march 2016 psap managers meetings - north carolina 2016 psap managers... · psap inspections 3. if...

135
PSAP Managers Regional Meetings March, 2016 911 Board Information Technology

Upload: others

Post on 06-Nov-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

PSAP Managers Regional Meetings

March, 2016

911 Board

Information Technology

Page 2: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

2

•Tina Bone – Network Specialist•Staff to Standards Committee•Text-to-911•Back-Up PSAP Plans

11/7/2016

Page 3: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

3

•Dave Corn – Network Specialist•Staff to NG911 Committee•Translation Services

11/7/2016

Page 4: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

4

•David Dodd – PSAP Liaison•Staff to Education Committee•Weekly Newsletter•Regional PSAP Managers Meetings•911 Board Regional Meetings•Back-Up PSAP Plans

11/7/2016

Page 5: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

511/7/2016

Page 6: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

611/7/2016

Page 7: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Rules Update and PSAP Inspections

911 Board

Information Technology

Page 8: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

8811/7/2016

Page 9: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

9911/7/2016

Page 10: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

10

Rules Update

There were six rules that had to go back through the rulemaking process.

1011/7/2016

Page 11: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

11

Rules Update

TITLE 09, CHAPTER 06, SUBCHAPTER C

911 BOARDSECTION .0100 – FORMS,

DEFINITIONS, ADMINISTRATION

1111/7/2016

Page 12: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

12

Rules Update

09 NCAC 06C .0111 REQUESTS FOR DECLARATORY RULINGS

Describes procedures for a PSAP or service provider to follow when requesting a declaratory ruling from the 911 Board.

1211/7/2016

Page 13: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

13

Rules Update

09 NCAC 06C .0112 RESPONSE TO A REQUEST

FOR A DECLARATORY RULING

Describes procedures 911 Board shall follow when responding to a request for a declaratory ruling.

1311/7/2016

Page 14: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

14

Rules Update

09 NCAC 06C .0113 DURATION OF A DECLARATORY RULING

Describes effects of a declaratory ruling.

1411/7/2016

Page 15: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

15

Rules Update

09 NCAC 06C .0114 RECORD OF RULING

Requires that records of declaratory rulings be kept on file at the 911 Board office.

1511/7/2016

Page 16: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

16

Rules Update

SECTION .0200 – PUBLIC SAFETY ANSWERING POINTS (PSAPS)

1611/7/2016

Page 17: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

17

Rules Update

09 NCAC 06C .0205 COMPREHENSIVE EMERGENCY MANAGEMENT PLAN

(CEMP)

Outlines requirements for creation of a comprehensive emergency management

plan by each PSAP.1711/7/2016

Page 18: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

18

Rules Update

09 NCAC 06C .0216 ASSESSING PSAP OPERATIONS

Outlines procedures to be followed by the 911 Board when conducting

assessments of PSAPs.

1811/7/2016

Page 19: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

19

Rules Update

• Rulemaking hearing was February 26, 2016

• No comments

• Board voted

• Rules passed

• Rules take effect July 1, 2016

• PSAP Inspections will begin July 1, 2017

1911/7/2016

Page 20: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

202011/7/2016

Page 21: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

212111/7/2016

Page 22: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

22

PSAP Inspections

The Compliance Process was voted on and approved in the February

2015 Board Meeting.

2211/7/2016

Page 23: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

23

PSAP Inspections

DEFINITIONS

• Corrective Action Plan – A plan to correct deficiencies.

• Deficiency – Failure to fulfill a PSAP operation rule.

• Full compliance – Completion of a site review free of deficiencies.

2311/7/2016

Page 24: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

24

PSAP Inspections

DEFINITIONS

• Site review – An examination of a PSAP to determine compliance with Rules.

• Written Response – An acknowledgement of deficiencies and statement of deficiencies corrected within 30 days of the site review report.

2411/7/2016

Page 25: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

25

PSAP Inspections

Site Review Process

1. Every PSAP will be inspected to determine its fulfillment of PSAP operation rules. Site reviews will begin within one year from the date the rules are effective. Failure to fulfill PSAP operation rules is a deficiency. Inspectors will deliver reports to the Executive Director.

2511/7/2016

Page 26: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

26

PSAP Inspections

Site Review Process

2. Site reviews will be performed by peer reviewers supervised by Staff members. Peer reviewers will include volunteers selected by the Board from outside the region of the PSAP to be inspected. Staff members may accompany peer reviewers for any site review.

