mag sur rpt proj 191 sunday creek area€¦ · section 77 (19) 8** "mining claims aitemd"...

32
consul 32L04SE9483 2.5836 SUNDAY "LAKE" 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 191 Sunday Creek Area, Ontario (To Accompany Maps 82-120 A to H) RECEIVED AUG 3 01982 MINING LANDS SECTION August 24, 19S2

Upload: others

Post on 23-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

consul32L04SE9483 2.5836 SUNDAY "LAKE"

010

Magnetic Survey for

DOME EXPLORATION (CANADA) LIMITEDon

PROJECT 191

Sunday Creek Area, Ontario

(To Accompany Maps 82-120 A to H)

RECEIVEDAUG 3 01982

MINING LANDS SECTION

August 24, 19S2

Page 2: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

- l -

INTRODUCTION

A magnetic survey was carried out for Dome Exploration

(Canada) Limited on Project 191 in June, 1982.

g Tlie property is located east and west of Sunday Creek,

immediately northwest of Sunday Lake, 92 miles northeast of

~ Cochrane, Ontario from where access was made by aircraft.

l The purpose of this survey was to identify magnetic

environments conducive for gold mineralization. Numerous magnetic

l structures of relatively low magnetic relief were outlined.

l The accompanying maps show the area surveyed and the

results obtained.

A technical data sheet is appended to this report.

l

l

l

l

l

l

l

Page 3: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

- 2 -

RESULTS

Map A

Numerous, isolated small anomalies, up to kOQ gammas

above background, were located in this area. The magnetic pattern

is rather random.

Map B

A discrete band of magnetic material, about 250 feet

wide, appears to strike under the south end of the lake from 16+50N

between 336E and 3^0E to UN between 368E and 372E on Map E.

Map C

There is relatively little magnetic relief in this area.

Map D

The magnetic pattern is rather random in this area.

A small, sharp anomaly, 800 gammas above background, was located

on Line 268E at 2^+505.

Maps E and F

The magnetic pattern suggests a different rock-type

underlying this area compared with the area to the north. There

appears to be a geological contact, or fold axis, marked by a

Page 4: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

l l lm series of magnetic "lows", extending from Line 300E, 2N (Map E)

to Line 40^E, 25S (Map F) e Numerous magnetic "highs", up to

l 1^00 gammas above background, were located which are part of a

series of east-southeast striking structures.

j Maps G and II

There is little magnetic relief in these areas except

l for the northwest corner of Map H where there is an anomaly

extending down from Map F,

l

l

l

l

l

l

REG OMMENDATIO NS

l These results should be used in conjunction with

detailed geological mapping and the knowledge of the known geology

' to determine the areas favorable for further exploration.

l

lGEOSEARCII CONSULTANTS LIMITED

J. A. Woodard, P. Eng.

Geophysicist

Page 5: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

32L04SE9483 2.5036 SUNDAY LAKE 300

1984 01 05 Your File: 229 Our File : 2.5036

Mining RecorderMinistry of Natural ResourcesGO Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

RE: Geophysical (Magnetometer) Survey on Mining Claims P 618311 et al in the Sunday Lake Area.

The Geophysical (Magnetometer) Survey assessment work credits as listed with ay Notice of Intent dated December 9, 1963 have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly,

J.R. MortonActing DirectorLand Management Branch

Whitney Block, Room 6643Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380

D. K1nv1g:sc

cc: Dome Explorations (Canada) Ltd Suite 2700l First Canadian Place Toronto, Ontario

cc: Resident Geologist Timmins, Ontario

cc: Mr. G.K. FergusonMining 4 Lands Commissioner Toronto, Ontario

Page 6: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry of Technical Assess Natural ... , . .. m Resources Work Credits

Ontario 4^fc

mont "i*2.5036

Det* , Mining Recorder'* Report of1983 12 09 workfio. 22g M

Recorded HolderDOME EXPLORATION (CANADA) LIMITED

Township or AreaSUNDAY LAKE AREA

Type of survey and number of Assessment days credit per claim

Geophysical

20 , Maflnetometfir days

Rariinmatrie days

Other days

Section 77 (19) 8** "Mining Claims Aitemd" column

Geological day*

Gflochfimical days

Man days G Airborne D

Special provision H Ground Q

D Credits have been reduced because of partial

coverage of claims.

d! Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Au****d

P 618321 618430 620511 - 12 620583 620597

Special credits under section 77 (16) for the following mining claims

No credits have been allowed for the following mining claims

l l not sufficiently covered by the survey l . 1 Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary In order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical 80; Geological 40; Geochemical 40; Section 77(19) 60:

828 (83/6)

Page 7: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry ofNaturalResources

ntario

1983 12 09

Your (ile:

Our file:

229

2.5036

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

Enclosed are two copies of a Notice of Intent with statements

listing a reduced rate of assessment work credits to be allowed

for a technical survey. Please forward one copy to the recorded

holder of the claims and retain the other. In approximately

fifteen days from the above date, a final letter of approval of

these credits will be sent to you. On receipt of the approval

letter, you may then change the work entries on the claim record

sheets.

For further information, if required, please contact

Mr. F.W. Matthews at 416/965-1380.

Yours very truly,

^Anderson ^ector

Land Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316D. Kinvig:mc - -

Ends: " -- '^- -'-'. .

cc: Dome Exploration (Canada) Limited P.O. Box 270 Suite 2700l First Canadian Place Toronto, Ontario M5X l HI

Mr.G.H. FergusonMining S Lands CommissionerToronto, Ontario

845

Page 8: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry ofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1983 12 09

2.5036/229

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

846 (82/b)

Page 9: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry ofNaturalResources

OntarioR^ou

Report of Work(Geophysical, Geological, Geochemical and Expenditures)

The Mining ActType of Survey(s)

MagneticClaim Holder(s)

Or*

ructions: — Please type or print.— tf number of mining claims traversed

exceeds space on this form, attach a list. Note: — Only days credits calculated in the

"Expenditures" section may be entered in the "Expend. Days Cr." columns.

not use sliddtW .'limn In lin [Township or Area

junday^Lake Area (M.3003)

Dome Exploration (Canada) Limited A. 21304Address

P.O. Box 270, Suite 2700, l First Canadian Place, Toronto, Ontario, M5X 1H1Survey Company

Geosearch Consultants Ltd.Date of Survey (from Si to)

08 , 03 83Day l Mo. l Yr.

11 , 03 83Day j Mo. | Yr.

Total Miles of (ine Cut8

Name and Address of Author (of Geo-Technical report)

_______J. A. Woodard, Ste. 700, 88 University Avenue, Toronto, Ontario, M5J 1T6Credits Requested per Each Claim in Columns at right Mining Claims Traversed (List in numerical sequence)Special Provisions

for first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Geophys cal Days per Claim

- Electromagnetic 1

1 - Magnetometer Arj

i [ - Radiometric

- Other

Geological !

Geochemical

Man Days Geophys Days per

cal ClaimComplete reverse side

. ,, , , - Electromagnetic and enter total(s) here i a

- Magnetometer

RECOlVif- Othe

SEP 1 3

Airborne CWM'^^J U/^INIJ

Note: Special provisions credits do not apply to Airborne Surveys.

|l!83*'c

^~ t owietricJ —— ————r

3

Geochemicalfe SCCY'^ ————————*~* ' i Days per

Claim

; Electromagnetic

Magnetometer i

Radiometric

Expenditures (excludes power stripp ng)Type Of Work Performed

Performed on Claim(s)

Calc ulation of Expenditure Days uredits

Total Expenditures

S -r

Total Days Credits

15 =

Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

Date Re

August 30, 1983 ^

-

:orded Ho ^

Certification Verifying Report of Wofihereby certify that 1 have a personal

or witnessed same during and/or after itName and Postal Address of Person Certify

L. B. HalladayP.O. Box 270, Suite 27( 1 First Canadian Place,

ter or Agent (Signature)

6^*fc-^fc-*Cc-J-Jff^.-^ *

Mining ClaimPrefix Number

p. 618321

618430

620511

620512

620583

620597

*N.B. ReporToj?en

^9 cnT

"~^*") " " * ^

Shrpr-' . ,:x -

Expend. Days Cr.

