MARGARET RIVER YOUTH PRECINCT SD02.16002.D PRELIMINARY DESIGN REPORT MARCH 2016

Upload: ngophuc

Post on 17-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

MARGARET RIVER YOUTH PRECINCT

SD02.16002.D

PRELIMINARY DESIGN REPORT MARCH 2016

Page 2: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

2 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

PREPARED BY

FOR

ACKNOWLEDGEMENTS Convic Pty Ltd. Would like to acknowledge the contributions of all those who participated in the development of the Margaret River Youth Precinct, including the Shire of Augusta-Margaret River staff and residents, community groups and other stakeholders who responded to the various opportunities for input and/or who provided advice and information where required.

KEY DEFINITIONS Repeated terms and organisational acronyms used throughout this report have been defined for clarity as follows:SAME - Shire of Augusta Margaret RiverLGA - Local Government AreaMRYP - Margaret River Youth PrecinctCWP - Community Working Group

INTRODUCTION

Site Context

Existing Skate Assessment

Previous Engagement

Current Engagement

Skate Context

01

03

04

05

05

06

CONTENTS

COMMUNITY WORKSHOP

Community Workshop Summary

Community Workshop Outcomes

BUDGET ALLOCATION

MRYP Option One Budget Allocation

MRYP Option Two Budget Allocation

02

07

07

06

16

17

COMPETITION BOWL AND PROCESS BUDGET

International Competition Potential

MRYP DESIGN PROPOSAL

MRYP Design Proposal Option One

MRYP Design Proposal Option Two

03

09

0410

11

DESIGN ELEMENTS

Materials Program

Planting Program

Furniture & Play Program

Lighting Program

Colour Palette

05

12

13

14

14

15

Page 3: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

MARGARET RIVER YOUTH PRECINCT

MARGARET RIVER

MARGARET RIVER HOSPITAL

ST THOMAS MORE PRIMARY

CULTURAL CENTRE

GLOUCESTER PARK

INTRODUCTION

THE MARGARET RIVER YOUTH SPACE IS BEING DESIGNED AS A UNIQUE, ICONIC AND SITE RESPONSIVE MULTIPURPOSE, MULTI-GENERATIONAL FACILITY THAT AIMS TO COMPLEMENT THE EXISTING USES AND FACILITIES OF THE MARGARET RIVER YOUTH PRECINCT.

This facility will become the central social hub within the Gloucester Park recreational precinct for the youth and the broader community of Augusta-Margaret River while also appealing to the national skate community by including a design of a facility that is world class and creating a draw card to attract more active recreation tourism to the already vibrant Margaret River region.

In January of 2016, Convic started the engagement process with the community working group. The aim of these meetings is to empower the community by having them involved in the design process of the facility. Gathering this initial informative feedback will generate the design vision for the draft concept design options, create a community driven identity for the facility and build a baseline picture regarding the demographics of the skate and broader community.

The following report outlines the strategic approach to define an informed conceptual response and design for the current community demand and their future needs.

SITE CONTEXT The proposed site is located on Wallcliffe Road, next to the Shire of Augusta-Margaret River offices. The space is currently used as a programmed activity node with the existing skate park, covering approximately half of the site, and an informal recreation area utilised by the ‘Zone Room’ and Scout Hall. A number of established trees flank the internal service roads and existing skate park banks.

The Youth Space site presents an opportunity to develop the precinct to create a dynamic and activated community hub, offering recreational and social experiences for all members of the community, from day to day usage to community centred activities and events.

01

3MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

Page 4: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

4

INTRODUCTION

PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

1. Existing Margaret River Skate Park

1

EXISTING SKATE ASSESSMENT

As part of previous engagement Convic undertook an assessment of the current Skate and BMX facility at Margaret River as part of the redevelopment of the site. The facility was assessed according to function and condition using the assessment system outlined in the Site Assessment Report (July 2013).

The existing skate park is highly activated, however, due to weathering and constant high impact use since its construction in 1999, it has become dilapidated and many safety hazards have developed. For a number of years numerous local users and community groups have driven for the skate park to be re-developed or remediated.

The facility is planned for refurbishment and expansion to meet with current community needs for the youth space, particularly as this precinct has been provisioned to act as a central Youth Space with the Zone Room, public toilets and the skate / BMX facility.

Page 5: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

5MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

PREVIOUS ENGAGEMENT Convic were engaged in 2013 to undertake an assessment of the existing skate park. The facility was assessed according to function and condition of which the following outcome was a result of this assessment.

