MAINTENANCE PROCEDURE
MUHAMMAD REHAN KHANMAINTENANCE ENGINEER
EDC FURNACE TUBE TREE PREVENTIVE
MAINTENANCEHF-301 A/B
TUBE TREE
GENERAL ASSEMBLY VIEW
TUBE TREE
TUBE TREE
REQUIREMENTS
Cast Axle
Common Consumables
ROCOL Anti Seize compound 01 can
Kerosene 01 can
Wire Brush 04
Cotton gloves 12
Cotton Cloth 02 kg
Common Tools
Brass Hammer 5lbs 02
Combination spanner 22 02
Crow Bar 01
Other Requirements
Lifting beam 01
Rigging equipment 01
Crow Bar 01
Common Manpower
Supervisor 01
Fitter 02
Asst. fitter 01
Rigger 02
TUBE TREEJOB METHOD STATEMENT
1. Remove canopy from the top roof of furnace. It is fasten with nut bolts.
2. Carefully remove the fire cloth which protect heat from the opening between roof and Tube Tree carefully. It is binded with SS wire and strip.
Canopy
TUBE TREEJOB METHOD STATEMENT
3. Install a U-type support H-Beam which contains eye hooks to hang chain block of 10 ton capacity .
MAINTENANCE ACTIVITYJOB METHOD STATEMENT
3. The chain block will lift the tube tree up to 1/4 inch to free the Cast Axle. After removing, a spare cast axle is inserted in place. Clean all parts with kerosene.
4. Grease all parts of cast axle and rollers with high temperature ROCOL Anti Seize compound.
MAINTENANCE ACTIVITYJOB METHOD STATEMENT
5. Now do the same lifting procedure and installed back all parts after greasing.
MAINTENANCE ACTIVITYJOB METHOD STATEMENT
6. Remove U support beam and chain block.
7. Reinstall the fire cloth and then canopy.
THANK YOU