 132 KV Rampur Baghelan, 132 KV RTS

11 220 KV Chichli CB status of 132 KV Udaipura 1

12 220 KV Mandideep CB status of 220/132 KV Xmer II & III

13 220 KV Nimrani Telemetry of 33 KV Maral

SLDC informed that large no. of discrepancies pertaining to ISP are persisting since long

time & no significant action in the matter has been taken by ISP. ISP informed that the case for purchasing new RTUs has been initiated by ISP & it will be completed by 4-5 months in response to which ISP was requested to expedite the progress. SLDC informed that problems in MFM of Generator 2 is also observed & non-availability of telemetry of Generator is creating inconvenience in grid operation as manual entry of the same is required on periodic basis. Accordingly, SLDC requested ISP to arrange telemetry of GEN-2 by utilizing MFM of some other line/reactor etc. ISP agreed that they will arrange for the same.

MPPTCL informed that there is some problem in RTU at 400 KV Kirnapur. MPPTCL (T&C)

is pursuing the matter with BHEL but no significant response/action has been taken by BHEL. SLDC requested MPPTCL to arrange for its rectification at the earliest as 132 KV Kirnapur-Dongargarh is drawal point of MP & its telemetry is of utmost importance. MPPTCL further informed that they will arrange for rectification of the all the other discrepancies at priority.

SLDC further informed that the status of telemetry is being monitored by MPERC through MIS report and hence telemetry is required to be maintained properly with highest possible availability.

9.3 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC:-

SLDC informed that the RGMO signal of Pench HPS has integrated in SLDC SCADA

system & extension of RGMO/FGMO signal of following generating units is still pending:-

S.No. Name of Generating

Station Unit.No. MPPGCL response

1 Satpura TPS 6,7,8,9 MPPGCL informed that they will explore the possibility of providing FGMO signal status & will inform SLDC within one week.

2 SGTPS 1,2,3,4 MPPGCL informed that it is under tendering process & shall be completed within 3-4 months. SLDC informed that no progress in the matter has been observed & requested MPPGCL to expedite the work..

3 BARGI HPS 1,2 MPPGCL informed that equipments from BHEL have been received & commissioning shall be done during AOH of Units in 2019.

4 Singhaji TPS Phase II 3,4 MPPGCL informed that as discussed with M/s L&T, RGMO/FGMO is not required. SLDC

Minutes of 67th OCCM of MP 23

Page 26: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

requested MPPGCL to confirm the same in written so that the matter may be placed before WRPC. However SLDC also informed that as per IEGC 5.2(f) RGMO/FGMO is mandatory for all the thermal units above 200 MW.

9.4(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS

SLDC informed that the telemetry of Hydel Power Stations is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present

Status Availability

Sep-18 Oct-18 Nov-18 Dec-18

Pench Intermittent 55 60 75 72 Bansagar-III Intermittent 70 72 70 74 Madikheda Intermittent 69 65 76 71 Rajghat Intermittent 75 71 60 62 Gandhisagar Intermittent 75 72 78 71 Bargi Intermittent 75 71 76 79 Tons Intermittent 65 68 62 65 Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS SLDC informed that as per CERC communication regulation 2017, availability of telemetry is

required to be ensured more than 99.9% however as indicated above the telemetry availability of Hydel Power Stations is very low.

SLDC informed MPPGCL that following measures are required to be taken up by MPPGCL for

improving availability of telemetry of power stations:- 1. Arrangement of essential spares at power stations and one set of all spares at centralized

location with intimation to all power stations 2. Arrangement of training to persons looking after telemetry work. 3. Arrangement of measuring instruments like level meters wherever not available. 4. Ensuring availability of RTU configuration at all power stations.

MPPGCL agreed to arrange the same.

9.4(B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC TO THERMAL/ HYDEL POWER STATIONS :- SLDC informed that despite constant pursuance most of the PLCC voice communication of various power stations to SLDC is out since long time. The details of outage are here as under:-

Sr.No Name of HPS/TPS

2 wire PLCC channel

MPPGCL response in meeting dtd.30.10.18

Remark

PLCC channel isnot working since last 5 months.

AE Bargi informed that quotation from M/s ABB for purchasing of new card is still pending. SLDC

1.Restoration of PLCC channel is still pending

Minutes of 67th OCCM of MP 24

Page 27: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

1

Bargi

suggested to check the card in spare PLCC cabinet available at other Power Houses and take the card on loan basis. During the discussion representative from Rajghat HPS informed that card is available in his Power House. In response SLDC suggested Bargi HPS take the card from Rajghat HPS and restore the voice communication of Bargi HPS at the earliest. SLDC also suggested to contact T&C division, and arrange the desired module from T&C, on loan basis. It was also requested to procure spare modules in advance so that so long outage in future may be avoided.

2.BSNL landline number/ Mobile number not working most of the time.

2.

Bansagar- IV

PLCC voice communication is not established

Mr.Vinay, AE, Tons HPS informed that he will visit Bansagar-IV for restoration of voice communication of Bansagar-IV at the earliest.

1.Restoration of PLCC channel is still pending.

3.

Madikheda

PLCC voice channel is not working since last 2 years.

SLDC informed that recently Pichore wideband node commissioned therefore 2 wire PLCC voice communication could be restored to established PLCC channel upto Pichhore wideband. Madikheda HPS informed that requirement of PLCC cabinet has already submitted to central office therefore as PLCC cabinet available to him, voice channel will be commissioned upto Pichhore substation. SLDC further requested MPPGCL officers from Jabalpur to expedite the procurement of material desired by site officers.

1.Restoration of PLCC channel is still pending.

4

Rajghat

PLCC voice channel is not working since last 2 years

SLDC suggested to extend voice facility upto Rajghat HPS while making the subscriber of 220 KV Bina in coordination with AE Bina. Therefore to commissioned above link voice channel between Rajghat HPS to 220 KV Bina shall require to be established and connect to this channel in PDH equipment at220 KV Bina to extend the voice facility of Rajghat HPS upto SLDC/Backup SLDC.

1.Restoration of PLCC channel is still pending.

5

Gandhisagar

PLCC voice channel is not working since last 6 month

1.Restoration of PLCC channel is still pending.

6

Birsinghpur HPS /TPS

PLCC voice channel is not working since long time due to faulty PLCC

AE Birsinghpur informed that presently voice communication between SLDC to thermal power

Restoration of voice channel is still pending.

Minutes of 67th OCCM of MP 25

Page 28: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

exchange at Birsinghpur.

house is proper & the commissioning of EPAX at site is under progress. AE Birsinghpur assured that the voice channel of Birsinghpur HPS shall be restored within one month.

7.

Satpura TPS

PLCC voice channel is not working since last 1 years.

AE Satpura informed that faulty card shall be repaired at the earliest. Further, SLDC informed that the OPGW has already been laid between 400 KV Ashta and Satpura TPS and suggested that alternate path can be established using this path by installing end optical equipment.

Repair/replacement of Exchange & Card of PLCC equipment at Satpura TPS side is still pending.

SLDC informed that the matter regarding Non Availability/ Unreliable voice communication Between

SLDC to Thermal/ Hydel Power Stations was discussed in last various OCC meeting & special meeting on 30.10.18. However there is no progress in the matter & status provided by MPPGCL in meeting dtd.30.10.18 remains the same.

SLDC informed that the restoration of above PLCC voice Communication is of utmost importance as

lot of inconvenience in system operation is observed by SLDC as voice communication through Mobile/ P&T lines is not reliable and remains out /unreachable for most of the time. MPPGCL agreed to discuss this matter with its higher officials.

SLDC pursued the matter regarding extending 2 wire voice facility upto Singhaji 1 & 2 TPS ,

Madikheda HPS, Rajghat HPS, ISP & OSP HPS from nearest wide band node utilizing PLCC channel due to non-availability of 2 wire print in ETL make & OG Print in PUNCOM make PLCC cabint at power stations. MPPGCL & NHDC agreed to look into the matter at priority. 9.5 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA

SLDC informed that on some instances, it has been observed that the SOE was not received or wrong time stamping of SOE was received in SLDC SCADA system. The matter was taken up with field for verification for proper configuration /connections of SOE data in RTUs & after long pursuance, the matter was investigated and it was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS where settings were modified is now receipt in SLDC SCADA/EMS system.

Further SLDC informed that the SOE verification of all RTUs is being done & out of 157 RTUs,

SOE verification of 81 RTUs has been done & requested MPPTCL to expedite the SOE verification of balance RTUs at the earliest. MPPTCL informed that they have instructed all the field offices to coordinate with SLDC for SOE verification. 9.6. UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS

SLDC informed that despite constant pursuance utilization of node at Birsingpur TPS is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and laying of fiber optic cable is still pending. The MPPGCL informed that the procurement of optical cable & modem is still under tendering process.

Minutes of 67th OCCM of MP 26

Page 29: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

The matter regarding utilisation of wideband nodes at Gandhi Sagar HPS was also discussed in the meeting. MPPGCL informed that cable between wide band equipment & RTU Panel along with the converter has been laid. 9.7 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel was discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01 132 KV Waidhan S/s Very intermittent

02 132 KV Datia Very intermittent

03 Rajghat HPS Very intermittent

04 220 KV Ashoknagar Very intermittent

05 Tons HPS Very intermittent

06 220 KV Rewa Very intermittent

07 Bansagar III HPS Very intermittent

08 220 KV Anuppur Very intermittent

09 220 KV Shahdol Very intermittent

SLDC requested MPPTCL & MPPGCL to sort out rectification of above RTU/data channel on top most priority. SLDC further informed that MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. 9.8 TELEMETRY OF RAILWAY TSS SUB STATIONS: -

SLDC informed that the telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP.

SLDC further informed that Railways stated in last OCC Meeting that telemetry integration of

Railway TSS shall be completed by next OCC meeting. However no progress in the matter was observed. SLDC informed that despite constant pursuance Railways has not yet submitted the architecture of telemetry scheme, details of equipments & protocol. SLDC further informed that as discussed in last various OCC meetings, Railways was requested to arrange a meeting with the implementing agency in coordination with SLDC. However no such meeting was arranged by

Minutes of 67th OCCM of MP 27

Page 30: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Railways so far. Railways informed that currently the telemetry of Railway TSS is being extended to Railway Zonal office & further it will be integrated with SLDC.

SLDC informed that non-availability of telemetry is serious violation of grid code & no

significant progress in the matter has been observed from Railways. SLDC again requested to submit the architecture of telemetry scheme, details of equipments & protocol & arrange a meeting with the implementing agency in coordination with SLDC before next OCC meeting. Railways agreed for the same. 9.9 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:-

SLDC informed that under the “Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU’s are installed and its adjacent sub-stations .

SLDC also informed that the matter has been constantly being pursued by SLDC from last 3

OCC Meetings, however still the required information is pending to be provided by MPPTCL. SLDC thus requested MPPTCL to furnish the data at the earliest. MPPTCL agreed to provide the same on priority.

SA-1: REPAIRING/ REPLACEMENT OF FAULTY AIR CONDITIONER AT INDORE WIDE BAND NODE:- SLDC informed that 03 no. Air conditioner are installed at 400 KV S/s Indore Wind Band Node. Out of three, 01 no. AC is completely not working and other two have faulty compressor & fan. SLDC further informed that the matter was pursued by SLDC vide letter dtd. 27.12.18 & 17.11.18. However the rectification/ replacement of AC is still pending to be done by MPPTCL. SLDC thus requested MPPTCL to arrange for rectification/replacement of faulty 03 no.s Air Conditioner on urgent basis. MPPTCL agreed to look into matter on priority. ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

As discussed in 66th OCCM & confirmed by entities the schedule & host of upcoming Operation and Coordination Committee meeting of MP is detailed as below:-

S.NO. OCC MEETING

OF MP HOSTING ENTITY

TENTATIVE DATE

1. 68TH MP-OCCM KALPTARU 23.02.2019 2. 69TH MP-OCCM NHDC 26.04.2019 3. 70TH MP-OCCM MPPGCL 28.06.2019 4. 71ST MP-OCCM DISCOM(WZ) 22.08.2019 5. 72ND MP-OCCM JP BINA 29.10.2019

In view of the above hosting entity of 68th OCCM may confirm the same in the meeting. The venue of the 68th OCC meeting will be intimated later.

Kalptaru confirmed the same in the meeting.

***********

Minutes of 67th OCCM of MP 28

Page 31: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Minutes of 67th OCCM of MP 29

Page 32: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Minutes of 67th OCCM of MP 30

Page 33: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Minutes of 67th OCCM of MP 31

Page 34: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.07 HzBetween 08.00 hrs & 09.00 Hrs on 07.10.18

50.09 HzBetween 21.00 hrs & 22.00 Hrs on 22.11.18

1.2 Minimum Frequency 49.82 HzBetween 16.00 hrs & 17.00 Hrs on 22.10.18

49.85 HzBetween 05.00 hrs & 06.00 Hrs on 29.11.18

1.3 Average Frequency 49.97 Hz 49.97 Hz

2

2.1 Maximum Frequency 50.2 HzAT 12.02.20 HRS ON 28.10.18

50.25 HzAT 22.00:10 HRS ON 22.11.18

2.2 Minimum Frequency 49.69 HzAT 17.24:10 HRS ON 20.10.18

49.7 HzAT 21.35:50. HRS ON 12.11.18

3 Percentage of time when frequency was :-

%age of time when frequency was Oct-18 Nov-18

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 12.05 10.92

3.7 Between 49.9 Hz and 50.05 Hz 79.20 79.87

3.8 Between 50.05 Hz AND 51.5 Hz 8.75 9.21

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Oct-18 Nov-18

Minutes of 67th OCCM of MP 32

Page 35: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

I S.

No. NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH CIRCUIT

KMS.

MONTH OF COMPLETIO

N

DATE OF COMMI-SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (ADB-III Saving)

DCDS 4.382 17.528 June'2018 28.06.2018

2220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line with lilo of one ckt of line at Morena 220Kv s/s (ADB-III Saving)

DCDS 69.64 139.28 Aug'2018 19.08.2018

3220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.217) ADB-III (S)

DCDS 39.217 78.434 Oct'2018 30.10.2018

C. 132 KV TRANSMISSION LINES

1132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.726)

DCDS 4.726 9.452 April'2018 11.04.2018

2

132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.421) (Contribution Supervision Work)

DCSS 2.421 2.421 May'2018 05.05.2018

3132 kv DCDS Line Chichli - Udaypura (On 220Kv Tower) (ADB-III)

DCDS 46.860 93.720 June'2018 04.06.2018

4LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) (ADB-III Saving)

DCDS 18.266 36.532 June'2018 06.06.2018

5LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x0.774 + 4x1.216) (ADB-III)

DCDS 1.990 6.412 June'2018 13.06.2018

6132kV MACT (Bhopal) - Mugaliachhap line (4x20.2 + 2x10.536)

DCDS 30.736 101.872 June'2018

14.06.2018 (ckt-I)

22.06.2018 (ckt-II)

7132 kv DCSS Dewas-Agrod line (1x20.76) (ADB-III)

DCSS 21.600 21.600 June'2018 27.06.2018

82nd ckt of 132kV Maihar - Amarpatan 132kV line (GEC)

2nd ckt 26.000 26.000 June'2018 28.06.2018

9132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) (ADB-III Saving)

DCSS 17.200 35.800 June'2018 28.06.2018

10132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) (CCW)

DCSS 19.414 19.414 June'2018 29.06.2018

11132kv Mugaliya Chaap - Sehore DCSS line (1x19.914 +2x1.140) (JICA)

DCSS 21.054 22.194 July'2018 20.07.2018

12132 kv DCSS Dewas-Barotha line (1x17.428) (JICA)

DCSS 17.428 17.428 July'2018 25.07.2018

13LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station (2x21.503) (ADB-saving)

DCDS 43.006 43.006 July'2018 17.07.2018

14LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (4x1.423) (ADB-saving)

DCDS 1.423 5.692 July'2018 30.06.2018

15132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 2x1.457) (ADB-saving)

DCDS 27.956 29.413 July'20181x26.499

30.07.2018

16132kv DCSS line Chhindwara-Saori line (1x31.23) (ADB-saving)

DCSS 31.23 31.23 July'2018 31.07.2018

17132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968) (Contrib)

DCSS 5.968 5.968 July'2018 06.07.2018

18132Kv DCSS line PS III &IV for NVDA at Simrol (1x8.031) (Contrib only supervision)

DCSS 8.031 8.031 July'2018 19.07.2018%

ANNEXURE - 2.2.5.i

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2018-19 (UP TO 30.11.2018)

EHV TRANSMISSION LINES

Minutes of 67th OCCM of MP 33

Page 36: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

19132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.06) (CCW)

DCSS 13.06 13.06 Oct'2018charged on 25.10.2018

20132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III

DCSS 20.969 20.969 Nov'2018

Part line 20.969 CktKm

charged on 05.11.2018 by

tapping arrangement

21LILO of 132Kv Bhopal(220kV) - Bairagarh line at 132kV S/s Badwai (IT Park) (2x0.513) (CCW)

DCDS 1.026 1.026 Nov'2018charged on 30.11.2018

22132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in phase manner on 132kV for RTS Singroli (1x1.809) (CCW)

DCDS 1.052 1.052 Nov'2018

1.052 CktKm charged upto

dead end tower

30.11.2018

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer &

Cap.(MVA)

EFFECTIVE CAPACITY

MVA

MONTH OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1400 KV sub-station Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Dist-BALAGHAT) ADB-III

400/132 1x100 100 Oct'2018

1x100 MVA charged on 29.10.2018

(132 KV side)

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III S

220/132 kV1x1601x160

320June'2018Aug'2018

30.06.2018 20.08.2018 (2nd X-mer)

2220 kV Indore N/Z (Upgradation) with 2x160MVA (UBI)

220/132 1x160 160 July'2018 30.07.2018

(1st unit)

3Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV X-mer (50 MVA X-mer charged on 19.08.2018) (ADB-III S)

220/132 kV 2x160 320 Sept'2018

20.09.2018 & 30.09.2018 both X-mer

charged from 132 KV &

30.10.2018 from 220KV

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1 Udaipura 132kv s/s with 1x40 MVA (ADB-III) 132/33 kV 1x40 40 April'2018

27.04.2018 (33)

04.06.2018 (132)

2Bilkishganj 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 June'2018 29.06.2018

3Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) (ADB-III)

132/33 kV 1x40 40 July'201829.07.2018

(33kV)

4Khujner/Sindaota 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 July'2018 31.07.2018

5 Budha 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kV 1x50 50 July'2018 17.07.2018

6Bisnoor 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 Aug'201821.08.2018

(33KV)

7Patera 132kv s/s with 1x50 MVA (ADB-III Saving)

132/33 kV 1x50 50 Aug'2018 10.08.2018

8 Saori 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kV 1x50 50 Aug'2018 23.08.2018

9 Rehli 132kv s/s with 1x50 MVA (ADB-III S) 132/33 kV 1x50 50 Sept'2018 30.09.2018

10Satna-II 132kV S/s with 2x50MVA (ADB-III Saving)

132/33 kV 2x50 100 Oct'2018 31.10.2018 from 33 KV

side

11 Pipalpani 132kV S/s with 1x50 MVA (REC-II) 132/33 kV 1x50 50 Nov'2018charged on 27.11.2018 (from 33KV)

12IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) (CCW)

132/33 kV 1x63 63 Nov'2018charged on 27.11.2018

EHV SUB - STATIONS

Minutes of 67th OCCM of MP 34

Page 37: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ANNEXURE-2.2.5.ii

S. No. NAME OF THE TRANSMISSION LINECKT.KMS.

PROGRESS IN % (NOv'2018)

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur (2x69.968+ 2x68.626)

277.188 89%

2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) 140 94%

3LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375)

6.75 69%

4LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163)

33 64%

5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s 137.32 27%

6400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

56 43%

7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 18%

8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 58%

9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 26%

B. 220 KV TRANSMISSION LINES

1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 84%

2LILO of one ckt of 220 KV DCDS jabalpur-Amarkantak line & 132 KV Jabalpur - Maneri S/C at proposed 220 KV S/s Gorabazar JBP

43%

3LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV S/S (4x6.012)

24.048 83%

4LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

66 8%

5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 38%

6220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x5.6)

24.4 48%

7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 18%

8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 21%

9 LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2) 24.4 69%

10Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

77.728 37%

11 220kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s 70 97%

12 220kV DCDS line from Badnawar 400kV S/s - Kanwan 220kV S/s 63 55%

13 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 56%

14LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.427)

44.854 10%

15220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s

92.294 18%

16 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s 94 77%

17 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 40%

18220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s

66.42 87%

19 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 36%

20 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 68%

21LILO of both ckt of Ujjain - Badod 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691)

24.182 16%

22LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766)

47.064 5%

23 220 kV Sabalgarh - Sheopur line (2x110) 220 11%

24220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

86.852 88%

a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813)

17.626 23.05.2017

b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 84%

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 30.11.2018

Minutes of 67th OCCM of MP 35

Page 38: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

25220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917)

1.83417.06.2018 &

23.07.2018

26220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572)

5.144

100%1st ckt 2.572 charged on

22.07.2018 & 2nd ckt 2.572 on dtd

11.10.2018

27220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917)

4.33 60%

132 KV TRANSMISSION LINES

1 132kv DCSS Gautampur -Depalpur line (1x19) 19 63%

2 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 42%

3132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209)

53.209 82%

4 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 69%

5 132 kv DCSS Guna-Eshagarh line (1x72) 72 33%

6LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1)

2

7 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18%

8 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 20%

9LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

55.09 44%

10 132 KV Shyampur - Pilukhedi DCSS line (1x22.834) 22.834 14%

11 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 27%

122nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5)

56 23%

13132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) (2x21.43)

42.86 7%

142nd circuiting of 132 kV Nepa- Dharni (MSEB line) & LILO for 132kV S/s Pipalpani (34.8 ckm 2nd ckt + 2x1.225)

37.25 92%

15 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296 24%

16 LILO of 132 KV Badod - Garoth line at 132KV S/s Shyamgarh 2.56 20%

17 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 25%

18 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7%

19132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III (20.969 ckt charged on 05.11.2018)

28.26

90%Part line 20.969

CktKm charged on 05.11.2018 by

tapping arrangement

20 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 25%

21 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 15%

22 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 56%

23 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 22%

24 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 55%

25 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 34%

26 LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s (2x18.997) 38 15%

27LILO of 132 kv Tikamgarh - Bijawar line at BadaMalhera132 KV S/s (2x1.675)

3.35 26%

28 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)

0.216 97%

29LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 132 kV S/s Waraseoni (2x4.7)

9.4 99%

30 132kV DCSS Sagar - Rehli line (1x40) 40 87%

31 132kV DCSS line Chichli - Palohabada (1x25.606) 25.606 29%

32LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14)

56 84%

33 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) 35 92%

34 132kv DCDS line Guna-Bhonra (2x21.394) 21 62%

Minutes of 67th OCCM of MP 36

Page 39: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

35 132kv DCSS Damoh-Patera line (1x38) 38 95%

36 LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047) 22.094 8%

37132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)

44.821 96%

382nd circuiting of 132kv Birsinghpur -Shahdol DCSS line (1x45) (Sanc.no.0204dtd.08.12.2017)

44.821 85%

39LILO of 132kV Julwania-Sendhwa-Shahpura at 220 KV Sendhwa including 2nd ckt between 220 KV Sendhwa to 132 kV Sendhwa (2nd ckt-7.071+2x2.538)

12.147 27%

40 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 36%

41132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s (2x13.115+ 3.4 Cktkm 2nd ckt)

26 53%

42 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line 24 96%

43 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 87%

44LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV S/s (2x71.464)

142.928 10%

45132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) (2x9.825)

19.65 37%

462nd Circuiting of Sidhi 220 Mauganj 132 kV DCSS line (new line 6 km involved)(2x12+ 36 ckm 2nd ckt)

60 23%

47132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344)

36.688 98%

48 2nd ckt of 132kV Alot - Sitamau 132kV line 40 100%

49LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s (2x2x30.052)

120.208 3%

50 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) 74.866 96%

512nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt-6.5 + 2x2.5)

11.510%

52132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938)

26.938 55%

53 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 62%

54132Kv DCSS 2 phase 2wire line from 132Kv s/s Barhi for PS to RTS Khanna Banjari(1x3.174)

3.174 46%

55132Kv DCSS 2 phase 2wire line from 132Kv s/s Beohari for PS to RTS Beohari (1x20.278)

20.278 10%

56132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS Marwasgram(1x51.341)

51.341 16%

57132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra Bahara (1x17.435)

17.435 5%

58132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur (1x49.851)

49.851 34%

59132Kv DCSS 2 phase 2wire line from 132Kv s/s Prithvipur to RTS Niwadi for p/s to RTS Niwadi (1x22.712)

22.712 11%

60 132 KV line 2 phase 2 wire Nainpur - RTS Nainpur line 4.04 7%

61 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 28%

62 132Kv DCSS 2 phase 2wire line Nainpur Ghansor line (1x34.413) 34.413 3%

63132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Linga from 220 KV S/s Chhindwara

8.989 35%

64132 KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon

17.413 15%

65 2nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTS Mungaoli RVNL 38 100%

66 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 10%

67 132Kv 2ph 2 wire DCSS Jaora - RTS Jaora line 1.3 48%

68132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152)

24.152 57%

69132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department. (1x6.79+4x1.007)

10.818 100%

Minutes of 67th OCCM of MP 37

Page 40: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

S.No.

