main house roof...
TRANSCRIPT
-
/ /SCALE:- 1:50 @ A0
DRAWING No:-
ESSEX, CO76HA
HIGH STREET, DEDHAM,
OLD EXCHANGE,
QUINLAN & FRANCIS TERRY LLP
MAIN HOUSE ROOF PLAN
KILNWOOD, BURNHAM BEECHES, BUCKS
5TH MARCH 2012
MAIN HOUSE ROOF PLAN
545 545
545
545
545
545
FACE OF MAIN HOUSE WALL
FACE OF MAIN HOUSE WALL
FACE OF MAIN HOUSE WALL
FACE OF MAIN HOUSE WALL
SLATE LINE TO EAVESSLATE LINE TO EAVES
SLATE LINE TO EAVES
SLATE LINE TO EAVES
SLATE LINE TO EAVES
SLATE LINE TO EAVES
FACE OF FASCIA BOARD
FACE OF FASCIA BOARD
FACE OF FASCIA BOARD
FACE OF FASCIA BOARD
FACE OF FASCIA BOARD
FACE OF FASCIA BOARD
3
54 6 7 9
C
B
A
D
E
2
8
4672 FACE OF MAIN HOUSE WALL TO OF STEEL
4672 F
AC
E O
F M
AIN H
OU
SE W
ALL T
O O
F S
TEEL
4672 FACE OF MAIN HOUSE WALL TO OF STEEL
100 WALL PLATE
100 WALL PLATE
100 W
ALL P
LA
TE
100 W
ALL P
LA
TE
100 W
ALL P
LA
TE
100 W
ALL P
LA
TE
23451275
1139
2282
32541906
6420
7580
2200
2080
1300013000
16200
150
LEAD FLAT ROOF DRIP
LEAD FLAT ROOF DRIP
OF HOUSE
150 M
IN
449
458
OF STEEL OF ROOFLIGHT
150 MIN
AIR FLOW
AIR FLOW
TO DRAWING NO. 1257/3/10
FOR DETAIL OF LEAD DRIP REFER
PLATEAU RANGE TO SUIT SIZES SPECIFIED ON PLAN
EMAIL: [email protected]
TEL: 01993-830613
OXFORDSHIRE OX7 6XU
SHIPTON - UNDER - WYCHWOOD,
MILTON ROAD,
UNIT 8, WYCHWOOD BUSINESS CENTRE,
THE ROOFLIGHT COMPANY
ROOFLIGHT TO BE FROM
AIR FLOW
AIR FLOW
LEAD FLAT ROOF EITHER SIDE OF ROOFLIGHT
DASHED LINE INDICATES PROFILE OF
AIR FLOWAIR FL
OW
NEATLY UNDER BULGE OF WOOD ROLL.
THE TOP SLATE TO ENABLE LEAD TO BE DRESSED
BASE OF WOOD ROLLTO BE SET 5MM ABOVE
LAP OVER MAIN ROOFING FELT.
DRESSED EVENLY OVER RIDGE AND
600MM WIDE STRIP OF ROOFING FELT
150
FLOW OF AIR MOVEMENT.
TIMBER AT 300MM C/C'S TO ENABLE CROSS
20MM DIA HOLES DRILLED THROUGH RIDGE
250 X 38MM RIDGE TIMBER
NAILS AT 300MM C/C'S.
FREE EDGES OF LEAD WITH O.7MM THICK COPPER
LESS THAN 200MM. PROVIDE CLIPPING ALONG
COVER BY LAP JOINT WHICH SHOULD NOT BE
CLOUT NAILS TO THE TOP OF EACH SHEET AND
AND FIXED TO WOOD ROLL WITH 6 NO. COPPER
FLASHING TO BE NO GREATER THAN 1500MM
CODE 5 LEAD FLASHING TO RIDGE. LENGTH OF
HIP
RIDGE
ROOF AND LEAD PEDIMENT ROOF
THRO VALLEY BETWEEN SLATE
1:5 SCALE SECTION TAKEN
(HIP SIMILAR)
THRO SLATE ROOF RIDGE.
1:5 SCALE SECTION TAKEN
75 X 38 TILTING FILLET
225 X 5
0 R
AFTER
TO SIDES OF RAFTERS.
CUT BETWEEN RAFTERS ON 32 X 50 NOGGINS FIXED
RAFTERS & 18MM EXTERIOR QUALITY VALLEY BOARDS
4MM EXTERIOR QUALITY PLYWOOD LAID ACROSS
WOOD CORE ROLL NOTCHED OVER LEAD
SPACED AT NOMINAL 400 C/C'S
50 X 50 COUNTER BATTENS
TIMBER BOARDS AND LEAD SHEETS
SEPARATING MEMBRANE BETWEEN
220 LAP
CODE 6 LEAD PEDIMENT ROOF
250 X 50 VALLEY RAFTER
150 MIN
150
150
50 x 50 BATTENS
50MM WIDE AND FIXED UNDER WOOD ROLL.
STEEL CLIPS AT 500 C/C'S. CLIPS TO BE MIN
TERNE COATED AUSTENITIC GRADE STAINLESS
ROOF SLOPE MIN 150MM WITH 0.46 THICK
EX 75 X 75 WOOD ROLL DRESSED DOWN
OF CODE 6 LEAD WITH LAPS OF 200MM ON
RIDGE FORMED USING 1500MM LONG STRIPS
PACKER TO THE TOP FOR FIXING WOOD ROLL TO.