“Overall the skate park was rated as a “FAIL”(0%), which equates to it having little remaining useful life. Parks at this stage of their life cycle require regular inspections and higher levels of maintenance to ensure they remain safe to users. There were a number of maintenance and significant issues present that require addressing to mitigate facility risk.

The need for replacement will be required in the next year. Planning and budgeting for these works should be undertaken with this time frame in mind”.

Through some initial community consultation, Convic have worked with council to develop a master plan for the youth precinct. This master plan was generally well received by the community with a more detailed consultation needed for the design of the proposed skate facility.

CURRENT ENGAGEMENT Convic are currently engaged by the Shire of Augusta-Margaret River to produce a concept design for the facility that will meet both council’s and community’s requirements. Through this process council have selected a representative community working group (CWG) that Convic are engaging to understand the community requirements for the proposed facility. This consultation process with the CWG will help to inform the design of precinct.

An initial pre-design community workshop was carried out in January 2016 to gather ideas, requirements and needs of the community. Upon the resolution and definition of a return brief, a draft concept design will be developed and presented to provide opportunity for comments from the CWG. The feedback will be collated and considered in the continued development of the design into the final concept report.

Original 2013 Convic Master Plan

INTRODUCTION

Page 6: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

6 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

INTRODUCTION

1 23

4

5 6 7

SKATE CONTEXT The Shire of Augusta-Margaret River has a rich surfing and skating culture. The existing skate park has been a pivotal part of the youth community for over 13 years and has become an essential part of the broader community.

The Shire currently has two skate parks within a 45 minute drive of Margaret River. These have an emphasis on flow terrain such as banks, transitions and hips. These parks include Augusta to the south and Dunsborough to the north.

The current skate park within the Youth Space site in Margaret River has a street style focus with banks and ledges. The spine that connects the mini ramp and bowl creates a unique area for BMX users while still being integrated into the overall skate facility. The facility is set into an integrated open space of landscape context with a lawn area and established trees.

This facility and its features are to be considered with respect to the redevelopment of the existing skate park to ensure a varied provision of skate is provided within the wider South West region of Australia.

1. Augusta Skate Park

2. Dunsborough Skate Park

3. Dunsborough Skate Park

4. Existing Margaret River Skate Park

5. Busselton YAA street section

6. Busselton YAA street section

7. Busselton YAA bowl

Page 7: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

02 COMMUNITY WORKSHOP SUMMARY

COMMUNITY WORKSHOP SUMMARY On Friday 29th January 2016 a pre-design CWG workshop was held on site of the existing skate facility, at the Margaret River Zone Room. The workshop focussed on gathering ideas, requirements and needs form the community representatives for the Margaret River Youth Precinct.

Following an informative presentation that outlined and defined the workshop process, workshop outcome expectations, definition of the council brief and estimated project budget, the working group was asked the following questions:

• What works well in the existing facility and space?• What needs improving in the existing facility and space?• What is missing in the existing facility and space?• What amenity items should be included in the new precinct?• What recreational items should be included in the new

precinct?• What activation opportunities should be allowed for?

The outcomes of this discussion resulted in a “wish list” of items that the working group would like to be included within the design of the precinct. Working with the CWG, a number of bubble diagrams were developed to create spatial mapping for the precinct. These diagrams will help develop a draft concept design. The CWG is engaged throughout the design phases of the project and will continue to review and inform the design outcomes.

COMMUNITY WORKSHOP OUTCOMES

WHAT WORKS?The idea of the beginner's pump track

Mini ramp

Flat bank hips

Wave quarter pipe

AMENITY RECREATION ACTIVATION TRANSITION STREET SKATESeating Half court basketball Multi-purpose stage and terracing Beginners pump track Stoner Plaza (Lots of space)

Toilet upgrade Outdoor table tennis Learn to skate workshops Vertical transition of varying depths and radius Bank to rail

BBQs Bouldering and climbing obstacles Demonstrations by professional teams Old school pool with tight transition Mirror Park (Joondalup) jersey barrier

Water bubblers Informal play areas Local competitions Love seat in tight transition Obstacles from Copenhagen Pro 2015

Shade structures State competitions Granite pool coping Street quarters - no coping

Lighting National compettions Steep transition Slappy kerbs

Bowl Simple plaza

Flowy snake run China banks

Ledges and manual pads

Busselton wall ride (but bigger)