NAME OF THE SUBSTATIONEFFECTIVE CAPACITY

MVA

A. 400 KV SUBSTATIONS

1400 KV sub-station Kirnapur with 2x100MVA 400/220 KV X-mer+ 1X40 MVA X-mer

200

80% 1x100 MVA charged on

29.10.2018 (132 KV side)

2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer 630 80%

3400 KV sub-station Mandsore with 2x315MVA 400/220 KV X-mer + 2x160 MVA

630 6%

4 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer 630 47%

5 400 KV sub-station Ujjain with 2x315MVA 400/220 KV X-mer+ 2x160 630 11%

6 2x125 MVAR reactor at 400 KV S/s Pithampur alongwith 04 Nos feeder bay 57%

B. a 220 KV SUBSTATIONS

1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA 160 14%

2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 9%

3 Adampur 220/33kv S/s 2x50MVA 100 8%

4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA 160 18%

5 220/132kV S/s Sailana (2x160MVA + 1x63) 320 51%

6 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) 320 40%

7 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) 160 42%

8 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) 160 52%

9 220/132kV S/s Gudgaon (1x160MVA + 1x63) 160 46%

10 220/132kV S/s Ratangarh (2x160MVA + 1x63) 320 3%

11 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA 300 wc 14.10.2018

12 33/220kV Pooling Sub-station at Ramnagar 3x100 300 83%

13 33/220kV Pooling Sub-station at Badwar (3x100) 300 19%

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Biston 132kv s/s1x40 MVA 40 9%

2 Shamgarh 132kv s/s1x40 MVA 40 4%

3 Teesgaon 132kv s/s 1x40MVA 40 30%

4 Bada malehra 132kv s/s 1x40MVA 40 11%

5 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 39%

6 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 56%

7 Khimlasa 132kv s/s 1x40 MVA 40 3%

8 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 20%

9 Narsinghgarh 132kv s/s with 1x40 MVA 40 7%

10 Silvani 132kv s/s with 1x40 MVA 40 26%

11 Palohabada 132kv s/s with 1x50 MVA 50 33%

12 Shahpura 132kv s/s with 1x40 MVA (Barwani) 40 57%

13 Bhesola 132kV S/s with 1x50 MVA 50 5%

14 Pilukhedi 132kV S/s with 1x50 MVA 50 6%

15 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 8%

16 Bhitarwar 132kV S/s with 1x50 MVA 50 23%

17 Morwan 132kV S/s with 1x40 MVA 40 1%

Minutes of 67th OCCM of MP 38

Page 41: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-2.3(i)

Oct-18 Nov-18 Oct-18 Nov-18

Commissinary HQ 23:52 23:52 23:40 23:50

District HQ 23:51 23:52 23:38 23:51

Tehsil HQ 23:48 23:49 23:34 23:40

Rural -Mixed 23:29 23:32 22:52 23:14

Rural -DLF 23:29 23:32 23:03 23:22

Rural -Irrigation 9:58 9:58 9:36 9:47

Oct-18 Nov-18 Oct-18 Nov-18

Commissinary HQ 23:48 23:51 23:46 23:50

District HQ 23:50 23:55 23:46 23:52

Tehsil HQ 23:44 23:53 23:43 23:47

Rural -3Phase 22:25 23:37 23:13 23:24

Rural -1Phase 23:30 23:44 23:21 23:32

Total Rural 9:47 9:53 9:47 9:53

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Minutes of 67th OCCM of MP 39

Page 42: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

(For which group to be allocated) JABALPUR REGION

Name of EHV Substation Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission-ing of feeder

132KV

132KV Lakhanadon 33KV Ghansor-II

08.02.2012 09.05.2018

132KV Chourai 33KV Sankh

26.03.2018 09.04.2018

REWA REGION

Name of EHV Substation Name of 33KV feeder

Date of commission-ing of feeder

bay

Date of commission-ing of feeder

220KV

220 KV Anuppur 33KV Jaithari feeder

(Mojer bear)

Desktop\OCC- 67th meeting\JBP_07.07.2018.doc

Minutes of 67th OCCM of MP 40

Page 43: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ANNEXURE-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

UJJAIN REGION

E:\E-DRIVE\OCC\OCC- 67th meeting\IND-03.12.18.doc

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of commissioning

of feeder 220KV

220KV Pithampur (Sec-III)

33KV Mittal Corp-2 33KV SRF

08.05.2011 03.09.2013

08.05.2011 03.09.2013

132KV

132KV Kasrawad

33KV Bamandi

07.09.2016

24.04.2018

132KV Sanawad

33KV Dhakalgaon

30.11.2015

21.04.2018

132KV Singot

33KV Khar 33KV Khalwa

30.03.2018 30.03.2018

25.04.2018 25.04.2018

132KV Chandrawatiganj

33KV Chandrawatiganj

27.04.2015

27.04.2015

132KV Electronic

33KV AKVN (Namkeen Cluster)

31.03.2016

31.03.2016

132KV GhataBillod

33KV Kesoor-II

19.10.2014

19.10.2014

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of Charging of feeder

132KV

132KV Agar

33KV Agar Town-II

03.12.2012

24.05.2018

132KV Arniyakalan

33KV Designco Manufacture & Exporter (5MW Solar Power Plant)

01.05.2018

01.05.2018

132KV Zarda

33KV Semliya 18.11.2017 20.04.2018

Minutes of 67th OCCM of MP 41

Page 44: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ANNEXURE-2.3.ii

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated)

BHOPAL REGION

Name of EHV Substation

Name of 33KV feeder

Date of charging of feeder bay

Date of charging of feeder

132 KV 132 KV Tamot 33 KV Obedullaganj

05.05.2016

02.02.2017

132 KV Lateri 33 KV Aligarh Kotra 33 KV Madankhedi 33 KV Anantpura

28.08.2017 27.06.2017 15.06.2017

20.12.2017 05.01.2018 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 33 KV Aamkheda

04.12.2017 04.12.2014

04.12.2017 04.12.2017

132 KV Udaipura 33 KV Thaladigawan 33 KV Boras

26.04.2018 04.06.2018

04.06.2018 06.06.2018

E:\E-DRIVE\OCC\OCC- 67th meeting\BPL-21.11.2018.doc

Minutes of 67th OCCM of MP 42

Page 45: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-3.2

Date Time Date Time

1 400 400KV 315 MVA ICT III at 400KV S/s Indore 01-Jan-19 09:00 02-Jan-19 18:00 continue For maintenance and testing related work

2 400 TIE BAY OF 315MVA BHEL XMER-III at 400KV S/s Nagda 03-Jan-19 08:00 03-Jan-19 17:00 Daily For maintenance and testing related work

3 400 400KV 315 MVA ICT IV at 400KV S/s Indore 03-Jan-19 09:00 04-Jan-19 18:00 continue For maintenance and testing related work

4 400 TIE BAY OF 315MVA BHEL XMER-IV at 400KV S/s Nagda 07-Jan-19 08:00 07-Jan-19 17:00 Daily For maintenance and testing related work

5 400 400KV 3X105 MVA ICT II at 400KV S/s Indore 07-Jan-19 09:00 08-Jan-19 18:00 continue For maintenance and testing related work

6 400 315 MVA 400/220/33 KV X-MER - I at 400KV S/s Nagda 14-Feb-19 08:00 16-Feb-19 17:00 Continue For pre monsoon maintenance / Testing work

7 400 315 MVA X-mer - I (EMCO) at 400KV S/s Bina 20-Feb-19 09:00 22-Feb-19 17:00 Continue For pre monsoon maintenance / Testing work

8 400 315 MVA 400/220/33 KV X-MER - II at 400KV S/s Nagda 21-Feb-19 08:00 22-Feb-19 17:00 Continue For pre monsoon maintenance / Testing work

9 400 315MVA EMCO X-mer-II at 400KV S/s Julwaniya 22-Feb-19 09:00 26-Feb-19 17:00 Continue For replacement of top cover gaskets by OEM M/s EMCO

10 400 315 MVA X-mer - II (BHEL) at 400KV S/s Bina 26-Feb-19 09:00 28-Feb-19 17:00 Continue For pre monsoon maintenance / Testing work

11 400 315 MVA 400/220/33 KV X-MER - III at 400KV S/s Nagda 27-Feb-19 08:00 28-Feb-19 17:00 Continue For pre monsoon maintenance / Testing work

1 400 80 MVAR Reactor 1 at 400KV S/s Bhopal 21-Jan-19 08:00 28-Jan-19 18:00 Continue For rectification of oil leakage problem and maintenance work

2 400 80 MVAR Reactor 2 at 400KV S/s Bhopal 29-Jan-19 08:00 02-Feb-19 18:00 Continue For rectification of oil leakage problem and maintenance work

1 400 400KV Birsinghpur-Katni-I 03-Jan-19 09:00 03-Jan-19 18:00 Daily For line maintenance work

2 400 400KV Transfer Bus-Coupler at 400KV S/s Julwaniya 07-Jan-19 09:00 07-Jan-19 17:00 Daily For maintenance and testing related work

3 400 400KV Birsinghpur-Katni-II 07-Jan-19 09:00 07-Jan-19 18:00 Daily For line maintenance work

4 400 400KV SSTPH-Chhegaon 07-Jan-19 09:00 07-Jan-19 18:00 Daily For line maintenance work

5 400 400KV Chhegoan-Julwania 09-Jan-19 09:00 09-Jan-19 18:00 Daily For line maintenance work

6 400 400KV SSTPH-Julwaina 11-Jan-19 18:00 11-Jan-19 09:00 Daily For line maintenance work

7 400 400KV Indore-Nagda 21-Jan-19 09:00 21-Jan-19 18:00 Daily For line maintenance work

Basis(Daily/

Continue)Reason

A- 400 KV TRANSFORMERS

B- 400 KV REACTORS

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE DURATION 01-01-19 TO 28-02-19

Sr- No

KV Line / Transformer / Reactor / BayFrom To

Minutes of 67th OCCM of MP 43

Page 46: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Date Time Date Time

Basis(Daily/

Continue)Reason

Sr- No

KV Line / Transformer / Reactor / BayFrom To

8 400 400KV Indore-Nagda 22-Jan-19 09:00 22-Jan-19 18:00 Daily For line maintenance work

9 400 400KV Sarni-ISP 30-Jan-19 07:00 30-Jan-19 17:00 Daily For line maintenance work

10 400 400KV MTPH-Chhegoan 01-Feb-19 10:00 01-Feb-19 17:00 Daily For line maintenance work

11 400 400KV Main Bus -2 at 400KV S/s Bina 04-Feb-19 09:00 18-Feb-19 17:00 ContinueFor 400KV PG Isolators replacement works of Bus Reactor, X-mer-II and Bhopal - I & II.

12 400 400KV Chhegoan-Julwania 04-Feb-19 10:00 04-Feb-19 17:00 Daily For line maintenance work

13 400 400KV MTPH-Julwaina 05-Feb-19 10:00 05-Feb-19 17:00 Daily For line maintenance work

14 400 400KV Birsinghpur-Katni-I 11-Feb-19 09:00 11-Feb-19 18:00 Daily For line maintenance work

15 400 400KV ISP-Indore-II 12-Feb-19 10:00 12-Feb-19 17:00 Daily For line maintenance work

16 400 400KV Birsinghpur-Katni-II 13-Feb-19 09:00 13-Feb-19 18:00 Daily For line maintenance work

17 400 400KV ISP-Indore-II 13-Feb-19 10:00 13-Feb-19 17:00 Daily For line maintenance work

18 400 400KV ISP-Indore-II 14-Feb-19 10:00 14-Feb-19 17:00 Daily For line maintenance work

19 400 400KV Sarni-ISP 20-Feb-19 07:00 20-Feb-19 17:00 Daily For line maintenance work

20 400 400KV Indore-Nagda 21-Feb-19 10:00 21-Feb-19 17:00 Daily For line maintenance work

21 400 400KV Indore-Nagda 22-Feb-19 10:00 22-Feb-19 17:00 Daily For line maintenance work

22 400 400KV Indore-Nagda 23-Feb-19 10:00 23-Feb-19 17:00 Daily For line maintenance work

1 220 220 KV bus -II at 400KV S/s Indore 01-Jan-19 09:00 04-Jan-19 18:00 Continue for replacement of bus-II isolator of ICT -III.ICT-IV

2 220 220 KV ICT-III at 400KV S/s Indore 01-Jan-19 09:00 02-Jan-19 18:00 Continue for replacement of bus-II isolator of ICT -III.ICT-III will be off.

3 220 220 KV ICT-IV at 400KV S/s Indore 03-Jan-19 09:00 04-Jan-19 18:00 Continue for replacement of bus-II isolator & Line Isolator of ICT -IV.ICT-IV will be OFF.

4 220 220KV Rewa-Tons-I 03-Jan-19 10:00 03-Jan-19 17:00 Daily For line maintenance work

5 220 220KV SSTPH-Chhegaon-I 03-Jan-19 09:00 03-Jan-19 18:00 Daily For line maintenance work

6 220 220KV Sagar-Bina -I 04-Jan-19 09:00 04-Jan-19 17:00 Daily Routine maintatance work

7 220 220KV Barwaha-Itarsi 07-Jan-19 10:00 07-Jan-19 17:00 Daily Maintenance work.

8 220 220KV Rewa-Tons-II 07-Jan-19 10:00 07-Jan-19 17:00 Daily For line maintenance work

D- 220 KV FEEDER & BAYS-

Minutes of 67th OCCM of MP 44

Page 47: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Date Time Date Time

Basis(Daily/

Continue)Reason

Sr- No

KV Line / Transformer / Reactor / BayFrom To

9 220 220KV Sagar-Bina-II 08-Jan-19 09:00 08-Jan-19 17:00 Daily Routine maintatance work

10 220 220KV Nimrani-Chhegaon-II 08-Jan-19 10:00 08-Jan-19 17:00 Daily Maintenance work.