:s and"S" so A 2|U? *"

1 II —

. . .*

,'^r'[ bc

For Office Use OnlyTotal Day Recorded

2f"t Cr. Date Recorded ,

^^4^4^-1 i/o ^J

Hi je 54!

i

C

Date /ypproved a5 Recorded

Mining ClaimPrefix

ps sul Your I 6

3

Number

Knitted to'ile Nos.

i? n9^

JT^ Ax^

X

vPV^r'

Total number of mining claims covered by this report of work. f^sil^ 1**^ \tf***

rrfrrj^tjftl^^^^^^^^^^^WWM*^*

Expend. Days Cr.

6U^J !3f — ik

Bd0lOflal wrung Hdcoraer;

—— —— id [i^Viaftbknotal^cigefcf th* feots t*K| cproplePten aj&l th* agneged (^portjs

i :. ; 0r:53 fflA.M. '

JL P f f

i b^orifcoj l 'dntarloV M5X

-th in the Report of Work annexed hereto, having performed the work •ue.

j Date Certified

1M1 Ajgust 30, 1983Cerjeg^u^^^

Page 10: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

5.5036?

1983 06 06 2.5036

Mr. Will1am L. GoodMining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

RE: Geophysical (Magnetometer) Survey on Mining Claims P618311 et di 1n the Sunday Lake Area

The Geophysical (Magnetometer) Survey assessment work credits as listed with my Notice of Intent dated Ray 12, 1983 have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly,

E. F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380

D. K1nv1g:mc

cc: Dome Exploration (Canada) Limited Toronto, Ontario Attention: E. Plgulskl

cc: Mr. J.A. Woodard Toronto, Ontario

cc: Mr. G.H. FergusonMining S Lands Commissioner Toronto, Ontario

cc: Resident Geologist Timmins, Ontario

Page 11: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Miihoii} utNatural Resources

Ontarig

Report of WoiU,, .j," i) (Geophysical, Geological, Geochemical and Expenditures)

The Mining Act

Instructions: — Please typti or prim.— If number of mining claims traversed

exceeds space on this form, attach a list.— Only days credits calculated in the

"Expenditures" section may be entered in the "Expend. Days Cr," columns.

— Do not use shaded areas below.Type of Survey(s)

MagneticClaim Holder(s)

Dome Exploration (Canada) Limited "Survey Company Survey Dates (Mr

Geosearch Consultants Ltd e Day | MO. | Y

Township or Area

W. of Sunday

A21304iBcutting to office) iTotel^ 24,08 82r. Day Mo, 1 Yr.

Name and Address of Author (of Geo-Technical report)

J. A. Woodard, Suite 700, 88 University Ave 0 , Toronto, Onto M5J

LakeiWMNNo.

Miles of Una Cut 111

1T6Special Provisions Credits RequestedInstructions

For flrit lurvey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days {for each)

Geophyiloal

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Days per Claim

40

Man DaysInstructions

Complete reverse side - and enter total (s) here

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Days per Claim

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys,

Electromagnetic

Magnetometer

Radiometric

Days per Claim

Expenditures (excludes power stripping)Type of Work Performed

Performed on Claim(s)

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

Report CompletedDate of Report

An*. 24. 1982Recorded Holder or Agent (Signature)

,*' /^ J-' , ,i c r - f s-/le '.'^ \, .Certification Verifying Report of Work

Mining Claims Traversed (List in numerical sequence)Mining Claim

Praflx

(See

* ' f

ro K r, i

AM

Numbar

Attached)

f

f ftt !

J

PINE MINING DIVI5

t— P-fC— li— W— E-

uu s o i"P?

'!^. — !..-Jl^

Expand, Diyi Cr,

:

(v

fi J

l J0V*7\V

ON

f)]

P M

———

y

Mining ClaimPrefix

R

MINI

X-

RE

R'ocoi

Numbar

prF*"lCVa. fc- '

SEP 17 W82

40 LANu^ ^

CJ^B DI

ATT(T3~Cn9B?

)fNO;.....,..,,.