2611/7/2016

Page 27: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

27

PSAP Inspections

3. A site review report will be delivered to the PSAP stating whether the PSAP fulfilled PSAP operation rules. The report shall identify any deficiencies.

4. The PSAP will not be re-inspected for 3 years if the site review finds no deficiencies.

11/7/2016

Page 28: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

28

PSAP Inspections

5. If the site review finds a deficiency and that deficiency is corrected to the satisfaction of the Staff reviewer within 30 days’ notice of the site review report, the PSAP will not be re-inspected for 3 years.

11/7/2016

Page 29: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

29

PSAP Inspections

6. If the PSAP site review identifies a deficiency and the deficiency is not corrected within 30 days’ notice of the deficiency, the next PSAP site review will be conducted within 12 months.

11/7/2016

Page 30: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

30

PSAP Inspections

7. Deficiencies found or reported at the PSAP may result in additional site reviews.

11/7/2016

Page 31: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

31

PSAP Inspections

PSAP Written Response And Corrective Action Plan

1. A PSAP shall deliver a Written Response to the Staff reviewer acknowledging any deficiencies reported. The PSAP’s response is due within 30 calendar days of receiving the Site review report.

2. The PSAP’s Written Response will also identify actions the PSAP has taken to remediate the deficiencies and a

statement that the deficiencies have been corrected.

3111/7/2016

Page 32: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

32

PSAP Inspections

PSAP Written Response And Corrective Action Plan

3. Deficiencies remaining after the PSAP’s Written Response shall be the subject of a Corrective Action Plan. A Corrective Action Plan shall be submitted by the PSAP to the Executive Director for approval within 90 calendar days of the PSAP site review report. The Plan may be extended one time if requested up to another 90 calendar days at the discretion of the Executive Director.

3211/7/2016

Page 33: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

33

PSAP Inspections

4. If the Corrective Action Plan is approved, the PSAP will correct the deficiencies under the terms, conditions, and time frames stated therein. A Staff reviewer will follow-up to ensure that the PSAP completes the corrective action(s) and verify that the PSAP is in compliance.

11/7/2016

Page 34: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

34

PSAP Inspections

5. If the Corrective Action Plan is not approved by the Executive Director, the PSAP will be requested to submit another Corrective Action Plan within a specified period of time until an approved Corrective Action Plan is submitted and approved by the Executive Director.

11/7/2016

Page 35: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

35

PSAP Inspections

Standards Committee Action

1. If no Corrective Action Plan is approved or the PSAP fails to deliver a CAP or there is insufficient activity to implement the approved Corrective Action Plan, the Executive Director will refer the matter to the Standards Committee for action.

3511/7/2016

Page 36: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

36

PSAP Inspections

Standards Committee Action

2. At its next scheduled meeting, the Standards Committee will discuss any matter referred by the Executive Director. The Standards Committee will provide notice of that meeting to the PSAP. The Standards Committee shall deliver notice of its conclusions and recommended actions to the PSAP Director with a copy to the appropriate supervising or managing authority of that PSAP. Inclusive of the conclusions from the Standards Committee, will be a request for response from the PSAP Director and/or the supervising or managing authority to the Standards Committee.

3611/7/2016

Page 37: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

37

PSAP Inspections

3. If there is no response from the PSAP as requested by the Standards Committee or if the response is unsatisfactory, the Committee will send a letter to the appropriate supervising or managing authority of that PSAP with a copy to the PSAP Director asking for a reply by a specified date.

3711/7/2016

Page 38: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

38

PSAP Inspections

4. If there is still no response from the PSAP or the supervising or managing authority or if the response is unsatisfactory the Standards Committee will refer the matter to the 911 Board with a recommendation for further action.

5. The 911 Board will follow the process it has established for PSAPs who fail to comply with the Rules as found in rules.

3811/7/2016

Page 39: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

39

PSAP Inspections

We Need Volunteers

3911/7/2016

Page 40: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Grant Program Changes & Updates

911 Board

Information Technology

Page 41: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

41

Grants Update

§ 143B-1407. (formerly 62A-47) PSAP Grant and Statewide 911 Projects Account; Next Generation 911 Reserve Fund

• (b) PSAP Grant and Statewide 911 Projects Grant Application. -- A PSAP may apply to the 911 Board for a grant from the PSAP Grant and Statewide 911 Projects Account. An application must be submitted in the manner prescribed by the 911 Board. The 911 Board may approve a grant application and enter into a grant agreement with a PSAP if it determines all of the following: (4) The costs for consolidating one or more PSAPs with a primary PSAP, the relocation costs of primary PSAPs, or capital expenditures that enhance the 911 system, including costs not authorized under G.S. 143B-1406(e) and construction costs.