11 220 220KV Damoh(PGCIL)-Tikamgarh -I 09-Jan-19 09:00 09-Jan-19 18:00 Daily For line maintenance work

12 220 220KV Damoh-Katni 10-Jan-19 09:00 10-Jan-19 17:00 Daily Routine maintatance work

13 220 220KV Kotar-Tons-I 10-Jan-19 10:00 10-Jan-19 17:00 Daily For line maintenance work

14 220 220KV Pithampur-Rajgarh (PGCIL) 10-Jan-19 09:00 10-Jan-19 18:00 Daily For line maintenance work

15 220 220KV Nimrani-Maheshwar-I 11-Jan-19 10:00 11-Jan-19 17:00 Daily Maintenance work.

16 220 220KV Pithampur-Rajgarh (PGCIL) 11-Jan-19 09:00 11-Jan-19 18:00 Daily For line maintenance work

17 220 220KV 3x40MVA X-mer Bay at 220KV S/s Barwaha 12-Jan-19 10:00 12-Jan-19 17:00 Daily Maintenance work.

18 220 220KV Damoh(PGCIL)-Sagar -I 14-Jan-19 09:00 14-Jan-19 18:00 Daily For line maintenance work

19 220 220 KV bus -I at 400KV S/s Indore 14-Jan-19 09:00 15-Jan-19 18:00 Continue for replacement of bus-I isolator of dewas.dewas will be on TBC.

20 220 220KV Indore-Dewas 14-Jan-19 09:00 15-Jan-19 12:00 Continue for replacement of bus-I isolator of dewas.dewas will be on TBC.

21 220 220KV Kotar-Tons-II 14-Jan-19 10:00 14-Jan-19 17:00 Daily For line maintenance work

22 220 220KV Dhar-Rajgarh (PGCIL) 14-Jan-19 09:00 14-Jan-19 18:00 Daily For line maintenance work

23 220 220KV Dhar-Rajgarh (PGCIL) 15-Jan-19 09:00 15-Jan-19 18:00 Daily For line maintenance work

24 220 220KV Damoh(PGCIL)-Sagar -II 16-Jan-19 09:00 16-Jan-19 18:00 Daily For line maintenance work

25 220 220KV SSTPH-Chhegaon-II 16-Jan-19 09:00 16-Jan-19 18:00 Daily For line maintenance work

26 220 220KV Itarsi (PGCIL)- Itarsi-I 17-Jan-19 07:00 17-Jan-19 17:00 Daily For line maintenance work

27 220 220KV Seoni PGCIL -Chhindwara-I 17-Jan-19 09:00 17-Jan-19 18:00 Daily For line maintenance work

28 220 220KV Main Bus-I, at 220KV S/s Shivpuri 18-Jan-19 09:00 18-Jan-19 17:00 Daily Routine maintenance work

29 220 220KV Chhegaon-SSTPH-I 18-Jan-19 10:00 18-Jan-19 18:00 Daily Pre-monsoon maintenance work.

30 220 220KV Indore-Indore East 18-Jan-19 09:00 18-Jan-19 18:00 Daily for replacement of line isolator

31 220 220KV Bina(PGCIL)-Shivpuri 18-Jan-19 09:00 18-Jan-19 17:00 Daily For line maintenance work

Minutes of 67th OCCM of MP 45

Page 48: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Date Time Date Time

Basis(Daily/

Continue)Reason

Sr- No

KV Line / Transformer / Reactor / BayFrom To

32 220 220KV Rewa-Birsingpur 18-Jan-19 10:00 18-Jan-19 17:00 Daily For line maintenance work

33 220 220KV Main Bus-II, at 220KV S/s Shivpuri 21-Jan-19 09:00 21-Jan-19 17:00 Daily Routine maintenance work

34 220 220KV Chhegaon-Nepanagar 21-Jan-19 10:00 21-Jan-19 18:00 Daily Pre-monsoon maintenance work.

35 220 220KV Satna (PGCIL)-Chhatarpur-I 21-Jan-19 09:00 21-Jan-19 18:00 Daily For line maintenance work

36 220 220KV Omkareshwar-Chhegaon 21-Jan-19 09:00 21-Jan-19 18:00 Daily For line maintenance work

37 220 220KV Datia-Bina 22-Jan-19 09:00 22-Jan-19 17:00 Daily Bay maintenance work

38 220 220KV Seoni PGCIL -Seoni-I 22-Jan-19 09:00 22-Jan-19 18:00 Daily For line maintenance work

39 220 220KV Sidhi-ATPS 23-Jan-19 10:00 23-Jan-19 17:00 Daily For line maintenance work

40 220 220KV Omkareshwar- Khandwa 23-Jan-19 09:00 23-Jan-19 18:00 Daily For line maintenance work

41 220 220KV Damoh PGCIL -Damoh-I 24-Jan-19 09:00 24-Jan-19 18:00 Daily For line maintenance work

42 220 220KV Damoh PGCIL -Damoh-II 28-Jan-19 09:00 28-Jan-19 18:00 Daily For line maintenance work

43 220 220KV Damoh PGCIL -Damoh-III 30-Jan-19 09:00 30-Jan-19 18:00 Daily For line maintenance work

44 220 160MVA AREVA X-mer-I at 400KV S/s Chhegaon 02-Feb-19 10:00 02-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

45 220 220Kv Damoh-Katni 02-Feb-19 09:00 02-Feb-19 17:00 Daily For line maintenance work

46 220 220KV Chhegaon-Nimrani-I 04-Feb-19 10:00 04-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

47 220 220KV Damoh PGCIL-Damoh-I 04-Feb-19 09:00 04-Feb-19 18:00 Daily For line maintenance work

48 220 220KV Rewa-Tons-I 04-Feb-19 10:00 04-Feb-19 17:00 Daily For line maintenance work

49 220 220KV Seoni PGCIL-Chhindwara-I 05-Feb-19 09:00 05-Feb-19 18:00 Daily For line maintenance work

50 220 220KV Damoh PGCIL-Damoh-II 05-Feb-19 09:00 05-Feb-19 18:00 Daily For line maintenance work

51 220 220KV Pithampur-Rajgarh(PGCIL) 05-Feb-19 10:00 05-Feb-19 17:00 Daily For line maintenance work

52 220 220KV Chhegaon-Nimrani-II 06-Feb-19 10:00 06-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

53 220 220KV Damoh PGCIL-Damoh-III 06-Feb-19 09:00 06-Feb-19 18:00 Daily For line maintenance work

54 220 220KV Seoni PGCIL-Seoni-I 07-Feb-19 09:00 07-Feb-19 18:00 Daily For line maintenance work

55 220 220KV Bus Coupler Bay at 220KV S/s Barwaha 07-Feb-19 10:00 07-Feb-19 17:00 Daily For line maintenance work

Minutes of 67th OCCM of MP 46

Page 49: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Date Time Date Time

Basis(Daily/

Continue)Reason

Sr- No

KV Line / Transformer / Reactor / BayFrom To

56 220 220KV Rewa-Tons-II 07-Feb-19 10:00 07-Feb-19 17:00 Daily For line maintenance work

57 220 220KV Omkareshwar-Julwania 07-Feb-19 10:00 07-Feb-19 17:00 Daily For line maintenance work

58 220 220KV Bus Coupler Bay at 220KV S/s Nimrani 08-Feb-19 10:00 08-Feb-19 17:00 Daily For line maintenance work

59 220 220KV Damoh-Tikamgrah 08-Feb-19 09:00 08-Feb-19 17:00 Daily For line maintenance work

60 220 220KV Damoh (PGCIL)-Tikamgarh-I 08-Feb-19 09:00 08-Feb-19 18:00 Daily For line maintenance work

61 220 220KV Omkareshwar-Nimrani Tap Barwaha 08-Feb-19 10:00 08-Feb-19 17:00 Daily For line maintenance work

62 220 160MVA X-mer-I At 220KV s/s Mehgaon 11-Feb-19 09:00 11-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

63 220 220KV Shivpuri-Sabalgarh-I 11-Feb-19 09:00 11-Feb-19 17:00 Daily For line maintenance work

64 220 220KV Omkareshwar-Chhegoan 11-Feb-19 10:00 11-Feb-19 17:00 Daily For line maintenance work

65 220 160MVA BHEL X-mer-II at 220KV S/s Nimrani 11-Feb-19 10:00 11-Feb-19 17:00 Daily For line maintenance work

66 220 220KV Kotar-Tons-I 11-Feb-19 10:00 11-Feb-19 17:00 Daily For line maintenance work

67 220 220KV Pithampur-Rajgarh(PGCIL) 11-Feb-19 10:00 11-Feb-19 17:00 Daily For line maintenance work

68 220 220KV Omkareshwar-Khandwa 11-Feb-19 10:00 11-Feb-19 17:00 Daily For line maintenance work

69 220 160MVA X-mer-II At 220KV s/s Mehgaon 12-Feb-19 09:00 12-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

70 220 220KV Sagar-Bina -I 12-Feb-19 09:00 12-Feb-19 17:00 Daily For line maintenance work

71 220 220KV Sagar-Bina-II 13-Feb-19 09:00 13-Feb-19 17:00 Daily For line maintenance work

72 220 220KV Bina (PGCIL)-Bina-II 13-Feb-19 09:00 13-Feb-19 17:00 Daily For line maintenance work

73 220 220KV Omkareshwar-Barwaha 13-Feb-19 10:00 13-Feb-19 17:00 Daily For line maintenance work

74 220 220KV Seoni PGCIL-Seoni-II 15-Feb-19 09:00 15-Feb-19 18:00 Daily For line maintenance work

75 220 220KV Shivpuri-Sabalgarh-II 15-Feb-19 09:00 15-Feb-19 17:00 Daily For line maintenance work

76 220 220KV Chhegaon-Sant Singaji (SSTPH)-I 15-Feb-19 10:00 15-Feb-19 17:00 Daily For line maintenance work

77 220 160MVA BBL X-mer-I at 220KV S/s Chhanera 15-Feb-19 10:00 15-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

78 220 220KV Kotar-Tons-II 15-Feb-19 10:00 15-Feb-19 17:00 Daily For line maintenance work

79 220 220KV Dhar-Rajgarh (PGCIL) 15-Feb-19 10:00 15-Feb-19 17:00 Daily For line maintenance work

80 220 160MVA BBL X-mer-II at 220KV S/s Chhanera 16-Feb-19 10:00 16-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

Minutes of 67th OCCM of MP 47

Page 50: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Date Time Date Time

Basis(Daily/

Continue)Reason

Sr- No

KV Line / Transformer / Reactor / BayFrom To

81 220 220KV Damoh(PGCIL)-Sagar -I 16-Feb-19 09:00 16-Feb-19 18:00 Daily For line maintenance work

82 220 220KV Dhar-Rajgarh (PGCIL) 16-Feb-19 10:00 16-Feb-19 17:00 Daily For line maintenance work

83 220 220KV Chhegaon-Sant Singaji (SSTPH)-II 18-Feb-19 10:00 18-Feb-19 17:00 Daily For line maintenance work

84 220 160MVA BHEL X-mer, at 220KV S/s Nepanagar 18-Feb-19 10:00 18-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

85 220 220KV Damoh(PGCIL)-Sagar -II 18-Feb-19 09:00 18-Feb-19 18:00 Daily For line maintenance work

86 220 220KV Rewa-Birsingpur 18-Feb-19 10:00 18-Feb-19 17:00 Daily For line maintenance work

87 220 220KV Datia- Bina 19-Feb-19 09:00 19-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

88 220 220KV Rajgarh-Sujalpur (PGCIL)-I 19-Feb-19 09:00 19-Feb-19 17:00 Daily For line maintenance work

89 220 220KV Seoni PGCIL-Chhindwara-II 20-Feb-19 09:00 20-Feb-19 18:00 Daily For line maintenance work

90 220 220KV Datia- Gwalior 20-Feb-19 09:00 20-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

91 220 220KV Nepanagar-Khandwa (PGCIL) 20-Feb-19 10:00 20-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

92 220 220KV Rajgarh-Sujalpur (PGCIL)-II 20-Feb-19 09:00 20-Feb-19 17:00 Daily For line maintenance work

93 220 220KV Satna(PGCIL)-Chhatarpur-I 20-Feb-19 09:00 20-Feb-19 18:00 Daily For line maintenance work

94 220 220KV Nepanagar-Chhegaon 21-Feb-19 10:00 21-Feb-19 18:00 Daily For pre monsoon maintenance / Testing work

95 220 220KV Itarsi (PGCIL)- Itarsi-I 21-Feb-19 07:00 21-Feb-19 17:00 Daily For line maintenance work

96 220 220KV Sidhi-ATPS 21-Feb-19 10:00 21-Feb-19 17:00 Daily For line maintenance work

97 220 220KV Bina (PGCIL)-Shivpuri 22-Feb-19 09:00 22-Feb-19 17:00 Daily For line maintenance work

98 220 220KV Khandwa-Nepanagar 23-Feb-19 10:00 23-Feb-19 17:00 Daily For line maintenance work

