Page 1: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Maintenance Plan for the Maintenance Plan for the Chicago PM2.5 Chicago PM2.5

Nonattainment AreaNonattainment Area

Illinois Environmental Illinois Environmental

Protection AgencyProtection AgencyJuly 14, 2010July 14, 2010

1

Page 2: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

The Maintenance PlanThe Maintenance Plan The maintenance plan provides for The maintenance plan provides for

continued attainment of the 1997 annual continued attainment of the 1997 annual PM2.5 NAAQS for the Chicago nonattainment PM2.5 NAAQS for the Chicago nonattainment area for ten years after U.S. EPA formally area for ten years after U.S. EPA formally redesignates the area to attainment.redesignates the area to attainment.

The plan provides assurances that if a The plan provides assurances that if a subsequent violation of the NAAQS occurs, subsequent violation of the NAAQS occurs, contingency measures would be triggered to contingency measures would be triggered to prevent further violations.prevent further violations.

The plan establishes motor vehicle The plan establishes motor vehicle emissions budgets to assure that increases emissions budgets to assure that increases in miles driven do not result in an increase of in miles driven do not result in an increase of emissions.emissions.

2

Page 3: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Maintenance Plan Maintenance Plan RequirementsRequirements

A comprehensive emission inventory of the A comprehensive emission inventory of the precursors of PM2.5 completed for the “attainment precursors of PM2.5 completed for the “attainment year”.year”.

A projection of the emission inventory to a year at A projection of the emission inventory to a year at least ten years following redesignation and a least ten years following redesignation and a demonstration that the projected level of demonstration that the projected level of emissions is sufficient to maintain the PM2.5 emissions is sufficient to maintain the PM2.5 NAAQS.NAAQS.

  

A commitment that, once redesignated, the state A commitment that, once redesignated, the state will continue to operate an appropriate monitoring will continue to operate an appropriate monitoring network to verify that the area continues to attain.network to verify that the area continues to attain.

3

Page 4: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Maintenance Plan Maintenance Plan Requirements, cont’d.Requirements, cont’d.

A demonstration of legal authority to A demonstration of legal authority to implement and enforce all control measures.implement and enforce all control measures.

Provisions for future updates of the inventory Provisions for future updates of the inventory to enable tracking of the emission levels, to enable tracking of the emission levels, including an annual emissions statement including an annual emissions statement from major sources.from major sources.

A commitment to submit a revised A commitment to submit a revised maintenance plan eight years after maintenance plan eight years after redesignation.redesignation.

4

Page 5: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Maintenance Plan Maintenance Plan Requirements, cont’d.Requirements, cont’d.

A commitment to enact and implement A commitment to enact and implement additional contingency control measures additional contingency control measures expeditiously in response to exceeding expeditiously in response to exceeding specified levels (triggers) or in the event specified levels (triggers) or in the event that future violations of the NAAQS occur.that future violations of the NAAQS occur.

A list of potential contingency measures A list of potential contingency measures that could be implemented in such an event.that could be implemented in such an event.

The state must hold a public hearing on the The state must hold a public hearing on the maintenance plan prior to adoptionmaintenance plan prior to adoption

5

Page 6: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Annual PM2.5 Design Values in the Chicago Annual PM2.5 Design Values in the Chicago AreaArea

2000-2002 2007-2009

6

Page 7: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

2008 Base Year Inventory2008 Base Year Inventory

Point SourcesPoint Sources– Annual emission reports, permit data, etc.Annual emission reports, permit data, etc.

Area SourcesArea Sources– Emission factors and activity levelsEmission factors and activity levels

On-road mobile sourcesOn-road mobile sources– MOBILE6.2 modelMOBILE6.2 model

Off-road mobile sourcesOff-road mobile sources– NONROAD modelNONROAD model– Other data (locomotives, commercial Other data (locomotives, commercial

marine vessels, aircraftmarine vessels, aircraft))

Page 8: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Future Year InventoriesFuture Year Inventories

2008 Base Year grown to 2015, 2020 and 20252008 Base Year grown to 2015, 2020 and 2025– Point and area sourcesPoint and area sources

Growth factorsGrowth factors Shutdowns/changes/consent decreesShutdowns/changes/consent decrees Illinois Multi-Pollutant Rule for utilitiesIllinois Multi-Pollutant Rule for utilities