11/7/2016

Page 42: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

42

Grants Update

Must have an NCID with privileges to the North Carolina 911 Board grant application site

Must have completed and approved FY2015 Revenue /Expenditure Report

Back-up PSAP Plan submitted

11/7/2016

Page 43: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

43

Grants Update

This year’s application DOES NOT require an NCID. The application is a Microsoft Word form (unfortunately not compatible to Apple, IPad or apps for IPad because it requires Active X interaction).

The link to the application is located on the opening page of the NC 911 Board webpage at www.nc911.nc.gov

11/7/2016

Page 44: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

44

Grants Update

11/7/2016

Page 45: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

45

Grants Update

Grant Cycle opened Monday March 7, 2016

Open for 90 Days (June 6, 2016)

11/7/2016

Page 46: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

10 Minute Break

911 Board

Information Technology

Page 47: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Where is Your Backup PSAP?

911 Board

Information Technology

Page 48: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

48911 Board Information Technology11/7/2016

TR1

Page 49: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 48

TR1 Taylor, Richard, 2/9/2016

Page 50: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

4911/7/2016 911 Board Information Technology

TR1

Page 51: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 49

TR1 Taylor, Richard, 2/9/2016

Page 52: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

50911 Board Information Technology

Fire burned a Vass home to the ground early Sunday during a three‐hour outage of Moore County's 911 system.

The home, at 110 Birch Drive, is a total loss, authorities said. The homeowner was not home at the time, and no one was injured.

Neighbor Patrick Brock told WRAL News that he called to report the fire but got no answer on 911 or the sheriff's office emergency number. He dialed *HP, which also attempted to get a message to the fire department.

"The middle of the entire roof was on fire. I mean it had broke through the roof," he said. "So we did it the old fashion way. Equivalent of sounding the town bell."

11/7/2016

TR1

Page 53: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 50

TR1 Taylor, Richard, 2/9/2016

Page 54: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5111/7/2016 911 Board Information Technology

He said it took 15 minutes for a fire truck to arrive, although the station is only 2 miles away. 

Emergency officials confirmed that their 911 system crashed overnight. It took about 3 hours to repair.

Moore County Manager Wayne Vest says there was an internal power failure around 12:45am.

"Well, we know we had a power outage. That triggered a breaker to trip and that shut the power down in the 911 center. This is a very serious matter to us and we're addressing it," Vest said. 

TR1

Page 55: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 51

TR1 Taylor, Richard, 2/9/2016

Page 56: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5211/7/2016 911 Board Information Technology

TR1

Page 57: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 52

TR1 Taylor, Richard, 2/9/2016

Page 58: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5311/7/2016 911 Board Information Technology

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW 2014-66 SENATE BILL 797

*S797-v-5*

AN ACT TO AMEND THE DUTIES OF THE 911 BOARD RELATING TO PUBLIC SAFETY ANSWERING POINTS, AS

RECOMMENDED BY THE JOINT LEGISLATIVE OVERSIGHT COMMITTEE ON INFORMATION

TECHNOLOGY, AND TO CLARIFY THE COLLECTION AUTHORITY OF THE DEPARTMENT OF REVENUE FOR

THE 911 FEE ON PREPAID WIRELESS.

TR1

Page 59: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 53

TR1 Taylor, Richard, 2/9/2016

Page 60: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5411/7/2016 911 Board Information Technology

SECTION 1.1. G.S. 62A-40 is now § 143B-1400. Definitions "(6) Back-up PSAP. – The capability to operate as part of the 911 System and all other features of its associated primary PSAP. The term includes a back-up PSAP that receives 911 calls only when they are transferred from the primary PSAP or on an alternate routing basis when calls cannot be completed to the primary PSAP."

SECTION 1.2. G.S. 62A-42(a) is now § 143B-1402. Powers and duties of the 911 Board "(a) Duties. – The 911 Board has the following powers and duties:

(1) To develop the 911 State Plan. In developing and updating the plan, the 911 Boardmust monitor trends in voice communications service technology and in enhanced 911service technology, investigate and incorporate GIS mapping and other resources into theplan, ensure individual PSAP plans incorporate a back-up PSAP, and formulate strategiesfor the efficient and effective delivery of enhanced 911 service.