Banked vert wall

Euro gap

Flow, speed and practical use obstacles

Real street obstacles

COMMUNITY WISH LIST

International competitions(Coincide with Surf League competiton)

EXISTING SKATE FACILITYNEEDS IMPROVEMENTLarge hip could be extended

Flat bar doesn’t work

Funbox is not functional

Pump track requires more features

WHAT'S MISSING?A kids play area segregated from the skatepark

Deep vertical transition

Advanced level obstacles

Activation and advanced competition potential

7MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

Page 8: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

8 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

COMMUNITY WORKSHOP SUMMARY

CWG Spatial Mapping Diagrams

Page 9: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

03 COMPETITION BOWL AND PROCESS BUDGET

INTERNATIONAL COMPETITION POTENTIAL ‘Surf culture’ is a major influence in the region with world renowned waves and international professional competition. As a hub of this ‘surf culture’ in the region and the close ties between surf and skate as sports, it creates an amazing opportunity to expand on the already developed competition infrastructure, sponsors, attendance and business influx into the Shire.

To host a successful and ongoing international competition, planning is required to be undertaken during the design phase to ensure both the skate facility is of an appropriate scale and standard and the adjoining amenities cater to the potential of large crowds and requirements for holding a large scale competition. To ensure this type of advanced level facility will be an asset to the wider community, it would require complementary ‘stepping stone’ level infrastructure to allow for users to develop rider skills, before riding the more difficult features. To accommodate this level of infrastructure requires the acquisition of additional and supporting funding of in the order of $650k-$800k.

These works would include:

• Deep competition bowl. A unique design in comparison to competition bowls around the world to meet world class construction tolerances and materials. To create a draw card and destination for professional skaters from around the world.

• Seating and platform options that are expandable with temporary seating structures for events.

• Drainage and earthwork requirements for an in ground bowl of the required depth. (This may be anything up to 4m deep).

• Lighting, electrical and multimedia requirements to cater to event use.

Apart from the physical infrastructure, to fully understand the requirements of getting a successful international competition off the ground, a business management plan is required to be developed. Convic have the capability to lead the preparation of this document in partnership with specialist professional event organisers such as Renton Millar of Shredability. This document should include:

Event Opportunities:• Margaret River Pro & possible opportunities • Event Vision for the Margaret River Youth Precinct• Event Opportunities for the Margaret River Youth Precinct

Contest Pathway:• Existing Contest Pathway• Progressional Events• Proposed Contest Pathway for Competitors at the Margaret River

Youth Precinct

Skate Event Programming:• Skate Event Programming for the facility• Three Year Event Strategy• Skate Event Strategy Diagram

Economic Programming:• Economic Benefits• Breakdown of Event Costs• International Level Event Management

Event direction:• Volunteer Input • Volunteer Training • Judging • Prize Purses

Bondi Annual Bowl-A-Rama Skate Competition.

9MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

Page 10: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

MRYP DESIGN PROPOSAL

OPTION ONE

Layout Plan - Option One1:400 @ A3

0m 4m 20m

2m 10m

LEGEND SKATE WORKS

3.3m Deep Bowl

2.1m Shallow End

1200H Quarter with Central Waterfall Hip

Mellow Hip

Mellow A-Frame with Pole Jam

China Bank

Out/Down Rail

Curved Wall Ride

Jersey Barrier Rail

Hubba/Out Ledge

600H Bank to Pole Jam

Varied Height Coffin Ledge

1200H Tight Corner Pocket with Love Seat

1650H Semi-Enclosed Bowl End

450H Mogul

450H Camel Humps

Manual Pad w. Ramps

450H Mogul

Long Skate Ledge

Escalating Spine

LANDSCAPE WORKSAdventure Play

Bench Seating

Outdoor Ping Pong Table

Drinking Fountain

Proposed Shade Structures

Raised Timber Stage

BBQ Area

Rubbish Bins

Curved Seating Wall

Gravel Access Paths

Relocated Sculptures

Curved Bouldering Wall

Turf Mounds

Proposed Landscaping

Existing Trees

1

2

3

4

5

6

7

8

9

21

28

21

21

21

31

32

33

33

33

34

34

34

34

35

32

30

20

27

20

20

20

23

30

23

23

24

31

24

24

24

25

32

25

26

33

34

26

27

27

28

29

22

29

22

1

2

3

4

6

7

8

9

10

5

20

10

11

11

12

13

14

12

13 14

15

15

16

17

18

17

18

19

19

19

20

0416

CLIENT

10

Unit 13, 46-50 Regent StreetRichmond VIC 3121T (03) 9486 9899Convic.com

PROJECTMargaret River Youth Precinct

TITLE

CLIENT

PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

DATE11.03.2016

REVISION01

Page 11: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

MRYP DESIGN PROPOSAL

OPTION TWO

Layout Plan - Option Two1:400 @ A3

0m 4m 20m

2m 10m

LEGEND SKATE WORKS

3.3m Deep Bowl

2.1m Shallow end

1800H Quarter Pipe with kerb coping to central pocket

Mogul

Out/Down Rail

Jersey Barrier on Bank

Out Ledge

Jersey Barrier Rail

Hubba/Out Ledge

600H Bank to Pole Jam

Varied Height Coffin Ledge

1200H Tight Corner Pocket with Love Seat

1650H Semi-Enclosed Bowl End

Escalating Spine

450H Mogul

450H Camel Humps

Manual Pad with Ramps

450H Mogul

Long Skate Ledge

LANDSCAPE WORKSAdventure Play

Bench Seating

Outdoor Ping Pong Table

Drinking Fountain

Proposed Shade Structures

Raised Timber Stage

BBQ Area

Rubbish Bins

Curved Seating Wall

Gravel Access Paths

Relocated Sculptures

Curved Bouldering Wall

Turf Mounds

Proposed Landscaping

Existing Trees

1

2

3

4

5

6

7

8

9

21

28

21

21

21

31

32

33

33

33

34

34

34

34

32

32

30

20

27

20

20

20

23

30

23

23

24

31

24

25

32

25

26

33

34

26

27

27

28

29

22

29

22

1

2

3

4

10

11

12

13

678

9

5

14

10

11

12

13

14

15

15

16

16

17

18

17

18

1919

19

11

Unit 13, 46-50 Regent StreetRichmond VIC 3121T (03) 9486 9899Convic.com

CLIENT PROJECTMargaret River Youth Precinct

TITLE

PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

DATE11.03.2016

REVISION02

Page 12: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

DESIGN ELEMENTS05 MATERIALS PROGRAM

The material finishes and textures of the youth precinct play a key role in the integration of this development within the surrounding area. Materials have been selected to relate to the local character of Margaret River and its surrounding context.

1. Brick Features

2. Folded steel furniture

3. Black steel framework on structures

4. Folded corten features

5. Corrugated concrete form

6. Locally sourced limestone gravel

7. Dry creek bed landscape

8. Locally sourced Jarrah timber

1

23 4

5 6 7 8

12 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

Page 13: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

13MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

DESIGN ELEMENTS

PLANTING PROGRAM The plant species selection is designed to soften the transition between the hard nature of the facility and the soft nature of the broader park whilst providing all year interest through the use of colour, dry creek bed species and architectural structure. It combines the local natural character with a contemporary selection of plant species.

Trees have been selected to provide varying scale and build a canopy structure between the existing trees throughout the middle of the precinct and the Eucalyptus species on the peripheral boundaries.

The planting palette for the Margaret River Youth Precinct has been carefully selected from indigenous species that represent the local landscape character of south western Australia. The species include but are not limited to:

TREES1. Eucalyptus marginata2. Eucalyptus diversicolor3. Uytsia floribunda4. Xanthorrhoea preissii

SHRUBS5. Carex inversa6. Eutaxia obovata7. Eremophila glabra8. Juncus kraussii9. Leucophyta brownii10. Lomandra longifolia

11. Westringia fruticosa

GROUNDCOVERS 12. Austrostipa stipoides13. Dianella caerulea14. Myoporum parvifolium15. Pennisetum alopecuroides16. Rhagodia spinescens ‘Creeping Saltbush’

1

2

4

9 12

5

7

16

6

8

Page 14: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

14 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

DESIGN ELEMENTS

FURNITURE + PLAY PROGRAM The precinct will have a furniture palette that is unique to the youth precinct while forming connections to newly developed areas of the Shire of Augusta - Margaret River. This palette will be overlayed with the precinct colour palette, forming a totally integrated facility.

Play elements within the precinct create an informal, unstructured style of use and this will be replicated through their design and colour palette.

LIGHTING PROGRAM The lighting palette aims to create a usable, iconic and safe night time space. This will be achieved through several lighting types and techniques, such as 400 Watt Area Flood Lighting on a 12m columns for active sport usability.

