Page 1: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Managing Capacity

Chapter 6

Page 2: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 2

6 Chapter Objectives

Be able to:• Explain what capacity is, how firms measure capacity, and the

difference between theoretical and rated capacity. • Describe the pros and cons associated with three different

capacity strategies: lead, lag, and match. • Apply a wide variety of analytical tools to capacity decisions,

including expected value and break-even analysis, decision trees, learning curves, the Theory of Constraints, waiting line theory, and Little’s Law.

Page 3: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 3

6 Definitions

Capacity – The capability of a worker, a machine, a workcenter, a plant, or an organization to produce output in a time period.

Capacity decisions – How is it measured? Which factors affect capacity? The impact of the supply chain on the organization’s

effective capacity.

© 2010 APICS Dictionary

Page 4: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 4

6 Measures of Capacity

Theoretical capacity – The maximum output capability, allowing for no adjustments for preventive maintenance, unplanned downtime, or the like.

Rated capacity – The long-term, expected output capability of a resource or system.

© 2010 APICS Dictionary

Page 5: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 5

6 Examples of Capacity

Table 6.1

Page 6: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 6

6 Indifference Point Examples

Capacity for a PC Assembly Plant

(800 units per line per shift)×(# of lines)×(# of shifts)

Controllable Factors Uncontrollable Factors

1 or 2 shifts? 2 or 3 lines? Employee

training?

Supplier problems? 98% or 100% good?

Late or on time?

Page 7: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 7

6 Three Common Capacity Strategies

Lead capacity strategy – A capacity strategy in which capacity is added in anticipation of demand.

Lag capacity strategy – A capacity strategy in which capacity is added only after demand has materialized.

Match capacity strategy – A capacity strategy that strikes a balance between the lead and lag capacity strategies by avoiding period of high under or overutilization.

Page 8: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 8

6 Comparing Strategies

Figure 6.1

Page 9: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 9

6 Evaluating Capacity Alternatives

Cost Comparison Expected Value Decision Trees Break-Even Analysis Learning Curves

Page 10: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 10

6 Cost Comparison

Fixed costs – The expenses an organization incurs regardless of the level of business activity.

Variable costs – Expenses directly tied to the level of business activity.

Page 11: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 11

6 Cost Comparison

TC = FC + VC * X

TC = Total CostFC = Fixed Cost

VC = Variable cost per unit of business activityX = amount of business activity

Page 12: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 12

6 Cost Comparison - Example 6.1

Figure 6.2

Table 6.2

Page 13: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 13

6 Cost Comparison - Example 6.1

Total cost of common carrier option = Total cost of contract carrier option

$0 + $750X = $5,000 + $300X

X = 11.11 or 11 shipments

Total cost of contract carrier option = Total cost of leasing

$5,000 + $300X = $21,000 + $50X

X = 64 shipments

Find the indifference point – the output level at which the two alternatives generate equal costs.

Page 14: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 14

6 Expected Value

Expected value – A calculation that summarizes the expected costs, revenues, or profits of a capacity alternative, based on several demand levels with different probabilities.

Page 15: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 15

6 Expected Value – Example 6.2

Page 16: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 16

6 Expected Value – Example 6.2

C(low demand) = $5,000 + $300(30) = $14,000C(medium demand) = $5,000 + $300(50) = $20,000

C(high demand) = $5,000 + $300(80) = $29,000

EVContract = (14,000 * 25%) + ($20,000 * 60%) + ($29,000 * 15%)

= $19,850EVCommon = (22,500 * 25%) + ($37,500 * 60%) + ($60,000 * 15%)

= $37,125EVLease = (22,500 * 25%) + ($23,500 * 60%) + ($25,000 * 15%)

= $23,475

Page 17: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 17

6 Decision Trees

Decision tree – A visual tool that decision makers use to evaluate capacity decisions to enable users to see the interrelationships between decisions and possible outcomes.

Page 18: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 18

6 Decision Tree Rules

Draw the tree from left to right starting with a decision point or an outcome point and develop branches from there.

Represent decision points with squares. Represent outcome points with circles. For expected value problems, calculate the financial

results for each of the smaller branches and move backward by calculating weighted averages for the branches based on their probabilities.

Page 19: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 19

6 Decision Trees – Example 6.3

Original Expected Value Example

Figure 6.4

Page 20: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 20

6 Break-Even Analysis

Break-even point – The volume level for a business at which total revenues cover total costs.

Where:BEP = break-even pointFC = fixed costsVC = variable cost per unit of business activityR = revenue per unit of business activity

Page 21: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 21

6 Break-Even Analysis – Example 6.4

Suppose the firm makes $1,000 profit on each shipment before transportation costs are considered. What is the

break-even point for each shipping option?