Expend, Days Cr,

-D

ewew

D

Total Dayi Cr, Recorded

For Office Use OnlyDate Recorded ,

to/ #Date Ap'proved'as Recorded

Total number of mining claims covered by this report of work, 129

M i n 1 \n

Regional Mlnlna Recorder

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

J, A. Voodard, Suite 700, 88 University Ave., Toronto, Ont. M5J 1T6Data Certified

08/24/82l by (Signature)

Page 12: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry ofNaturalResources

Technical Assessment

Work CreditsOntario

1983 05 12Recorded Holder

DOME EXPLORATION (CANADA) LIMITEDTownship or Area

SUNDAY LAKE.AREA

Type of survey and number of Assessment days credit per claim

GeophysicalElectromagnetic

40Magnetometer

Radiometric

Induced polarization

77(19)Section H&ll^K^X.

Geological

Geochemical

Man days ED Airborne

Special provision EXJ Ground

days

days

days

days

days

days

days

D

Q

Q Credits have been reduced because of partialcoverage of claims.

CD Credits have been reduced because of correctionsto work dates and figures of applicant.

77(16)

Mining Claims Assessed

P 618311 to 20 incl618322 to 39 incl618414 to 29 incl618431 to 39 incl620513 to 44 incl620546-47

620574620576 to 81 incl620584620586 to 89 incl620591 to 96 incl620598 to 609 incl620625 to 29 incl

Special credits under sectionXP&^XSAQrtor the following mining claims

20 days Mag

P 618321 618430 620511-12 620545

620583620597

No credits have been allowed for the following mining claims

not sufficiently covered by the survey l_l Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 86(18)-60:

828

Page 13: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ontario

Ministry ofNaturalResources

1983 05 12

Your file:

Our file: 2.5036

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins t OntarioP4N 2S7

Dear Sir:

Enclosed are two copies of a Notice of Intent with state ments listing a reduced rate of assessment work credits

to be allowed for a technical survey. Please forward one

copy to the recorded holder of the claims and retain the

other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent

to you. On receipt of the approval letter, you may then

change the work entries on the claim record sheets.

Yours very truly,

E.F. AndersonDirectorLands Administration Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM?A 1W3Phone: 416/965-1316

D.Kinvig:sc

cc: Dome Exploration (Canada) Limited Toronto, Ontario Attn: E. Plgulski.

cc: Mr. J.A. Woodard Toronto, Ontario

cc: Mr. G.H. FergusonMining 4 Lands Commissioner Toronto, Ontario

845 (6/79)

For further Informaton, 1f required, please contact Mr. F.W. Matthews at 416/965-1380.

Page 14: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Ministry ofNaturalResources

Notice of Intent

for Technical ReportsOntario

1983 05 12

2.5036

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

846 (82/5)

Page 15: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

CLAIM NO.

P-618311

618,312 '

618313618314618315618316618317618318618319618320

618321618322

618323

618324

618325

618326

618327

618328

618329

618330

618331

618332

618333

618334

618335

618336

618337

618338

618339

618414618415

618416618417618418618419618420618421618422

618423618424618425618426618427

CLAIM NO.

P-618428

618429

618430618431

618432'618433618434618435618436618437618438618439

** i

620511620512620513620514620515620516620517620518620519

620520620521620522620523620524620525620526620527620528620529620530620531620532620533620534620535620536620537620538620539620540620541

CLAIM NO t

P-620542

620543

620544

620545

620546

620547

620574

620576

620577

620578

620579

620580

620581

620583

620584620586620587620588620589620591620592

620593620594620595620596620597620598620599620600620601620602620603620604620605620606620607620608620609620625620626620627620628620629

Page 16: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

f Ontario

Ministryof Geotechnical Sees Report

Approval

File

3- 5036

Mining Lands Comments

To: Geophysics

Comments

D-ftpproved | | Wish to see again with corrections

To: Geology - Expenditures

Comments

J~J Approved | | Wish to see again with correctionsSignature

To: Geochemistry

Comments

Approved \\ Wish to see agai n with correctionsDate Signature

To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

1693(81/10)

Page 17: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

1982 09 27 2.5036

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

W* have received reports and naps for a Geophysical (Magnetometer) Survey submitted under Special Provisons (credit for Performance and Coverage) on Mining Claims P 618311 et al in the W. of Sunday Lake Area.

This material will be examined and assessed and a statement of assessment work credits will be issued.

Tours very truly

B.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone 416/965-1316

J. Skuratsc

ccs Dome Exploration (Canada) Limited Toronto, Ontario Attn: E. Pigulski.

