LEARNING OBJECTIVES

By the end of this session, you must have learnt and understood:• the concept and meaning of man power planning.•Process of planning•Different techniques for forcasting.

Page 3: Manpower Planning

3

Definition of Manpower planning

1. According to Coleman, human resource or manpower planning is “the process of determining manpower requirements and the means for meeting those requirement in order to carry out the integrated plan of the organization.”

Page 4: Manpower Planning

4

Definition of Manpower planning (Contd..)

2. According to E.W. Uetter, human resource planning is “a process by which an organization should move from its current manpower position to its desired manpower position”.

Page 5: Manpower Planning

5

Objective of Manpower Planning

Through planning, management strives to have the right number and right kind of people at the right place at the right time, doing things which result in both the organization and the individual receiving maximum long-run benefit.

Page 6: Manpower Planning

6

Manpower Planning – A Prelude

It is only after manpower planning that HRM department can initiate a recruitment and selection process.

HRP is a sub-system in the total organizational planning.

Page 7: Manpower Planning

7

Need for Human Resource Planning

Every organization has to plan for Human Resource due to:

1. Shortage of certain categories of employees and /or variety of skills despite the presence of general category employees.

Page 8: Manpower Planning

8

Need for Human Resource Planning (Contd..)

2. The rapid changes in technology, marketing, management etc., and the consequent need for new skills and new categories employees.

Page 9: Manpower Planning

9

Need for Human Resource Planning (Contd..)

3. The changes in organization design and structure affecting manpower demand.

Page 10: Manpower Planning

10

Need for Human Resource Planning (Contd..)

4. The demographic changes like the changing profile of the workforce in terms of age, sex, education etc.

Page 11: Manpower Planning

11

Need for Human Resource Planning (Contd..)

5. The government policies with respect to reservation, child labour, working conditions etc.

Page 12: Manpower Planning

12

Need for Human Resource Planning (Contd..)

6. The labour laws affecting the demand for and supply of labour.

7. Pressure from trade unions, politicians, sons of soil.

8. Introduction of computers, robots etc.

Page 13: Manpower Planning

13

Manpower Forecasting

Manpower forecasting is the process of estimating the future quantity and quality of people required.

Page 14: Manpower Planning

14

Manpower Forecasting (contd..)

The basis of the forecast must be the annual budget and long-term corporate plan, translated into activity levels for each function and department.

Page 15: Manpower Planning

15

Need for Manpower Forecasting

1. Quantify the jobs necessary for producing a given number of goods or offering a given amount of services.

Page 16: Manpower Planning

16

Need for Manpower Forecasting (Contd..)

2. Determine what staff-mis is desirable in the future.

3. Assess appropriate staffing levels in different parts of the organization so as to avoide unnecessary costs.

Page 17: Manpower Planning

17

Need for Manpower Forecasting (Contd..)

4. prevent shortage of people where and when they are needed most.

5. Monitor compliance with legal requirements with regard to reservation of jobs.

Page 18: Manpower Planning

18

Objectives of Manpower planning

the important objectives of manpower planning in an organization are:

1. To recruit and retain human resource of required quantity and quality.

Page 19: Manpower Planning

19

Objectives of Manpower planning (Contd..)

2. To meet the needs of the programmes of expansion, diversification etc.

Page 20: Manpower Planning

20

Objectives of Manpower planning (Contd..)

3. To foresee the impact of technology on work, existing employees and future human resource requirement.

Page 21: Manpower Planning

21

Objectives of Manpower planning (Contd..)

4. To improve the standard, skills, knowledge, ability, discipline etc.

5. To assess the surplus or shortage of human resources and take measures accordingly.

Page 22: Manpower Planning

22

Objectives of Manpower planning (Contd..)

6. To minimize imbalance caused due to non-availability of human resources of tight kind, tight number in tight time and at the right place.

7. To make the best us of human resource

Page 23: Manpower Planning

23

Objectives of Manpower planning (Contd..)

8. To estimate the cost of human resources.

9. To foresee the employee turnover and make arrangements for minimizing turnover and filling up offer consequent vacancies.

Page 24: Manpower Planning

24

Objectives of Manpower planning (Contd..)

To maintain congenial industrial relations by maintaining optimum levels and structure of human resources.