250 X 50 RIDGE TIMBER WITH TIMBER
THRO RIDGE TO PEDIMENT ROOF
1:5 SCALE SECTION TAKEN
OF ROOFLIGHTOF STEEL
902
FOR ROOFLIGHT STRUCTURAL OPENING
225 X 50 TIMBER TRIMMERS
150 M
IN
VALLEY
HIPHIP
HIP
VALLEY
VALLEY
VALLEY
VALLEYVALLEY
CHIMNEY
DINING ROOM
CHIMNEY
HALL
CHIMNEY
TV ROOM
CHIMNEY
DRAWING ROOM
CHIMNEY
LIBRARY
CHIMNEY
KITCHEN
12702350200
875
361445330(RFL 6)
ROOFLIGHT
900 x 600
(RFL 1)
ROOFLIGHT
450 x 600
(RFL 2)
ROOFLIGHT
900 x 600
(RFL 4)
ROOFLIGHT
900 x 600
445
445
2792
2510
445
3690
4405
EITHER SIDE OF ROOFLIGHT.
TO HAVE LOCALLY ADJUSTED FALLS TO SHED WATER
LEAD AREA BETWEEN ROOFLIGHT AND LEAD DRIP
LINE OF GUTTER
LINE OF GUTTER
LINE OF GUTTERLINE OF GUTTER
LINE OF GUTTER
LINE OF GUTTER
1720
1237
1720
1720
HIP
18371783
150
FOR ROOFLIGHT STRUCTURAL OPENING
225 X 50 TIMBER TRIMMERS
TO SIDES OF RAFTERS.
CUT BETWEEN RAFTERS ON 32 X 50 NOGGINS FIXED
RAFTERS & 18MM EXTERIOR QUALITY VALLEY BOARDS
4MM EXTERIOR QUALITY PLYWOOD LAID ACROSS
75 X 38 TILTING FILLET
TO TOP OF RAFTERS
38 X 225 LAY BOARD FIXED
CODE 6 LEAD VALLEY
THRO MAIN ROOF VALLEY
1:5 SCALE SECTION TAKEN
150
HATCH
ROOF ACCESS
634
1237
2451
1268
2580 2580
225 x 5
0 R
AFTER
225 X 5
0 R
AFTER
150 150
125 MIN
6800 3620 5160 3620 6800 2200
2200
OF STEEL OF ACCESS HATCH
447
TO DRAWING NO. 1257/3/10
FOR DETAIL OF LEAD DRIP REFER
FOR ROOFLIGHT STRUCTURAL OPENING
225 X 50 TIMBER TRIMMERS
EITHER SIDE OF ROOFLIGHT.
TO HAVE LOCALLY ADJUSTED FALLS TO SHED WATER
LEAD AREA BETWEEN ROOFLIGHT AND LEAD DRIP
EMAIL: [email protected]
FAX:+44 (0)1922 714099
TEL:+44 (0)1922 711185
WS2 7NL
WEST MIDLANDS.
WALSALL,
LEAMORE CLOSE, LEAMORE ENTERPRISE PARK,
SURESPAN LTD
TO OPEN THE DOUBLE SKINNED LID.
COMPLETE WITH GAS SPRING ASSISTED OPENING TO ENSURE THE MINIMUM OF EFFORT
SINGLE LEAF ROOF HATCH CLEAR OPENING SIZE 600 X 600 SRH78SURESPAN
TAKEN THRO ROOF ACCESS HATCH
1:5 SCALE SHORT SECTION
WITH MANUFACTURERS DETAILS AND SPECIFICATION
ROOF HATCH TO BE FITTED IN ACCORDANCE
398
HIP
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 5)
UBBINK UB39 SLATE VENTS TO
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 5)
UBBINK UB39 SLATE VENTS TO
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 4)
UBBINK UB39 SLATE VENTS TO
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 4)
UBBINK UB39 SLATE VENTS TO
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 3)
UBBINK UB39 SLATE VENTS TO
TO VECTOR DESIGN DETAILS
HEAT RECOVERY UNIT (HR 2)
UBBINK UB39 SLATE VENTS TO
RIDGE
S04 EXTRACT FANS
CONNECTED TO
TEL. 0845 0098 980
FROM NICHOLSON
ROOF VENTILATORS
AIRTRACK LV9X LEAD
S06 EXTRACT FANS
CONNECTED TO
TEL. 0845 0098 980
FROM NICHOLSON
ROOF VENTILATORS
AIRTRACK LV9X LEAD
CONNECTED TO SVP (STACK 2 & 4)
FROM NICHOLSON TEL. 0845 0098 980
AIRTRACK LV9X LEAD ROOF VENTILATORS
SVP (STACK 1)
UBBINK UB39 SLATE VENT TO
SVP (STACK 6)
UBBINK UB39 SLATE VENT TO
F16 EXTRACT FAN
UBBINK UB39 SLATE VENT TO
SVP (STACK 3)
UBBINK UB39 SLATE VENT TO
1364
1481
1560
(RFL 8)
ROOFLIGHT
600 x 600
(RFL 9)
ROOFLIGHT
600 x 600
1:5 SCALE SHORT SECTION TAKEN THRO ROOFLIGHTS RF 1, 2, 4 & 9 1:5 SCALE SHORT SECTION TAKEN THRO ROOFLIGHT RF 6
1257 3 14 C3
C3
REV C3 - EXTRACT VENTS TO S02 OMITTED - 04/11/14
DRAFT ISSUED FOR CLIENT COMMENT - 28/10/14
REV C2 - LEAD CODE REVISED - 12/06/14
REV C1 - CONSTRUCTION ISSUE - 4/12/13
REVISIONS