"Make Green, Go Green, by Going Lean”
2
How to Go Green?
How to Go Lean?
Why?
3
Doing nothing is not an option!
Governor Arnold Schwarzenegger signed into law emission reduction targets for California:
• By 2010, reduce GHG emissions to 2000 levels,
• By 2020, reduce the GHG emissions to 1990 levels,
• By 2050, reduce GHG emissions to 80 percent below 1990 levels
4
Green and Lean
• 15-30% of a manufacturing company’s monthly energy bill creates greenhouse gases.
• The energy management within a facility - benchmark competitors.
• Lean methodologies can be used to reduce waste in the consumption of energy within a manufacturing facility.
• The ultimate goal - eliminate equipment not needed in the process.
• If elimination is not possible, minimize the use– plot energy consumption to predict maintenance schedules
and replacement cycles.
5
Analysis of Electric Industry CO2 Impacts
• The electric industry cannot provide substantial reductions in CO2 emissions in the near future to meet goals
• Limited potential to switch to “greener energy” near-term• CO2 reduction must come from reducing demand
– supported by new energy efficient technologies– conservation programs
• A market-based collaborative systematic approach to demand reduction is a critical success factor (profit potential)
6
The Economic Case For Change
• Asset performance management can reduce energy consumption by 6% to 11%.
• DOE has established a minimum 10% energy reduction guideline as attainable through the application of proper maintenance and technology solutions.
7
G.A.S. Index: Global Asset Sustainability Index
G.A.S. Index = Availability * Performance * Quality * Energy Efficiency
• Availability = All downtime / Scheduled time• Performance = Actual output for scheduled
time / Design output for scheduled time• Quality = Total production minus defects or
rework / Total production • Energy Efficiency = Design energy
consumption/Actual energy consumption
8
Example: Motor Efficiency
90,000 Watts 100 HP 76,000 Watts
1HP = .746 kWatts
15,400 Watts (17.4%)
9
Motor Efficiency Savings
• Energy Savings = 90kW x 8,000 hrs./year x (1-(.828/.94)) = 87,336 kWh/yr.
• At an average cost of 11 cents per kWh, the estimated savings would be $9,607 per year.
• Motor operating cost: – (100 HP x .746 kW/HP x 8,000 hrs. x $.11/KWh
) / .94 efficiency = $69,838 per yr.
10
Repair v. Buy
• Break even analyses must be based on the increased cost of purchasing a new, more energy efficient equipment versus the energy consumption reduction.
• The cost energy today ranges from 10-13 cents per kilowatt-hour.
11
Lean Definition
• “A philosophy of production that emphasizes the minimization of the amount of all the resources (including time) used in the various activities of the enterprise.”
- APICS Dictionary, 10th ed.
12
Lean Enterprise
• “An enterprise with a focus on waste elimination and the customer’s needs in all parts of its operations, manufacturing and administration. Emphasis is given to lean structures and processes, flexibility of response and methods and techniques to continually seize new opportunities as they arise.”
- APICS Lean SIG
13
Early Lean Processes
Mass Production• Early 1900’s• Ford Motor Company was a pioneer• Assembly line production• High volume production• Limited number of products• Significant cost reductions
14
Today• More than 96% of all U.S. companies have less than
250 employees • Global competition / low cost labor• Demands by customers:
• Higher quality• Innovation• Mass customization• Flexibility• Lower Costs
• Limited resources
Source: U.S. Bureau of Census, 2004
15
What is Lean?• It is NOT:
• Collection of techniques or a methodology
• Reduced staffing or low inventories
• It IS:• A philosophy of manufacturing
• Totally different way of thinking
• A different value system
• Seeks to eliminate waste (non-value added activities to the customer)
• Emphasis on flow manufacturing
16
What is Lean?
Lean Production
Total Quality Management (TQM)Six Sigma
Cellular ManufacturingBusiness Process Improvement (BPI)
Just in TimeTheory of Constraints
Zero DefectsSPCTQC
Kanban
17
Lean Characteristics
• Focus is on the improvement of resource utilization:
― Equipment setup time reduced
― Scheduled machine maintenance
― Orderly, clean workplace
― Pull production being used
― JIT inventory control
― Factory layout in work cell arrangement by products
― Active error elimination
― Improved quality, etc.