Page 25: Manpower Planning

25

Human Resource Planning Process

The HR planning process consists of the following steps:

1. Analyzing organization plans.

Page 26: Manpower Planning

26

Human Resource Planning Process (contd..)

2. Demand forecasting: forecasting the overall human resource requirement in accordance with the organizational plans.

Page 27: Manpower Planning

27

Human Resource Planning Process (contd..)

3. Supply forecasting: obtaining the data and information about the present quantum of human resource inventory.

Page 28: Manpower Planning

28

Human Resource Planning Process (contd..)

4. Estimating the net human resource requirements.

5. In case of future deficit, forecast the future supply of human resource from all sources with reference to plans of other companies.

Page 29: Manpower Planning

29

Human Resource Planning Process (contd..)

6. In case of future surplus, plan for redeployment, retrenchment and lay-off.

7. Plan for recruitment, development and internal mobility if future supply is more than or equal to net human resource requirement.

Page 30: Manpower Planning

30

Human Resource Planning Process (contd..)

8. Plan to modify or adjust the organizational plan if future supply will be inadequate with reference to future net requirements.

Page 31: Manpower Planning

31

Human Resource Planning

Three steps to Human Resource Planning. Access current human resources. Determine future needs. Develop a plan to meet those needs.

Page 32: Manpower Planning

32

Tools for Human Resource Planning

Job analysisDefines the jobs within the firm and the

behaviors necessary to perform those jobs.

Page 33: Manpower Planning

33

Tools for Human Resource Planning (Contd..)

Job descriptionA written statement of what a jobholder

does, how the job is done, and why it is done.

Page 34: Manpower Planning

34

Tools for Human Resource Planning (Contd..)

Job specificationThe minimum acceptable qualifications an

incumbent must have to perform a job successfully.

Page 35: Manpower Planning

35

Manpower Forecasting

The factors on which manpower forecasting depends are:

1. External Factors.2. Internal Factors.

Page 36: Manpower Planning

36

External Factors

1. Competition (foreign and domestic)2. Economic climate.3. Laws and regulatory bodies.4. Changes in technology.5. Social factors.

Page 37: Manpower Planning

37

Internal Factors

1. Budget constraints2. Production levels3. New products and services4. Organizational structure5. Employee separations

Page 38: Manpower Planning

38

Methods or Techniques of Manpower Forecasting

The organization generally follow more than one technique. The technique are

1. Managerial judgment2. Ration-trend analysis3. Word study techniques

Page 39: Manpower Planning

39

Methods or Techniques of Manpower Forecasting (Contd..)

4. Delphi technique. 5. Flow models. 6. Other techniques of forecasting.

Page 40: Manpower Planning

40

Managerial judgment

Most of the small-scale and unorganized industries cannot have systematic data-banks for manpower information and job analysis.

Such organizations resort to the managerial-judgment approach.

Page 41: Manpower Planning

41

Managerial Judgment (contd..) In this method, the manager or

supervisor who is well- acquainted with workload, efficiency and ability of employees, thinks about their future workload, future capabilities of employees and decides on the number and type of human resources required.

Page 42: Manpower Planning

42

Ratio-trend Analysis

In this method, the ratios are calculated, for the past data rlating to number of employees of each category and production level and direct employees and indirect employees.

Page 43: Manpower Planning

43

Ratio-trend Analysis (Contd..) Future production levels, sales level,

activity/work load are estimated with an allowance for changes in organization methods and jobs.

Page 44: Manpower Planning

44

Ratio-trend Analysis (Contd..) Future ratios are also estimated when

there are changes to come in organization and human resources.

Then, future resource is calculated on the basis of established ratios.

Page 45: Manpower Planning

45

Work Study Techniques

These techniques are more suitable where the volumes of work are easily measurable.

Page 46: Manpower Planning

46

Work Study Techniques (Contd..)

In this method, total production activities in terms of clear units are estimated in an year.

Man-hours required to produce/perform each unit are calculated.

Page 47: Manpower Planning

47

Work Study Techniques (Contd..)

Work ability of each employee is estimated in terms of manpower after giving due weightage to absenteeism, rest etc.

Then required number of employees is calculated.

Page 48: Manpower Planning

48

Work Study Techniques (Contd..)