Page 18: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Dome Exploration (Canada) Limited

Executive Office

DELIVER

Mr. Fred W. Matthews Administrator, Projects Section Lands Administration Branch Ministry of Natural Resources Whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3

P.O. Box 2701 First Canadian PlaceToronto, OntarioM5X1H1(416) 364-3453Telex 065-24590

August 27, 1982

Our Project No. 191

Dear Mr. Matthews:

Re: Mining Claims P.618311 et al ___-Sunday Lake Area (M.3003)

enclose herewith, in duplicate, a report and plan by Geosearch Consultants Limited (J. A. Woodard) covering a Magnetic Survey performed on 129 mining claims located in the Porcupine Mining Division.

This submission is made under the Special Provisions Regulations as to 40 days per claim.

For your information and records, we are enclosing a copy of our letter together with a copy of the Report of Work, relevant to this submission, which we are mailing to the Mining Recorder in Timmins, Ontario.

Please date-stamp the enclosed copy of this letter and return it to me.

Yours very truly,

DOME EXPLORATION (CANADA) LIMITED

EAP:ts Enclosure

Edward A. Pigulski Assistant Secretary

PLEASE DATE-STAMP AND RETURN TO E. A. PIGULSKI

Member of the Dome Mines Group

RECEIVEDLand Management Branch CIRCULATE CDCOMMENTS Plf'.SE BY

'KM TO '\'. r. t--'i :". O

Page 19: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Dome Exploration (Canada) Limited

Executive Office

REGISTERED

Mr. William L. GoodMining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioPAN 2S7

Copy For: Mr. Fred W. Matthews

P.O. Box 2701 First Canadian PlaceToronto, OntarioM5X 1H1(416) 364-3453Telex 065-24590

August 27, 1982

Our Project No. 191

Re: Mining Claims P.618311 et al -Sunday Lake Area (M.3003)

Dear Mr. Good:

Enclosed is Report of Work covering a Magnetic Survey (40 days for each claim) performed by Geosearch Consultants Limited, (J. A. Woodard) on the 129 mining claims as shown on the list attached to the Report of Work.

We will be forwarding the survey report and plan in duplicate, for this survey to Mr. Fred W. Matthews within the prescribed period. This assessment work is being filed under the Special Provisions Regulations.

Yours very truly,

DOME EXPLORATION (CANADA) LIMITED

EAP:ts Enclosures

Edward A. Pigulski Assistant Secretary

c.c. Mr. Fred W. Matthews

Member of the Dome Mines Group

Page 20: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

o Dome Exploration (Canada) p 0 Bo* 270l " "x J 1 F' rst Canadian Place UmitGCl Toronto, Ontario

M5X1H1 (416) 364-3453Telex 065-24590

Executive OfficeAugust 27, 1982

DELIVER

Mr. Fred W. MatthewsAdministrator, Projects SectionLands Administration Branch Our Project No. 191Ministry of Natural ResourcesWhitney Block, Room 6450Queen ' s ParkToronto, OntarioM7A 1W3

Re: Mining Claims P. 618311 et al -Sunday Lake Area (M. 3003)

Dear Mr. Matthews:

We enclose herewith, in duplicate, a report and plan by Geosearch Consultants Limited (J. A. Woodard) covering a Magnetic Survey performed on 129 mining claims located in the Porcupine Mining Division.

This submission is made under the Special Provisions Regulations as to 40 days per claim.

For your information and records, we are enclosing a copy of our letter together with a copy of the Report of Work, relevant to this submission, which we are mailing to the Mining Recorder in Timmins, Ontario.

Please date-stamp the enclosed copy of this letter and return it to me.

Yours very truly,

DOME EXPLORATION (CANADA) LIMITED

-***

t?Edward A. Pigulski Assistant Secretary

EAP:ts Enclosure

Member of the Dome Mines Group

Page 21: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

l l l l l l

Qntarjo

Ministry of Natural Resources

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

Fi Ir

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

^TECHjVICj\L REPORT^MUST^^CONTAININTERPRETATION, CONCLUSIONS ETC.