18
The Importance of Waste Elimination
• Lean deals with the elimination or reduction of many types of non-value-added activities, often referred to as waste
― The driving force for waste elimination is improved value in the products and services customers buy
19
Seven Popular Wastes
• Overproduction
• Waiting
• Excessive transportation
• Inappropriate processing (the hidden factory)
• Unnecessary inventories
• Unnecessary motion
• Defects - Taiichi Ohno Toyota Production System
20
The Nature of Wastes
1. Overproduction– Target and achievement unclear– Processes not statistically capable
2. Waiting– Operators waiting– Operators slower than production line
3. Excessive Transportation– Widely spaced equipment waiting– Forklifts not available when needed
21
The Nature of Wastes (continued)
4. Inappropriate Processing– Variability in operator’s performance– Processes not statistically capable
5. Inventory– Large safety stocks– Variable procurement lead times
22
The Nature of Wastes (continued)
6. Motion– Double handling– Non-standard layouts– Equipment widely spaced from each other
7. Defects– Low material yields– Excessive process variability
23
Correcting Wastes
1. Overproduction– Eliminate by reducing setup times.– Synchronizing quantities and timing
between processes.– Make only what is needed now.
2. Waiting– Eliminate through synchronizing work flow.– Balancing uneven loads with flexible
workers and equipment.
24
Correcting Wastes (continued)
3. Excessive Transportation– Establish layouts and locations to make
transport and handling unnecessary, if possible.
4. Inappropriate Processing– Why should this item be made?– Why is each process necessary?– Are any processes being performed that
are not part of the work flow?
25
Correcting Wastes (continued)
5. Inventory– Reduce by shortening setup times.– Improving work skills.– Smoothing fluctuations in demand for the product.– Reducing all the other wastes reduces the waste
in stocks.
6. Motion– Study motion for economy and consistency.– Economy improves productivity, and consistency
improves quality. – Improve the motions, then mechanize or
automate. Otherwise, there is a danger of automating waste.
26
Correcting Wastes (continued)
7. Defects– Develop the production process to prevent
defects.– Eliminate the need for inspection. At each
process, produce no defects. – Design processes to be failsafe (Poka
yoke).– Quality processes yields quality products –
automatically.
27
Can you think of other actions to eliminate waste in your
company?
28
Leadership Function
• Initiate needed change by identifying a vision
• Aligning employees to that vision
• Motivating to achieve that vision
29
Leadership –Lean Change Infrastructure
Project & Training Plans
________________________________________________________________________________________________________________________________________________________________
___________
Vision & Lean Strategy
Value –No Waste –
Flow –Pull –
Standard Work –JIT –
ChampionCEO
Plant Management/PresidentVice President
Sponsors:Manufacturing Engineering
Quality
Lean Office
FacilitatorFacilitator Facilitator
Team Team Team Team Team Team
30
Transparent Workplace
31
Transparent Workplace
• Define Processes• Value-Added Activities• A Value-Added Step• Value versus Non-Value-Added• Value-Stream Mapping• Typical Process Flow Analysis• Visual Order – The Five S’s• Visual Control
32
• A particular method of doing something which involves a number of steps, activities, or operations
• Processes are found in manufacturing & service industries
• Example:
Transparent Workplace –Processes Definition
Grind
Type Contract
Turn Mill Drill
Obtain Signature
Type Envelope Mail
Manufacturing
Office
33
Process Map
Supplier Customer
Stamping Weld Assembly Paint Shipping
Staging
Weekly Orders
Weekly Orders
Weekly Schedule
1
2
3
4
5
Production Control
I I II
Daily Daily
Total Time: 10 DaysValue-Added Time: 6 minutes
1 Day 1 Day 2 Days 3 Days 1 Day2 Days
50 sec 40 sec 90 sec 120 sec 60 sec
Process Time Line
34
• Map customer requirements (orders)• Map order information flows• Map physical product/material flows• Map plant/office information flows• Add a process time line• Summarize current stateAsk questions at each step to
determine waste or non-value-added areas
Transparent Workplace –Value-Stream Mapping Process
35
• The % of value-creating time• The number of units of inventory
required to support a production unit• Total travel distance versus value-
creating distance
Transparent Workplace –Summarize Current State
36
• Add value to products & services that customers are willing to pay for– Improvements that change a product’s or
service’s form, fit or function
• Other activities use resources but add no value
• Some non-value-added activities may be necessary• Based on current knowledge or technology• Long term goal - Eliminate • Remaining non-value-added activities should be
eliminated now!
Transparent Workplace –
What Are Value-Added Activities?