Work study techniques for direct workers can be combined with ratio-trend analysis to forecast for indirect workers, establishing the ratio between the two categories.the same logic can be extended to any other category of employees.

Page 49: Manpower Planning

49

Delphi Technique

Named after the ancient Greek oracle at the city of Delphi.

The Delphi technique is a method of forecasting personnel needs.

Page 50: Manpower Planning

50

Delphi Technique (Contd..)

It solicits estimates of personnel needs from a group of experts, usually managers.

The HRP experts act as intermediaries, summarize the various responses and report the findings back to the experts.

Page 51: Manpower Planning

51

Delphi Technique (Contd..)

The experts are surveyed again after they receive this feedback.

Summaries and survey are repeated until the experts’ opinions begin to congerge.

Page 52: Manpower Planning

52

Delphi Technique (Contd..)

The agreement reached is the forecast of the personnel needs.

The distinguishing feature of the Delphi technique is the absence of interaction among experts.

Page 53: Manpower Planning

53

Flow Models

Flow models are frequently associated with forecasting personnel needs.

The simplest one is called the Markov model.

Page 54: Manpower Planning

54

Flow Models (Contd..)

In this technique, the forecasters will1. Determine the time that should be

covered. Shorter length of time are generally more accurate than longer ones.

Page 55: Manpower Planning

55

Flow Models (Contd..)

However, the time horizon depends on the length of the HR plan which, in turn, is determined by the strategic plan of the organization.

Page 56: Manpower Planning

56

Flow Models (Contd..)

2. Establish categories, also called states, to which employees can be assigned.

These categories must not overlap and must take into account every possible category to which an individual can be assigned.

Page 57: Manpower Planning

57

Flow Models (Contd..)

3.Count annual movements (also called flows) among states for several time periods.

These states are defined as absorbing or non-absorbing states.

Page 58: Manpower Planning

58

Flow Models (Contd..)

Losses include death or disability absences, resignations and retirements.

Page 59: Manpower Planning

59

Flow Models (Contd..)

4. Estimate the probability of transition from one state to another based on past trends.

Demand is a function of replacing those who make a transition.

Page 60: Manpower Planning

60

Flow Models (Contd..)

Markov Analysis is advantageous because it makes sense to decision-makers.

They can easily understand its underlying assumption.

Likely to accept results.

Page 61: Manpower Planning

61

Flow Models (Contd..)

Disadvantages:a) Heavy reliance on past data, which may

not be accurate in periods of turbulent change.

b) Accuracy in forecast about individuals is sacrificed to achieve accuracy across groups.

Page 62: Manpower Planning

62

Other Techniques

1. New venture analysis New venture analysis will be useful

when new ventures contemplate employment planning.

Page 63: Manpower Planning

63

New Venture Analysis

This technique requires planners to estimate HR needs in line with companies that perform similar operations.

Page 64: Manpower Planning

64

New Venture Analysis (Contd..) For example: A petroleum company that

plans to open a coal mine estimates its future employment needs by determining levels of other coal mines.

Page 65: Manpower Planning

65

Other Techniques

Judgmental Methods:o Use intentions and opinions as data.

Intention studies-how people say they will act.

Page 66: Manpower Planning

66

Other Techniques (Contd..)

Surveys of opinions. Jury of executive opinion.

Page 67: Manpower Planning

67

Other Techniques (Contd..)

Projective Methods Start with informed ideas and build on

them. Brainstorming

Groups focus intensively on given problem.

Page 68: Manpower Planning

68

Other Techniques (Contd..)

Generates many ideas rapidly No evaluation until idea generation is

completed Scenario construction

Page 69: Manpower Planning

69

Other Techniques (Contd..)

Extrapolation Method: Project past and/or current trends

into future.Time series analysis.

Page 70: Manpower Planning

70

Other Techniques (Contd..)

Causal Methods: Econometric methods. Segmentation methods.

Page 71: Manpower Planning

71

Other Techniques (Contd..)

Bootstrapping Methods: Develop an explicit model from the

judgmental forecast of an individual to attain more consistent performance.

Page 72: Manpower Planning

72

Summary

So far, we have seen: The concept of man power planning. Planning steps. Different techniques for forecasting.