Lighting can be designed to be implemented within the skate plaza construction, or as a secondary project. Conduits will be considered and allowed for within the skate plaza design.

Light columns will be positioned to provide even distribution of light to mitigate shadows in skate landing zones.

1 2 3 4

5 6 7

8 9 10 11

1. Painted graphics2. Large skate shade structure3. Drinking fountains4. Outdoor ping pong tables5. Integrated entry signage6. Unique precinct furniture palette7. Sports lighting8. Informal/Adventure play9. Bouldering walls10. Outdoor BBQ’s11. 400W Flood lighting

Page 15: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

15MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

DESIGN ELEMENTS

HOT LIPSDulux Custom ColourPB1F2R: 201G: 44 B: 43

BLACK SPURDulux Custom ColourRB49R: 54G: 53 B: 53

CCS PORTLAND GREYGrey CementR: 181 C: 29G: 182 M: 22B: 181 Y: 24 K: 0

CCS OBSIDIAN Grey CementR: 109 C: 54G: 102 M: 53B: 99 Y: 53 K: 20

LIMESTONEGrey CementR: 192 C: 23G: 172 M: 29B: 115 Y: 65 K: 1

COLOUR PALETTE The colour palette for the Margaret River Youth Precinct has been selected to reflect the natural landscape character of the Augusta - Margaret River shire. This will further provide a visual connection between the existing character of the shire and recently developed neighbouring precincts.

>

Page 16: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

06 OPTION ONE BUDGET ALLOCATION

Note : This estimate is based on currently available industry prices. Skate park construction is a specialised trade and costs are prone to fluctuation. Convic have based the skate park costs on recently tendered projects in metro areas with a remote loading for the Margaret River location. No allowance has been made for upgrade of local electrical supply to the site , excavation of rock and/or upgrade of existing subgrade. This is an estimate of probable costs only, all components of which are subject to escalation in construction, labour and material costs. Prices submitted at tender may vary according to market demand at the time of tender in the order of +/-10%.

MARGARET RIVER YOUTH PRECINCT - PROPOSED SKATE PARK & LANDSCAPE WORKS

PRELIMINARIESIncluding project contingency and design fees for documentation.

$212,000.00

DRAINAGE Supply and install all material for drainage of skate park including pump for drainage of competition bowl.

$38,000.00

PROPOSED BEGINNERS PUMP TRACK CONCRETE WORKSInclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete including curing and sealing.

$83,000.00

PROPOSED CONCRETE WORKSInclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete to a specialised finish including all class 1 finish, curing and sealing.

$896,376.00

PROPOSED RE-SKIN OF EXISTING SKATE PARKSupply and install of new concrete skate park surface with minor functional improvements to existing skate park features.

$269,624.00

MULTI-PURPOSE STAGESupply and install all material for multipurpose stage to cater for skate competitions and youth community events.

$163,000.00

LANDSCAPE FURNITURESupply and install custom seating, drinking fountains, signage, rubbish bins and BBQ.

$47,000.00

LANDSCAPE FURNITURE - PLAYSupply and install outdoor table tennis table, bouldering/climbing wall and adventure play elements.

$111,000.00

ARTWORKRelocation of existing artwork located within the precinct and installation of proposed artwork.

$3,000.00

SHADE STRUCTURE (2x Structures)Supply and install all architectural structure works for shade structures.

$103,750.00

MARGARET RIVER YOUTH PRECINCT - PROPOSED SKATE PARK & LANDSCAPE WORKS

ELECTRICAL WORKSSupply and install all electrical works including poles, conduits, fittings and footings.

$154,000.00

LANDSCAPE WORKS - SOFTSCAPESupply and install all material for softscaping including trees, groundcovers and shrub planting , proposed turf, mulching and topsoil.

$99,000.00

LANDSCAPE WORKS - HARDSCAPESupply and install all material for hardscaping including concrete paths and compacted granitic sand.

$137,000.00

LANDSCAPE IRRIGATION WORKSSupply and install of landscape reticulation to all garden beds and turf areas.

$100,000.00

SUB-TOTAL (EX. GST) $2,416,750.00

MARGARET RIVER YOUTH PRECINCT - PROPOSED ARCHITECTURAL WORKS

PRELIMINARIESIncluding project contingency and design fees for documentation.