99 220 160 MVA X-Mer-I at 220KV S/S Datia 25-Feb-19 09:00 25-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

100 220 160 MVA X-Mer-II at 220KV S/S Datia 26-Feb-19 09:00 26-Feb-19 17:00 Daily For pre monsoon maintenance / Testing work

Minutes of 67th OCCM of MP 48

Page 51: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

A. ThermalStn. Name UNIT No. Capacity

MW Oct-18 Nov-185 210 143.59 153.97

PH III 210 143.59 153.97TOT 210 143.59 153.97

6 200 0.00 99.597 210 16.38 110.58

PH II 410 16.38 210.178 210 126.99 115.979 210 122.17 1.99

PH III 420 249.16 117.9610 250 185.90 179.8911 250 184.31 178.75

PH IV 500 370.21 358.64TOT 1330 635.75 686.77

1 210 122.68 116.802 210 121.39 103.81

PH I 420 244.07 220.613 210 77.57 94.254 210 122.63 118.23

PH II 420 200.20 212.485 500 368.37 355.27

PH III 500 368.37 355.27TOT 1340 812.63 788.35

1 600 287.04 280.532 600 313.56 250.05

PH1 1200 600.60 530.583 660 290.01 243.71

PH II 660 290.01 243.71

TOT 1860 890.61 774.29

4740 2482.58 2403.39

B. HydelCapacity

MW Oct-18 Nov-18115.0 0.00 41.69172.0 27.00 72.0899.0 19.48 44.56

386.0 46.47 158.32193.0 23.24 79.16160.0 49.65 6.67107.0 33.10 4.4590.0 32.00 19.33

315.0 26.46 20.8420.0 0.46 0.0160.0 38.26 0.0030.0 2.82 3.2845.0 6.29 17.5122.5 3.15 8.7620.0 5.08 8.2660.0 4.38 21.66

1186.0 211.87 255.88915.0 165.40 139.24917.5 168.94 165.74

CapacityMW Oct-18 Nov-18

Indira Sagar Hydel Project 1000 184.23 133.27Omkareshwar Hydel Project 520 84.85 59.47

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Minutes of 67th OCCM of MP 49

Page 52: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

S No. Source Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Total30 31 30 31 31 30 31 30 244

A.1 Thermal 1923.24 1570.02 1869.78 1656.07 1636.40 1648.88 2031.86 2166.02 14502.272 Hydel 43.21 64.48 59.23 122.45 211.77 287.99 167.38 163.73 1120.243 Total 1966.45 1634.50 1929.02 1778.51 1848.17 1936.87 2199.24 2329.75 15622.51

B.1 Indira Sagar 26.16 66.30 41.07 15.70 64.84 233.13 181.55 129.57 758.342 Omkareshwar 12.50 32.62 20.66 15.34 43.84 109.03 84.85 59.47 378.313 MPPMCL Schedule from Central Sector of WR 1795.68 1868.24 1627.45 1808.73 1709.00 1705.21 2014.05 1916.01 14444.374 MPPMCL Schedule from Central Sector ER 33.98 30.77 24.82 34.85 36.56 28.47 41.92 45.40 276.785 Total MPPMCL Schedule from Central Sector (WR+ER) 1829.66 1899.01 1652.26 1843.58 1745.56 1733.68 2055.98 1961.41 14721.156 Deviation Energy of (WR+ER) -25.45 -9.57 -67.85 -14.40 -10.14 25.90 -10.18 -50.19 -161.897 NET NR ISGS POWER SCH to MP 0.00 0.00 15.53 27.11 37.72 64.96 76.74 72.24 294.318 RUMS SOLAR REWA 0.00 0.00 0.00 0.71 3.50 16.25 27.93 30.46 78.849 Schedule From Sugen 0.54 5.08 0.43 3.96 3.24 5.27 9.73 2.53 30.79

10 LANCO Amk 162.03 186.79 171.98 171.49 115.32 111.60 177.67 168.21 1265.1011 SASAN 990.18 994.72 976.50 852.02 921.36 873.16 938.38 965.76 7512.0912 ESSAR (STOA against LTA) 1.38 3.27 1.58 1.58 2.65 8.43 12.27 4.91 36.0613 J P Nigri 294.92 335.85 313.61 141.84 281.40 297.61 338.99 308.45 2312.6514 MB Power 192.75 208.08 108.70 201.61 142.68 135.47 199.64 237.09 1426.0115 JHABUA Power 31.73 31.77 44.22 47.39 31.21 87.76 71.27 83.27 428.6216 Other Open Access Schedule other than MPPMCL Incl. Seci -80.41 -30.49 -107.06 -49.82 -76.57 -46.99 -29.11 -62.12 -482.5617 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0019 Schedule from Sardar Sarovar -0.70 -0.76 -0.73 3.04 9.74 45.53 55.00 50.81 161.9320 SCH to Railway from RGPPL_ebid 160.44 165.31 162.90 166.68 166.63 160.02 161.25 156.44 1299.6821 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0022 Schedule from Rihand+Matatila 2.02 5.15 2.06 2.80 4.83 13.93 18.31 11.77 60.86

23 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 Additional Power Purchase 3.49 0.00 0.00 0.00 0.00 0.00 15.17 26.61 45.2726 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0027 Banking of Energy -441.88 -369.30 -404.32 -871.65 -803.51 -867.01 144.69 896.18 -2716.8028 Sale of Power -557.64 -167.20 -801.20 -140.91 -128.76 -244.79 -89.43 -46.87 -2176.8029 Total MP Schedule (Including Railway) 2588.52 3267.30 2136.46 2401.41 2457.02 2394.88 4184.46 4867.14 24297.2030 Total MP Drawal (Including Railway) 2563.07 3257.72 2068.61 2387.01 2446.88 2420.78 4174.29 4816.96 24135.3131 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 0.01 0.00 2.19 8.70 10.9132 Wheeled Energy of Wind Farm 15.18 19.45 20.05 13.88 17.63 9.48 3.98 3.46 103.1233 Wheeled Energy of Solar Plant 68.57 61.61 45.70 33.58 32.32 44.30 57.37 53.43 396.8834 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0035 Wheeled Energy of Ascent Hydro 1.46 1.41 1.39 1.11 1.31 1.01 1.24 1.26 10.1936 Export to MSEB (Nepa-Dharni) -6.08 -5.89 -3.94 -3.31 -3.34 -3.55 -6.13 -5.44 -37.6837 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -0.05 -3.52 -8.37 -11.49 51.62 40.67 254.82 43.25 366.9438 Energy Purchased by MP from Wind Farm 437.86 584.49 678.72 592.59 635.88 424.36 155.44 115.89 3625.2339 Energy Purchased by MP from Solar Plant 151.93 162.97 134.33 88.86 87.34 110.60 167.81 131.51 1035.36

40 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

60.47 38.27 113.76 73.85 91.59 47.61 16.72 55.96 498.24

41Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

24.49 7.73 6.31 2.67 2.55 6.91 3.34 6.87 60.86

42 Deviation Energy of ISP 2.68 4.21 3.27 1.74 2.23 4.24 2.68 3.70 24.7343 Schedule Energy of BLA Power against LTOA 0.00 2.16 4.82 5.49 3.50 0.00 0.00 0.00 15.9844 Schedule Energy of JP BINA Power against LTOA 165.38 155.48 111.80 91.52 90.57 100.01 206.86 167.76 1089.3745 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.40 1.94 1.50 3.8746 Chambal Complex Excess / less Overshare by MP -1.15 -1.72 -2.27 -2.76 -3.05 -3.90 -21.47 -35.96 -72.2847 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.07 -0.04 0.14 2.46 4.23 1.50 4.08 12.2848 State Supply (Ex-Power st. Bus) 5488.91 6017.75 5164.90 5084.43 5416.36 5486.17 7488.23 7891.70 48038.4649 AVERAGE DAILY (Ex-Bus) 182.96 194.12 172.16 164.01 174.72 182.87 241.56 263.06 196.8850 MINIMUM DAILY (MP Periphery) 163.56 163.85 140.57 139.40 151.95 138.27 2023.45 234.71 138.2751 MAXIMUM DAILY (MP Periphery) 185.36 197.05 186.70 166.05 184.93 205.87 254.89 265.87 265.8752 State Supply (Ex-Power st. Bus):- YEAR : 2017-18 5494.33 5544.84 4725.99 4626.86 5108.56 5168.84 6313.68 7073.82 44056.9053 Year ((18-19)-(17-18))*100/Year (17-18) -0.10 8.53 9.29 9.89 6.03 6.14 18.60 11.56 9.0454 Unshedule L/S : Year-2018-19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0055 Frequency Correction 5.16 8.76 4.57 4.11 3.70 5.68 7.05 7.46 46.5156 Restricted Requirement : Year-2018-19 5494.07 6026.51 5169.47 5088.54 5420.06 5491.86 7495.28 7899.17 48084.9657 Shedule L/S : Year-2018-19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0058 Un-Restricted Requirement : Year-2018-19 5494.07 6026.51 5169.47 5088.54 5420.06 5491.86 7495.28 7899.17 48084.96

ENERGY BALANCE SHEETYear : 2018 - 19

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Minutes of 67th OCCM of MP 50

Page 53: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

S.NO. Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Yr 18-19

C.1 DEMAND MET 8511 8641 8232 7398 8577 9270 12268 13304 133042 LOAD RELIEF 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 7908 8306 8122 7753 8289 9481 10919 12058 120582 LOAD RELIEF 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8621 8897 8437 7753 8577 9481 12268 13304 13304G. COMPUTED MAXIMUM DEMAND 8624 8916 8460 7800 8577 9515 12301 13312 13312H. UNRESTRICTED MAXIMUM DEMAND 8624 8916 8460 7800 8577 9515 12301 13312 13312I.1. Div. Head Quarters 23:47 23:44 23:43 23:43 23:44 23:44 23:46 23:50 23:452. District Head Quarters 23:49 23:48 23:45 23:50 23:50 23:47 23:46 23:52 23:483. Tahsil Head Quarters 23:42 23:40 23:34 23:36 23:39 23:37 23:43 23:47 23:404. Rural -Mixed 23:19 23:16 23:01 23:07 23:18 23:06 23:13 23:24 23:135. Rural -DLF 23:25 23:23 23:05 23:17 23:23 23:19 23:21 23:32 23:216. Rural -Irrigation 9:47 9:44 9:33 9:40 9:43 9:43 9:47 9:53 9:44J LOAD FACTOR % 88.43 90.91 84.77 87.66 84.23 79.18 80.89 81.31 84.67

S.N PARTICULARS Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Yr 18-19

A. INTGRATED FREQUENCY1 MAXIMUM 50.08 50.10 50.15 50.08 50.08 50.08 50.07 50.09 50.152 MINIMUM 49.81 49.77 49.74 49.78 49.81 49.77 49.82 49.85 49.74

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.20 50.23 50.25 50.24 50.22 50.20 50.20 50.25 50.252 MINIMUM 49.62 49.57 49.60 49.62 49.62 49.57 49.69 49.70 49.57

C. AVG FREQUENCY 49.97 49.95 49.98 49.98 49.98 49.97 49.97 49.97 49.97D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 7.63 7.42 11.19 11.27 10.63 6.57 8.75 9.21 9.093 49.9 TO 50.05 Hz 79.57 70.06 76.97 78.48 80.44 80.22 79.20 79.87 78.084 49.7 TO 49.9 Hz 12.80 22.52 11.84 10.25 8.93 13.21 12.05 10.92 12.835 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2018 - 19

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2018-19

Minutes of 67th OCCM of MP 51

Page 54: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen Lanco Sasan Essa

rJP

Nigri

RUMS (SOLAR)

REWA TO MPPMCL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 49.95 3203 2969 164 185 97 279 266 3960 2684 103 7 230 1225 20 440 0 258 92 71 190 0 203 -29 25 15 22 5556 9516 5545 -11 -7 9498 0 0 0 9512 9512

2:00 49.97 3204 2971 160 152 73 280 261 3897 2667 94 7 230 1227 20 440 0 253 84 71 190 0 203 -34 25 15 22 5513 9410 5428 -86 -6 9318 0 0 0 9327 9327

3:00 49.98 3207 2973 148 136 57 282 252 3848 2677 117 5 230 1228 19 440 0 254 86 70 191 0 203 -32 25 15 22 5550 9397 5647 98 -6 9489 0 0 0 9496 9496

4:00 50.00 3197 2964 148 160 69 281 248 3871 2683 161 5 230 1228 19 440 0 258 94 70 190 0 203 -28 25 15 22 5616 9487 5665 50 -6 9530 0 0 0 9534 9534

5:00 49.94 3241 3005 150 184 77 283 241 3941 2692 110 5 230 1227 19 440 0 260 94 69 190 0 203 -28 25 15 22 5574 9516 5581 7 -6 9517 0 0 0 9533 9533

6:00 49.98 3601 3344 201 274 125 282 233 4460 2677 146 9 230 1219 18 439 2 260 97 68 188 0 203 -43 13 15 22 5564 10024 5355 -208 -6 9809 0 0 0 9818 9818