MagneticType of Survey(s) —Township or Area West of Sunday Lake————.————Claim Holder(s) Dome Exploration (Canada) Limited

Survey finmpny Geosearch Consultants Ltd.—————-

Author of Report J* A. Voodard___________.————Suite 700, 88 University Ave.,

Address of Author Toronto, Ont.——MJJ 1T6————————Covering Dates of SnrvcyJIay to Aufc, 24. 1982_______

Total Miles of Line Cut. HI(linecutting to office)

SPECIAL PROVISIONSCREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.

Geophysical

—Mfigrnrtompter...,

— Rrtrfjorriftrio.

-Other

OpoohPrri'Cal _ —

DAYS per claim

40

AIRBORNE CREDITS (Special provision credits do not apply to airborne lurveyi)

.Electromagnetic. . Radiometric(enter days per claim)

nATR-Aug. 24/82 SIGNATURE:.Author of Report or Agent

Res. Geol.. .Qualifications.Previous Surveys

File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

P-618311 to """6Wi""to" 618339

6181/39""'

620511 to 620547

620574

620576 to

620583 to

620581

620584

620586 to

620591 to

620625 to

620589

620609

620629

TOTAL CLAIMS 1 29

837 (5/79)

Page 22: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

GEOPHYSICAL TECHNICAL DATA

lNumber of Stations.

Station interval ——Profile scale —-———.

Contour interval

mole l lian one survey, specify data for each type of survey

5101

100 feet.Number of Readings .Line spacing

5^ 3**

feet

5 O fcammas

l

u*~*H W ^O

u*-H

Z Z,O< Ss'bw,-J w.

Instrument Scintrex Model MP-2 Proton Magnetometer

Accuracy - Scale constant 1 gammaDiurnal correction method Base station recorder with readings every 30 seconds,

Base Station check-in interval (hours)_________i_______________________________—— Base Station location and value 288E, ON 39,^28 gammas__________. ————.-—————

InstrumentCoil configuration Coil separation — Accuracy ——.—^ Method: Frequency————

Parameters measured.

d Fixed transmitter D Shoot back D In line O Parallel line

(specify V.L.F. nation)

Instrument,Scale constant.Corrections made.

Base station value and location .

Elevation accuracy

Q

Instrument .——^———— Method D Time Domain

Electrode array Electrode spacing . Type of electrode

f~l Frequency Domain

RESISTIVITY

Parameters — On time .- Off time

— Delay time . ,— fnfgrftirm time

Power

Frequency

Range

Page 23: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground
Page 24: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

0.

•U f

SO

^ y •O -P

soo

#

\

o

os

O to

VV

V\

II

/^

\

Page 25: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

JL

Con

tour

in

terv

al................................

50 g

amm

as

50 g

amm

a co

nto

ur.

....

....

....

....

250g

amm

a co

nto

ur.

....

....

....

....

....

...

1000

gam

ma

co

nto

ur.

....

....

....

...,

....

..

Dep

ress

ion

. ..

....

....

....

...

....

.. .

......

IN)

6A

MM

A9

ABSO

LUTE

: VAL

UES^

ADD

1=0

,000

TO

P

LO

TT

ED

g

EA

DlN

J(S

S

A- &

AS

C S

tAT

l^tO

A

T B

.L-O

M

LIM

E

Key

MAP

ZZ^Z

- A^

Z2s^ p

B e G

C F M

TO

TA

L

FIE

LD

M

AG

NE

TO

ME

TE

R.

byG

EO

SE

AR

CH

C

ON

SU

LT

AN

TS

L

IMIT

ED

-fo

r

DOM

E EX

PLO

RATI

ON

(CAN

ADA)

LI

MIT

EDPR

OJE

CT

191

s n

Ma

p

HP

AT

S-

SU

ND

AY

CR

EE

K, O

NT

AR

IO

- l

ineK

-t-o

2sD

O F

EE

T-

M.H

-M82

-120

A32L04SE9403 2.5036 SUNDAY LAKE

S0

0

Page 26: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

RE

AD

ING

S 1

KJ

©A

M/r

tAS

FOR

ABSO

LUTE

: VAL

UES,

, ADD

59,

000

TO P

LOTT

ED R

EADI

NGS

Con

tour

in

terv

al..

....

....

....

.. .

....

....

...