37
• A process that physically changes the work passing through it that makes it more valuable to the customer
• A step requested by the customer - they are willing to pay for it
Transparent Workplace –A Value-Added Step
38
Transparent Workplace –Value versus Non-Value-Added
Value-Added Activities• Entering order• Ordering materials, supplies• Preparing drawings• Assembling• Shipping to customers• Processing customer deposits• Examining patients• Filing insurance claims• Dispensing event tickets• Fueling airplane
Non-Value-Added Activities• Waiting/sorting• Moving• Kitting/staging• Counting• Inspecting• Checking• Recording• Obtaining approvals• Testing• Reviewing• Copying• Filing• Revising/reworking• Tracking work - Charlene B. Adair & Bruce A. Murray,
Breakthrough Process Redesign
39
Value Stream Costing
Value Stream
OperationalSupport
Facilities & Maintenance
All otherValue
Stream Costs
ProductionLabor
ProductionMaterials
ProductionSupport
Machines &equipment
40
Traditional Accounting and Lean Controls
System/Issue Traditional Accounting
Lean
Production Inventory Control
• Work Order• Production tracking• Inventory Cycle Count
• Kanban• Visual signals• Five S
Procurement • Purchase order approval• Three way match in AP
• Key Suppliers• Master POs• Supplier Certification
Quality of Products • Detailed inspection• Rework or scrap
• Standardized work• Single-piece flow
Production Cost Control • Standard cost• Variance Reports• Analysis of Variance
• Cell/VS CSFs and measures• Analysis of Root Cause
41
Costs Outside the Value Stream
• Identify tasks not related to the Value Stream– Exp. - ISO 9000
• These costs are not allocated to the Value Stream• They are treated as sustaining costs of the business
– Budgeted– Controlled
• No need for full absorption costing• Value Stream costing proves relevant, accurate cost info
about the Value Stream
42
• Observe & record the flows of orders, materials, goods and information for a product family– Product family: A group of product variants
passing through similar processing steps that use common equipment
• Mapping identifies waste situations for improvements
Transparent Workplace –Value-Stream Mapping (VSM)
43
What are some value-added & non-value-added activities at your company?
44
• To eliminate waste, you must first find it
• Visual order makes waste evident and is a good starting point for managing resources
• Toyota Production - Five S’s as the method for exposing waste & poor utilization of resources
Transparent Workplace –Visual Order – The Five S’s
45
Sort
Set in order
Shine
Standardize
Sustain
Transparent Workplace –Visual Order – The Five S’s
46
Transparent Workplace –Lockheed & Boeing’s Six S’s
SORT SUSTAIN
STRAIGHTEN SAFETY
SHINE STANDARDIZE
6 S
47
• Sort: Classify tools, parts, instructions into necessary & unnecessary
• Set in Order: Make it visible & easy to use; 3 Es = easy to see, easy to get & easy to return
• Shine: Conduct cleanup to identify abnormalities
• Standardize: Put a system in place to readily identify abnormal conditions
• Safety: Identify & eliminate dangerous & hazardous conditions
• Sustain: Make a habit of properly maintaining & following standard practices
Transparent Workplace –The Six S’s
48
• Awareness of what’s happening– Manpower: Skill levels, performance, continuous
training– Machines: Develop Maintenance schedules and use
them– Materials: Demand Signals indicating shortages;
shadow boards for location of tools– Methods: Standard Worksheets and Operating
Procedures– Measurements: Performance trends
• Display schedule• Quality targets • Reductions in setup & lead times
Transparent Workplace –Visual Control
49
Pull versus Push Production Strategy
Value Value Stream Flow Pull Perfection
Lean Principles
50
Pull
• No one upstream should produce any good or service until the customer downstream asks for it
• Kanban
Value Value Stream Flow Pull Perfection
Lean Principles
51
Push
• Build product to forecast
• Excess inventory
• Poor utilization & distribution of product
• Filled distribution channels
• 50% of all books manufactured are shredded
Value Value Stream Flow Pull Perfection
Lean Principles
52
Pull
• Design
• Schedule based on actual demand signals
• Produce exactly what the customer wants
• Flow takes place throughout the supply chain, not just inside your production facility
Value Value Stream Flow Pull Perfection
Lean Principles
53
Pull
• Benefits
• High throughput
• Excellent protection against stock-outs
• Higher flexibility
• Less congestion
• Shorter lead times
• Higher customer service
Value Value Stream Flow Pull Perfection
Lean Principles
54
Perfection
• Begins with visualizing the “perfect” process
• Continuous process to remove waste by eliminating effort, time, space and defects
Value Value Stream Flow Pull Perfection
Lean Principles
55
Final Thoughts – Lean and Green
• There is a social responsibility component to saving energy and reducing the amount of CO2 emissions.
• Green as a marketing tool.• Select an small area with high visibility and a
manageable number of variables for the first G.A.S. Assessment and Lean project.
• The journey is never-ending and definitely not easy (especially at first) but the results are well worth the effort.