7:00 49.97 3744 3479 275 367 177 283 277 4858 2741 196 50 234 1221 16 433 19 260 100 68 180 0 175 -57 48 9 22 5712 10571 5781 68 -8 10631 0 0 0 10644 10644

8:00 50.01 3760 3493 286 421 186 283 511 5179 2746 101 38 234 1205 14 433 47 263 100 69 180 0 223 -73 48 -15 22 5635 10814 5536 -99 -9 10707 0 0 0 10712 10712

9:00 49.99 3720 3456 253 331 152 282 680 5155 2724 58 14 230 1197 14 437 84 263 100 70 180 0 223 -105 48 -45 22 5513 10668 5489 -25 -9 10635 0 0 0 10643 10643

10:00 50.00 3583 3327 190 278 131 284 857 5067 2681 50 14 230 1201 13 439 105 259 96 72 180 0 223 -138 48 -70 22 5425 10492 5362 -63 -9 10421 0 0 0 10425 10425

11:00 49.98 3401 3157 151 204 99 303 975 4889 2631 39 5 230 1201 12 439 116 254 92 72 175 0 198 -226 19 -102 22 5177 10066 5113 -64 -8 9993 0 0 0 10001 10001

12:00 50.00 3165 2935 148 172 85 305 1017 4661 2565 52 0 222 1197 7 439 124 244 85 72 174 0 197 -335 0 -116 22 4950 9611 4765 -186 -9 9417 0 0 0 9421 9421

13:00 49.99 3151 2921 130 176 82 306 994 4610 2587 94 7 222 1197 6 439 120 226 90 72 174 0 197 -296 0 -114 22 5043 9652 5159 117 -8 9760 0 0 0 9767 9767

14:00 49.97 3162 2931 138 192 93 307 897 4558 2619 126 5 222 1201 11 439 108 238 87 73 174 0 197 -204 10 -101 22 5225 9783 5235 10 -9 9785 0 0 0 9797 9797

15:00 49.95 3200 2967 170 192 95 308 756 4489 2602 156 7 226 1202 13 439 85 256 93 73 174 0 204 -205 16 -86 22 5278 9767 5373 95 -8 9854 0 0 0 9870 9870

16:00 49.93 3217 2982 218 253 113 339 550 4455 2672 175 12 226 1207 15 439 54 267 100 73 173 0 204 -182 16 -91 22 5382 9837 5419 38 -8 9866 0 0 0 9888 9888

17:00 49.93 3245 3008 249 316 136 341 290 4341 2704 134 14 230 1204 16 439 27 269 100 75 174 0 203 -158 16 -74 22 5396 9737 5408 13 -8 9741 0 0 0 9762 9762

18:00 49.92 3348 3106 286 389 172 342 200 4496 2762 86 26 230 1207 17 440 5 268 96 76 175 0 180 -144 0 -54 22 5391 9887 5232 -159 -9 9719 0 0 0 9742 9742

19:00 49.98 3362 3119 297 381 165 342 266 4570 2716 79 28 238 1207 16 441 0 271 94 74 176 0 169 -158 0 -59 22 5315 9885 5208 -107 -9 9769 0 0 0 9777 9777

20:00 50.02 3306 3066 247 247 130 311 298 4298 2630 61 9 238 1209 14 441 0 275 93 74 178 0 170 -123 0 -32 22 5259 9557 5157 -102 -8 9447 0 0 0 9450 9450

21:00 50.02 3260 3024 198 155 80 306 315 4077 2555 49 5 234 1212 13 441 0 247 75 74 180 0 170 -95 0 -27 22 5155 9232 5079 -76 -8 9148 0 0 0 9149 9149

22:00 50.02 3181 2949 192 185 97 305 330 4059 2540 49 2 231 1222 14 441 0 230 69 74 181 0 170 -99 0 -27 22 5118 9177 4900 -219 -8 8951 0 0 0 8953 8953

23:00 49.98 3216 2982 220 321 145 292 326 4286 2715 77 17 238 1230 18 441 0 271 98 74 180 0 170 -72 35 -6 22 5507 9793 5616 109 -7 9895 0 0 0 9903 9903

24:00 50.00 3188 2955 219 280 151 281 306 4193 2711 68 14 238 1232 18 441 0 273 94 74 181 0 176 -58 38 10 22 5532 9725 5553 21 -7 9739 0 0 0 9743 9743

Avg. 49.98 3328 3087 202 248 116 300 473 4426 2666 99 13 231 1213 15 439 37 257 92 72 180 0 194 -122 20 -38 22 5391 9817 5359 -32 -8 9777 0 0 0 9786 9786

00 TO 06 HRS.

49.97 3276 3038 162 182 83 281 250 3996 2680 122 6 230 1226 19 440 0 257 91 70 190 0 203 -32 23 15 22 5562 9558 5537 -25 -6 9527 0 0 0 9537 9537

06 TO 12 HRS.

49.99 3562 3308 217 296 138 290 719 4968 2681 82 20 230 1204 13 437 83 257 96 71 178 0 207 -156 35 -57 22 5402 10370 5341 -61 -9 10301 0 0 0 10308 10308

12 TO 18 HRS.

49.95 3220 2986 199 253 115 324 614 4492 2657 129 12 226 1203 13 439 67 254 94 74 174 0 197 -198 10 -87 22 5286 9777 5305 19 -9 9788 0 0 0 9804 9804

06TO 18 HRS.

49.97 3391 3147 208 274 127 307 667 4730 2669 105 16 228 1203 13 438 75 256 95 72 176 0 202 -177 22 -72 22 5344 10074 5323 -21 -9 10044 0 0 0 10056 10056

18 TO 24 HRS.

50.00 3252 3016 229 262 128 306 307 4247 2645 64 13 236 1219 15 441 0 261 87 74 179 0 171 -101 12 -24 22 5314 9561 5252 -62 -8 9492 0 0 0 9496 9496

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Devia -tion

Export to MS

Minutes of 67th OCCM of MP 52

Page 55: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs

Injection

Total CSSNet

NR to MP

Sugen Lanco Sasan Essa

rJP

Nigri

RUMS (SOLAR)

REWA TO MPPMCL

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur STOA

Rihand+Matatila-

Rajghat

Total SCH UN SCH TOTAL

1:00 49.98 3196 2958 103 71 41 300 278 3752 2569 77 2 215 1298 7 410 0 310 104 69 216 0 591 0 69 -121 10 5826 9578 5703 -123 -6 9448 0 0 0 9456 9456

2:00 49.97 3212 2972 101 54 37 300 282 3747 2529 63 2 213 1292 7 409 0 283 84 67 218 0 591 0 69 -121 10 5716 9463 5551 -165 -5 9293 0 0 0 9302 9302

3:00 49.98 3258 3016 101 58 33 303 280 3791 2625 159 0 222 1296 7 409 0 311 107 63 219 0 591 0 95 -122 10 5993 9784 6037 44 -5 9822 0 0 0 9831 9831

4:00 49.98 3257 3016 101 75 37 303 280 3811 2649 207 0 218 1303 7 409 0 323 107 62 215 0 591 0 154 -123 10 6134 9945 6149 15 -5 9956 0 0 0 9963 9963

5:00 49.96 3276 3034 107 137 50 306 267 3901 2631 172 0 218 1296 7 409 0 305 100 62 217 0 591 0 220 -112 10 6127 10027 6143 16 -5 10038 0 0 0 10050 10050

6:00 49.98 3539 3280 157 227 105 306 265 4340 2635 203 0 224 1296 8 409 0 323 109 63 216 0 591 0 200 -96 10 6191 10530 6097 -94 -6 10430 0 0 0 10440 10440

7:00 49.95 3651 3384 241 241 113 309 280 4568 2684 154 5 229 1296 3 410 16 325 117 63 210 0 1632 -10 0 -57 10 7086 11654 7281 195 -7 11842 0 0 0 11861 11861

8:00 49.98 3641 3375 340 373 153 312 504 5056 2728 134 5 229 1298 7 410 55 330 119 65 209 0 2045 -10 0 -2 10 7631 12688 7377 -254 -8 12426 0 0 0 12437 12437

9:00 49.97 3649 3382 300 312 138 310 722 5165 2722 90 7 229 1299 7 410 92 331 119 67 208 0 2042 -14 0 -37 10 7581 12746 7518 -64 -8 12674 0 0 0 12689 12689

10:00 49.98 3632 3366 239 224 100 307 844 5080 2686 69 5 229 1299 5 410 119 328 119 67 208 0 2042 -52 0 -59 10 7483 12563 7380 -103 -8 12452 0 0 0 12463 12463

11:00 49.98 3372 3124 178 108 62 312 942 4728 2604 17 2 225 1299 2 410 140 321 119 66 208 0 2042 -117 0 -104 10 7243 11971 7140 -103 -8 11860 0 0 0 11868 11868

12:00 49.99 3284 3041 157 71 50 311 944 4574 2459 15 0 216 1295 1 410 152 303 99 67 209 0 2042 -240 0 -179 10 6859 11433 6560 -299 -8 11125 0 0 0 11134 11134

13:00 49.99 3256 3014 153 108 63 321 915 4574 2644 22 0 232 1291 1 410 141 321 120 65 202 0 2042 -122 0 -155 10 7225 11798 7303 78 -8 11869 0 0 0 11876 11876

14:00 49.98 3260 3019 148 117 61 322 817 4483 2610 65 0 237 1291 3 410 122 323 123 64 202 0 2045 -28 0 -141 10 7335 11819 7305 -30 -9 11780 0 0 0 11789 11789

15:00 49.95 3289 3045 141 93 59 322 642 4302 2640 56 2 237 1283 5 412 92 324 126 64 205 0 2045 -45 0 -88 10 7369 11671 7332 -36 -8 11626 0 0 0 11646 11646

16:00 49.94 3291 3047 158 150 69 327 386 4138 2669 82 2 237 1284 8 416 50 326 127 65 205 0 2045 -43 0 -43 10 7441 11579 7529 88 -9 11659 0 0 0 11682 11682

17:00 49.95 3307 3062 342 453 153 331 114 4455 2689 88 2 237 1285 11 422 20 330 127 66 206 0 2048 -62 0 -15 10 7463 11918 7071 -392 -8 11518 0 0 0 11536 11536

18:00 49.92 3296 3051 444 703 245 336 79 4859 2760 194 15 237 1285 21 424 8 334 127 69 206 0 981 0 26 -3 10 6693 11552 6318 -375 -9 11169 0 0 0 11195 11195

19:00 50.01 3257 3015 247 317 137 329 128 4172 2676 111 12 237 1285 14 425 1 334 120 70 206 0 500 -39 0 -1 10 5959 10130 5777 -181 -8 9941 0 0 0 9943 9943

20:00 50.02 3209 2970 194 112 62 300 180 3818 2573 65 0 234 1285 7 423 0 328 120 69 206 0 500 -65 0 -32 10 5721 9540 5581 -140 -7 9392 0 0 0 9394 9394

21:00 50.00 3167 2930 176 59 33 298 220 3716 2517 53 0 198 1285 5 416 0 295 87 69 206 0 503 -173 0 -91 10 5378 9094 5312 -65 -7 9021 0 0 0 9025 9025

22:00 50.06 3144 2909 186 86 42 298 244 3766 2457 31 0 199 1291 4 410 0 242 70 68 206 0 503 -250 0 -120 10 5120 8886 4915 -205 -7 8675 0 0 0 8675 8675

23:00 49.99 3231 2991 171 170 83 303 269 3987 2654 110 12 221 1295 7 410 0 308 112 68 206 0 591 -3 20 -100 10 5923 9910 5900 -23 -6 9881 0 0 0 9887 9887

24:00 50.01 3217 2978 148 157 70 300 265 3919 2606 96 2 221 1298 8 410 0 316 111 68 213 0 591 -3 26 -94 10 5878 9797 5750 -129 -6 9663 0 0 0 9665 9665

Avg. 49.98 3329 3083 193 186 83 311 423 4279 2626 97 3 225 1293 7 413 42 316 111 66 209 0 1241 -53 37 -84 10 6557 10836 6460 -98 -7 10732 0 0 0 10742 10742

00 TO 06 HRS.

49.97 3290 3046 112 104 51 303 275 3890 2606 147 1 218 1297 7 409 0 309 102 64 217 0 591 0 134 -116 10 5998 9888 5946 -51 -5 9831 0 0 0 9840 9840

06 TO 12 HRS.

49.97 3538 3279 242 222 103 310 706 4862 2647 80 4 226 1298 4 410 96 323 115 66 209 0 1974 -74 0 -73 10 7314 12176 7209 -105 -8 12063 0 0 0 12075 12075

12 TO 18 HRS.

49.95 3283 3040 231 271 108 326 492 4468 2669 84 4 237 1286 8 416 72 326 125 66 204 0 1868 -50 4 -74 10 7254 11723 7143 -111 -8 11603 0 0 0 11621 11621

06TO 18 HRS.