– On-road mobile sourcesOn-road mobile sources MOBILE6.2MOBILE6.2

– Off-road mobile sourcesOff-road mobile sources NONROADNONROAD Growth factorsGrowth factors 33rdrd airport airport

Page 9: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Chicago PMChicago PM2.52.5, NOx, and SO, NOx, and SO22 Emissions 2002 vs. 2008Emissions 2002 vs. 2008

2002

2008

Source Category PM2.5 NOx SO2

Point Sources 3,859 35,939 90,706Area Sources 9,189 32,318 4,109On-Road Mobile Sources 1,816 99,627 575Off-Road Mobile Sources

3,653 51,184 779

Total 18,517 219,068 96,169

Source Category PM2.5 NOx SO2

Point Sources 2,757 54,050 121,598Area Sources 8,441 32,325 3,290On-Road Mobile Sources 3,071 167,620 3,850Off-Road Mobile Sources

4,834 87,426 3,743

Total 19,103 341,421 132,481

Page 10: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Chicago PMChicago PM2.52.5, NOx, and SO, NOx, and SO22 Emissions 2008 vs. 20Emissions 2008 vs. 202525

2008

2025

Source Category PM2.5 NOx SO2

Point Sources 3,859 35,939 90,706

Area Sources 9,189 32,318 4,109

On-Road Mobile Sources 1,816 99,627 575

Off-Road Mobile Sources 3,653 51,184 779

Total 18,517 219,068 96,169

Source Category PM2.5 NOx SO2

Point Sources 4,604 29,638 56,310Area Sources 10,377 33,687 4,407On-Road Mobile Sources 1,064 23,687 734Off-Road Mobile Sources 2,267 27,173 1,215

Total 18,312 114,185 62,666

Page 11: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

PMPM2.52.5 Emissions Emissions

2008 (18,517 tons/yr)2008 (18,517 tons/yr)

21%

49%10%

20%Point

Area

On-road

Off-road

2025 (18,312 tons/yr)2025 (18,312 tons/yr)

25%

57%

6%12%

Point

Area

On-road

Off-road

Page 12: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

NOx EmissionsNOx Emissions

2008 (219,068 tons/yr)2008 (219,068 tons/yr)

16%

15%

46%

23%

PointAreaOn-roadOff-road

2025 (114,185 tons/yr)2025 (114,185 tons/yr)

26%

29%21%

24%Point

Area

On-road

Off-road

Page 13: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

SOSO22 Emissions Emissions

2008 (96,169 tons/yr)2008 (96,169 tons/yr)

94%

4%1%

1%PointAreaOn-roadOff-road

2025 (62,666 tons/yr)2025 (62,666 tons/yr)

90%

7% 1%2% Point

Area

On-road

Off-road

Page 14: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

PMPM2.52.5 Emission Trend Emission Trend

0

5000

10000

15000

20000

25000

2002 2008 2015 2020 2025

Point Area On-road Off-road

Page 15: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

NOx Emission TrendNOx Emission Trend

050000100000150000200000250000300000350000400000

2002 2008 2015 2020 2025

Point Area On-road Off-road

Page 16: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

SOSO22 Emission Trend Emission Trend

0

20000

40000

60000

80000

100000

120000

140000

2002 2008 2015 2020 2025

Point Area On-road Off-road

Page 17: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Contingency PlanContingency Plan A commitment to enact and A commitment to enact and

implement additional measures in implement additional measures in the event that future violations of the event that future violations of the NAAQS occurthe NAAQS occur

Level I and Level II “Triggers”Level I and Level II “Triggers”

Control measures to be Control measures to be implemented after States implemented after States determine appropriate response determine appropriate response

17

Page 18: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Level I and Level II Level I and Level II TriggersTriggers

Level I:Level I: Annual PM2.5 > 15 ug/m3 Annual PM2.5 > 15 ug/m3 at one location in any one year, or at one location in any one year, or Adverse Emission TrendsAdverse Emission Trends

Level II:Level II: Violation of the NAAQS Violation of the NAAQS

18

Page 19: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Analysis to be Conducted Analysis to be Conducted in the Event of Future in the Event of Future