$87,253.00

ARCHITECTURAL BREAK-OUT SPACE (450m2)Inclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete to a broom finish including curing and sealing.

$64,923.00

ARCHITECTURAL STRUCTURES (100m2)Supply and install all architectural structure works for shade structures including solar span insulated roof panel.

$108,962.00

UPGRADE OF EXISTING TOILET BLOCKSupply and install all architectural structure, plumbing works for upgrade of existing toilet block and equal access concrete paths.

$69,238.00

SUB-TOTAL (EX. GST) $330,376.00

TOTAL (EX. GST) $2,747,126.00

16 PRELIMINARY DESIGN REPORT | MARGARET RIVER YOUTH PRECINCT

Page 17: MARGARET RIVER YOUTH PRECINCT precinct... · International Competition Potential MRYP DESIGN PROPOSAL MRYP Design Proposal Option One ... MARGARET RIVER YOUTH PRECINCT PRELIMINARY

17MARGARET RIVER YOUTH PRECINCT | PRELIMINARY DESIGN REPORT

OPTION TWO BUDGET ALLOCATION

Note : This estimate is based on currently available industry prices. Skate park construction is a specialised trade and costs are prone to fluctuation. Convic have based the skate park costs on recently tendered projects in metro areas with a remote loading for the Margaret River location. No allowance has been made for upgrade of local electrical supply to the site , excavation of rock and/or upgrade of existing subgrade. This is an estimate of probable costs only, all components of which are subject to escalation in construction, labour and material costs. Prices submitted at tender may vary according to market demand at the time of tender in the order of +/-10%.

MARGARET RIVER YOUTH PRECINCT - PROPOSED SKATE PARK & LANDSCAPE WORKS

PRELIMINARIESIncluding project contingency and design fees for documentation.

$212,000.00

DRAINAGE Supply and install all material for drainage of skate park including pump for drainage of competition bowl.

$38,000.00

PROPOSED BEGINNERS PUMP TRACK CONCRETE WORKSInclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete including curing and sealing.

$83,000.00

PROPOSED CONCRETE WORKSInclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete to a specialised finish including all class 1 finish, curing and sealing.

$761,376.00

PROPOSED RE-SKIN OF EXISTING SKATE PARKSupply and install of new concrete skate park surface with minor functional improvements to existing skate park features.

$269,624.00

MULTI-PURPOSE STAGESupply and install all material for multipurpose stage to cater for skate competitions and youth community events.

$163,000.00

LANDSCAPE FURNITURESupply and install custom seating, drinking fountains, signage, rubbish bins and BBQ.

$47,000.00

LANDSCAPE FURNITURE - PLAYSupply and install outdoor table tennis table, bouldering/climbing wall and adventure play elements.

$111,000.00

ARTWORKRelocation of existing artwork located within the precinct and installation of proposed artwork.

$3,000.00

ELECTRICAL WORKSSupply and install all electrical works including poles, conduits, fittings and footings.

$154,000.00

MARGARET RIVER YOUTH PRECINCT - PROPOSED SKATE PARK & LANDSCAPE WORKS

LANDSCAPE WORKS - SOFTSCAPESupply and install all material for softscaping including trees, groundcovers and shrub planting , proposed turf, mulching and topsoil.

$96,000.00

LANDSCAPE WORKS - HARDSCAPESupply and install all material for hardscaping including concrete paths and compacted granitic sand.

$137,000.00

LANDSCAPE IRRIGATION WORKSSupply and install of landscape reticulation to all garden beds and turf areas.

$100,000.00

SUB-TOTAL (EX. GST) $2,135,000.00

MARGARET RIVER YOUTH PRECINCT - PROPOSED ARCHITECTURAL WORKS

PRELIMINARIESIncluding project contingency and design fees for documentation.

$87,253.00

ARCHITECTURAL BREAK-OUT SPACE (450m2)Inclusive of supply and install of all steel reinforcing; supply and setting of form work, supply and placement of concrete to a broom finish including curing and sealing.

$64,923.00

ARCHITECTURAL STRUCTURES (100m2)Supply and install all architectural structure works for shade structures including solar span insulated roof panel.

$108,962.00

UPGRADE OF EXISTING TOILET BLOCKSupply and install all architectural structure, plumbing works for upgrade of existing toilet block and equal access concrete paths.

$69,238.00

SUB-TOTAL (EX. GST) $330,376.00

TOTAL (EX. GST) $2,505,376.00