49.96 3411 3159 237 246 105 318 599 4665 2658 82 4 231 1292 6 413 84 325 120 66 206 0 1921 -62 2 -74 10 7284 11949 7176 -108 -8 11833 0 0 0 11848 11848

18 TO 24 HRS.

50.01 3204 2966 187 150 71 305 218 3896 2581 77 4 218 1290 7 416 0 304 103 69 207 0 531 -89 8 -73 10 5663 9559 5539 -124 -7 9429 0 0 0 9432 9432

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Devia -tion

Export to MS

Minutes of 67th OCCM of MP 53

Page 56: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.95 2892 3100 208 0 0 3105 3105 3057 3304 247 0 0 3309 3309 2955 2855 -100 0 0 2859 2859 190 249

2:00 49.97 2861 2940 80 0 0 2943 2943 3022 3174 151 0 0 3176 3176 3020 2973 -46 0 0 2976 2976 190 254

3:00 49.98 2793 2957 164 0 0 2959 2959 2935 3183 247 0 0 3185 3185 3111 3118 7 0 0 3121 3121 191 249

4:00 50.00 2772 2948 176 0 0 2949 2949 2955 3168 213 0 0 3169 3169 3158 3195 37 0 0 3196 3196 190 237

5:00 49.94 2775 2944 169 0 0 2949 2949 2939 3159 219 0 0 3164 3164 3192 3188 -3 0 0 3194 3194 190 241

6:00 49.98 2867 2916 49 0 0 2918 2918 3058 3244 185 0 0 3247 3247 3380 3429 49 0 0 3432 3432 188 244

7:00 49.97 2995 3137 143 0 0 3141 3141 3146 3396 250 0 0 3400 3400 3706 3862 156 0 0 3867 3867 180 246

8:00 50.01 3038 3105 67 0 0 3106 3106 3269 3327 58 0 0 3329 3329 3874 4037 163 0 0 4039 4039 180 252

9:00 49.99 2992 3026 34 0 0 3029 3029 3240 3374 134 0 0 3377 3377 3866 3997 132 0 0 4001 4001 180 248

10:00 50.00 2945 2970 25 0 0 2971 2971 3191 3308 117 0 0 3310 3310 3805 3912 108 0 0 3914 3914 180 254

11:00 49.98 2859 2900 41 0 0 2902 2902 3093 3196 104 0 0 3199 3199 3655 3679 24 0 0 3682 3682 175 250

12:00 50.00 2737 2654 -83 0 0 2655 2655 2942 2962 20 0 0 2964 2964 3497 3570 73 0 0 3571 3571 174 240

13:00 49.99 2700 2744 44 0 0 2746 2746 2848 2986 138 0 0 2988 2988 3631 3824 193 0 0 3826 3826 174 225

14:00 49.97 2657 2686 29 0 0 2689 2689 2879 2956 78 0 0 2960 2960 3710 3938 228 0 0 3943 3943 174 222

15:00 49.95 2623 2693 70 0 0 2698 2698 2852 2963 111 0 0 2968 2968 3713 3983 270 0 0 3989 3989 174 216

16:00 49.93 2629 2697 68 0 0 2703 2703 2844 2964 120 0 0 2970 2970 3741 3990 249 0 0 3999 3999 173 229

17:00 49.93 2633 2732 99 0 0 2738 2738 2857 3006 149 0 0 3012 3012 3645 3783 138 0 0 3791 3791 174 228

18:00 49.92 2797 2934 137 0 0 2941 2941 2947 3048 101 0 0 3055 3055 3549 3512 -37 0 0 3521 3521 175 233

19:00 49.98 3026 3213 187 0 0 3215 3215 2967 3065 97 0 0 3067 3067 3397 3249 -147 0 0 3252 3252 176 243

20:00 50.02 3017 3196 179 0 0 3197 3197 2955 2992 37 0 0 2993 2993 3170 3019 -151 0 0 3020 3020 178 240

21:00 50.02 2963 3128 165 0 0 3128 3128 2880 2922 42 0 0 2922 2922 3024 2871 -153 0 0 2872 2872 180 245

22:00 50.02 2951 3040 89 0 0 3040 3040 2880 2926 46 0 0 2927 2927 3012 2757 -255 0 0 2758 2758 181 253

23:00 49.98 3035 3215 181 0 0 3218 3218 3106 3439 333 0 0 3441 3441 3148 3021 -127 0 0 3023 3023 180 251

24:00 50.00 2990 3169 179 0 0 3170 3170 3163 3379 217 0 0 3381 3381 3128 2978 -150 0 0 2979 2979 181 252

Avg. 49.98 2856 2960 104 0 0 2963 2963 3001 3143 142 0 0 3146 3146 3420 3448 27 0 0 3451 3451 180 242

00 TO 06 HRS. 49.97 2826 2967 141 0 0 2970 2970 2995 3205 211 0 0 3208 3208 3136 3126 -9 0 0 3130 3130 190 246

06 TO 12 HRS. 49.99 2928 2965 38 0 0 2967 2967 3147 3261 114 0 0 3263 3263 3734 3843 109 0 0 3845 3845 178 248

12 TO 18 HRS. 49.95 2673 2748 74 0 0 2752 2752 2871 2987 116 0 0 2992 2992 3665 3838 174 0 0 3845 3845 174 225

06TO 18 HRS. 49.97 2800 2857 56 0 0 2860 2860 3009 3124 115 0 0 3128 3128 3699 3841 141 0 0 3845 3845 176 237

18 TO 24 HRS. 50.00 2997 3160 163 0 0 3162 3162 2992 3120 129 0 0 3122 3122 3146 2983 -164 0 0 2984 2984 179 248

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- October 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 67th OCCM of MP 54

Page 57: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.98 2966 2963 -3 0 0 2966 2966 3243 3257 14 0 0 3260 3260 3169 2993 -176 0 0 2995 2995 216 236

2:00 49.97 2859 2737 -122 0 0 2740 2740 3125 3064 -61 0 0 3067 3067 3325 3255 -71 0 0 3258 3258 218 237

3:00 49.98 2796 2804 8 0 0 2806 2806 3050 3178 128 0 0 3181 3181 3555 3608 53 0 0 3611 3611 219 233

4:00 49.98 2780 2806 26 0 0 2808 2808 3114 3194 80 0 0 3196 3196 3638 3737 99 0 0 3740 3740 215 219

5:00 49.96 2847 2849 2 0 0 2852 2852 3173 3251 79 0 0 3255 3255 3672 3713 41 0 0 3717 3717 217 225

6:00 49.98 2960 2850 -110 0 0 2853 2853 3324 3349 25 0 0 3352 3352 3960 4011 51 0 0 4015 4015 216 220

7:00 49.95 3274 3259 -15 0 0 3265 3265 3540 3735 195 0 0 3741 3741 4569 4606 37 0 0 4614 4614 210 241

8:00 49.98 3487 3348 -139 0 0 3351 3351 3917 3800 -118 0 0 3803 3803 5062 5038 -24 0 0 5043 5043 209 240

9:00 49.97 3487 3350 -137 0 0 3354 3354 3956 3999 43 0 0 4004 4004 5064 5094 30 0 0 5100 5100 208 231

10:00 49.98 3457 3329 -128 0 0 3332 3332 3929 3941 12 0 0 3945 3945 4951 4952 2 0 0 4957 4957 208 229

11:00 49.98 3361 3251 -110 0 0 3253 3253 3816 3812 -4 0 0 3814 3814 4630 4575 -54 0 0 4578 4578 208 222

12:00 49.99 3175 2903 -271 0 0 2906 2906 3578 3400 -177 0 0 3403 3403 4476 4583 106 0 0 4586 4586 209 239

13:00 49.99 3160 3042 -119 0 0 3044 3044 3484 3622 138 0 0 3624 3624 4902 4991 90 0 0 4994 4994 202 214

14:00 49.98 3072 2929 -143 0 0 2931 2931 3571 3571 -1 0 0 3573 3573 4935 5072 138 0 0 5076 5076 202 208

15:00 49.95 3022 2888 -134 0 0 2893 2893 3499 3498 0 0 0 3504 3504 4861 5017 156 0 0 5025 5025 205 224

16:00 49.94 3015 2947 -68 0 0 2953 2953 3462 3489 27 0 0 3496 3496 4827 4995 168 0 0 5005 5005 205 228

17:00 49.95 3223 3068 -155 0 0 3072 3072 3648 3591 -57 0 0 3597 3597 4737 4626 -111 0 0 4634 4634 206 233

18:00 49.92 3327 3271 -56 0 0 3279 3279 3603 3467 -136 0 0 3475 3475 4305 4195 -110 0 0 4205 4205 206 236

19:00 50.01 3237 3290 53 0 0 3290 3290 2985 2951 -34 0 0 2952 2952 3602 3455 -147 0 0 3456 3456 206 245

20:00 50.02 3122 3190 68 0 0 3191 3191 2874 2796 -78 0 0 2797 2797 3314 3163 -151 0 0 3164 3164 206 243

21:00 50.00 3024 3088 64 0 0 3089 3089 2753 2665 -88 0 0 2666 2666 3155 3029 -126 0 0 3031 3031 206 239

22:00 50.06 2914 2902 -13 0 0 2902 2902 2707 2648 -58 0 0 2648 2648 3073 2895 -178 0 0 2895 2895 206 230

23:00 49.99 3044 3098 54 0 0 3100 3100 3197 3406 209 0 0 3408 3408 3273 3154 -119 0 0 3156 3156 206 222

24:00 50.01 2985 3027 42 0 0 3028 3028 3274 3306 32 0 0 3307 3307 3271 3108 -162 0 0 3109 3109 213 221

Avg. 49.98 3108 3049 -59 0 0 3052 3052 3368 3375 7 0 0 3378 3378 4097 4078 -19 0 0 4082 4082 209 230

00 TO 06 HRS. 49.97 2868 2835 -33 0 0 2837 2837 3171 3216 44 0 0 3219 3219 3553 3553 -1 0 0 3556 3556 217 228

06 TO 12 HRS. 49.97 3373 3240 -133 0 0 3243 3243 3789 3781 -8 0 0 3785 3785 4792 4808 16 0 0 4813 4813 209 234

12 TO 18 HRS. 49.95 3137 3024 -113 0 0 3028 3028 3544 3540 -5 0 0 3545 3545 4761 4816 55 0 0 4823 4823 204 224

06TO 18 HRS. 49.96 3255 3132 -123 0 0 3136 3136 3667 3660 -7 0 0 3665 3665 4776 4812 36 0 0 4818 4818 206 229

18 TO 24 HRS. 50.01 3054 3099 45 0 0 3100 3100 2965 2962 -3 0 0 2963 2963 3281 3134 -147 0 0 3135 3135 207 233

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- November 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 67th OCCM of MP 55

Page 58: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 10.10.2018 in 220kv s/s Damoh: On dated 10.10.2018at around 07:50

Hrs. M.P system was normal and frequency of National Grid was 49.91 Hz.At 07:55 Hrs, B-ph CT of 132 kvDamoh-Tejgarhckt burst at 220kv s/s Damoh,resulting in the tripping of following feeders :

160 MVA X-mers I & II at 220kv Damoh, 132kv Damoh-Hatta ckt 132 kvDamoh-Tejgarhckt,

This caused the total interruption in 220kv Damohs/s, 132kv s/s Damoh,132kv s/s Batiagarh,132kv s/s Narsinghgarh.There was load loss of around 90 MW and no generation loss. Supply restored by charging 160 MVA X-mers-Iat 08:13 hrs and later supply extended to all nearby s/s gradually.

2. System Disturbance on 09.11.2018 in 400kv s/s Pithampur: On dated 09-11-2018 at 04:30 hrs. M.P system was normal and frequency of National Grid was 49.98 Hz, at 04:37 hrs, 400/220KV 315MVA ICT-II ,Y- Ø C.T (400 KV side) burst at 400kv s/s Pithampur. Due to which 400 KV Busbar-II Protection Operated,resulting in the tripping of followingelements :

400/220 kv 315 MVA X-mers I & II 400kv Pithampur-SSTPSckt-I & II 400kv Pithampur-Indore(PGCIL)ckt-I & II 400kv BUS tie 400kv 2*50 MVAR Bus reactor

No any system and areas affected as load managed by other nearby feeders and

transformers.There was no load loss and no generation loss. Supply restored by charging Bus at 05:33 hrs . As per the received information the burst C.T.was replaced by a new one, Make- ABB on dtd:10.11.2018 at 12:53 Hrs.

3. System Disturbance on 20.11.2018 in 220kv s/s Tikamgarh: On dated 20-11-2018 at 12:00 hrs.

M.P system was normal and frequency of National Grid was 50.17 Hz, at 12:03 hrs, 132kv Y- Ø P.T burst at 220kv s/s Tikamgarh , resulting in the tripping of followingelements :

220/132kv160 MVA X-mers I & II 132kv Tikamgarh-Bijawarckt

This caused total supply interruption at 220kv s/s Tikamgarh , 132kv s/s Tikamgarh , 132kv s/s

Prithvipur, 132kv s/s Jatara, 132kv s/s Budhera, 132kv s/s Digoda. There was load loss of 151 MW and no generation loss. Supply restored by132kv Bijawarckt at 12:58 hrs .Later the supply extended to nearby s/s.

*********

Minutes of 67th OCCM of MP 56

Page 59: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-8.1.2

132KV33KV132KV33KV132KV33KV132KV33KV132KV33KV

NOTE:- New Transformer add in substation please marke Below

REMARKS

2

PREVIOUS READING

WITH TIME & DATE

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS

1

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

EXPORT

ASSESEMENTMETER SERIAL NO.