ViolationsViolations Number, location, severity of exceedancesNumber, location, severity of exceedances Weather patterns / PMWeather patterns / PM2.52.5 conduciveness conduciveness Contributing emission sourcesContributing emission sources Impacts due to transportImpacts due to transport Emission trendsEmission trends Timeliness of implementation of scheduled Timeliness of implementation of scheduled

control measurescontrol measures Availability of new control technologiesAvailability of new control technologies Geographic applicability of contingency Geographic applicability of contingency

measuresmeasures19

Page 20: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Contingency MeasuresContingency Measures

IL MPS/CPS for utilitiesIL MPS/CPS for utilities

VOC and NOx RACTVOC and NOx RACT

Best Available Retrofit Best Available Retrofit Technology (BART)Technology (BART)

Consent DecreesConsent Decrees

Enhanced Vehicle I/MEnhanced Vehicle I/M

Federal Off-Road Federal Off-Road Emissions StandardsEmissions Standards

Tier 2/Low Sulfur Tier 2/Low Sulfur Fuel StandardsFuel Standards

Heavy Duty Diesel Heavy Duty Diesel Vehicle Emissions Vehicle Emissions StandardsStandards

Consumer Products, Consumer Products, AIM, Aerosol AIM, Aerosol Coatings, Portable Coatings, Portable Fuel ContainersFuel Containers

20

Page 21: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

CommitmentsCommitments

Update Maintenance Plan Within Eight Update Maintenance Plan Within Eight YearsYears

Update Emission Inventory Every Three Update Emission Inventory Every Three YearsYears

Continue to Operate Monitoring Continue to Operate Monitoring NetworkNetwork

Enforce all Applicable Requirements in Enforce all Applicable Requirements in the State Implementation Planthe State Implementation Plan

Contingency MeasuresContingency Measures 21

Page 22: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Transportation ConformityTransportation Conformity

A Clean Air Act requirement intended to A Clean Air Act requirement intended to ensure that the implementation of ensure that the implementation of transportation plans does not:transportation plans does not:

• Cause or contribute to new air quality Cause or contribute to new air quality violationsviolations

• Worsen existing violations , orWorsen existing violations , or• Delay timely attainment of relevant air Delay timely attainment of relevant air

quality quality standards standards

Therefore, total motor vehicle emissions from Therefore, total motor vehicle emissions from the implementation of a Transportation Plan the implementation of a Transportation Plan are “capped” at specific levels identified as are “capped” at specific levels identified as “motor vehicle emissions budgets” within the “motor vehicle emissions budgets” within the State Implementation Plan State Implementation Plan 22

Page 23: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Transportation ConformityTransportation Conformity

Attainment Year motor vehicle emissions Attainment Year motor vehicle emissions budgets based on the actual vehicle miles budgets based on the actual vehicle miles travelled in 2008 in the Chicago travelled in 2008 in the Chicago Nonattainment AreaNonattainment Area

58.8 billion miles per year58.8 billion miles per year

Maintenance Plan Year 2025 budgets based Maintenance Plan Year 2025 budgets based on 2008 VMT “grown” by 1.5% per year on 2008 VMT “grown” by 1.5% per year

75.7 billion miles per year75.7 billion miles per year

23

Page 24: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Transportation ConformityTransportation Conformity

Key emissions control programs assumed Key emissions control programs assumed and incorporated into the budgets and incorporated into the budgets include:include:

• Use of Northern grade Reformulated Use of Northern grade Reformulated GasolineGasoline

• Continued operation of the Vehicle Continued operation of the Vehicle Inspection and Maintenance Program Inspection and Maintenance Program

• Implementation of the national Tier 2 light-Implementation of the national Tier 2 light-duty vehicle emissions standards and duty vehicle emissions standards and gasoline sulfur limitsgasoline sulfur limits

• Implementation of the national heavy-duty Implementation of the national heavy-duty diesel emissions standards and diesel diesel emissions standards and diesel sulfur limitssulfur limits

24

Page 25: Maintenance Plan for the Chicago PM2.5 Nonattainment Area Illinois Environmental Protection Agency July 14, 2010 1

Proposed Chicago PM2.5 Maintenance Plan

Motor Vehicle Emissions Budgets (tons per year)

Year PM2.5 NOx

2008 1,816 99,627

2025 1,064 23,687

25