market park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and...

19
NOW LEASING Market Park Anchored by Safeway and CVS 100,692 SF Shopping Center Berryessa Rd. & Sierra Rd., San Jose, CA New Mixed-Use Transit Village BRUCE FRAZER 408.216.2315 | [email protected] CA Lic. No. 00576968 901 Campisi Way, Suite 245 | Campbell, CA 95008 Development & Project Management CONSTRUCTION TO COMMENCE IN NOVEMBER 2019

Upload: others

Post on 17-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

NOW LEASING

Market ParkAnchored by Safeway and CVS

100,692 SF Shopping Center

Berryessa Rd. & Sierra Rd., San Jose, CA

New Mixed-Use Transit Village

BRUCE FRAZER408.216.2315 | [email protected]

CA Lic. No. 00576968

901 Campisi Way, Suite 245 | Campbell, CA 95008

Development & Project Management

CONSTRUCTION TO COMMENCE INNOVEMBER 2019

Page 2: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Executive Summary

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

MARKET PARK Berryessa Rd. & Sierra Rd., San Jose, CA

• Entitled Mixed-Use Transit Village on 120 Acres• Approximately 1,000 new residential units adjacent to the shopping

center.• The south side of the project adjacent to BART is in the process of

being entitled for approximately 3,400 residential units and up to 1,500,000 SF of office.

• Easy Access to Mass Transit• BART extension to Downtown SJ now officially underway with Design

and ROW acquisition. Scheduled to open for service in 2025 with connection to Diridon Train Station, Cal Train and High Speed Rail.

• One hour direct BART ride to Financial District in Downtown San Francisco.

• Watch KPIX 5 Video: CLICK HERE• New VTA Bus Transit Center & Express Bus Service to Downtown San

Jose.• Direct access to Penitencia Creek Bike Trail and Coyote Creek Trail.

• Outstanding Silicon Valley Location & Utility• Urban core of Silicon Valley, home to over 6,600 technology

companies.• Excellent access to major freeways (I-680, I-880, US Highway 101).• Prime in-fill location surrounded by recreational, entertainment,

educational and business attractions.• Impressive Demographics (5 Mile Radius)

• 590,947 population (734,027 daytime: workers & residents)• $112,120 average household income

RETAIL DELIVERY 2020 (EST.)

Page 3: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North View

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 4: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North View

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 5: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 6: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 7: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 8: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Oblique View From Corner

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 9: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - The Platform By Western National Group

Phase 1 of above reference project

STOP

No Obstructions Window

No Obstructions Window

No Obstructions Deck

No Obstructions Deck

No Obstructions Deck

No Obstructions Deck

No Obstructions Deck

No Obstructions Window

No Obstructions Window

No Obstructions Window

No Obstructions Window

No Obstructions Window

Deck - obstruction

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruction

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruc tion

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Deck - obstruction

Dec

k - o

bstru

c tio

n

Dec

k - o

bstru

c tio

n

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

24.6'

DN

UP

UP

UP

DN

DN

UPDN

DNDN

UP

DNUP

DNUP

BLOCK 9 & 10

PIV

DE ROME DRIVE

FLEA

MAR

KET

PLAC

E

BERRYESSA ROAD

SIER

RA

RO

AD

PROPERTY LINE

PROPERTY LINE

PRO

PER

TY L

INE

PRO

PER

TY L

INE

KNOX BOX

KNOX BOX

KNOX BOX

KNOX BOXKNOX BOXKNOX BOXF.H.F.H.

F.H.

F.H.

F.H. F.H.

GAS CONNECTIONS

UNDERGROUND TRANSFORMER

UNDERGROUND TRANSFORMER

UNDERGROUND TRANSFORMER UNDERGROUND

TRANSFORMER

UNDERGROUND TRANSFORMER

UNDERGROUND TRANSFORMER

*

**

**

FIRE DEPT. ACCESS

WORK POINT

BUILDING ENTRANCE

PROPERTY LINE/IMAGINARY LOT LINE (PODIUM BUILDING SEPARATION AT FIRE WALL - ALSO DENOTES SCOPE OF WORK LIMIT)

ACCESSIBLE PATH OF TRAVEL

FIRE HYDRANT

KNOX BOX

ELECTRIC TRANSFORMERUNDERGROUND

*T

EASEMENT LINE, REFER TO CIVIL DRAWINGS

RIGHT OF WAY

CENTERLINE OF STREET

1. THE INFORMATION REGARDING THE EXISTING CONDITIONS AND FEATURES SHOWN HEREIN ARE TAKEN FROM THE BEST AVAILABLE DATA AND SOURCES. HOWEVER THE INFORMATION IS NOT GURANTEED. THE CONTRACTOR SHALL CONFIRM THE ACCURACY THEREOF.