....

50

gam

mas

50 g

amm

a co

ntou

r

250

gam

ma

cont

our

1000

gam

ma

cont

our

~~

T ~J?

KEV

MA

P

- &

AS

E S

TA

TIO

K)

AT

B.L

. O

N).

LI W

ET

Dep

ress

ion

A Vn E G

C F M

TO

TA

L

FIE

LD

MA

GN

ET

OM

ET

ER

S

UR

VE

Yby

GE

O5E

AR

CH

CO

MS

ULT

AM

TS L

IMIT

ED

•for

DO

ME

E

XP

LO

RA

TIO

N

(CA

NA

DA

) L

IMIT

ED

PROJ

ECT

191

SU

ND

AY

CR

EE

K.O

NT

AR

IO

32LB4SE9433 2.5836 SUNDAY LAKE

210

Lo

ca

+io

n M

ap

- 1

IH^K

4-0

200

- M

.H,M

-8Z

-120

B

Page 27: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

42

3 62

05

77

6Z

05

1 1

400

6-2

O5

G2

O5

Z1

G2052O

G2O

583

G2O

525

TO

TA

L.

FIE

LD

M

A&

Wfe

TO

ME

TE

Rby

GE

OS

EA

RC

M C

ON

SU

LTA

NTS

LIM

ITE

D•f

or

Con

tour

in

terv

al...

....

....

....

....

....

....

....

. 50

ga

mm

as

50 g

amm

a co

ntou

r

250

gam

ma

cont

our

1000

gam

ma

cont

our

Dep

ress

ion.

...

.,..

....

... ..

....

...

.........(

A

^

KE

Y

/V\A

PIW

G

AM

MA

S

FOR

ABSO

LUTE

: VAL

UC.S

, AP

O S

9yoo

o G

AM

MA

ST

O P

LO

TT

ED

R

EA

DIN

GS

DOME

EXP

LORA

TION

(CAN

ADA)

LI

MIT

EDP

RO

JEC

T 1

91A

T e.U

.OM

^

LI W

E

5U

ND

AV

C

RE

EK

', O

NT

AR

IO

on

Ma

p H

&Z-1

ZO C

32

L0

4S

E9

40

3

2.5

036

SU

ND

AY

LA

KE

Page 28: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

618428

GI8

42

7

G1S

43O

61

3/4

31

(31843

61

84

36

618439

-13-

2.3

TO

TA

L

FIE

LD

M

AG

NE

TO

ME

TE

Rb

y

GEO

SEAR

CH

CO

WSU

LTAN

T5 L

IMIT

ED

for

Con

tour

in

terv

al

50 g

amm

a co

ntou

r

250

gam

ma

cont

our

000

gam

ma

cont

our

Dep

ress

ion

50 g

amm

as

DO

ME

EX

PLO

RAT

ION

!(C

ANAD

A)

LIM

ITED

P

RO

JEC

T 1

91S

UN

DA

Y

CR

EE

K, O

NT

AR

IO

SC

AL

E"-

1 in

ch

to

RS

R A

BS

OL

UT

E^

VA

LU

ES

, A

DD

5

9,O

OO

G

AM

MA

S

TD

P

LO

TT

ED

R

EA

DIN

GS

Loca

tion

Map

tf)n

Map

H

82-1

20 D

32L04SE94a3 2.5036 SUNDAY LAKE

230

Page 29: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

62

05

9

62O

S97

62

05

94

-

2O&

OO

G2O

&O

4

2.21

0605

62

O6

O7

62

OG

O8

TO

TA

L

FIE

LD

M

AG

NE

TO

ME

TE

R

SU

RV

ET

yby

GEO

SEAR

OH

CO

MSU

LTAN

TS L

IMIT

ED

•for*

Con

tour

in

terv

al

50 g

amm

a co

ntou

r 25

0 ga

mm

a co

ntou

r 10

00 g

amm

a co

ntou

r D

epre

ssio

n

DO

ME

EX

PLO

RA

TIO

N)

(CA

NA

DA

) L

IMIT

ED

PR

OJE

CT

191

SU

ND

AV

CR

^EK

, O

NT

AR

IO

SCAL

E" -

1 in

ch -

to Z

OO

FO

R A

BS

OLU

TE

VA

LU

ES

, A

DP

59,

OO

O G

AM

MA

S

TO

PLO

TT

ER

R

EA

DIN

GS

e.L.

ow; L

.IME:

S2-

120E

32L84SE9403 2.5036 SUNDAY LAKE

Page 30: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

Con

tour

in

terv

al..