TR1

Page 61: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 54

TR1 Taylor, Richard, 2/9/2016

Page 62: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5511/7/2016 911 Board Information Technology

SECTION 1.3. G.S. 62A-46 is now § 143B-1406. Fund distribution to PSAPs (a) Monthly Distribution. – The 911 Board must make monthly distributions to primary PSAPsfrom the amount allocated to the 911 Fund for PSAPs. A PSAP is not eligible for a distributionunder this section unless it complies with the requirements of this Article, provides enhanced911 service service, and received distributions from the 911 Board in the 2008-2009 fiscal year.The Board may reduce, suspend, or terminate distributions under this subsection if aPSAP does not comply with the requirements of this Article.

§ 143B-1406. Fund distribution to PSAPs.…(f) Compliance. – A PSAP, or the governing entity of a PSAP, must comply with all of the following in order to receive a distribution under this section:

TR1

Page 63: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 55

TR1 Taylor, Richard, 2/9/2016

Page 64: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5611/7/2016 911 Board Information Technology

§ 143B-1406. Fund distribution to PSAPs.…(f) Compliance. – A PSAP, or the governing entity of a PSAP, must comply with all of the following in order to receive a distribution under this section:

(5)A PSAP must have a plan and means for 911 call-taking in the event 911 calls cannot bereceived and processed in the primary PSAP. The plan must identify the alternativecapability of taking the redirected 911 calls. This subdivision does not require a PSAP toconstruct an alternative facility to serve as a back-up PSAP.

TR1

Page 65: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 56

TR1 Taylor, Richard, 2/9/2016

Page 66: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5711/7/2016 911 Board Information Technology

GENERAL ASSEMBLY OF NORTH CAROLINASESSION 2015

SESSION LAW 2015-219HOUSE BILL 512

*H512-v-3*AN ACT TO ALLOW TIME EXTENSIONS FOR IMPLEMENTATION OF BACK-UP

PSAP REQUIREMENTS, TO DEFINE UNIFORM STANDARDS FOR BACK-UP PSAPS, AND TO DEVELOP A MASTER PURCHASING LIST FOR 911 SYSTEM

ELIGIBLE EXPENSES.

TR1

Page 67: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 57

TR1 Taylor, Richard, 2/9/2016

Page 68: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5811/7/2016 911 Board Information Technology

SECTION 1. G.S. 62A-46(e)(4a) is now § 143B-1406(f)(5) "(5) A By July 1, 2016, a PSAP must have a plan and means for 911 call-taking in the event 911 calls cannot be received and processed in the primary PSAP. If a PSAP has made substantial progress toward implementation of the plan and means, the 911 Board may grant the PSAP an extension until July 1, 2017, to complete implementation of the plan and means. The plan must identify the alternative capability of taking the redirected 911 calls. This subdivision does not require a PSAP to construct an alternative facilityto serve as a back-up PSAP."

TR1

Page 69: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 58

TR1 Taylor, Richard, 2/9/2016

Page 70: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

5911/7/2016 911 Board Information Technology

SECTION 1. G.S. 62A-46(e)(4a) is now § 143B-1406(f)(5) "(5) A By July 1, 2016, a PSAP must have a plan and means for 911 call-taking in the event 911 calls cannot be received and processed in the primary PSAP. If a PSAP has made substantial progress toward implementation of the plan and means, the 911 Board may grant the PSAP an extension until July 1, 2017, to complete implementation of the plan and means. The plan must identify the alternative capability of taking the redirected 911 calls. This subdivision does not require a PSAP to construct an alternative facilityto serve as a back-up PSAP."

TR1

Page 71: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 59

TR1 Taylor, Richard, 2/9/2016

Page 72: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6011/7/2016 911 Board Information Technology

The North Carolina 911 Board, at the 2/26/2016 meeting, has defined “ If a PSAP has made substantial progress toward implementation of the plan and means”as a backup plan has been submitted for approval to the NC 911 Board and a timeline for completion of the backup plan accompanies the request for an extension by July 1, 2016

TR1

Page 73: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 60

TR1 Taylor, Richard, 2/9/2016

Page 74: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6111/7/2016 911 Board Information Technology

ALL BACK-UP PLANS MUST BESECTION 1. G.S. 62A-46(e)(4a) is now § 143B-1406(f)(5) "(5) A By July 1, 2016, a PSAP must have a plan and means for 911 call-taking in the event 911 calls cannot be received and processed in the primary PSAP. If a PSAP has made substantial progress toward implementation of the plan and means, the 911 Board may grant the PSAP an extension until July 1, 2017, to complete implementation of the plan and means. The plan must identify the alternative capability of taking the redirected 911 calls. This subdivision does not require a PSAP to construct an alternative facilityto serve as a back-up PSAP.“