2. PROPERTY LINES, EASEMENTS & EXISTING BUILDINGS SHOWN ON THIS SITE PLAN ARE BASED UPON INFORMATION SUPPLIED BY OTHERS. REFER TO CIVIL DRAWINGS

3. CONFIRM EXACT LOCATION OF EASEMENTS WITH CIVIL DRAWINGS

4. PRIOR TO POURING FOUNDATION, CONTRACTOR TO VERIFY LOCATION OF ALL UNDER-SLAB PIPING, SLEEVES, OR CONDUITS REQ'D. BY ANY CONSULTANT OR VENDOR, INCLUDING BUT NOT LIMITED TO: CIVIL, PLUMBING, MECAHNICAL, ELECTRICAL, LANDSCAPE, ELEVATOR, ALARM SYSTEMS, CABLE T.V. & COMMUNICATIONS.

11. PROVIDE WALKS AND SIDEWALKS WITH A CONTINUOUS COMMON, SLIP-RESISTANT SURFACE NOT INTERRUPTED BY STEPS OR ABRUPT CHANGES IN LEVEL.

12. PROVIDE CONC. CURBS & GUTTERS, STRIPING & TRAFFIC MARKINGS AND TRAFFIC SIGNAGE PER CIVIL DRAWINGS

13. REFER TO UTILITY/JOINT TRENCH PLUMBING DRAWINGS FOR GAS METERS

14. FOR ADDITIONAL FIRE SERVICE AND MAIN INFORMATION SEE REFERENCE DRAWINGS BY DESIGN BUILD FIRE SPRINKLER CONTRACTOR

15. SEE SHEET A011 FOR PARKING SPACE TABLES

16. PROVIDE BLUE REFECTOR AT FIRE HYDRANTS - S.C.D.

17. SEE EXTERIOR OPENINGS SHEET A014 FOR DISTANCE OF IMAGINARY PROPERTY LINES FROM EXTERIOR WALLS

5. SITE LAYOUT, DIMENSIONS & UTILITIES SHOWN FOR REFERENCE ONLY, REFER TO CIVIL DRAWINGS FOR HORIZONTAL CONTROL, SITE UTILITIES, ROUGH GRADE ELEVATIONS, AND FINISH FLOOR ELEVATIONS.

6. REFER TO LANDSCAPE DRAWINGS FOR FINE GRADING PAVING, IRRIGATION AND PLANTING REQUIREMENTS.

7. REFER TO CIVIL AND LANDSCAPE DWGS. FOR RETAINING WALL, PROPERTY LINE WALL AND FENCE CONSTRUCTION INCLUDING FOOTING AND TOP OF WALL ELEVATIONS.

8. REFER TO CIVIL AND LANDSCAPE FOR SITE ACCESSIBILITY INCLUDING SITE STAIRS, SITE RAMPS, TRUNCATED DOMES AND SITE PARKING ACCESSIBILITY SIGNAGE.

9. REFER TO ELECTRICAL DRAWINGS FOR SITE ELECTRICAL SERVICE AND STREET LIGHTING.

10. REFER TO ELECTRICAL FOR SITE LIGHTING.

18. SLD FOR TRUNCATED DOME LOCATIONS

19. PROVIDE CONTROLLED CARD KEY ACCESS IN ALL BUILDING ENTRANCES.

20. CONTRACTOR TO COORDINATE AND INSTALL WATER METERS FOR DOMESTIC WATER & IRRIGATION SERVICE.

580 Second St., Suite 200Oakland, CA 94607ktgy.com510.272.2910

Architecture + Planning

KTGY Project No:Project Contact:Email:

Principal:Project Designer:

Developer

It is the clients responsibility prior to or during construction to notify the architect in writing of any perceived errors or omissions in the plans and specifications of which a contractor thoroughly knowledgeable with the building codes and methods of construction should reasonably be aware. Written instructions addressing such perceived errors or omissions shall be received from the architect prior to the client or clients subcontractors proceeding with the work. The client will be responsible for any defects in construction if these procedures are not followed.

PHONE NO.FAX NO.