MF

1

2

PREVIOUS READING WITH TIME & DATE

M.P. POWER TRANSMISSION COMPANY LTDNAME OF T & C CIRCLE :-

CONSU- MPTION (MWH)

MFSl. No.

132KV/33KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) MONTH:-

NAME OF SUBSTATION

ASSESEMENT

IMPORT

4 2

1

3

3

5

Minutes of 67th OCCM of MP 57

Page 60: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-9.2 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220KV MUGALIACHAAP CB FAULTY CLOSE

1 132KV KHATEGAON CB OPEN CLOSE

1 132/33 KV 50 MVA XMER (HV SIDE) CB OPEN CLOSE

24-10-2018ASHTA 400 KV S/S

ASHTA 400 KV S/S

HANDIA 220 KV S/S

ITARSI 220 KV S/S

Minutes of 67th OCCM of MP 58

Page 61: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400/220 315 MVA XMER-4(HV & LV SIDE) CB OPEN CLOSE

1 220/132 160 MVA XMER-2(HV SIDE) CB FAULTY CLOSE

1 132/33 KV 20 MVA XMER -1 CB FAULTY CLOSE

BHOPAL 400 KV S/S

BERASIYA 132 KV S/S

MANDIDEEP 220 KV S/S

Minutes of 67th OCCM of MP 59

Page 62: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV SABALGARH-2 CB FAULTY CLOSE2 132 KV SABALGARH-1 & 2 MW,MVAR3 132 KV BARODA MW,MVAR4 132/33KV 63MVAX-MER-2(HV) MW,MVAR

1 220/132KV 120MVAX-MER(LV) CB FAULTY CLOSE

1 220 KV SHIVPURI- 1 CB FAULTY CLOSESABALGARH 220 KV S/S

SHOEPURKALAN 132 KV S/S

WRONG DIRECTIONWRONG DIRECTION

WRONG VALUES

GWALIOR 220 KV S/S

Minutes of 67th OCCM of MP 60

Page 63: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

1 132KV BUS VOLTAGE 113 133

1 220 KV SATNA 1 CB FAULTY CLOSE

1 132KV 63 MVA XMER (PRI) CB FAULTY CLOSE2 132 KV KYMORE CB FAULTY CLOSE3 160 MVA XMER 2 (SEC) CB FAULTY CLOSE4 134 KV INTRECONNECTOR 2 CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY1 132 KV WAIDHAN 2 220 KV SILPARA (REWA)3 220 KV ANUPPUR 4 220 KV SHAHDOL

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLEAMARPATAN 132 KV S/S

Telemetry freequently N/C

KOTAR 220 KV S/S

SATNA 220

WAIDHAN 132 KV S/S

Minutes of 67th OCCM of MP 61

Page 64: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

1 132 KV UDYAPUR 1 CB N/A CLOSE

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLECHICHLI 20 KV S/S

Minutes of 67th OCCM of MP 62

Page 65: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site1 132 KV BUS VOLTAGE/ FREQUENCY N/A 132/502 220 KV BUS 2 VOLTAGE 191 225

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site1 132 KV BUS DONGARGRAH MW/MVAR 26/16 ;-40/20

SEONI 220 KV S/S

KIRNAPUR 132 KV S/S

Minutes of 67th OCCM of MP 63

Page 66: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

1 132kV BUS Voltage Not Coming

1 132kV Seilvolta CB OPEN CLOSE2 132/33 TRF CB OPEN CLOSE

SITAMAU 132 KV S/S

MEGHNAGAR 132 KV S/S

Minutes of 67th OCCM of MP 64

Page 67: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

2 400kV ISP-II Reactor CB OPEN CLOSE

1 220/132 TR3 SEC SIDE MW,MVAR N/C2 132kV SEZ CB FAULTY CLOSE3 132kV INTCC-1 CB FAULTY CLOSE4 132kV SRF CB FAULTY CLOSE

1 220/132 TRF3 (Pri) CB OPEN CLOSE2 220/132 TRF2 Sec CB faulty CLOSE2 132/33 TRF1 Pri CB Open CLOSE3 132kV Intcc-1 & 2 CB FaULTY CLOSE

PANSEMAL 132KV S/SNote:- All the CB's are suspected.

Note:- All the CB are coming suspect from fieldCHHEGAON 400KV S/S

PITAMPUR 220 KV S/S SECTOR-1

JETPURA 220 KV S/S

INDORE 400 KV S/S

Note:- All the CB are coming suspect from fieldPITAMPUR 220 KV S/S(CHEMTROL RTU)-SEC-3

Minutes of 67th OCCM of MP 65

Page 68: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

1 220/132 TRF3 (Pri) CB OPEN CLOSE2 220/132 TRF2 Sec CB faulty CLOSE2 132/33 TRF1 Pri CB Open CLOSE3 132kV Intcc-1 & 2 CB FaULTY CLOSE

CHHEGAON 400 KV S/S

Minutes of 67th OCCM of MP 66

Page 69: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Name at SLDC end at site end

1 400 KV AASTHA 1 & 2 LINE REACTOR N/A

1 GENERATOR 3 MW/MVAR N/A2 GEN NO 3 RGMO N/A

1 400 KV STN TRANSFORMER 5A MW 150 32 STN TR 1 ,2 (220 KV ) CB NA CLOSE3 220 KV BUS TIE CB NA CLOSE4 220 /33 KV TR CB/MW/MVAR NA5 GEN 1 CB FAULTY CLOSE6 400 KV BUS 1 FREQ 49.79 49.987 220 KV BUS 2 VOLTAGE 264 2308 GEN NO.1,2,3,4 RGMO N/A

1 GEN 3 CB OPEN CLOSE

1 GEN NO 1 ,2 RGMO N/A

1 GEN 4 CB FAULTY CLOSE2 33 KV Rajisthan feeder MW/MVAR N/A3 Gen 5 MVAR 7 24 132 Manasa MW 56 525 132 KV BUS 1 KV 127 1316 132 KV BUS 2 FREQUENCY 50.12 50.047 132 KV BUS 2 KV 120 131

GANDHI SAGAR H P S

BARGI

SATPURA T P S

SINGHA JI phase 2 S T P S

S G T P S

RAJGHAT H P S

Minutes of 67th OCCM of MP 67

Page 70: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Sr.No Parameter Field value Scada value /status1 ISP –INDORE 400 KV Feeder 1 (MVAR) 40 4022 ISP –NAGDA 400 KV Feeder (MVAR) 50 5043 GENERATOR 5 & 6 MAVR 5 N /A4 ALL CB N/C5 GENERATOR (OFF CONDITION) N/C6 400 KV BUS 1& 2 VOLTAGE , FREEQUENCY N/C

ISP

Minutes of 67th OCCM of MP 68

Page 71: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Annexure-9.5Sub Station name RTU MAKE SOE verified ANUPPUR 220 DFE yesBALAGHAT 132 DFEBHANEGAON 132 DFEBOREGAON 132 DFEBINA 220 DFEBINA 400 DFE yesBIRSINGPR 220 DFE yesBIJAWAR 132 KV S/S DFECHHATARPR 220 DFECHHINDWRA 132 DFECHHINDWRA 220 DFECHICHLI 220 DFECHAURAI 132 DFEGADARWARA 132 DFEJABALPUR 220 DFEKATNI 220 DFEKATNI 400 DFEKOTAR 220 DFEKHAPA SWAMI DFEKYMORE 132 DFEMAJGAWAN DFEMADHOTAL 132 DFEMANSAKRA 132 DFENAINPUR DFENARSINGPR 220 DFEPANDURNA 220 DFEPONDAR DFEPANAGAR 220 DFEREWA 132 DFESAGAR 220 DFE YESSATNA 132 DFESATNA 220 DFESHAHDOL 220 DFE yesSEONI 132 DFESIRMOR DFESIDHI 220 DFESUKHA 220 DFETIKAMGRAH 220 DFEUMARIYA 132 DFE YESUMRETH 132 DFESHAHPURA DFEBAIRAGARH DFEBETUL 220 DFEBHOPAL 220 DFEGUNA DFEGWALIOR DFE yesHANDIA DFEHOSHANGABAD DFEITARSI 220 DFEMEHGAON DFE yes

Minutes of 67th OCCM of MP 69

Page 72: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

MALANPUR DFE yesPIPARIYA 220 DFERAJGARH BEORA DFESARNI DFESABALGARH DFE yesSHIVPURI DFE yesVIDISHA DFEGWALIOR 2 DFE yesDATIYA 220 DFE YESASHOK NAGAR DFEGANJBASODA DFEMUNGALIYA CHHAP DFEMORENA DFE yesBHOPAL 400 DFE yesASTHA 400 DFEASTHA 132 DFEAMLA DFEKHILCHIPUR DFEGUDGAON DFEICHHAWAR DFEVIJAYPUR 132 DFE yesMANDIDEEP 132 DFEMUNGAWALI DFECHANDERI 132 DFERAISEN 132 DFE

SEHORE 132 DFE

AYODHYANAGAR132 DFE

BERASIA 132 DFE

PACHORE 132 DFE

SIRONJ 132 DFE

BETUL 132 DFE

MULTAI 132 DFE

DATIA 132 DFE yes

SEMRIHARCHAND 132 DFE

BANKHEDI 132 DFE

KOTHIYA 132 DFE

KURAWAR DFE

BIAORA 132 KV DFE400 KV Indore DFE YES400 Kv Chhegaon DFE yes400 KV Julwaniya DFE YES220 kv South zone Indore DFE yes220 Kv Chhanera DFE yes200 Kv Indore North Zone DFE yes220 kv Jetpura Indore DFE yes220 Kv Mangliya DFE yes220 kv Pithampur Sec-I DFE yes220 kv Dhar DFE yes220 kv Rajgar DFE YES220 kv Barwaha DFE yes220 kv Nepa DFE YES

Minutes of 67th OCCM of MP 70

Page 73: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

132 kv Petlawad DFE yes132 kv kukshi DFE YES132 pansemal DFE yes132 kv Bahadarpur DFE YES132 Kv Chambal DFE yes132 kV Chhegaon DFE YES400 Kv Nagda DFE YES220 kv Nagda DFE YES220 KB Bhanpura DFE yes200 Kv Daloda DFE YES220 Kv Ratlam DFE YES220 Kv Badnagar DFE yes220 Kv neemauchh DFE YES220 Kv Ujjain DFE YES220 Kv Badod DFE YES220 Kv Dewas DFE YES220 Kv Shujalpur DFE YES220 kV Shajapur DFE YES220 Kv Suwasra DFE yes132 KV Sailana DFE YES132 Kv Khachrod DFE YES132 Meghnagar DFE yes132 KV Jaora DFE yes132 Kv Khachrod DFE YES132 KV Sanwer DFE yes132 Ratangar DFE YES132 Kv Sitamau DFE yes132 KV Ingoriya DFE yes132 Kv Bherugar DFE YES132 kv Alot DFE yes132 kv Depalpur DFE yes132 Kv Agar DFE yes132 KV Susner DFE yes132 KV Ghosla DFE YES132 Kv Ratadiya DFE YES132 Kv Dews BNP DFE YES132 Kv Polikalan DFE YES132 KV Arnikalan DFE yes132 Sonkatchh DFE YES132 KV Shankargar DFE yes132 KV Kannod DFE yes132 kv Chapda DFE YES132 Kv Shujalpur DFE YES 132 kv Berchha DFE YES132 kv makshi DFE yes132 Kv Mominbadodiya DFE YES132 Kv Makdone DFE YES132 KV Suwasra DFE YES220 kv DAMOH DFE YES132 kv KOTMA DFE YES132 KV SARANGPUR DFE YES132 KV PICHORE DFE132 KV MORWA DFE132 KV WAIDHAN DFE132 KV TARANA DFE yes132 KV MALHARGARH DFE yes

Minutes of 67th OCCM of MP 71

Page 74: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

ANNEXURE-9.9.iS.NO. NAME OF SUB-STATION VOLTAGE LEVEL

1 BINA 4002 BHOPAL 4003 KATNI 4004 INDORE 4005 NAGDA 4006 SGTPS 400 & 2207 ISP 4008 JP BINA 4009 BINA-PG 400

10 ITARSI-PG 40011 DAMOH-PG 40012 KSTPS 40013 SHUJALPUR-PG 40014 DEHGAM 40015 ASOJ 40016 RAJGARH-PG 40017 INDORE-PG 40018 BHOPAL-BDTCL 400

Minutes of 67th OCCM of MP 72

Page 75: MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED … · at Annexure-2.1. The brief detail of frequency profile is given here under:- MINUTES FOR 67TH MEETING OF OPERATION & COORDINATION

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Forward(ZF) Reverse(ZR)

Positive sequence

impedance

Substation Name

Line Name / X'mer

CT/CVT Ratio

PT Ratioline length in

Km

Zone-I

Zone-2

Zone-3

Zone-4 Power Swing Blocking

Annexure-9.9.II

Negative sequence

impedance

Zero sequence

impedance Relay Type

Voltage Level

Minutes of 67th OCCM of MP 73