Contracting: BEP = $5,000 / $700 = 7.1 or 8 shipments

Common: BEP = $0 / $250 = 0 shipments

Leasing: BEP = $21,000 / $950 = 22.1 or 23 shipments

Page 22: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 22

6 Learning Curves

Learning curve theory – A theory that suggests that productivity levels can improve at a predictable rate as people and even systems “learn” to do tasks more efficiently.

For every doubling of cumulative output, there is a set percentage reduction in the amount

of inputs required.

Page 23: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 23

6 Learning Curves

Page 24: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 24

6 Learning Curve – Example 6.5

What is the learning percentage?

4/5 = 80% or .80

Page 25: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 25

6 Learning Curve – Example 6.5

How long will it take to answer the 25th call?

Figure 6.6

Page 26: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 26

6 Other Capacity Considerations

The strategic importance of an activity to a firm.

The desired degree of managerial control.

The need for flexibility.

Page 27: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 27

6 The Theory of Constraints

Theory of Constraints – An approach to visualizing and managing capacity which recognizes that nearly all products and services are created through a series of linked processes, and in every case, there is at least one process step that limits throughput for the entire chain.

Figure 6.7

Page 28: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 28

6 The Theory of Constraints

Identify the constraint Exploit the constraint

Keep it busy! Subordinate everything to the constraint

Make supporting it the overall priority Elevate the constraint

Try to increase its capacity — more hours, screen out defective parts from previous step.

Find the new constraint and repeat As one step is removed as a constraint, a new one will emerge.

Page 29: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 29

6 Theory of Constraints – Example 6.6

Where is the Bottleneck? Cut and Style

Table 6.5

Page 30: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 30

6 Theory of Constraints – Example 6.6

Current ProcessFigure 6.9

Page 31: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 31

6 Theory of Constraints – Example 6.6

Adding a Second StylistFigure 6.10

Page 32: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 32

6 Theory of Constraints – Example 6.6

Adding One Shampooer

and Two Stylists

Figure 6.11

Page 33: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 33

6 Waiting Line Theory

Waiting Line Theory – A theory that helps managers evaluate the relationship between capacity decisions and important performance issues such as waiting times and line lengths.

Figure 6.12

Page 34: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 34

6 Waiting Line Theory

Waiting Line Concerns: What percentage of the time will the server be busy? On average, how long will a customer have to wait in line?

How long will the customer be in the system? On average, how may customers will be in line? How will those averages be affected by the arrival rate of

customers and the service rate of the workers?

Page 35: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 35

6 Waiting Lines – Example 6.7

The probability of arrivals in a time period =

Example: Customers arrive at a drive-up window at a rate of 3 per minute. If the number of arrivals follows a Poisson distribution, what is the probability that two or fewer

customers would arrive in a minute?

P(< 2) = P(0) + P(1) + P(2) = .050 + .149 + .224 = .423 or 42.3%

Page 36: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 36

6 Waiting Lines – Example 6.7

The average utilization of the system:

Example: Suppose that customers arrive at a rate of four per minute and that the worker at the window is able to handle on average 5 customers per minute. The average utilization of the

system is:

Page 37: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 37

6 Waiting Lines – Example 6.8

The average number of customers waiting in the system (CW) =

The average number of customers in the system (CS) =

Example: Given an arrival rate of four customers per minute and a service rate of five customers per minute:

Average number of customers waiting:

Average number in the system:

Page 38: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 38

6 Waiting Lines – Example 6.9

The average time spent waiting (TW) =

The average time spent in the system (TS) =

Example: Given an arrival rate of four customers per minute and a service rate of five customers per minute:

Average time spent waiting:

Average time spent in the system:

Page 39: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 39

6 Little’s Law

Little’s Law is a law that holds for any system that has reached a steady state that enables us to understand the relationship between inventory, arrival time, and throughput time.

I = RT

Page 40: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 40

6 Little’s Law - Example 6.11

Figure 6.14

Page 41: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 41

6 Little’s Law - Example 6.11Average Throughput Time =

T = I/R = (25 orders) / (100 orders per day) = .25 days in order processing

Average time an order spends in workcenter A = T = I/R = (14 orders)/(70 orders per day)

= .2 days in workcenter A

Amount of time the average A order spends in the plant = Order processing time + workcenter A time

= .25 days + .2 days = .45 days

Amount of time the average B order spends in the plant = Order processing time + workcenter B time

= .25 days + .05 days = .30 days

Page 42: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 42

6 Little’s Law - Example 6.11

Average time an order spends in the plant = 70% x .45 days + 30% *.30 days

= .405 days

Estimate average throughout time for the entire system = T = I/R = (40.5 orders)/(100 orders per day)

= .405 days for the average order

Page 43: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

6 - 43Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall

Managing Capacity Case Study

Forster’s Market

Page 44: Managing Capacity Chapter 6. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall6 - 2 Chapter Objectives Be able to: Explain what capacity

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 6 - 44

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or

otherwise, without the prior written permission of the publisher. Printed in the United States of America.