...

50 g

amm

a co

ntou

r.

250

gam

ma

cont

our.

1000

gam

ma

cont

our.

Dep

ress

ion

.

50 g

amm

asIN

A&SO

UU

TE V

ALU

ES,

AOD

SA

MM

AS

T

O

PL

OT

TeP

KE

Y M

AP

— B

ASE:

AT

236

e:

A D

e E G

C

^^

^^ H

PATE

:-

TO

TA

L

FIE

LD

M

AG

ME

TO

ME

TE

Rby

G

EO

SE

AR

CH

CO

NSU

LTAN

TS L

IMIT

ED

-f c?

r

DO

ME

E

XP

LO

RA

TIO

N

(C A

W A

D A

) L

IMIT

ED

PR

OJE

CT

19

1S

UM

DA

V

CC

EE

^O

KJ

TA

RlO

SC

ALE

- 1

incH

-te

Z

OO

feet

1982

.o

n

Map H

L.

32La4SE9403 2.5036 SUNDAY LAKE

82-lZ

OF

2B

0

Page 31: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

40

S

SO

S

Ul

^

vn enin

Vu ^J- va CO

lu 00

va CO

UJ OsJ

VuUJ

O

oo

—C

onto

ur

inte

rval................................

50

gam

mas

50 g

amm

a co

nto

ur.

.........................

250

gam

ma

co

nto

ur.

.......................

1000

gam

ma

co

nto

ur.

....

....

....

....

....

,.,

Dep

ressio

n........................ .

......

IM

GA

MM

AS

FO

R A

BS

OL

UT

E

VA

LU

ES

, A

DD

59,O

OO

GA

MM

AS

TO

PL

OT

TE

D R

EA

DIN

GS

B

AS

E

ST

AT

ION

) A

T e

.L.

OW

;

32L04SE9403 2.5036 SUNDAY LAKE

260

MA

P

-D

e

M

TOTA

L,

FIE

LD

M

AG

NE

TO

ME

TE

R:

by

GE

OS

EA

RC

H C

OW

SU

LTA

NTS

LIM

ITE

D

DATC

-

DOAA

E EX

PLOR

ATIO

N (C

ANAD

A) L

IMIT

EDP

RO

JEC

T 1

91S

UN

DA

Y C

RE

EK

', O

NT

AP

lO

SC

ALE

- 1

inch -

to

on

H-

MH

M8Z

-1ZO

G

Page 32: MAG SUR RPT PROJ 191 SUNDAY CREEK AREA€¦ · Section 77 (19) 8** "Mining Claims Aitemd" column Geological day* Gflochfimical days Man days G Airborne D Special provision H Ground

62

0S

43

Sunday

Lake

*

SU

RV

EY

AR

EA

G2O

547

Lo

catio

n

Map

inch

-te

? -

TOTA

L FI

ETUO

MAG

NET

OM

ETER

by

GE

OS

EA

RC

H C

ON

SULT

ANTS

LIM

ITE

D-f

or

Con

tour

in

terv

al...

....

....

....

....

....

....

....

. 50

gam

mas

50 g

amm

a co

ntou

r

250

gam

ma

cont

our

[OO

Oga

mm

a co

ntou

r

Depre

ssio

n............... ..

....

...

....

....

.(

^"1

~

Key

MAP

RE

AD

ING

S

IN)

GA

MM

AS

FOR

AB

SO

LU

TE

V

AL

UE

S,

AO

D 5

9,0

00

GA

MM

AS

TD

P

LO

TT

ED

R

EA

DIN

GS

DO

ME

EX

PLO

RA

TIO

N

(CA

NA

DA

) LI

MIT

ED

PR

OJE

CT

191

SU

ND

AV

CR

EE

K,

ON

TA

RIO

SC

ALE

- l

inch

+0

ZOO

AT

B

.L.O

lsJ

LIM

E

&2

.-1

ZO

H2

70