IMPLEMENTED BY JULY 1, 2017

TR1

Page 75: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 61

TR1 Taylor, Richard, 2/9/2016

Page 76: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6211/7/2016 911 Board Information Technology

Reduce

Suspend

Terminate

No 911 Plan OR

Substantial Progress On

A Plan

TR1

Page 77: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 62

TR1 Taylor, Richard, 2/9/2016

Page 78: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6311/7/2016 911 Board Information Technology

TR1

Page 79: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 63

TR1 Taylor, Richard, 2/9/2016

Page 80: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6411/7/2016 911 Board Information Technology

TR1

Page 81: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 64

TR1 Taylor, Richard, 2/9/2016

Page 82: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6511/7/2016 911 Board Information Technology

TR1

Page 83: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 65

TR1 Taylor, Richard, 2/9/2016

Page 84: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6611/7/2016 911 Board Information Technology

Back up PSAP Information

What type back up facility are you interested in:single agency stand alone facilitymulti agency stand alone facilityutilizing another existing PSAPmobile solutionhosted third party solutionsomething else, explain

TR1

Page 85: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 66

TR1 Taylor, Richard, 2/9/2016

Page 86: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6711/7/2016 911 Board Information Technology

*How many positions/workstations are normally manned in your Primary PSAP? Do you and can you staff for more positions to handle peak workloads? How many additional positions are used during these peak workloads?*If you are entering into an agreement with another Primary PSAP or a Secondary PSAP, how many positions do they staff to handle their call volume, and do they staff extra positions for peak times?*Does your backup plan have enough total seats to handle your peak call volume staffing, as well as that of the other agency?

TR1

Page 87: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 67

TR1 Taylor, Richard, 2/9/2016

Page 88: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6811/7/2016 911 Board Information Technology

The plan should include both the projected start up costs and the annual operating costs of the backup PSAP. Since funding of an approved backup PSAP is an allowable use of surcharge funds, and since future funding will be based on actual expenses, it is critical that 911 Board staff have an accurate cost projection for budgetary purposes.

TR1

Page 89: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 68

TR1 Taylor, Richard, 2/9/2016

Page 90: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

6911/7/2016 911 Board Information Technology

TR1

Page 91: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 69

TR1 Taylor, Richard, 2/9/2016

Page 92: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

7011/7/2016 911 Board Information Technology

Don’tOverthink

It !!

TR1

Page 93: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 70

TR1 Taylor, Richard, 2/9/2016

Page 94: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

7111/7/2016 911 Board Information Technology

Tina Bone [email protected]

David Dodd [email protected]

Dave Corn [email protected]

TR1

Page 95: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 71

TR1 Taylor, Richard, 2/9/2016

Page 96: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

7211/7/2016 911 Board Information Technology

TR1

Page 97: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 72

TR1 Taylor, Richard, 2/9/2016

Page 98: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Lunch911 Board

Information Technology

Page 99: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Greg HauserViper & Backup

911 Board

Information Technology

Page 100: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Next Generation 911 PSAP Managers

March 2016

911 Board

Information Technology

Page 101: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

767603/01/16 911 Board Information Technology

QUESTIONS?

TR1

Page 102: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 76

TR1 Taylor, Richard, 2/9/2016

Page 103: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

777703/01/16 911 Board Information Technology

Is the NC 911 Board really working on NextGen 911?

TR1

Page 104: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 77

TR1 Taylor, Richard, 2/9/2016

Page 105: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

78783/01/16 911 Board Information Technology

TR1

Page 106: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 78

TR1 Taylor, Richard, 2/9/2016

Page 107: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

797903/01/16 911 Board Information Technology

Really?

TR1

Page 108: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 79

TR1 Taylor, Richard, 2/9/2016

Page 109: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

808003/01/16 911 Board Information Technology

When is it going to happen?

2018

TR1

Page 110: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 80

TR1 Taylor, Richard, 2/9/2016

Page 111: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

818103/01/16 911 Board Information Technology

When will every PSAP be on the new statewide NextGen 911?

2020

TR1

Page 112: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 81

TR1 Taylor, Richard, 2/9/2016

Page 113: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

828203/01/16 911 Board Information Technology

What is going to happen?