COPYRIGHT ©A120

SITE PLAN

160511

1590

BER

RYE

SSA

RO

ADSA

N J

OSE

, CA

MAR

KET

PARK

BLO

CKS

9/10

Zac [email protected]

Michael Gould

Western National Properties890 N. McCarthy Blvd., Suite 120Milpitas, CA 95035

(408) 955-0218(408) 263-7479

SCALE: 1" = 20'-0" 1SITE PLAN

No. Date Description2 Date 2 DD markups

SYMBOLS LEGENDGENERAL NOTESKEY NOTES

Under construction with occupancy in Q3 2019

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 10: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - Apex At Berryessa by KB Home

KB Home is finishing their final phase of 162 townhomes called Apex at Berryessa Crossing. KB Home previously built 287 single-family and townhomes. All phases total 449 units.

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 11: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - Facchino Property Planning Stage For 200K SF Office and 820 Apartments

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 12: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - North and South View

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 13: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

South Ground Floor Retail Adjacent to BART

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 14: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park - South Aerial View

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 15: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Retail Trade Area

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 16: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Market Park

Source: ©2015 Esri

February 25, 2017

©2016 Esri Page 1 of 1

Market at a Glance

SAN JOSE FAST FACTS: ► 10th largest city in the U.S. and Silicon Valley’s urban center ► Host to unprecedented skilled, international workforce ► Home to more than half the largest tech firms in the world ► Represents one-third of venture capital funding in the U.S. ► Leads the nation in patent generation ► Equidistant to San Francisco and the Monterey Peninsula

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Page 17: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

Demographics

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

1 Mile Radius 3 Mile Radius 5 Mile RadiusPOPULATION2018 Population 23,618 248,455 590,9472023 Projected Growth 25,036 266,308 628,232Annual Growth: 2018-2023 1.17% 1.40% 1.23%Median Age 37.4 34.5 34.6

HOUSEHOLDS2018 Households 6,920 75,314 181,2462023 Estimated Households 7,269 80,828 192,876Projected Household Growth: 2018-2023 0.99% 1.42% 1.25%

EDUCATION: Bachelor's / Graduate / Professional Degree 44.6% 36.9% 38.6%INCOME: Average Household $128,221 $103,570 $112,120

DAYTIME POPULATION (In Area)2018 Daytime Population 11,882 184,045 382,942Total Businesses 825 11,941 25,470

RACEWhite 19.9% 28.8% 32.9%Hispanic 25.9% 36.9% 37.4%Black 1.6% 3.1% 3.0%Asian 61.0% 44.1% 39.5%

Source: Esri and InfoGroup, U.S. Census

Page 18: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

1 Mile InfoGraphics

Exclusive Listing Agent:

Development & Project Management

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

KEY FACTS

23,618Population

37.4

Median Age

6,920Households

$76,948Median Disposable Income

EDUCATION

19%

No HighSchool

Diploma 16%High School

Graduate

21%Some College 45%

Bachelor's/Grad/ProfDegree

INCOME

128,221Average Household

Income

$37,859Per Capita Income

$221,457Median Net Worth

BUSINESS

825Total Businesses

11,882Total Employees

HOUSEHOLDS BY INCOME

0 -

$1

4,9

99

$1

5,0

00

- $

24

,99

9

$2

5,0

00

- $

34

,99

9

$3

5,0

00

- $

49

,99

9

$5

0,0

00

- $

74

,99

9

$7

5,0

00

- $

99

,99

9

$1

00

,00

0 -

$1

49

,99

9

$2

00

,00

0 &

Ab

ove

1,200

800

400

0

21%20%

16% 16%

10%

6% 5%5%

RACE

28%

17%

13%

1%41%

White Population

Black Population

Asian Population

Hispanic White Pop

Hispanic Population

Page 19: Market Park · 2019. 9. 3. · 9. refer to electrical drawings for site electrical service and street lighting. 10. refer to electrical for site lighting. 18. sld for truncated dome

BRUCE FRAZERSenior Vice President408.216.2315 | [email protected] CA Lic: 00576968

Exclusive Listing Agent:

Downtown San Jose, CA

The information contained herein was obtained from sources deemed to be reliable. However, SRS Real Estate Partners makes no guarantees, warranties, or representations as to the completeness or accuracy thereof.

SRS Real Estate Partners | 901 Campisi Way, Suite 245 | Campbell, CA 95008 | 408.553.6135 | www.srsre.com/sfbayarea

Development & Project Management