• ESInet – Emergency Service IP Network• Hosted CPE• NMAC – Network Management Assistance Center• Hosted CAD• GIS Call Routing• CAD Interoperability• Radio Interoperability

TR1

Page 114: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 82

TR1 Taylor, Richard, 2/9/2016

Page 115: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

838303/01/16 911 Board Information Technology

Will it change the operation of my 911 Center?TR1

Page 116: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 83

TR1 Taylor, Richard, 2/9/2016

Page 117: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

848403/01/16 911 Board Information Technology

What is NextGen 911 going to change?TR1

Page 118: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 84

TR1 Taylor, Richard, 2/9/2016

Page 119: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

858503/01/16 911 Board Information Technology

Will I begin receiving videos when I go NextGen 911?TR1

Page 120: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 85

TR1 Taylor, Richard, 2/9/2016

Page 121: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

868603/01/16 911 Board Information Technology

What will change with NextGen 911?

• More reliable network• Location arrives with the call• Location information on call transfers• Less paperwork

TR1

Page 122: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 86

TR1 Taylor, Richard, 2/9/2016

Page 123: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

878703/01/16 911 Board Information Technology

What do I need to do now?

• Learn about NextGen 911• Do not sign a long-term contract• Do not buy non-NextGen 911 equipment• Clause in contract to protect yourself

TR1

Page 124: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 87

TR1 Taylor, Richard, 2/9/2016

Page 125: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

888803/01/16 911 Board Information Technology

TR1

Page 126: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Slide 88

TR1 Taylor, Richard, 2/9/2016

Page 127: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

Education Committee Updates

911 Board

Information Technology

Page 128: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

90

Class for New PSAP Managers

• Target Audience: new and inexperienced PSAP managers

• Class length 4-5 days• Scheduling flexibility• Training Sub-Committee could use some help. Do you have the skills to write lesson plans and create classes?

• Will be an ongoing work in progress

Current Project for Training Sub-Committee

908/17/2015 Information Technology

Page 129: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

91

Possible Class Topics

• History of 911 in NC• Makeup of the 911 Board, Powers and Duties• Transitioning to Management• Leadership and Team Building• Selection, Hiring, and Retention• Funding, Procurement, and Budgets• Making Presentations to Governing Officials• New Technologies

May Include But Not Limited To:

918/17/2015 Information Technology

Page 130: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

92

Public Education

• Guideline PE1: The state has an effective public education program that includes information about the capabilities and appropriate use of 9 1-1.

• Guideline PE2: The state has a 9-1-1 education program for appointed/elected officials and policy makers.

• Guideline PE3: The state has identified special needs populations and developed specific educational programs for each.

• Guideline PE4: The state has specific 9-1-1 educational programs for children at all grade levels.

• Guideline PE5: The state has an educational program for emergency responders.

92

Scored Weak in this Area on Statewide Assessement

8/17/2015 Information Technology

Page 131: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

93

COOP Technical Assistance Program

• 09 NCAC 06C .0205 COMPREHENSIVE EMERGENCY MANAGEMENT PLAN (CEMP)

• (a) Each PSAP shall have a written Comprehensive Emergency Management Plan (CEMP) that includes:

• (1) An emergency fire plan;• (2) A damage control plan; and• (3) A back-up PSAP plan that includes alternate 911 call routing

conforming to 47 C.F.R. 20.18 and G.S. 62A-49.• (b) The PSAP shall test the plans in Paragraph (a) of this Rule and the

CEMP at least once annually.• History Note: Authority G.S. 62A-42; 62A-46; 47 C.F.R. 20.18;• Eff. July 1, 2016.

DHS Office of Emergency Communications

938/17/2015 Information Technology

Page 132: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

94

Information About the Program

• 1 class in each of the 4 PSAP Managers Regions• Classes Tentatively Set for weeks of May 9th-eastern part of the

State, and• Week of May 16th in the central and western part of the State• Classes can be 1 day or 1 ½ days• Do classes need to be geared toward individual COOP plans or

regional plans? Or individual plans that don’t conflict with regional plans?

• Staff in process of reviewing class material to ensure it does not contradict the State’s message.

94

Feedback From You

8/17/2015 Information Technology

Page 133: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

95

Thank You for Your Attention

95

Questions/Comments?

8/17/2015 Information Technology

Page 134: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

96

Thank You for Your Attention

Now we want to hear from YOU!

968/17/2015 Information Technology

Page 135: March 2016 PSAP Managers Meetings - North Carolina 2016 PSAP Managers... · PSAP Inspections 3. If there is no response from the PSAP as requested by the Standards Committee or if

PSAP Managers Regional Meetings

March, 2016

911 Board

Information Technology